S02 - SOW Attachment 5 - Past Performance Questionnaire.docx

DOCX document 18 KB Posted

Attached to
Z1AZ--EHRM Infrastructure Upgrades - Phase 2 - Hines, IL 578-21-701 (VA-21-00020757)
Solicitation number
36C77621R0058
Issued by

About this file

This document is a presolicitation notice for architectural and engineering services related to EHRM infrastructure upgrades at the Hines VA Medical Center in Hines, Illinois. The project requires design and construction period services for network infrastructure installation, renovations, and upgrades to information technology systems. Responses are due by March 11, 2021. The anticipated period of performance for design completion is 180 calendar days from award. The contract value is estimated between $20-50 million. This opportunity is 100% set aside for service-disabled veteran-owned small businesses. The selection process will evaluate responses based on specialized experience, professional qualifications, capacity, past performance, locality, and construction period services. The highest rated firm may receive discussions and negotiations for award.

View the file

Other files

File Type Posted
S02 - SOW Attachment 4 - EHRM Readiness Infrastructure Self-Assessment Hines.xlsx XLSX spreadsheet
S02 - SOW Attachment 21 - OIT Design Guide.pdf PDF
S02 - SOW Attachment 9 - Contractor PIV Instructions and Form.pdf PDF
S02 - SOW Attachment 27 - Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 - SOW Attachment 16 - VA EHRM Site Infrastructure and EUD Requirements - 1.8.pdf PDF
S02 - SOW Attachment 11 - Contractor Parking.pdf PDF
S02 - SOW Attachment 20 - HEFP SEP-EHRM Training_Admin Space-Planning Job Aid.pdf PDF
36C77621R0058.docx DOCX document
S02 - SOW Attachment 13 - OIT Horizontal Cable Requirements.pdf PDF
S02 - SOW Attachment 6 - EHRM Design Schedule.docx DOCX document
S02 - SOW Attachment 18 - OIT Standards Alert 003C2B-SA-017.pdf PDF
S02 - SOW Attachment 2 - SOCAMES 6 Design Alert 1 Hines.pdf PDF
S02 - SOW Attachment 28 - Cutting Welding and Other Hot Work.pdf PDF
S02 - SOW Attachment 10 - No Smoking Policy 10-1-19.pdf PDF
S02 - SOW Attachment 1 - SOW EHRM Infrastructure Upgrades 578-21-701.docx DOCX document
S02 - SOW Attachment 29 - Safety and Health During Construction Activities.pdf PDF
S02 - SOW Attachment 24 - Hines Data Closet Security.pdf PDF
S02 - SOW Attachment 26 - Dig Permit SOP Form.pdf PDF
S02 - SOW Attachment 23 - EHRM Readiness Infrastructure Self-Assessment 2020 10 27.xlsx XLSX spreadsheet
S02 - SOW Attachment 19 - SOCAMES 6 Design Alert 1.pdf PDF
S02 - SOW Attachment 32 - Infection Control Risk Assessment (ICRA).docx DOCX document
S02 - SOW Attachment 8 - Hines Underground Utility Plan.pdf PDF
S02 - SOW Attachment 14 - Fire Protection Code Reviews.pdf PDF
S02 - SOW Attachment 12 - AE Design Checklist.pdf PDF
S02 - SOW Attachment 17 - OIT-InfrastrucStdsTelecommSpaces v3.0.pdf PDF
S02 - SOW Attachment 30 - Pre-Construction Risk Assessment (PCRA).docx DOCX document
S02 - SOW Attachment 31 - Interim Life Safety Measures (ILSM).docx DOCX document
S02 - SOW Attachment 3 - Sensitive Infrastructure Data Classication.pdf PDF
S02 - SOW Attachment 7 - Hines VA Campus Site Plan.pdf PDF
S02 - SOW Attachment 25 - Hines COVID-19 Guidelines.pdf PDF
S02 - SOW Attachment 22 - OIT-Design Guide Templates-CriticalTelecommSpaces.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 5 - PAST PERFORMANCE QUESTIONNAIRE

1. Contractor Information

Firm Name:

Address:

Phone Number:

Point of Contact:

Contact Phone Number:

DUNs Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other

Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: |_| Firm Fixed Price |_| Cost Reimbursement |_| Other (Please specify):

Contract Title:

Contract Location:

Project Description:

Complexity of Work |_| High |_| Med |_| Routine Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

Rating: Please evaluate the past performance using only the following ratings without variation. DO NOT RATE ON A “+” OR “-“ SCALE. If a “+” or “-“ is used, the rating without the "+" or "-" will be applied. In addition to the ratings, please provide a short narrative in the appropriate block or in the remarks section of this form.

“O”
Outstanding
The Offeror’s performance met contractual requirements and exceeded many requirements to the Client’s benefit. The contractual performance was accomplished with few minor problems for which corrective actions taken by the offeror were highly effective.
“A”
Above Average
The Offeror’s performance met contractual requirements and exceeded some requirements to the Client’s benefit. The contractual performance was accomplished with some minor problems for which corrective actions taken by the offeror were effective.
“S”
Satisfactory
The Offeror’s performance met contractual requirements. The contractual performance contained some minor problems for which corrective actions taken by the offeror were satisfactory.
“M”
Marginal
Performance did not meet some contractual requirements. Performance indicated that there are some potential risks associated with the quality products, timeliness of service, and contract performance.
“U”
Unacceptable
Performance did not meet contractual requirements. The contractual performance reflected a serious problem for which the offeror has yet to identify corrective actions or the offeror’s proposed actions appear only marginally effective or were not fully implemented.

Please rate and provide any supporting information/comments for the following:

1. The quality of the working relationship with the client (the tenant and/ or owner).
O A S M U
2. The professionalism and integrity with which offeror conducted business.
O A S M U

3. The responsiveness to the client’s needs and expectations.

O A S M U

4. The Offeror’s ability to successfully management and perform the project.
O A S M U
5. The offeror’s level of communication.
O A S M U
6. The quality control of the project.
O A S M U

7. Any Value added to the project as the result of cost savings, favorable financing, positive asset management, etc.

Yes No

8. Would you award another contact to the party being evaluated? If no, please explain.
Yes No
9. The delivery of the project within the budget and on schedule.
O A S M U

10. Other relevant aspects in the management of a project development for the client.

11. Overall rating for this firm:
O A S M U

Signature of Evaluator

Date

File details come from the government source that posted it. Updated .