Questions_and_Answers.docx

DOCX document 15 KB Posted

Attached to
Pease ANGB, NH Furniture Build Out
Solicitation number
S5105A-15-R-0006
Issued by

View the file

Other files

File Type Posted
Questions_and_Answers_2.docx DOCX document
Pease_bldg_145_Propose_layout_Plan_Rev_3.pdf PDF
PEASE_MAP.pdf PDF
DIRECTIONS_for_Site_visit.docx DOCX document
Pricing_Sheet.xlsx XLSX spreadsheet
S5105A-15-R-0006.pdf PDF
Pease_bldg_145_Demo_PlanR1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

1) Are there metal studs in the walls that are to be demolished?

Yes, this location is on a military installation; most military installation only use authorized metal studs in the renovation/construction in any facility.

2) How many medium totes, boxes, labels are required for the packing of product and what size in particular is needed for the totes and boxes?

In accordance with paragraph 7.1 of the solicitation’s Technical Work Statement, the contractor shall move no more than 20 employees. The amount of totes and boxes per person are below:

2 per person - Plastic BOX Round Trip Tote - Internal Dimensions: 14.25" Length x 20.25" Width x 12.75" Depth - Gray - Multipurpose - 1 / Carton

4 per person - Cardboard File Storage Box - Inside dimensions are 15" x 12" x 10".

3) In the private offices, what size whiteboard are you looking for?

Whiteboard Cabinet measures 96"W x 48"H and includes two corkboard panels attached to the inside of each door for posting notes and other items. The two doors have a magnetic catch that keeps them securely closed, measuring 48"W x 48"H.

4) In the workstations, are you looking for a panel mounted whiteboard, and what size are you looking for?

Yes, we are looking for a cubicle panel whiteboard for each cubicle. This will be determine by the vendor on what size panel frames are being installed.

5) Is the desk lamp in the private office to be LED?

Yes

6) In the workstations, it mentions for the contractor to provide power poles/data poles/electrical whips and pigtails. Would it be acceptable to provide base infeed pigtails, rather than power poles? Or are there not sufficient power sources along the wall, and power must be supplied through a ceiling power in some of the workstation clusters?

Yes, we prefer based feed power and data to be installed to the cubicles for the build-out to give the space a professional look.

File details come from the government source that posted it. Updated .