This scope of work document outlines design services required for the Expand and Renovate Center for Aging to Support the Psychiatric Residential Recovery Program project located at the VA Pacific Islands Health Care System in Honolulu, Hawaii. The architect-engineer will provide design and construction support services, including a schematic design, design development documents, construction documents, and record drawings. Key requirements include a 12,000 square foot building addition and renovating 15,000 square feet of an existing building. The design must support residential recovery program functions and comply with VA design criteria and codes. The estimated construction cost range is between $10-20 million. The performance period for design services is 301 calendar days with submittals required at 35%, 65%, 95%, and 100% completion. Construction period services are optional and will not be exercised at time of award. The Department of Veterans Affairs Technology Acquisition Center is listed as the contracting agency.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Pacific Islands Health Care System Expand and Renovate Center for Aging to Support the Psychiatric Residential Recovery Program Honolulu, Hawaii
17 October 2023 Project No. 459-310
ARCHITECT-ENGINEER DESIGN SCOPE OF WORK
Expand and Renovate Center for Aging to Support the Psychiatric Residential
Recovery Program
PROJECT NO: 459-310
PROJECT NAME: Expand and Renovate Center for Aging to Support the Psychiatric Residential Recovery Program
1. GENERAL INTENT:
The Contractor (herein referred to as “the A/E”) shall provide Architect/Engineer (A/E) services to design a construction project at the Department of Veteran’s Affairs (VA) Pacific Islands Health Care System (VAPIHCS) in accordance with this design scope.
2. STATEMENT OF WORK:
A/E Part One Services (also known as Design Phase): for this design project includes site visits, field investigation, studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to Expand and Renovate Center for Aging to Support the Psychiatric Residential Recovery Program. The project shall include, but is not limited to the following:
a) A new 12,000 Gross Square Footage (GSF) building addition to existing Building 110 Center for Aging (CFA) to support the required services for the Psychiatric Residential Recovery Program (PRRP). The expansion must include patient care services, administrative areas, and support areas as described in the Farnsworth Group project Study Appendix 6.1 Program for Design (reference: SOW - Att 01 - Farnsworth - Bldg 110 - CFA Exp Study - Residential Recovery Prg – Honolulu) .
b) Renovate up to 15,000 GSF of the existing CFA B-Wing including: converting double bedrooms with shared bathrooms (4-beds/1-bathroom) to single bedrooms with adjacent bathroom, as described in the Farnsworth Group project Study.
A/E Part Two Services: of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately one (1) site visit per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance and participation during the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor’s as-built drawings. The A/E
Honolulu, Hawaii shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. All Part Two Services are optional line items and will not be exercised at the time of award.
The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of VA Pacific Islands Health Care System (VAPIHCS) record drawings will be made available to the highest rated A/E firm; the A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design.
The A/E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A/E shall further provide meeting minutes for all meetings held under this design project.
The A/E firms’ representatives performing site investigations on VAPIHCS campus must have the following additional requirements before starting site investigations on campus:
1. Pre and weekly negative COVID test while working in patient care areas
2. Daily visit at check-in station for COVID and temperature screening
a. Sticker/device must be worn visibly.
3. Contractor badge must be obtained and worn by contractor or representative at all times while on campus
3. DESIGN WITHIN FUNDING LIMITATIONS:
The design shall be prepared by the A/E to permit the award of a construction contract, using Federal Acquisition Regulation (FAR) procedures for the construction of the facilities, at a cost that does not exceed the project’s estimated Veteran’s Affairs Acquisition Regulations (VAAR) Magnitude of Construction between $10,000,000.00 and $20,000,000.00.
4. DESIGN INDEPENDENCE, FURNITURE AND EQUIPMENT: Designs for construction must produce a “complete and usable” facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. In addition, the A/E must certify that it has produced a design that does not include furniture and equipment that will be procured separately. Equipment that can be part of the design in the includes those items to meet code requirements for building occupancy, items covered in the VA’s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26 or 28 through 48, non-IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00.
The A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design’s independence.
