MOCAS LIM Strategy Brief (For Informational Purposes Only)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S5121A-15-R-0012-0006.pdf | ||
| S5121A15R0012-0006.docx | DOCX document | |
| S5121A-15-R-0012-0005.docx | DOCX document | |
| S5121A-15-R-0012-0004.docx | DOCX document | |
| Attachment_5_DCMA_Pricing_Sheet_Revised_022916.xlsx | XLSX spreadsheet | |
| S5121A-15-R-0012-0003.pdf | ||
| Attachment_5_DCMA_Pricing_Sheet_Revised_3.xlsx | XLSX spreadsheet | |
| S5121A-15-R-0012_MOCAS_Q A_vs_2.pdf | ||
| S5121A-15-R-0012-0002.pdf | ||
| Attachment_5_DCMA_Pricing_Sheet_Revised_2.xlsx | XLSX spreadsheet | |
| S5121A-15-R-0012-0001.pdf | ||
| S5121A-15-R-0012_Q A.pdf | ||
| Attachment_5_DCMA_Pricing_Sheet_Revised.xlsx | XLSX spreadsheet | |
| Attachment_5_DCMA_Pricing_Sheet.xlsx | XLSX spreadsheet | |
| S5121A-15-R-0012.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOCAS
Lifecycle Investment Management (LIM)
Program
Program Strategy & Status
December 2015
Goals:
• Improve efficiencies for deploying system changes to production.
• Reduce schedules and regression risk related major changes.
• Enable efficiencies across DoD P2P – Source through Target systems.
• Improved Contract Intake and Validation
• Streamlined Contract Processing
• Improved Reporting
• Enhanced Usability
Boundaries:
• Maintain operational capabilities.
• Maintain customer responsiveness.
• Maintain problem resolution responsiveness.
Commitments:
• Deploy SLOA. (Q1 FY18)
• Deploy PIID. (Q1 FY16 - Interim)
• FIAR, SAE16 & Transition to RMF. (Q3 FY16)
Program Goals, Boundaries and
Commitments
MOCAS Problem Root Cause Analysis
Organizational
• DCMA/DFAS – Separate Business Process & Priorities
• No Single Voice of the Customer
Technology
• Antiquated Technology
• Convoluted Code Base
Process
• Outdated/Inefficient SDLC
• Significant regression risk related each invasive SCR
Efficiency in Moving Changes/Directives to Production
After in depth root cause analysis within DCMA and DFAS the organizations proposed three separate initiatives that would address the identified root causes:
Resource Alignment: Joint PMO
Technology Insertion (Modernize in Place)
Vision Realized through…
That Will Increase Efficiency in Moving Changes/Directives to Production.
Process Improvement: Common
Lifecycle Framework (5000.02)
A three pronged solution of:
An improved and integrated approach to be more proactive to changes within DoD P2P.
The alignment of resources, common processes, and technology to enable rapid, low risk development and deployment of new capabilities that will improve our response to DoD directives and customer change requests.
Program Strategy
Improved Technical Architecture (time-phased technology insertion)
JPMO & Standard SDLC (DCMA/DFAS resources + common/shared business processes)
Required/Priority SCR’s & Warmlines (deployment of business & technical priorities)
Integrated CM & Release Planning (integrated/iterative production releases supporting multiple projects)
Organizational Strategy:
Joint Program Management Office
JPMO
Across all DFAS & DCMA Business Capabilities
Project Teams
Enforcement of Policies, Standards & Rules
Provides consolidated administrative foundation and structure that establishes decision rights, accountability, policies and processes that will work together to guide management decisions to get maximum value from MOCAS LIM program
Serves as a single point of entry for evaluating and prioritizing all MOCAS changes
Collaboration & Cooperation
Contract Administration
Shipments/ Acceptance
Invoice Control Entitlement Pre-
Validation Cash
Management Disbursement Financial Reporting
Accounts Receivable
Contract Closeout
Business Area Leads Business Process Owners Key Stakeholders Customers Employees
Communication Training Change Agent Workshops Business Readiness Validation Metrics
Organizational Change Management (OCM) A w a r e n e s s A c c e p t a n c e A b i l i t y
Harmonize the OCM activity timelines with the planned releases
Better alignment: initiatives effectively cater to business & regulatory needs
Better application & data lifecycle management:
mitigation of risk
Architecture & design that foster interoperability
Formalized structure & processes:
clarity in terms of ownership, accountability, decision rights, roles & responsibilities
IT agility: increased ability to flex, scale, synergize and optimize the deployment of IT resources
Improved enterprise-wide utilization of resources
Minimal or no overlap of effort/work across agencies
Integrated change & release management
Improved communication, & collaboration resulting in timely decisions & efficient delivery
Improved visibility & transparency into the pipeline of changes:
proactive planning & abstraction of common functionality
K ey
G o al s
B e n ef it s
St ak e h o ld r
En ga ge m e n t
M o d e l
C e n tr al iz d
G o ve rn an ce
M an ag e m e n t
• Implement a common Software Development Lifecycle for all projects.
