This solicitation is for a design-build project to replace finishes in Building 3 of the Community Living Center at the Lake City Veterans Affairs Medical Center in Lake City, Florida. The project involves design and construction services and has a total estimated value between $250,000 and $500,000. The performance period is 168 calendar days upon receipt of the notice to proceed.
The solicitation is set aside 100% for service-disabled veteran-owned small businesses. Phase one proposals are due July 5, 2023 and will be evaluated based on technical approach, qualifications, past performance, and project planning. A maximum of five offerors will be invited to submit phase two proposals, which will include price and more detailed technical factors. Award is expected to be a firm-fixed-price contract to the offeror representing the best overall value to the government.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 10 - Past Performance Questionnaire (4 pages).pdf | ||
| Attachment 03 -Price Matrix (1 Page).xls | XLS spreadsheet | |
| Attachment 04 - Wage Determination Davis Bacon A (6 pages).pdf | ||
| Attachment 11 - Safety or Environmental Violations.pdf | ||
| Attachment 09 - Subcontractor Past Performance Consent Form (1 page).pdf | ||
| Attachment 02 - Specifications (98 Pages).pdf | ||
| Attachment 06 - Letter of Commitment Key Subcontract (1 page).pdf | ||
| Attachment 07 - Letter of Commitment for Design Firm Teaming Arrangement (1 page).pdf | ||
| Attachment 08 - Specialized Experience Form (3 pages).pdf | ||
| Attachment 01 - Statement of work (5 Pages).pdf | ||
| Attachment 05 - Drawings - 573A4-23-800.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date, and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 72
36C24823R0142 X
06-05-2023
573A4-23-800
36C248
Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
8875 Hidden River Parkway Suite 525 Tampa FL 33637
VIA EMAIL AT: Calixte.Saintil@va.gov
Calixte Saintil 813-940-0323
Project Title: Replace CLC3 Finishes Project Location: Lake City Veterans Affairs Medical Center Lake City, FL 32608 IAW VAAR 836.204 the magnitude of construction VA project is: between $250,000.00 and $500,000.00 NAICS: 236220 - Commercial and Institutional Building Construction Service Code: Y1DA - Construction of Hospitals and Infirmaries Project Description: This project will provide design and construction services for the replacement of CLC3 finishes at the Lake City VAMC, Lake City, FL. All work is to be completed in accordance with the requirements.
This solicitation will be evaluated on a Tradeoff basis. As stated elsewhere in this solicitation, this procurement is a Two-Phase Design-Build IAW FAR 36.3.
One solicitation will be issued covering both phases. In Phase One proposals will be evaluated to determine which offerors will submit proposals for Phase Two. Block 13a, refers to Phase One proposals.
THIS ACQUISITION IS SET-ASIDE 100% FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) ONLY, UNDER THE AUTHORITY OF 38 U.S.C. PART 74. ANY PERSON(S) OR BUSINESS ENTITY SUSPECTED OF MISREPRESENTATION FOR THE PURPOSE OF THE SECURING A GOVERNMENT CONTRACT MAY BE CRIMINALLY INVESTIGATED AND PROSECUTED FOR FRAUD AGAINST THE UNITED STATES GOVERNMENT.
Offerors must be registered in SAM (www.sam.gov) and VISIBLE/CERTIFIED in https://veterans.certify.sba.gov/ at the time of offer submission and prior to award to be considered an eligible SDVOSB concern.
The Malcom Randall VAMC is a smoke free facility.
Refer to solicitation instructions for Phase One cutoff date for submission of Requests for Information (RFIs), or Questions (if any). No Site Visit will be conducted during Phase One of this solicitation.
All Offerors must comply with all solicitation terms and conditions.
Please refer to solicitation 36C24823R0142 package for further requirements.
It shall be known that funds are not currently available. No contract award will be made until appropriated funds are made available.