5. DESIGN CRITERIA: The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility http://www.cfm.va.gov/til/index.asp
Honolulu, Hawaii
Management and is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning and design guides. The documents of the TIL shall be the minimum design alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the VA TIL, including (but not limited to) the following listed Department of Veterans Affairs References:
PG-18-1 Master Construction Specifications SOW – Att 10 VHA Required Division 01 Specification Section List PG-18-3 Design and Construction Procedures [Including but not limited to: Codes, Standards, and Executive Orders] PG-18-4 Standard Details and CAD Standards PG-18-5 Equipment Guide List H-18-8 Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) [Including but not limited to: Guiding Principles checklists as indicated for Minor Projects in Sustainable Design Manual, Life Cycle Cost Analysis]
PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management Procedures OIT Infrastructure Standard for Telecommunications Spaces v3.1 (1 July 2021) Joint Commission Criteria
The following references should also be used to complete the design documents:
• The Farnsworth Group Project Study: Building 110 Center for Aging (CFA) Post- Traumatic Stress Disorder Recovery Rehabilitation Program (PRRP) Addition(reference: SOW - Att 01 - Farnsworth
- Bldg 110 - CFA Exp Study - Residential Recovery Prg – Honolulu; SOW - Att 02 - Farnsworth - Appx 61-64 - Residential Recovery Prg – Honolulu; and SOW - Att 03 - Farnsworth - Appx 65-610
- Residential Recovery Prg – Honolulu).
Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide.
6. DESIGN COLLABORATION: The A/E during this design project shall collaborate with the Veteran’s Health Administration (VHA) Office of Healthcare Environment and Facilities Programs Special Engineering Program (HEFP/SEP) staff, Veteran Integrated Services Network (VISN) 21 and the Independent Life Safety Review Agent (LS Agent) for the project. Design submittal comments from these contractors, if concurred with by VA, shall be incorporated into the design. HEPF/SEP and/or VISN deliverables shall be coordinated with the A/E’s design submittals to ensure compliance with all http://www.cfm.va.gov/CFM/TIL/spec.asp http://www.cfm.va.gov/CFM/TIL/cPro.asp http://www.cfm.va.gov/CFM/TIL/sDetail.asp http://www.cfm.va.gov/CFM/TIL/equip.asp http://www.cfm.va.gov/CFM/TIL/seismic.asp http://www.cfm.va.gov/CFM/TIL/planning.asp http://www.cfm.va.gov/cfm/til/dManual.asp http://www.cfm.va.gov/cfm/til/dGuide.asp http://www.cfm.va.gov/CFM/TIL/accessibility.asp http://www.cfm.va.gov/cfm/til/room/RoomFinishes.pdf http://www.cfm.va.gov/til/aeDesSubReq.asp http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf http://www.va.gov/vapubs/viewPublication.asp?Pub_ID=584&FType=2
Honolulu, Hawaii requirements are met. The A/E is required to ensure all elements of the design adhere to the Life Safety Code, including recommendations for temporary construction barriers, prior to the Independent Life Safety review.
7. INDEPENDENT LIFE SAFETY REVIEW: The A/E shall incorporate any comments from the VISN 21 Safety Manager - Life Safety Review.
8. ENVIRONMENTAL PROTECTION: The A/E shall assist the VA with completion of a National Environmental Policy Act (NEPA) assessment as required by the VAPIHCS. If the NEPA assessment results in potential environmental impacts, the A/E shall be responsible for completing any auxiliary documentation required per PG-18-17 NEPA Interim Guidance for Projects located on the TIL (http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf). Additional requirements may include, but are not limited to, Environmental Assessment, Environmental Impact Statement, and Record of Decision. The NEPA analysis and concluding documentation must be completed by the Final Bid Documents submittal.
9. PHYSICAL SECURITY: The A/E must include a certified physical security specialist. The specialists must be involved with the design beginning with the concept phase and the qualifications must be submitted to the Contracting Officer’s (CO) Representative (COR) for review and approval prior to the concept/basis of design phase. The specialists shall meet the specific requirements listed in the Physical Security Design Manual for Mission Critical Facilities located on the TIL (http://www.cfm.va.gov/til/PhysicalSecurity/dmPhySecMC.pdf). The A/E shall ensure that all aspects of the applicable VA Physical Security Design Manual (either Life-Safety Protected or Mission Critical Facilities; both will be applicable depending on the area the work is taking place) are incorporated into the design and shall prepare a written report acknowledging compliance as required by the VAMC. The A/E must inform the COR of any physical security items that will be difficult to achieve during the concept/basis of design phase of the design and assist the VA with waiver requests as necessary. (This determination shall be addressed by the selected A/E firm.)