• Rooted in DoD 5000.02 directives for defense business systems development.
• Supports an integrated master schedule with planned/iterative production releases.
Process Strategy:
Common Lifecycle Framework
Current (As-Is) Analysis Evaluation/Study Future (To-Be) Capability
Batch Oriented Processing
On-Line Transactions • Code Redesign/Refactoring
Workflow Driven
• Enhanced Workflow
• Rules Based Logic
Static and Batch Driven Reports Dynamic Reports Created On-Demand • Event Notifications
• Improved Reporting
• Event Reporting Need to Pull Reports/Status from MOCAS Subscribing to Events and Status Changes
Hard Coded Business Rules and Logic Rules Based Architecture
• Enhanced Workflow
• Rules Based Logic
Antiquated Data Storage Techniques Object/Relational Data Storage
• Database Technology
• Data Optimization
Multi-Level Data Translations and Maps
(XML->EDI->UDF)
Data Standardization • Native XML Support
FTP of Files at the Interfaces Adoption of Service Oriented Interfaces • Code Redesign/Refactoring
Static Column Oriented User Screens Dynamic Full Featured GUIs • User Interface Improvements
Multiple MOCs Consolidation/Integration
• Database Technology
• Data Optimization
Technology Insertion Strategy:
Modernize In Place
MS B
Planning
Conceptual Design and Prototyping
Detail Design Release
Management
IBM Green Screen Terminals
Applications
• COBOL/Batch •Mantis/Online
DATA
Supra Files
Highly Coupled
As-Is Analysis To-Be Insertion
DATA
•Object/relational data storage •Data sharing/data mart concepts
Application
• Business Rules •Workflow Engine
• Enterprise Service Bus
Presentation
•HTML 5
•User Workbench/Portal
Loosely Coupled Open Services
Data Abstraction/
Normalization Study
Conceptual Design and Prototyping
GUI/Portal
Code Conversion
Loosely Coupled
SQL/XML
Open Services
Technology Analysis/Insertion
MS B
Planning
Inter-Agency Coordination Activities
FY15
MOCAS Problem Statement (PS) Approved April FY14
MOCAS LIM Business Case/Strategy:
MOCAS JRB
Approved November FY15
DCMA/DFAS Management Chains Approved January FY15
DCMA/DFAS/DPAP Directors, OSD Comptroller Approved February FY15
RFIs 1 & 2 (Mainframe Modernization Approaches/MOCAS PS AoA Complete May FY15
MOCAS LIM MS A Preparation and Coordination:
January FY15 - August FY15
Program Management Plan Complete
Business Requirements Document
System Engineering Plan Complete
LCCE and Preliminary Release Plan
MOCAS LIM MS B Planning: (Pending)
Acquisition Strategy Panel Review Approved August FY15
MS B WBS and Schedule Complete August FY15
MS B Staffing Profile and JPMO Organizational Breakdown Structure Complete September FY15
MOCAS LIM Program Charter Ready for Signature
MOCAS LIM Milestone A Ready for Approval
MOCAS LIM Program Lifecycle
FY15 FY13
Completed
PROGRAM RISK
Planning Only
MOCAS LIM Program Summary
FY16 FY17 FY18 FY19 FY20 FY21
SLOA, PDS, Native XML, etc.
As-is Capabilities, Code Documentation, etc.