10 168
X X 52.211-10
X 10
VIA EMAIL 1:00 PM EDT
07-05-2023
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
SEE PRICE SCHEDULE
36C248
Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
8875 Hidden River Parkway Suite 525 Tampa FL 33637
Department of Veterans Affairs Financial Services Center
P.O. Box 149971 Austin TX 78714-9971
Adriana N. Gamm
VA-VHA-RPOE-2022-111960
36C24823R0142
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) . 1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION,
OR REPAIR)– BACK
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
A.4 DELIVERY SCHEDULE
INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION
I. GENERAL PROPOSAL INFORMATION
II. PROPOSAL PREPARATION AND EVALUATION INFORMATION
PROPOSAL PREPARATION INSTRUCTION
PROPOSAL SUBMISSION
BASIS FOR AWARD
SELECTION AND EVALUATION PROCEDURES
PROPOSAL REQUIREMENTS AND FORMATTING (PHASE ONE AND PHASE TWO)
PHASE ONE – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS
PHASE TWO – PRICE PROPOSAL PREPARATION INSTRUCTIONS
PHASE TWO – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS
PHASE ONE EVALUATION FACTORS
PHASE ONE – EVALUATION CRITERIA,
FACTOR 1: TECHNICAL APPROACH
FACTOR 2 - TECHNICAL QUALIFICATIONS:
FACTOR 3 - RELEVANT AND RECENT PAST PERFORMANCE
FACTOR 4 - PROJECT PLANNING/SAFETY/IC/QC
PHASE 2 PROPOSAL PREPARATION AND SUBMISSION:
PHASE TWO TECHNICAL PROPOSAL
FACTOR 1 – DESIGN METHODS
FACTOR 2 – CONSTRUCTION METHODS
FACTOR 3 – PROJECT COORDINATION AND SAFETY
FACTOR 4 –PROJECT SCHEDULE
FACTOR 5 – MANAGEMENT APPROACH, KEY PERSONNEL, QUALITY CONTROL,
AND WARRANTY SUPPORT
Phase 2 proposals will be evaluated as follows:
Phase 2 Evaluation and Award Determination Safety or Environmental Violations and Experience Modification Rate (EMR)
PART II - CONTRACT CLAUSES
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
2.2 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014)
2.4 52.228-1 BID GUARANTEE (SEP 1996)
2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB
2021)
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) ...24
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
2.11 PARTNERING
PART III - REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
3.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (NOV 2021)
PART IV - GENERAL CONDITIONS
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND
SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED
ENTITIES (NOV 2021)
4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
1984)
4.4 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)
4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(MAR 2023)
4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
4.8 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)
4.9 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR
EPA-DESIGNATED ITEMS (MAY 2008)
4.10 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)
4.11 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.13 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN
2020) (End of Clause)
4.14 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)
4.15 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-
DISABLED VETERAN-OWNED SMALL BUSINESSES (NOV 2022)
4.16 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.17 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR
2019)
4.18 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.19 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
ALTERNATE I (APR 2019)
4.20 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.21 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP
2019)
4.22 IT CONTRACT SECURITY
5.01 GENDER
5.02 CONTRACTOR'S COST BREAKDOWN
5.03 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES
5.04 OWNERSHIP OF ORIGINAL DOCUMENTS
5.05 RETENTION OF REVIEW DOCUMENTS
5.06 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED
PLANNING INFORMATION
5.07 COORDINATION WITH MEDICAL CENTER
5.08 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR
ATTACHMENTS
PART VI - LIST OF DOCUMENTS-EXHIBITS-AND-OTHER-ATTACHMENTS
Attachment 01 - Statement of Work [5 Pages] Attachment 02 - Specifications (98 Pages) Attachment 03 - Price Matrix (1 Page) Attachment 04 - Wage Determination Davis Bacon Act FL20210194 (6 pages) Attachment 05 - Drawings (2 page) Attachment 06 - Letter of Commitment Key Subcontractors (1 page) Attachment 07 - Letter of Commitment for Design Firm Teaming Arrangement (1 page) Attachment 08 - Specialized Experience Form (3 pages) Attachment 09 - Subcontractor Past Performance Consent Form (1 page) Attachment 10 - Past Performance Questionnaire (4 pages) Attachment 11 - Safety or Environmental Violations and Experience Modification Rate
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1.00 JB __________________ __________________
Design-Build to Replace CLC3 Finishes but not limited to, labor, materials, tools, equipment, supervision, transportation necessary for design and construct the project described herein and other specific tasks as further defined by this Request for Proposal
(RFP).