10. TELECOMMUNICATIONS DESIGN: In accordance with “Telecommunications and Special Telecommunications Systems Design Manual,” February 2016 (https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf), paragraph 1.2 (d), Telecommunications design must be performed and stamped by a BICSI Registered Communications Distribution Designer (RCDD) for all projects.
11. SUBMITTAL REQUIREMENTS: Design submittals shall follow the requirements of Program Guide, PG-18-15, Volume C - A/E Submission Instructions for Minor and NRM Construction Program dated November 2008 (reference: SOW - Att 04 - PG-18-15 - AE Sub Req - Vol C - Residential Recover Prg – Honolulu). Submittal documents shall be prominently marked “For Official Use Only (FOUO)” if they contain qualifying data as defined in VHA Memorandum 2019-11-13 Sensitive Infrastructure Data Classification – For Official Use Only (FOUO) (reference: SOW - Att 07 - Memo - Sensistive Infra Data - Residential Recovery Prg – Honolulu).
The A/E shall deliver design submittal documents that follow the iterative phase breakdown for design work in PG-18-15 and as additionally specified below. Specific requirements for each discipline/work product listed under each phase can be found in PG-18-15; it is expected for the phase of design that each of the checked items in the SD/DD/CD columns will be completed for the submittal. The A/E shall http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf http://www.cfm.va.gov/til/PhysicalSecurity/dmPhySecMC.pdf https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf
Honolulu, Hawaii attend a review meeting following each design submittal as indicated under the Project Schedule section of this Scope of Work. Each new submittal will incorporate all VA comments from the previous submittal. The Asbestos Abatement requirements in PG-18-15 are applicable at VAPIHCS.
All final drawings shall contain the A/E's stamp with professional seal along with name and address of firm. All correspondence with CO shall be signed by the Official of the A/E firm with whom contract was negotiated and may not be re-delegated to another person in the same firm. The use of VA furnished drawings and specifications does not preclude responsibility and are available to increase productivity and maintain architectural and interior design integrity. The A/E firm must verify all typical drawings for re-use and is to take full responsibility. All final drawings must be stamped.
A registered design professional must be responsible for the overall design and review of submittal documents prepared by others. The A/E must be registered or licensed to practice their respective design profession as defined by the statutory requirements of the professional registration laws in the state in which the design professional works.
The following submittals will be required for this project:
Quality Assurance/Quality Control (QA/QC) Plan Basis of Design (BD) - In addition to the requirements in PG-18-15, a Basis of Design is required.
Basis of Design is a narrative presentation of facts, sufficiently complete, to demonstrate that the project concept is fully understood, and that subsequent design details, and their ultimate presentation in the final drawings and specifications, will be based on sound architectural and engineering decisions. Conceptual drawings of the planned design and the initial cost estimate will additionally be included.
Schematic Design (SD)- 35% Design Development One (DD) – 65% Construction Documents (CD)- 95% Final Bid Documents (Bid) – 100%
12. PROJECT COMMISSIONING
The AE shall provide Commissioning and Commissioning Agent services and deliverables in accordance with the reference document, OCFM Whole Building Commissioning Process Manual located on the TIL (https://www.cfm.va.gov/til/Cx-RCx/CxManual.PDF). See “Commissioning Agent Tasks” in each section of the reference document. The Commissioning Agent shall be involved in all phases of the project, including both design and construction. It is anticipated that the Commissioning Agent will participate in the following: design reviews, owner’s requirements updates, design phase commissioning planning(facilitate), commissioning specification reviews (facilitate), construction project meetings, construction observation visits, equipment startup and testing, Testing Adjusting and Balancing (TAB) verification, and project commissioning (facilitate in coordination with General Contractor). The commissioning process shall be adapted to the size and complexity of the project. Deliverables shall be as described in the reference document. Additionally, the A-E shall develop the commissioning plan, pre-functional checklists, systems functional performance test checklists, integrated system test checklists, and edited master specification templates to serve as a starting point for the commissioning process on all projects based on the following Systems to be Commissioned.
