36C24121R0157 0001_1.docx

DOCX document 23 KB Posted

Attached to
C222--650-22-103 AE Replace Primary Substation Federal contract opportunity
Solicitation number
36C24121R0157
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document is an amendment to a special notice for qualifications requesting SF-330 submissions for architect/engineering design services. The Department of Veterans Affairs Veterans Medical Center in Providence, Rhode Island seeks to replace an existing campus primary substation through a firm fixed price contract. Services required include developing drawings, specifications, cost estimates, and construction period administration. Submissions are due by July 12, 2021. The project involves replacing a medium voltage substation and installing underground duct banks. Evaluation criteria in descending order of importance are professional qualifications, specialized experience designing similar electrical utility and substation projects, past performance on relevant government and private projects within the last five years, capacity, location, and experience providing construction period services. Responses are limited to 85 pages and must address all selection criteria.

View the file

Other files for this federal contract opportunity

Other files attached to C222--650-22-103 AE Replace Primary Substation, newest first.
File Type Posted
S02 PPQ Primary Substation 0001.pdf PDF
S02 UM30 MS3475.pdf PDF
S02 PPQ Primary Substation.pdf PDF
S02 650-22-103 SOW Replace Primary Substation.pdf PDF
S02 NGrid Installation Specifications.pdf PDF
S02 UM35 MS3476.pdf PDF
S02 UM20 MS3467.pdf PDF
36C24121R0157.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0001 TO SPECIAL NOTICE 36C24121R0157 REQUEST FOR QUALIFICATIONS (SF-330) Contract Opportunity Modification to a Previous Notice

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE

TYPE

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Modification to a Previous Notice C222 650-22-103 AE Replace Primary Substation 02908 36C24121R0157 07-12-2021

1:00PM

EASTERN TIME, NEW YORK, USA

N

SDVOSBC

541330 Department of Veterans Affairs VAMC Providence Contracting (90C) 830 Chalkstone Avenue Providence RI 02908 Sandra Mosca Sandra.Mosca@va.gov sandra.mosca@va.gov 401-455-4907

Sandra Mosca Sandra.Mosca@va.gov The purpose of this amendment is to incorporate the response to the Request for Information (RFI) received for special notice 36C24121R0157.

Question 1: To clarify the CPARS that PPQ requirement. Are you looking for CPARS or PPQ for all 10 projects provided in Section F or for just 3 projects?

Response: The intent of the PPQs are for those firms that do not have CPARS data available, i.e. projects performed in private sector.

Please reference Section F, Item 2. SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE

· Provide a detailed narrative of up to 3 (maximum) relevant projects completed within the last 5 years, which best illustrates overall team experience relevant to this scope. Include Government and private experience on projects similar in size, scope, and complexity.

Please note the following section is hereby changed:

· CPARS data or PPQs (if no CPARS data is available) must be provided for projects submitted under Factor 2 (Specialized Experience).

Question 2: Did not see a PPQ attachment which usually clarifies how many projects you are looking for CPARS/PPQ data to be provided for.

Response: The PPQ was attached in the original request for SF330’s and being attached in this modification.

ALL OTHER PROVISIONS IN THIS NOTICE BELOW REMAIN IN EFFECT.

See attached document: S02 PPQ Primary Substation.