Project No.: 573A4-23-800
Period of Performance: 168 calendar days.
Contract Period: Base POP Begin: 09-11-2023 POP End: 02-27-2024 PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Y1DA - Construction of Hospitals and Infirmaries
Note: The POP Begin, and POP End are estimated dates. Upon notice to proceed issuance, dates will be updated through a modification.
GRAND TOTAL __________________
A.4 DELIVERY SCHEDULE
ITEM NUMBER QUANTITY DELIVERY DATE
0001 SHIP TO: LAKE CITY VAMC
619 S. MARION AVE
LAKE CITY, FL 32025
USA
1.00 168 Calendar days After Receipt from NTP
INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION
I. GENERAL PROPOSAL INFORMATION
1. Solicitation, attachments, and any issued amendments will be posted at www.sam.gov. This is the only official location where these documents can be obtained and where updates are posted. No “hard copy” solicitation materials are available.
2. All references to “Bid” or “Bidder” shall be understood to mean “Offer” or “Offeror.”
3. MAGNITUDE OF THIS PROJECT: Between $250,000.00 and $500,000.00
4. PROPOSAL DUE DATE: Standard Form (SF) 1442, block 13a (or as amended on SF 30), refers to Phase One proposals.
5. SITE VISIT: No pre-proposal/Site Visit will be conducted during Phase One of this solicitation.
Those offerors selected to participate in Phase Two of the solicitation will receive information about Phase Two pre-proposal conference/Site Visit in the invitation to participate in Phase Two.
6. OFFER ACCEPTANCE PERIOD: Offers providing less than one-hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
7. REQUESTS FOR INFORMATION: Requests for Information (RFIs) shall be submitted in writing (only) by the Prime Contractor (SDVOSB) to the Contracting Officer’s email at calixte.saintil@va.gov. No telephone RFIs/Questions will be accepted. The cutoff for submission of RFIs for PHASE ONE is 06/26/2023 @ 3:30PM (EST). Responses will be provided in a Question & Answer format to all offerors via Standard Form (SF) 30 Amendment to the Solicitation.
RFI received after due date will only be answered if in the judgement of the CO impacts the project/ solicitation.
8. SPECIFICATIONS AND DRAWINGS: All applicable specifications and drawings will be provided electronically along with the solicitation. No hard copies will be made available to offerors.
9. Any reference contained within contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” “Senior Resident Engineer,” “Project Manager,” “Contracting Officer Technical Representative,” or their abbreviations are to be replaced with “Contracting Officer Representative (COR)”
10. SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS VERIFICATION: This solicitation is 100% set asides for verified Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The award of this requirement shall not be delayed due to loss of SDVOSB verification.
Proposals submitted by non-verified SDVOSB shall be excluded from award consideration.
11. SDVOSB Verification: The Government will review SBA VetCert (https://veterans.certify.sba.gov) to confirm SDVOSB status verification for the submitted proposal. Evaluations will be performed on proposals submitted by verified SDVOSBs only. Subsequent confirmation of SDVOSB verification status will be performed for the apparent awardee.
http://www.sam.gov/ mailto:calixte.saintil@va.gov https://veterans.certify.sba.gov/
12. LIMITATIONS ON SUBCONTRACTING (LOS) (Reference Contract Clause FAR 52.219-14 for further information): By submission of an offer and execution of a contract, the Offeror agrees that in performance of the contract, the concern will perform at least fifteen (15) percent of the cost of the contract, not including the cost of materials, with its own employees.