Honolulu, Hawaii
a) HVAC (VA Master Specification Section 23 08 00): Direct Digital Control System, Chilled Water System, Condenser Water System, Steam/Heating Hot Water System, HVAC Air Handling System, HVAC Ventilation/Exhaust Systems, HVAC Terminal Unit Systems, Decentralized Unitary HVAC Systems, Humidity Control Systems, Hydronic Distribution Systems
b) Electrical (VA Master Specification Section 26 08 00): Grounding and Bonding Systems, Electric Power Monitoring Systems, Low-Voltage Distribution System, Emergency Power Generation Systems
c) Communications (VA Master Specification Section 27 08 00): Grounding and Bonding Systems, Structured Cabling System
d) Electronic Safety and Security (VA Master Specification Section 28 08 00): Grounding and Bonding, Physical Access Control Systems, Access Control Systems, Security Access Detection Systems, Video Surveillance System.
13. DRAWING FORMAT: All drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD) available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit 2019 or the latest version available to VAPIHCS.
The A/E shall provide a computer 3D model and prepare various 3D renderings to present to VA throughout the design phase to adequately represent architectural, mechanical/electrical/plumbing (MEP), site conditions and other items in the design to aide with facility visualization and contractor coordination.
The project BIM model minimum requirements shall be developed to include the systems described below as they would be built, the processes of installing them and to reflect record drawing conditions (possibly incorporating into the VAPIHCS. Master Record Drawing – pending facility expertise). The deliverable model at the SD, DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase.
Architectural/Interior Design Square Footage/Volume Room Names and Numbers Architectural Schedules Architectural Specialties and Woodwork Doors Windows Louvers Roof Floors Ceilings Vertical Circulation Walls/Curtain Wall Sizes, Shapes, & Material Data General Signage Schedules Furniture
Equipment Structural Foundations Shafts and Pits Mechanical
HVAC
Plumbing Electrical/Telecommunications Power and Lighting Steam Distribution Other Engineering Data as Required Exterior Building Information Nurse Call System Asbestos/Hazardous Material Info Security System Information (Access Control, Security
Cameras, Panic Alarms, Overhead Paging) http://www.cfm.va.gov/til/projReq.asp
Honolulu, Hawaii
Life Safety Information (Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms)
Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition and
Strategic Capital Investment Program Department Definition)
14. SUBMITTAL FORMATS: Submittals shall be submitted in electronic format and hard copy formats as listed below. Portable Document Format (.pdf), Microsoft Office Suite formats (.doc, .xls, and .ppt), Microsoft Project (.mpp) and Autodesk Revit Project (.rvt) files are acceptable. Submittals shall additionally be compliant with Section 508 of the Rehabilitation Act (29 U.S.C. '794 d); information on the requirements for accessible media can be found at http://www.section508.gov/. The A/E shall be responsible for providing:
A. Meeting/Conference Minutes Meeting minutes for all formal meetings and conferences held with the VA; including weekly construction meetings. Meeting minutes shall be submitted within seven (7) calendar days of the meeting or conference. All documents in any of the electronic formats listed above.
Minimum meeting minutes requirements
• Project name, number, meeting host, Meeting Name
• Date, Time, meeting ID, call in number, Duration, and consecutive number of total related meetings
• Participant list (Name, Title, Phone number (office and Mobile), Email, Attended
Meeting (yes/no Check box)
• Meeting purpose, Roll call, COVID-19, and Additional Items
• Agenda items (Decisions, action items, and fixes or next steps)
• Next meeting date and time
• Detailed attachment list
B. Construction Cost Estimates Construction cost estimates shall comply with Manual for Preparation of Cost Estimates & Related Documents for VA Facilities dated March 8, 2011. This document is available on the TIL at http://www.cfm.va.gov/cost/index.asp. All estimates in any of the electronic formats listed above.
C. Quality Assurance/Quality Control (QA/QC) Plan All documents in any of the electronic formats listed above.
D. Basis of Design (BD) BD to be included with the SD and Bid Submittals only
One (1) half-size paper bond sets of drawings – 1 to VA
E. Schematic Design (SD)
Two (2) half-size paper bond sets of drawings – 2 to VA One (1) paper bond sets of specifications – 1 to VA http://www.section508.gov/ http://www.cfm.va.gov/cost/index.asp
Honolulu, Hawaii
One (1) paper bond sets of investigation reports (including geotechnical, hazardous materials), design calculations, space planning data and cost estimate - 1 to VA
F. Design Development (DD), and Construction Documents (CD)
Memo annotating how design review comments from previous submittal were implemented into current submittal. – electronic only One (1) half size set of paper bond drawings - 1 to VA One (1) full size set of drawings - electronic only One (1) set of specifications – electronic only One (1) set of investigation reports, design calculations, space planning data, construction schedule, construction statement of work (SOW) and cost estimate – electronic only
G. Final Bid Documents (Bid) PDF files of drawings, specifications, and any miscellaneous design analysis documents such as submittal log and physical security compliance report.
