S02 UM30 MS3475.pdf
PDF 411 KB Posted
- Attached to
- C222--650-22-103 AE Replace Primary Substation Federal contract opportunity
- Solicitation number
- 36C24121R0157
About this file
This document is a special notice for qualifications requesting SF-330 submissions from architectural and engineering firms for a project to replace an existing campus primary substation. Firms are requested to submit SF-330 packages by July 12, 2021 for consideration. The project involves providing A/E design services including drawings, specifications, cost estimates and construction period administration for replacing the primary substation at the VA Medical Center located at 830 Chalkstone Avenue in Providence, Rhode Island. The construction value is estimated to be over $10 million. This is a total small business set-aside for SDVOSB firms under NAICS code 541330. Submissions will be evaluated based on professional qualifications, specialized experience, past performance, capacity, location, and experience in construction period services. The selected firm will be required to negotiate a fixed price rate proposal for the design services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 PPQ Primary Substation 0001.pdf | ||
| 36C24121R0157 0001_1.docx | DOCX document | |
| S02 UM35 MS3476.pdf | ||
| S02 UM20 MS3467.pdf | ||
| 36C24121R0157.docx | DOCX document | |
| S02 PPQ Primary Substation.pdf | ||
| S02 650-22-103 SOW Replace Primary Substation.pdf | ||
| S02 NGrid Installation Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION DOCUMENT
Material Specification
Doc. # MS3475
PRECAST CONCRETE MANHOLE
Double Switchgear Manhole Version 2.0 – 7/19
Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.
File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole
Originating Department:
Electric Material Standards
Sponsor:
J.P. Knauss
INTRODUCTION
This specification covers the requirements for a double switchgear precast manhole.
REFERENCES
ASTM A-615
ASTM C-857, C-858, ACI 318
AASHO-H20-44
DOCUMENT CONTENTS
Table of Contents
1. GENERAL 2
2. COMPLIANCE WITH STANDARDS AND CODES 2
3. MATERIAL 2
4. DRAWINGS 3
5. REVISION HISTORY 6
Doc. # MS3475
PRECAST CONCRETE MANHOLE
Double Switchgear Manhole Version 2.0 – 7/19
Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.
File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole
Originating Department:
Electric Material Standards
1. GENERAL
1.1. This specification covers precast concrete manhole construction of a double switchgear manhole.
1.2. SAP Item ID 1003818, Standard Item UM30.
2. COMPLIANCE WITH STANDARDS AND CODES
2.1. Roof shall be designed for AASHO-HS20-44 direct wheel loading
2.2. Manholes to be in accordance with ASTM publication C-857, C-858, ACI 318 and AASHTO load factor design methods.
2.3. Steel reinforcing bars shall conform to ASTM-A-615 (latest revision). Grade 60 min. Cover - 1".
3. MATERIAL
3.1. Material shall be precast concrete with a minimum strength of 5,000 psi, 28 days.
3.2. Drawing shall be approved by National Grid Standards.
3.3. Steel reinforcing bars shall conform to ASTM-A-615 (latest revision). Grade 60 min. Cover - 1".
3.4. Design loading - the roof shall be designed for AASHO-HS20-44 direct wheel loading.
3.5. Do not extend horizontal rods into duct openings. Vertical reinforcing rods in top and bottom sections of the duct openings will be bent out in the field for support of incoming duct bank.
3.6. Pull eyes, furnished by manufacturer, to be 1" round galvanized eye bolt. Pull test 25,000 lbs. As per detail “Z”.
3.7. Bare 4/0 copper ground stub conductor and U-bolt clamps as shown in detail “Y” to be furnished by manufacturer.
3.8. Manholes to be supplied with a 3'-2" square hole in roof with a bevel between 1 ½" and 3" as standard.
3.9. Construction joint shall be sealed with asphalt or equivalent.
3.10. Purchaser will provide manhole frame, cover, end bells and brick.
3.11. Manholes to be in accordance with ASTM publication C-857 and C-858.
3.12. Manhole to be delivered to the job site by the manufacturer. Delivery to be coordinated with purchaser on a 48 hour notice.
3.13. Unistrut to be 1 5/8” x 1 5/8” galvanized steel embedded in wall and tied to reinforcing.
3.14. Manhole to be delivered in two pieces: top and bottom.
3.15. No changes to be made to this plan without purchaser’s approval
3.16. For collar drawings refer to MS3467.
Doc. # MS3475
PRECAST CONCRETE MANHOLE
Double Switchgear Manhole Version 2.0 – 7/19
Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.
File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole
Originating Department:
Electric Material Standards
4. DRAWINGS
Doc. # MS3475
PRECAST CONCRETE MANHOLE
Double Switchgear Manhole Version 2.0 – 7/19
Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.
File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole
Originating Department:
Electric Material Standards
Doc. # MS3475
PRECAST CONCRETE MANHOLE
Double Switchgear Manhole Version 2.0 – 7/19
Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.
File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole
Originating Department:
Electric Material Standards
Doc. # MS3475
PRECAST CONCRETE MANHOLE
Double Switchgear Manhole Version 2.0 – 7/19
Copyright 2019 National Grid. Printed copies of this document are not document controlled. Refer to the National Grid INFONET, Distribution Engineering Services website, for the latest version. Controlled copies are maintained in Documentum.
File: MS 3475 PRECAST CONCRETE MANHOLE Double Switchgear Manhole
Originating Department:
Electric Material Standards
5. REVISION HISTORY
Version Date Modification Author(s) Approval by (Name/Title)
2.0 7/2019 Changed inside width to 6’ A. Miuccio J.P. Knauss
Director, Electric Engineering
1.0 1/2019 New Material Specification
A. Miuccio J.P. Knauss Director, Electric
Engineering