12.1. Completed Mandatory (LOS) Certification: Completed Mandatory (LOS) Certification VAAR
852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF
COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) shall be signed on the SF 1442 and submitted.
13. FUNDS: Funds are not presently available for this acquisition. The Government does not compensate offerors for proposals’ development. Award is subject to availability of funds, in accordance with FAR 52.232-18 Availability of Funds and VAAR 807-173.
14. BONDS: Performance Bonds (SF25) and Payment Bonds (SF25A) are required. Offeror must refer to SF1442 Block 12a for Payment and Performance Bond requirements. Reference Contract Clause FAR 52.228-15 for further information on applicability.
15. OFFER GUARANTEE (BID BOND) (SUBMIT WITH YOUR PHASE TWO PRICE
PROPOSAL): Offeror must refer to SF1442 Block 13B (Bid Bond) requirement. Per FAR Clause 52.228-1-Bid Guarantee, the amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less. NOTE: A legible electronic copy of the original is acceptable;
offerors invited to Phase Two are required to submit bid bonds. The bid bond will be submitted with Phase Two Price Proposal in a separate PDF document (do not combine/save with other documents) and shall be named “BID BOND – OFFEROR COMPANY NAME”.
16. SAFETY AND ENVIRONMENTAL RECORD (SUBMIT WITH PHASE ONE PROPOSAL):
Offerors shall submit information that specifies the contractor in question has no more than three serious, or one repeat, or one willful Occupational Safety and Health Administration (OSHA) or any Environmental Protection Agency (EPA) violation(s) in the past three (3) years and has an Experience Modification Rate (EMR) should not exceed 1.0. If no EMR, state the reason way no EMR is available. EMR greater than 1.0 will not be acceptable. Offerors are required to complete and submit attached (Attachment 09 - Safety or Environmental Violations and Experience Modification Rate EMR Form) Past safety and environmental record or any other form that provided the above information. Offerors with an EMR greater than 1.0 will be considered ineligible and will not be evaluated.
17. VETS-4212, Federal Contractor Veterans’ Employment Report (SUBMIT WITH PHASE ONE PROPOSAL): Offerors are required to provide verification of their submission of the annual form VETS-4212 (https://www.dol.gov/agencies/vets/programs/vets4212). This verification shall be the emailed confirmation of receipt notification sent to the offeror after successful submission of their report.
18. PERFORMANCE PERIOD: Refer to SF1442, Block 11, for performance period. Performance period shall be commenced upon receipt of written Notice to Proceed (NTP) performed in concurrent or sequential phases as indicated or required.
https://www.dol.gov/agencies/vets/programs/vets4212
19. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall enroll in E- Verify within 30 days of the contract award date. They shall also begin using the E-Verify system to confirm that all their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54).
20. Section 743(a)(3) of Division C of Public Law 111-117: Companies awarded a contract with the federal government shall comply with the annually reporting requirements of 52.204-14, Service Contract Reporting Requirements and 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts. Note that the contracting officer shall make the contractor’s failure to comply with the reporting requirements a part of the contractor’s performance information under FAR Subpart 42.15.
II. PROPOSAL PREPARATION AND EVALUATION INFORMATION
PROPOSAL PREPARATION INSTRUCTION
1. PROPOSAL PREPARATION INSTRUCTION:
1.1. The submission of the documentation specified below will constitute the Offeror’s acceptance of the terms and conditions of the RFP, including attachments and any issued amendments.
1.2. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.
1.3. In order for proposals to receive full consideration for award, offerors should ensure that the information furnished in support of the proposal is factual, accurate, and complete, and directly responds to the requirements of this solicitation.
1.4. These instructions prescribe the format for the proposal and describe the approach for the development of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.
PROPOSAL SUBMISSION
2. PROPOSAL SUBMISSION:
2.1. All Phase One proposals shall be submitted by the Prime Contractor no later than (NLT) closing date and time specified in SF1442, Block 13.A. (subject to amendment) via email at calixte.saintil@va.gov. NO OTHER FORMS OF SUBMISSION WILL BE ACCEPTED.