MSA
Enhanced Usability – Technical Refresh
MSB
New Capabilities & Technology Insertion
$23.6M $33.4M $34.8M $30.6M $28.1M $28.1M
SUST: $16.8M
LIM: $6.8M*
SUST: $15.8M
LIM: $17.5M
SUST: $12.9M
LIM: $21.8M
SUST: $13.1M
LIM: $17.6M
SUST: $13.1M
LIM: $15M
SUST: $13.1M
LIM: $15M
Improved Reporting
Detailed Event Notifications
Streamline Contract Processing Enhanced Workflows
Improved Contract Intake and Validation
Adoption of New Data Standards
Document MOCAS Baseline
Establish LIM Program
Capability Realignment/Optimization of eTools/Sidecars
Program - Next Steps
• Conclude the BCPL Planning & Analysis Phase by obtaining the following for MS A:
– Approval by the DCMA and DFAS Directors of the MOCAS Program Charter and Milestone Decision Authority (MDA) Delegation Action Memo(s)
– Approval of program documentation required by the BCPL for MS A
– MDA approval of the MOCAS LIM Program MS A Decision Action Memo
– Stand-up and transition to the MOCAS LIM JPMO
• Proceed into the Conceptual Design & Prototyping Phase on the path to MS B
– Develop detailed specifications that enable the solution
– Perform prototyping for proof of concept, solicitation of requirements, and risk mitigation purposes
– Develop documentation required by the BCPL to reflect Conceptual Design & Prototyping Phase activities in preparation for MS B
Past
• Initiated by one Organization
• Contractor Led
• Contractor Involvement = 80% Government Involvement = 20%
• Invasive/Big Bang Conversion Strategy
• Technology Driven
Present
• Coordinated with both Organizations
• Government Led
• Government Involvement = 65% Contractor Involvement = 35%
• Integrated/Time-phased Business & Technological Insertions Strategy
• Business Driven
We need to change our approach to effectively support MOCAS and it’s users by:
• Responding to evolving Business Needs
• Adapting to changing Technology
• Accelerating to the increased velocity of changes
Why Now, What has Changed?
Approved MOCAS Problem Statement
DoD has a critical need for a sustainable, efficient and effective approach to processing centralized Procure to Payment functions on the complex contracts that constitute 51% of DoD procurement spend. This centralized function includes the following:
• Entitlement
• Financial Oversight
• Contract Management
• Contract Closeout
Since the 1960s this functionality has been provided by the Mechanization Of Contract Administration Services (MOCAS) system. The system last received a major technical upgrade during the mid-1980s.
Currently, no plan exists to modernize or replace the system or to subsume its functionality into another system or systems.
VISION: To develop and execute a plan in cooperation with stakeholders to ensure the continued availability of the critical functionality above in the To-Be environment by evaluating available technologies and investment options and identify the alternative that provides the best value to the department.
MOCAS Background
• Over the past decade, MOCAS has progressed through several system designation changes.
Legacy System System of Interest Target System
• Legacy/System of Interest designations provided only for “sustainment funding”.
• No pro-active technology refresh or forward-looking investment strategy.
• Limited direct customer/user involvement in planning.
• MOCAS has become understandably difficult and costly to sustain:
– Code base has become highly fragmented.
– Shielded from new technology and standards.
– Documentation is outdated and not current.
• Upcoming changes to align to various mandated data standards and regulations are very invasive and represent risks in terms of cost, schedule, and mission success.
To effectively maintain MOCAS, we need to improve our sustainment approach.
Program Governance Model
• Business Scope Control: Aligned Program Governance and Prioritization Models.
• Technical Scope Control: Common Software Development Lifecycle (SDLC).
• Programmatic Control: Integration with CPIC program and cross-Agency EVM.
Business
Analysis and Architecture
Design
Encompassing
All System Scope (Known at the time of MS A)
0 Project specific Business
Analysis and Architecture
Design refined (Fed back into Program baseline)
• SDLC applied and tracked at the Program Level.
• The “Execution” phase of the Program is the sum of individual projects (Warmlines, SCRs + Technical improvements).
• MS B for the Program defines the integrated analysis, design, test and release of business capabilities and improved technical architecture.
Integrated/Planned Releases
MOCAS LIM MS B Schedule