BUILDING 9 BUILD BACK.pdf
PDF 41 KB Posted
- Attached to
- Amendment - Repair Plumbing Federal contract opportunity
- Solicitation number
- 36C25726Q0713
About this file
This document is a Build Back Plan architectural drawing that outlines renovation and construction requirements for an office space comprising multiple rooms: Office 104, Mens Room 114A, and Materials Library 106.
The plan specifies the following work scope: installation of ceiling grid, lights, switches, HVAC systems, electrical outlets, and fire suppression systems as required, with drywall finishing (gypsum, tape, and mud) applied to all affected areas; addition of a new wall aligned with existing structures; installation of a 3-foot-0-inch door; relocation of toilet and sink fixtures with associated plumbing modifications; and drywall finishing in Room 114A. The document includes a note recommending field verification prior to construction commencement to confirm existing conditions and requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bldg 9 Electrical Drawing.pdf | ||
| Toilet Specs.pdf | ||
| bldg 9 Plumbing Drawing.pdf | ||
| Sink Specs.pdf | ||
| S06 - Amendment 36C25726Q0713 0001 Repair Plumbing.pdf | ||
| Urinal Specs.pdf | ||
| BUILDING 9 Original FP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFICE
MENS
114A
MATERIALS
LIBRARY
BUILD BACK PLAN
CEILING GRID,
LIGHTS, SWITCHES,
HVAC, ELECTRICAL
OUTLETS, FIRE
SUPRESSION AS
REQUIRED. ADD
GYP, TAPE AND MUD
TO AFFECTED
AREAS.
ADD WALL, ALIGN
WITH EXISTING
RELOCATE TOILET
AND SINK
INSTALL 3'-0" DOOR
AFFECTED
PLUMBING AND GYP
AS REQUIRED
ROOM 114A
ADD GYP, TAPE AND
MUD TO AFFECTED
AREAS
NOTE: FIELD
VERIFICATION IS
RECOMENDED