Pease_bldg_145_Demo_PlanR1.pdf
PDF 156 KB Posted
- Attached to
- Pease ANGB, NH Furniture Build Out
- Solicitation number
- S5105A-15-R-0006
- Issued by
-
Defense Contract Management Agency
About this file
Demo Plan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_2.docx | DOCX document | |
| Questions_and_Answers.docx | DOCX document | |
| Pease_bldg_145_Propose_layout_Plan_Rev_3.pdf | ||
| PEASE_MAP.pdf | ||
| DIRECTIONS_for_Site_visit.docx | DOCX document | |
| Pricing_Sheet.xlsx | XLSX spreadsheet | |
| S5105A-15-R-0006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
104A
104B
104C
104D 104
102B
104F
104E
Hallway
Main Entrance
10'-5"
'-1
/1 6"
15'-2 9/16"
'-5
226 sq. ft.
Union Office
124 sq. ft.
Other Tenants space
208 sq. ft.
Other Tenants space
315 sq. ft.
Other Tenants space
104 sq. ft.
Common Use Breakroom
450 sq. ft.
Common Used Bathrooms
1125 sq. ft.
Remove all walls and doors in red to include electrical.
Remove Door and Fill in. Relocate Door, if need
Remove Door and Fill in.Relocate Door if needed
17'-2"
'-8
Remove Door and Fill in.
Add standard interior door to wall
Remove Door and relocated to another wall if applicable
Remove Door and wall;
Reused Door if possible
Contractor shall remove all designed walls/doors and install new, relocate doors as outlined in the red on the Pease ANGB Demo Plan and in accordance with Pease ANGB building standards.
Contractor shall ensure all the necessary electrical, data, plumbing, and HVAC equipment are removed, terminated, rerouted, relocated, and remounted in the necessary point as instructed and in accordance with the current NFPA, NEC, UFC and with Pease ANGB design standards.
Contractor shall provide and ensure electrical power removal and connection to be service by certified electrician.
Contractor shall remove all existing carpet tile/roll and install new carpet tiles as outlined in Pease ANGB design carpet standards.
Contractor shall remove all existing ceiling tile, to include any insulation and install new ceiling tiles with insulation as outlined in the Pease ANGB design standards.
**For all the above information is located on the TWS/SOW**
Office
277 sq. ft.
Relocate Door other end of same wall.
Office
947 sq. ft.
Office
239 sq. ft.
Office
123 sq. ft.
Office
226 sq. ft.
Office
171 sq. ft.
0 ft. 10 ft. 0.6 in. 16 ft. 9.1 in. 33 ft. 6.1 in.
Pease ANGB
Bldg 145
21 Cubicles
1 Hotel Station
SIZE FSCM NO DWG NO REV
SCALE 1/2" = 1'-0" Not to Scale SHEET 1 OF 1
2020 + or – Square foot of Space
Disclaimer: Drawing is not to scale; Reference Only. The Items on the drawings are required.
Pease ANGB DEMO PLAN