Memo annotating how design review comments from previous submittal were implemented into current submittal. – electronic only Certified memo that the A/E design is independent of future projects and includes all equipment required for the project to be activated/full functional.
Word files of specifications.
Revit and AutoCAD files of drawings.
One (1) full size paper bond sets of drawings - 1 to VA Two (2) half-size paper bond sets of drawings – 2 to VA Two (2) paper bond sets of specifications – 2 to VA One (1) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction SOW and cost estimate - 1 to VA
H. Requests for Information (RFI): Requests for Information shall be submitted within three
(03) calendar days of submittal to the A/E.
I. Submittal Reviews: Submittal reviews shall be submitted withing seven (07) calendar days of submittal to the A/E.
J. Site Visit Reports: Site visit reports shall be submitted within seven (07) calendar days of the visit. All documents in any of the electronic formats listed above.
K. Modification/Change Order Requests: Modification requests shall be submitted within seven (07) calendar days of submittal to the A/E. This includes the review of the contractor’s change order/modification proposal for construction change orders, as well as the formulation of an IGCE for the modification, as requested. The A/E’s reply regarding his/her review of cost proposals and his/her recommendations shall include an independent breakdown of costs in detail, quantities, unit prices, and shall cover both additions and deductions of labor, materials, and equipment. The A/E shall also supply cost estimates as requested by the COR for Request for Proposals for anticipated changes. All documents in any of the electronic formats listed above. Note – If major modification, VA will provide
Honolulu, Hawaii additional time and document format guidance.
L. Punch List: Punch list shall be submitted within seven (07) calendar days of the final acceptance inspection. All documents in any of the electronic formats listed above.
M. Record Drawings: Record drawings shall be delivered to the VA within thirty (30) calendar days after VA acceptance of the construction project. Autodesk Revit Project (.rvt) format and Autocad (.dwg) format.
15. PROJECT SCHEDULE/PERIOD OF PERFORMANCE: The A/E shall perform Part One Services/Design Phase work according to the schedule shown below. The A/E is also responsible for following specification Section 01 32 16.10 Architectural and Engineering CPM Schedules (reference: SOW - Att 06
- AE & CPM Schedule - Residential Recovery Prg – Honolulu). If a due date on the timeline below falls on a Holiday or Weekend, the submittal shall be due the following business day. The remaining timeline will not be shifted to accommodate Holidays or Weekends.
QA/QC Submittal & Basis of Design (BD) 10% Submittal / Administrative Time
42 Calendar Days after end of Administrative Time
QA/QC Plan 10% Submittal Review Meeting
7 calendar days after VA receipt of QA/QC & BD 10% Submittals
35% SD Submittal 45 calendar days after acceptance of QA/QC Plan Submittals
35% SD Review Meeting 21 calendar days after VA receipt of 35% SD Submittal
65% DD Submittal 60 calendar days after VA acceptance of 35% SD Submittal
65% DD Review Meeting 21 calendar days after VA receipt of 65% DD Submittal
95% CD Submittal 60 calendar days after VA acceptance of 65% DD Submittal
95% CD Review Meeting 21 calendar days after VA receipt of 95% CD Submittal
Final Bid Documents Submittal 14 calendar days after VA acceptance of 95% CD Submittal
Final Bid Documents Acceptance Meeting 10 calendar days after VA receipt of Final Bid Documents Submittal
Total Part One Services/Design Phase Schedule
301 calendar days
The 301 days listed in part one project schedule may fluctuate based on when 95% CD submittal meets all VA guidelines and acceptance is issued. If 95% CD submittal is not accepted due to insufficient design
Honolulu, Hawaii requirements throughout the design period and additional time is deemed necessary. It is the responsibility of the AE firm to cover all costs associated with such delays.
Part Two Services/Construction Period Services (optional Line Items) shall be performed for the length of time between the time the option(s) are exercised and acceptance of Construction Completion. The VA has 365 calendar days from final acceptance of the design to exercise the option(s) for Construction Period Services.
