A
S-102
PC1 T.L +1509950 PC1 T.L +1509950
5000 5000 5000 5000 5000
700 4300 700 4300 700 4300 700 4300 700 4300 700
GMB 230 x 450 DP GMB 230 x 450 DP GMB 230 x 450 DP GMB 230 x 450 DP GMB 230 x 450 DP GMB 230 x 450 DPGMB 230 x 450 DP
PC1 T.L +1509950
460 x 480mm Brick Pier
460 x 480mm Brick Pier
460 x 480mm Brick Pier
460 x 480mm Brick Pier 460 x 480mm
Brick PierPC1 T.L +1509950
460 x 480mm Brick Pier
PC1 T.L +1509950 PC1 T.L +1509950
S-102
GMB 230 x 450 DP GMB 230 x 450 DP
PC1 T.L +1509950
GMB 230 x 450 DP GMB 230 x 450 DP GMB 230 x 450 DP GMB 230 x 450 DP GMB 230 x 450 DP
3692500050005000500050002979
Kinker Face/Hard Burnt Brick Wall
Kinker Face/Hard Burnt Brick Wall
460 x 480mm Brick Pier
460 x 480mm Brick Pier
460 x 480mm Brick Pier
460 x 480mm Brick Pier
460 x 480mm Brick Pier
460 x 480mm Brick Pier
PC1 T.L +1509950 PC1 T.L +1509950 PC1 T.L +1509950 PC1 T.L +1509950 PC1 T.L +1509950
A
GMB 230 x 450 DP
230 Brick Wall
Concrete Coping
Concrete Coping
W
AL
L H
EI
G H T 2.
m A bo ve N G L (N E
SE
E
LE
V)
W
AL
L H
EI
G H T 2m A bo ve N G L (N W S W E
LE
V)
Pile Cap
Pile
NGL
Expansion joint with kaylite
700 x 700 x 525mm(300 Dia Pile) GMB 230 x 450 DP 700
Concrete coping
Concrete coping
Kinker Face/Hard Burnt Brick Wall
Kinker Face/Hard Burnt Brick Wall
Concrete coping beam set back 10mm from face of wall to allow plaster to exposed face (typ.)
EX
TE
R N
AL
F
AC
E
IN
TE
R N
AL
F
AC
E levelling screed to make up difference between top of existing slab and underside of new concrete beam.
screed to be wide enough to provide level support bed to beam side shutters ba ck fil l b eh in d be am w al l co m pa ca te d to s pe ci fic at io n in m ax . 1 m m la ye rs face brick wall -exposed face to be jointed face brick wall -exposed face to be jointed
350350
300mm Diameter Pile
A ø 300
350 350
A
Z OMMIT C
B
C
102173
NO
RT
HW
ES
T
EL
EV
AT
IO
N
NORTHEAST ELEVATION
SOUTHWEST ELEVATION
SO
UT
HE
AS
T
EL
EV
AT
IO
N
PC1 T.L +1509950
PC1 T.L +1509950
PC1 T.L +1509950
PC1 T.L +1509950
PC1 T.L +1509950
PC1 T.L +1509950
PC1 T.L +1509950
PC1 T.L +1509950
PC1 T.L +1509950
PC2 T.L +1509950
PC2 T.L +1509650
PC2 T.L +1509650
PC2 T.L +1508950
PC2 T.L +1508950
PC2 T.L +1508950
PC2 T.L +1508950
PC2 T.L +1508950
PC2 T.L +1508470
PC2 T.L +1508470
PC2 T.L +1508470
PC2 T.L +1508470
PC2 T.L +1508470
PC2 T.L +1507845
PC2 T.L +1507845
PC2 T.L +1507845
PC2 T.L +1507845
PC2 T.L +1507845
PC2 T.L +1507400
PC1 T.L +1507400
PC1 T.L +1507400
PC1 T.L +1507400
PC1 T.L +1507400
PC1 T.L +1507400
PC2 T.L +1509500
PC2 T.L +1509500
PC2 T.L +1508700
PC2 T.L +1508700
PC2 T.L +1508700
PC2 T.L +1508700
PC2 T.L +1508700
PC2 T.L +1508700
PC2 T.L +1508000
PC2 T.L +1508000
PC2 T.L +1508000
PC2 T.L +1508000
PC2 T.L +1508000
PC2 T.L +1507450
PC2 T.L +1507450
PC2 T.L +1507450
PC2 T.L +1507450
PC2 T.L +1507450
PC1 T.L +1507450
PC1 T.L +1507450
PC1 T.L +1507200
PC1 T.L +1507200
PC1 T.L +1507200
PC1 T.L +1507200
PC1 T.L +1507200
PC1 T.L +1507200
PC1 T.L +1507200
PC1 T.L +1507200
PC1 T.L +1507200
PC1 T.L +1507200
50mm blinding pile pilecap
Reinforcement
Foundations
1/ All pad foundations -> Pile foundations to be designed by a pile specialist
2/ Only approved granular material to be used as backfill over all excavations, compacted to min. 93% mod.aashto unless otherwise specified, in layers not exceeding 150mm.
