S02 UM30 MS3475.pdf

PDF 411 KB Posted

Attached to
C222--650-22-103 AE Replace Primary Substation Federal contract opportunity
Solicitation number
36C24121R0157
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document is a special notice for qualifications requesting SF-330 submissions from architectural and engineering firms for a project to replace an existing campus primary substation. Firms are requested to submit SF-330 packages by July 12, 2021 for consideration. The project involves providing A/E design services including drawings, specifications, cost estimates and construction period administration for replacing the primary substation at the VA Medical Center located at 830 Chalkstone Avenue in Providence, Rhode Island. The construction value is estimated to be over $10 million. This is a total small business set-aside for SDVOSB firms under NAICS code 541330. Submissions will be evaluated based on professional qualifications, specialized experience, past performance, capacity, location, and experience in construction period services. The selected firm will be required to negotiate a fixed price rate proposal for the design services.

View the file

Other files for this federal contract opportunity

Other files attached to C222--650-22-103 AE Replace Primary Substation, newest first.
File Type Posted
S02 PPQ Primary Substation 0001.pdf PDF
36C24121R0157 0001_1.docx DOCX document
S02 UM35 MS3476.pdf PDF
S02 UM20 MS3467.pdf PDF
36C24121R0157.docx DOCX document
S02 PPQ Primary Substation.pdf PDF
S02 650-22-103 SOW Replace Primary Substation.pdf PDF
S02 NGrid Installation Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION DOCUMENT

Material Specification

Doc. # MS3475

PRECAST CONCRETE MANHOLE

Double Switchgear Manhole Version 2.0 – 7/19

Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.

File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole

Originating Department:

Electric Material Standards

Sponsor:

J.P. Knauss

INTRODUCTION

This specification covers the requirements for a double switchgear precast manhole.

REFERENCES

ASTM A-615

ASTM C-857, C-858, ACI 318

AASHO-H20-44

DOCUMENT CONTENTS

Table of Contents

1. GENERAL 2

2. COMPLIANCE WITH STANDARDS AND CODES 2

3. MATERIAL 2

4. DRAWINGS 3

5. REVISION HISTORY 6

Doc. # MS3475

PRECAST CONCRETE MANHOLE

Double Switchgear Manhole Version 2.0 – 7/19

Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.

File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole

Originating Department:

Electric Material Standards

1. GENERAL

1.1. This specification covers precast concrete manhole construction of a double switchgear manhole.

1.2. SAP Item ID 1003818, Standard Item UM30.

2. COMPLIANCE WITH STANDARDS AND CODES

2.1. Roof shall be designed for AASHO-HS20-44 direct wheel loading

2.2. Manholes to be in accordance with ASTM publication C-857, C-858, ACI 318 and AASHTO load factor design methods.

2.3. Steel reinforcing bars shall conform to ASTM-A-615 (latest revision). Grade 60 min. Cover - 1".

3. MATERIAL

3.1. Material shall be precast concrete with a minimum strength of 5,000 psi, 28 days.

3.2. Drawing shall be approved by National Grid Standards.

3.3. Steel reinforcing bars shall conform to ASTM-A-615 (latest revision). Grade 60 min. Cover - 1".

3.4. Design loading - the roof shall be designed for AASHO-HS20-44 direct wheel loading.

3.5. Do not extend horizontal rods into duct openings. Vertical reinforcing rods in top and bottom sections of the duct openings will be bent out in the field for support of incoming duct bank.

3.6. Pull eyes, furnished by manufacturer, to be 1" round galvanized eye bolt. Pull test 25,000 lbs. As per detail “Z”.

3.7. Bare 4/0 copper ground stub conductor and U-bolt clamps as shown in detail “Y” to be furnished by manufacturer.

3.8. Manholes to be supplied with a 3'-2" square hole in roof with a bevel between 1 ½" and 3" as standard.

3.9. Construction joint shall be sealed with asphalt or equivalent.

3.10. Purchaser will provide manhole frame, cover, end bells and brick.

3.11. Manholes to be in accordance with ASTM publication C-857 and C-858.

3.12. Manhole to be delivered to the job site by the manufacturer. Delivery to be coordinated with purchaser on a 48 hour notice.

3.13. Unistrut to be 1 5/8” x 1 5/8” galvanized steel embedded in wall and tied to reinforcing.

3.14. Manhole to be delivered in two pieces: top and bottom.

3.15. No changes to be made to this plan without purchaser’s approval

3.16. For collar drawings refer to MS3467.

Doc. # MS3475

PRECAST CONCRETE MANHOLE

Double Switchgear Manhole Version 2.0 – 7/19

Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.

File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole

Originating Department:

Electric Material Standards

4. DRAWINGS

Doc. # MS3475

PRECAST CONCRETE MANHOLE

Double Switchgear Manhole Version 2.0 – 7/19

Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.

File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole

Originating Department:

Electric Material Standards

Doc. # MS3475

PRECAST CONCRETE MANHOLE

Double Switchgear Manhole Version 2.0 – 7/19

Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.

File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole

Originating Department:

Electric Material Standards

Doc. # MS3475

PRECAST CONCRETE MANHOLE

Double Switchgear Manhole Version 2.0 – 7/19

Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.

File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole

Originating Department:

Electric Material Standards

5. REVISION HISTORY

Version Date Modification Author(s) Approval by (Name/Title)

2.0 7/2019 Changed inside width to 6’ A. Miuccio J.P. Knauss

Director, Electric Engineering

1.0 1/2019 New Material Specification

A. Miuccio J.P. Knauss Director, Electric

Engineering

File details come from the government source that posted it. Updated .