16. Solicitation Support Services: Pre-bid site visit to include meeting and project walk around. This is the meeting where contractors are invited to the job site to visually inspect the construction site to accurately develop a construction bid package.
Answer any technical questions/ RFIs received from contractors over the duration of the solicitation, including questions asked during the site visit. Questions from contractors may come at multiple times and cover several questions over the course of the solicitation period. Technical question responses will be provided to the Contracting Officer (CO) who will distribute the information via amendment to the solicitation.
Answers to RFIs will be required from the A/E within five (05) calendar days of the date the questions are sent to the A/E from either the project COR or CO. An alternate response period may be submitted for review, however, unless approved by the CO and COR, the A/E is required to comply with the five-calendar-day (05) requirement.
Throughout the solicitation period, the A/E shall provide addenda as necessary if required to revise specs and drawings.
In response to any technical questions and/or addenda issued during the solicitation period, the A/E shall provide any final revisions to the 100% FC CD as part of the construction contract. These documents shall be labeled “Final Construction”.
Construction Period Services (CPS)
Requests for Information (RFI) Requests for Information shall be submitted within three (03) calendar days of submittal to the A-E.
100% Issued for construction:
100% Issued for Construction set, once all RFIs and deducts are selected, to be submitted 2 weeks after construction award.
Submittal Reviews Submittal reviews shall be submitted within seven (07) calendar days of submittal to the A-E
Site Visit Reports
Honolulu, Hawaii
Site visit reports shall be submitted within seven (07) calendar days of the visit. All documents in any of the electronic formats listed above.
Modification/Change Order Requests Modification requests shall be submitted within seven (07) calendar days of submittal to the A/E. This includes the review of the contractor’s change order/modification proposal for construction change orders, as well as the formulation of an Independent Government Cost Estimate (IGCE) for the modification, as requested. The A/E's reply regarding their review of cost proposals and their recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A/E shall also supply cost estimates as requested by the COR for Requests for Proposals (RFP) for anticipated changes. All documents in any of the electronic formats listed above. Note: If major modification, VA will provide additional time and document format guidance.
Punch List Punch list shall be submitted within seven (07) calendar days of the final acceptance inspection.
All documents in any of the electronic formats listed above.
Record Drawings Record drawings shall be delivered to the VA within thirty (30) calendar days after VA acceptance of the construction project. Autodesk Revit Project (.rvt) format and AutoCAD (.dwg) format.
Third-Party Commissioning
The A/E shall provide Commissioning and Commissioning Agent services and deliverables in accordance with the reference document, OCFM Whole Building Commissioning Process Manual located on the TIL (https://www.cfm.va.gov/til/Cx-RCx/CxManual.PDF). See “Commissioning Agent Tasks” in each section of the reference document. The Commissioning Agent shall be involved in all phases of the project, including both design and construction. It is anticipated that the Commissioning Agent will participate in the following: design reviews, owner’s requirements updates, design phase commissioning planning (facilitate), commissioning specification reviews (facilitate), construction project meetings, construction observation visits, equipment startup and testing, Testing Adjusting and Balancing (TAB) verification, and project commissioning (facilitate in coordination with General Contractor). The commissioning process shall be adapted to the size and complexity of the project. Deliverables shall be as described in the reference document. Additionally, the A/E shall develop the commissioning plan, pre-functional checklists, systems functional performance test checklists, integrated system test checklists, and edited master specification templates to serve as a starting point for the commissioning process on the project:
• HVAC (VA Master Specification Section 23 08 00): Direct Digital Control System, Chilled Water System, Condenser Water System, Steam/Heating Hot Water System, HVAC Air Handling System, HVAC Ventilation/Exhaust Systems, HVAC Terminal Unit Systems, https://www.cfm.va.gov/til/Cx-RCx/CxManual.PDF
Honolulu, Hawaii
Decentralized Unitary HVAC Systems, Humidity Control Systems, Hydronic Distribution Systems
• Electrical (VA Master Specification Section 26 08 00): Grounding and Bonding Systems, Electric Power Monitoring Systems, Low-Voltage Distribution System, Emergency Power Generation Systems
• Communications (VA Master Specification Section 27 08 00): Grounding and Bonding Systems, Structured Cabling System
Electronic Safety and Security (VA Master Specification Section 28 08 00): Grounding and Bonding, Physical Access Control Systems, Access Control Systems, Security Access Detection Systems, Video Surveillance System.