Reinforced Concrete Work
1/ All concrete work to have 20mm nominal maximum aggregate size and 80mm slump, and to have the following grades:-
(a) Grade 30Mpa - base pads, pile caps, columns, suspended beam & slabs
(b) Grade 30Mpa - all ground floor floating slabs.
(c) Grade 25Mpa - all strip footings
2/ Cover:-
(a) All concrete in contact with the ground to have min. 40mm cover.
(b) Base pads to have min. 50mm cover.
(c) All other concrete sections to have 30mm cover unless otherwise shown.
3/ All exposed concrete to have finish to accept plaster unless otherwise noted.
4/ All exposed external corners to have 25mm chamfer.
5/ All concrete to be mechanically vibrated.
6/ All concrete and reinforcement to comply with specifications and for reinforcement: bs4449; bs4482 & bs4483
Floor Slabs
1/ Refer to drawings for for specific details and information on floor slab formation, backfill and construction joints. add fibre in concrete and a hardener on the top surface.
2/ Vapour barrier:-
(a) One layer 250 micron polythene sheeting to be placed under ground slabs and beams.
(b) Lapping of joints are to be sealed
(c) Penetrations by pipes or plumbing fittings shall be taped.
Structural Steelwork
1/All steelwork to be in accordance with sabs 1431 grade 350wa or similar approved.
2/All welds to be min. 6mm continuous fillet u.n.o.
3/Fabrication, workmanship etc. to be in accordance with sabs 1200m
4/All bolts to sabs 1700 (iso4016), all bolts to be grade 8.8 unless otherwise specified.
5/As built dimensions to be checked prior to fabrication
6/All steelwork to have red oxide primer coat touched up on site prior to application of finishing coats. Final paint coat to Architect's specification.
Brickwork
1/ All load bearing walls to have brick reinforcement every four courses.
2/ 'v' joints are to be formed along all lines of contact between masonary and concrete / steel.
3/ All walls to be constructed using a class b mortar (i.e. 1 cement: 4 sand) with min. 10.5mpa 28 day strength.
700 4300 700 4300 700 4300 700 4300 700 4300 700 4300 700
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
PC2 T.L +1508000PC2 T.L +1508000PC2 T.L +1508000PC2 T.L +1508000PC2 T.L +1507450PC2 T.L +1507450 PC2 T.L +1508000
PC2 T.L +1507450
GMB 230 x 450 DP
PC2 T.L +1508000
GMB 230 x 450 DP
PC2 T.L +1508000
GMB 230 x 450 DP
PC2 T.L +1508000
GMB 230 x 450 DP
PC2 T.L +1508000
GMB 230 x 450 DP
PC2 T.L +1507450
GMB 230 x 450 DP
230 x 460mm RC Column230 x 460mm
RC Column
230 x 460mm RC Column230 x 460mm
RC Column
230 x 460mm RC Column230 x 460mm
RC Column
230 x 460mm RC Column230 x 460mm
RC Column
230 x 460mm RC Column230 x 460mm
RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
230 x 460mm RC Column
15005000500050005000500050001022
Property Boundary Line
Power Supply Pole (ZESA)
230 Brick Wall
M in m m F in al D im en si on to b e de te rm in ed o n si te
Dimension to be determined on site during construction
BCHOD
22 York Avenue, Newlands
Zimbabwe Harare
Brian Colquhoun Hugh O'Donnell and Partners
E-mail : sem@bchodhre.co.zw / civils@bchodhre.co.zw Facsimile : (263-4) 795897 Telephone : (263-4) 250767, 255716 / 255718
CONSULTING ENGINEERS
Offices also in: South Africa, Botswana, Swaziland, Zambia
Scale
Checked by
Drawn by
Project Date
Project Number
A0 Size
As indicated
/8 /2 :2 1:
D
FOUNDATION LAYOUT
SUB-DIVISION A, PORTION
OF LOT No 379 HIGHLANDS
ESTATE, PORTION OF
WELMOED
July 2025
C.T.M
T.C
S-102
1 : 50
TYPICAL NORTH WEST FOUNDATION LAYOUT
1 : 50
TYPICAL NORTH WEST ELEVATION
1 : 25
TYPICAL WALL SECTION
1 : 25
ELEVATION AT EXPANSION JOINT
1 : 10 Typical Ground Beam Detail
1 : 25
PC1 SECTION
1 : 25
PC1 PLAN
1 : 200
FOUNDATION PLAN LAYOUT
1 : 10
TYPICAL PILE
No. Description Date
A FOR IFORMATION 09/07/2025
B REVISED WALL HEIGHTS 17/07/2025
C REVISED BRICK PIERS 24/07/2025
D MISSING DIMENSIONS
ADDED, TYPICAL BRICK
WALL DETAIL AROUND
ZESA POLE ADDED
28/08/25
1 : 50
TYPICAL NORTH EAST FOUNDATION LAYOUT
1 : 50
TYPICAL NORTHEAST ELEVATION
1 : 20 Typical Brickwork Detail around power supply poles