S200 -USA EMBASSY GENERAL SITE LAYOUT.pdf

PDF 199 KB Posted

Attached to
19Z11525Q0014-A00001: Residential Brick Perimeter Wall Construction for US Embassy Harare, Zimbabwe
Solicitation number
PR15171013
Issued by

About this file

This document is a general site layout drawing from Brian Colquhoun Hugh O'Donnell and Partners (BCHOD), a consulting engineering firm based in Zimbabwe with offices in multiple African countries. The site plan depicts a subdivision and portion of an estate located on Glenara Avenue North and Mulchersroad, using UTM 36S ARC 1950 coordinate system. The drawing (Sheet S-200) shows property boundaries, existing trees, potential building locations, and surrounding street infrastructure. The technical drawing is dated 25/07/2005 and includes a detailed site layout with north orientation, property lines, and contextual geographical information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1510.26 1509.97

1510.07

1509.67

1509.77

1509.87

1509.96

1510.06

1509.50

1509.53

1509.54

1509.59

1509.76

1509.87

1509.99

1509.34

1509.37

1509.40

1509.42

1509.43

1509.48

1509.71

1509.81

1509.91

1509.92

1509.22

1509.28

1509.29

1509.40

1509.56

1509.72

1509.67

1509.85

1509.98

1509.03

1509.09

1509.18

1509.19

1509.20

1509.24

1509.26

1509.36

1509.58

1509.75

1509.88

1508.91

1508.94

1508.99

1509.11

1509.14

1509.14

1509.18

1509.24

1509.23

1509.28

1509.63

1508.91

1508.95

1508.86

1509.03

1509.07

1509.12

1509.17

1509.12

1509.13

1508.87

1508.87

1508.80

1508.92

1508.96

1509.01

1509.09

1509.07

1508.82

1508.77

1508.80

1508.81

1508.85

1508.89

1508.95

1508.60

1508.66

1508.68

1508.61

1508.64

1508.66

1508.67

1508.69

1508.71

1508.75

1508.78

1508.38

1508.43

1508.48

1508.52

1508.52

1508.54

1508.55

1508.56

1508.58

1508.60

1508.64

1508.68

1508.24

1508.28

1508.29

1508.42

1508.41

1508.43

1508.44

1508.46

1508.47

1508.50

1508.53

1508.08

1508.14

1508.23

1508.24

1508.27

1508.31

1508.30

1508.33

1508.35

1508.36

1508.39

1507.94

1507.95

1508.01

1508.03

1508.05

1508.13

1508.20

1508.20

1508.20

1508.24

1508.25

1508.29

1507.82

1507.82

1507.85

1507.86

1507.88

1507.96

1508.06

1508.06

1508.08

1508.12

1508.14

1507.70

1507.70

1507.70

1507.70

1507.71

1507.75

1507.86

1507.94

1507.90

1507.93

1507.96

1507.58

1507.60

1507.60

1507.60

1507.60

1507.61

1507.70

1507.79

1507.83

1507.77

1507.83

1507.92

1507.48

1507.50

1507.51

1507.53

1507.55

1507.60

1507.69

1507.73

1507.67

1507.76

1507.44

1507.49

1507.53

1507.60

1507.63

1507.60

1507.45

1507.50

1507.50

NB: UTM 36S ARC 1950 COORDINATE SYSTEM USED

V

T

T

H

V

T

V

O/H POWERLINE

GLENARA AVENUE NORTH

KN

IG

H

TS

BR

ID

G E

RO

ADPOOL

Pum p shed Borehole

Borehole db

Generator switchbox & tank hydrant valve valve valve water tap water m eter

CL1509.00

MH

Fireplace walkway

Shade port

Paved Driveway

Lawn

Lawn

Lawn

Lawn

Lawn

Guard house

OPEN STORM DRAIN

C

HA

NN

EL

S

TO

RM

D

RA

IN

Raised island

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

Tbm1 dw drain 400m wide drain 400m il curb curb dr dr il gate/curb dw curb curb curb curb curb curb curb 910 TO HSE dw draindrain il pp ss dw dw dw

Bw 1.10 to bld east cnr bw drain drain il bw bw bld rw bld bld bld bld dw tp dw -z dw/dw curb curb curb curb curb/950 to hse tap

Gt hse

Gt hse

Gt hse

Gt tap ss ss ww ww ww ww ww ww ww

POOL VALVE MH

ww ww pool ss fireplace fireplace fireplace fireplace tp dw ss re mh genset genset genset genset genset

Db box tree ss

Pool pumphse

Pool pumphse

Pool pumphse pool pool

Valve dw tp

Bh pump db bh bh bh bh bh toc ss dw dw dw ss tp dw/dw ss ss ss ss tank plinth tank plinth

.50

.0

.5

.5

.0

1508.50

1509.00

.5

.0

.0

.0

1510.00

1509.50

1509.00

A

B

C

Guardhouse to remain

EXISTING MAINHOUSE

EXISTING COTTAGE

Relocate Pump Shed..New setting out position to be discussed on site

EXISTING POOL

Relocate Water tank.New setting out position to be discussed on site

Brick Piers Supporting Gate to remain with the automated gate

New Column

New Column

BCHOD

22 York Avenue, Newlands

Zimbabwe Harare

Brian Colquhoun Hugh O'Donnell and Partners

E-mail : sem@bchodhre.co.zw / civils@bchodhre.co.zw Facsimile : (263-4) 795897 Telephone : (263-4) 250767, 255716 / 255718

CONSULTING ENGINEERS

Offices also in: South Africa, Botswana, Swaziland, Zambia

Scale

Checked by

Drawn by

Project Date

Project Number

A0 Size

1 : 200

7/ /2 :5 7:

P M

General Site Layout

SUB-DIVISION A, PORTION

OF LOT No 379 HIGHLANDS

ESTATE, PORTION OF

WELMOED

25/07/2025

C.T.M

T.C

S-200

No. Description Date

1 : 200 Site

File details come from the government source that posted it. Updated .