17. CONTRACT OVERSIGHT: All contracts for this project shall be awarded by the Program Contracting Activity Central (PCAC); only a warranted VA CO shall have authority to change the terms and conditions of a contract. These changes may involve the contract award amount, contract period of performance, issuance of stop work orders and changes to the SOW.
PCAC shall designate a COR to monitor and manage the A/E’s performance under the design project contract. The COR shall be a representative of the VAPIHCS Engineering Service Project Section and have the technical knowledge required to monitor and oversee the project.
A COR from the VAPIHCS Engineering Service Project Section shall also be designated for the construction project contract to monitor and manage the construction contractor’s performance under the construction project contract. This designation under the construction contract shall be considered equivalent to the industry standard of “Owner’s Representative” and does not supersede or eliminate the A/E’s responsibility for Part Two Services/Construction Period Services. The A/E ultimately shall be responsible for any errors and omissions with the design discovered during and after the construction phase.
17. OI&T INFRASTRUCTURE STANDARD FOR TELECOMMUNICATION SPACE:
The current version for this standard is version 3.1, dated July 1, 2021 (https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf). The design for this project at The VAPIHCS must meet the Campus Support Center (CSC) requirements of the Infrastructure Standard for Telecommunications Spaces.
The Infrastructure Standard for Telecommunications Spaces (The Standards) serves as the master reference document of criteria for Department of Veterans Affairs (VA) facility Information Technology (IT) support infrastructure. It defines the technical requirements necessary to maintain optimum reliability and efficiency within VA facilities and computing centers. IT Support Infrastructure is defined as all passive telecommunications and information technology equipment, and supporting physical space and equipment.
This standard is owned and maintained by Solution Delivery (SD) Data Center and Infrastructure Engineering and questions or concerns should be directed to the following email group: OIT ITOPS SD Data Center and Infrastructure Engineering.
https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf
Honolulu, Hawaii
Users must ensure their use of this technology/standard is consistent with VA policies and standards, including, but not limited to, VA Handbooks 6102 and 6500; VA Directives 6004, 6513, and 6517; and National Institute of Standards and Technology (NIST) standards, including Federal Information Processing Standards (FIPS). Users must ensure sensitive data is properly protected in compliance with all VA regulations. Prior to use of this technology, users should check with their supervisor, Information Security Officer (ISO), Facility Chief Information Officer (CIO), or local Office of Information and Technology (OI&T) representative to ensure that all actions are consistent with current VA policies and procedures prior to implementation.
18. EXEMPTIONS TO VA OEHRM SITE INFRASTRUCTURE REQUIREMENTS:
Any variances or exemptions to Office of Electronic Health Records Modernization (OEHRM) Site Infrastructure Requirements, Version 2.0most recent version, must be referenced, documented and discussed with CO, COR and HEFP SEP. Following approval of variance or exemption, AE shall submit documentation describing variance or exemption, indicating reference in VA documentation, describe any mitigating measures, and include an attachment with documentation of discussion with CO, COR and HEFP SEP.
19. SOW and ATTACHMENTS:
The following list of documents are attached to this SOW for A/E use and incorporation into the project documents:
SOW - Att 01 - Farnsworth - Bldg 110 - CFA Exp Study - Residential Recovery Prg - Honolulu SOW - Att 02 - Farnsworth - Appx 61-64 - Residential Recovery Prg - Honolulu SOW - Att 03 - Farnsworth - Appx 65-610 - Residential Recovery Prg - Honolulu SOW - Att 04 - PG-18-15 - AE Sub Req - Vol C - Residential Recovery Prg - Honolulu SOW - Att 05 - VA Directive 1061 - Residential Recovery Prg – Honolulu SOW - Att 06 - AE & CPM Schedule - Residential Recovery Prg – Honolulu SOW - Att 07 - Memo - Sensitive Infra Data - Residential Recovery Prg – Honolulu SOW - Att 08 - PCAC Post Award Specs Checklist - Residential Recovery Prg – Honolulu SOW - Att 09 - Memo - Seasonal Influenza w Vaccines - Residential Recovery Prg – Honolulu SOW - Att 10 - Div 01 Spec Sections - Residential Recovery Prg – Honolulu SOW - Att 11 - HEFP SEP Design Alerts 1-9, 11 & 12 - Residential Recovery Prg - Honolulu
End of SOW