Pease_bldg_145_Demo_PlanR1.pdf

PDF 156 KB Posted

Attached to
Pease ANGB, NH Furniture Build Out
Solicitation number
S5105A-15-R-0006
Issued by

About this file

Demo Plan

View the file

Other files

File Type Posted
Questions_and_Answers_2.docx DOCX document
Questions_and_Answers.docx DOCX document
Pease_bldg_145_Propose_layout_Plan_Rev_3.pdf PDF
PEASE_MAP.pdf PDF
DIRECTIONS_for_Site_visit.docx DOCX document
Pricing_Sheet.xlsx XLSX spreadsheet
S5105A-15-R-0006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

104A

104B

104C

104D 104

102B

104F

104E

Hallway

Main Entrance

10'-5"

'-1

/1 6"

15'-2 9/16"

'-5

226 sq. ft.

Union Office

124 sq. ft.

Other Tenants space

208 sq. ft.

Other Tenants space

315 sq. ft.

Other Tenants space

104 sq. ft.

Common Use Breakroom

450 sq. ft.

Common Used Bathrooms

1125 sq. ft.

Remove all walls and doors in red to include electrical.

Remove Door and Fill in. Relocate Door, if need

Remove Door and Fill in.Relocate Door if needed

17'-2"

'-8

Remove Door and Fill in.

Add standard interior door to wall

Remove Door and relocated to another wall if applicable

Remove Door and wall;

Reused Door if possible

Contractor shall remove all designed walls/doors and install new, relocate doors as outlined in the red on the Pease ANGB Demo Plan and in accordance with Pease ANGB building standards.

Contractor shall ensure all the necessary electrical, data, plumbing, and HVAC equipment are removed, terminated, rerouted, relocated, and remounted in the necessary point as instructed and in accordance with the current NFPA, NEC, UFC and with Pease ANGB design standards.

Contractor shall provide and ensure electrical power removal and connection to be service by certified electrician.

Contractor shall remove all existing carpet tile/roll and install new carpet tiles as outlined in Pease ANGB design carpet standards.

Contractor shall remove all existing ceiling tile, to include any insulation and install new ceiling tiles with insulation as outlined in the Pease ANGB design standards.

**For all the above information is located on the TWS/SOW**

Office

277 sq. ft.

Relocate Door other end of same wall.

Office

947 sq. ft.

Office

239 sq. ft.

Office

123 sq. ft.

Office

226 sq. ft.

Office

171 sq. ft.

0 ft. 10 ft. 0.6 in. 16 ft. 9.1 in. 33 ft. 6.1 in.

Pease ANGB

Bldg 145

21 Cubicles

1 Hotel Station

SIZE FSCM NO DWG NO REV

SCALE 1/2" = 1'-0" Not to Scale SHEET 1 OF 1

2020 + or – Square foot of Space

Disclaimer: Drawing is not to scale; Reference Only. The Items on the drawings are required.

Pease ANGB DEMO PLAN

Page-1