S06 - Amendment 36C25726Q0713 0001 Repair Plumbing.pdf
PDF 294 KB Posted
- Attached to
- Amendment - Repair Plumbing Federal contract opportunity
- Solicitation number
- 36C25726Q0713
About this file
This is an Amendment of Solicitation/Modification of Contract issued by the Department of Veterans Affairs, Network Contracting Office 17 in San Antonio, Texas. Amendment number 0001 extends the deadline for receipt of quotes from Friday, July 17, 2026 to Monday, July 20, 2026 at 3:00 PM CDT for solicitation 36C25726Q0713. The amendment also provides answers to all questions submitted by July 10, 2026.
The solicitation concerns repair plumbing work in Building 9, encompassing demolition, fixture replacement, and system restoration. Key scope clarifications include: all existing plumbing piping, carriers, and valves must be replaced with new; all existing plumbing fixtures in both affected restrooms are to be replaced; water shutdown coordination with the Contracting Officer is required; new electrical circuits are needed for new outlets; fire alarm devices should be ceiling-mounted; and acceptance testing, inspections, and permits are required. Finishes including floor tile, wall tile, and paint are not in scope. The amendment includes seven attached documents providing detailed specifications and drawings for fixtures (toilet, urinal, sink), building floor plans (original and build-back), plumbing layout, and electrical requirements. All product submittals, shop drawings, and finish selections require Government approval prior to installation, and field dimensions govern over the conceptual sketch in case of discrepancies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Urinal Specs.pdf | ||
| BUILDING 9 Original FP.pdf | ||
| Sink Specs.pdf | ||
| Bldg 9 Electrical Drawing.pdf | ||
| Toilet Specs.pdf | ||
| bldg 9 Plumbing Drawing.pdf | ||
| BUILDING 9 BUILD BACK.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0001 07-13-2026
36C257
Department Of Veterans Affairs Network Contracting Office 17
5441 Babcock Road Ste. 302 San Antonio, TX 78240
To all Offerors/Bidders
36C25726Q0713
07-01-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 07-20-2026 3:00pm CDT
See CONTINUATION Page
X 1
The purpose of this amendment is to:
a. Answer all questions that were submitted by 7/10/2026.
b. Extend deadline to submit quotes from Friday, July 17, 2026 to Monday, July 20, 2026. by 3:00pm CDT.
///SEE CONTINUATION PAGES///
Shawn R. Reinhart Contracting Officer
36C25726Q0713 0001 CONTINUATION
PAGES
Questions - 36C25726Q0713 - Repair Plumbing
1. Please provide all available architectural, plumbing, and as-built drawings for Building 9 associated with this project.
SEE SPECS ATTACHED
2. Please provide finish specifications for the replacement floor tile, including manufacturer, size, color, pattern, installation method, and grout requirements. FINISHES NOT IN SCOPE
3. Please provide finish specifications for the replacement wall tile, including manufacturer, size, color, pattern, height of installation, and grout requirements. FINISHES NOT IN SCOPE
4. Please provide paint specifications for all affected areas, including manufacturer, color, sheen, and extent of repainting. FINISHES NOT IN SCOPE
5. Please provide door, frame, and hardware specifications for the new 3'-0" door, including fire rating (if applicable), finish, lockset, closer, hinges, kick plate, and any accessibility requirements. And quantities? SEE SPECS ATTACHED Metal Door Frame No. Disc. % 5-3/4 26 Header 1
70 RH LJ 5-3/4 1
70 RH HJ 1
2670 MB 90 min HM Door 1
4.5X4.5" BB HINGE-US26D 3
Privacy Lock with Indicator, SFIC
6. Please clarify the exact limits of demolition for walls, ceilings, flooring, and finishes. REFER
TO BUILD BACK FLOOR PLAN
7. Please clarify the required limits of restoration in adjacent spaces disturbed by demolition or utility relocation. REFER TO BUILD BACK FLOOR PLAN
8. Please confirm whether an asbestos survey, lead-based paint survey, or other hazardous materials survey has been completed and provide copies. ALL FLOOR TILES WILL REMAIN
9. Please provide plumbing drawings showing existing sanitary, vent, domestic water, and carrier locations. SEE ATTACH DRAWING
10. Please provide specifications for the new wall-mounted sink, toilet, urinal, faucets, flush valves, carriers, and accessories. And quantities? SEE SPECS ATTACHED
11. Please confirm whether all existing plumbing fixtures in both affected restrooms are to be replaced or only those directly impacted by the new layout. YES
12. Please clarify whether existing plumbing piping, carriers, and valves are expected to be reused where possible or replaced with new. REPLACE WITH NEW
13. Please identify any required water shutdown windows or operational restrictions. YES
CORDINATION WITH COR WILL HAVE TO BE DONE
14. Please identify all electrical devices requiring relocation, including receptacles, switches, lighting, exhaust fan controls, and associated circuitry. And quantities? SEE BUILD BACK
15. Please clarify whether any panel modifications or new circuits are anticipated.
NEW CIRCUIT FOR NEW OUTLETS
16. Please confirm the required ceiling layout after device relocation and must it be installed?
Match existing ceiling
17. Please provide fire alarm device layout and identify all notification devices requiring relocation. Devises should be mounted on the ceiling tile
18. Please identify any required fire alarm panel programming, testing, or third-party certification requirements. And quantities? Yes to meet code
19. Please provide fire sprinkler drawings showing existing piping and sprinkler locations and confirm the required scope of relocation. NONE
20. Please clarify whether acceptance testing, inspections, and permits are required as part of this contract. YES
21. Please confirm all required product submittals, shop drawings, and finish selections requiring Government approval prior to installation. YES, PROVIDE TO COR FOR APPROVAL Drawings are attached.
22. Please confirm whether field dimensions govern the conceptual sketch if discrepancies are discovered. FIELD DIMENSIONS
23. Please confirm whether any additional specifications or drawings will be issued by amendment prior to bid closing.
Drawings are attached.
See attached document: BUILDING 9 BUILD BACK.
See attached document: BUILDING 9 Original FP.
See attached document: Toilet Specs.
See attached document: bldg 9 Plumbing Drawing.
See attached document: Urinal Specs.
See attached document: Sink Specs.
See attached document: Bldg 9 Electrical Drawing.
(END OF QUESTIONS AND ANSERS)
(END OF AMENDMENT)
File details come from the government source that posted it. Updated .