2.2. Your proposal shall be submitted as portable data files (pdf), and documents submitted shall be no larger than 7 Mega Bytes (MB) in size. Send document in separate files as deem necessary. The offeror is responsible to verify that the Government has received the proposals.
2.3. Undeliverable emails due to an offeror’s proposal size, using wrong email address, or else, is not the responsibility of the Government.
mailto:calixte.saintil@va.gov
2.4. To be considered and accepted as timely the proposal must be received in its entirety prior to the deadline. Failure to provide a proposal in its entirety prior to the deadline will render the proposal noncompliant.
BASIS FOR AWARD
3. BASIS FOR AWARD: It is the Government’s intent to award one (1) firm-fixed price contract resulting from this solicitation to the responsible offeror whose offer, conforming to the solicitation, is fair and reasonable, and has been determined to be the most advantageous to the Government, non-price, price, and other factors considered. The proposals must conform to the solicitation requirements and judged to represent the Best Value to the Government. The source selection process will utilize FAR Part 36.3 Two Phase Design-Build Selection Procedures and FAR 15 to evaluate proposals and award the contract.
3.1. All evaluation factors other than price, when combined, are approximately equal to price. As differences in factor ratings and relative advantages and disadvantages become less distinct, difference in price may become the discriminating factor in determining the most advantageous offer. Conversely, as differences in price become less distinct, differences in ratings and relative advantages and disadvantages between offers are determinative.
3.2. Intent for No Discussions: Offerors are hereby advised that the Government intends to evaluate proposals and award a contract without conducting discussions with offerors. However, the Government reserves the right to contact Offerors and/or hold discussions if the Contracting Officer determines them to be necessary. Offerors are cautioned that discussions may not be conducted, and Offerors should not assume that they will have an opportunity to revise their proposals after submission.
SELECTION AND EVALUATION PROCEDURES
4. SELECTION AND EVALUATION PROCEDURES: This part describes the mechanism for evaluating and selecting offers for this two-phase design-build procurement.
4.1. This solicitation addresses both the Phase One and Phase Two proposal requirements.
4.2. The Phase One proposals will be evaluated to determine which offerors will be invited to submit Phase Two proposals. Do not submit Phase Two proposals unless specifically instructed by the Contracting Officer.
4.3. After evaluating Phase One proposals, the Government intends to select a maximum of five (5) of the most highly qualified offerors and those will be invited to submit a Phase Two proposals. However, the Government reserves the right to reject any and/all offers.
4.4. Do not submit pricing with the Phase One proposal. Phase One does NOT involve a pricing submission or evaluation of price.
4.5. In Phase Two, Offerors will compete to determine which Offeror will be awarded the Firm Fixed- Price contract. For Phase Two, Offerors must submit technical and price proposals. The Government reserves the right to reject any and/all offers in Phase Two.
PROPOSAL REQUIREMENTS AND FORMATTING (PHASE ONE AND PHASE TWO)
5. PROPOSAL REQUIREMENTS AND FORMATTING (PHASE ONE AND PHASE TWO):
5.1. Proposals shall be typewritten, with fonts no smaller than 10 points, with page layout no smaller than
½” top, bottom and ½” side margins, single space, paginated, portrait mode or letter size paper;
except charts may be displayed in landscape mode.
5.2. Solicitation forms requiring to be completed shall be typewritten with fonts no smaller than 9 points.
5.3. No hyperlinks or electronic media will be allowed or considered.
5.4. Any conceptual drawings, renderings, product data sheets, one-line diagrams, etc. included in your proposal, shall be submitted as portable data files (pdf).
5.5. Strongly recommend formatting your technical proposal factor by factor, as listed in the solicitation. Stick to the page limits.
5.6. Proposals which merely restate the requirement or state that the requirement will be met, without providing supporting rationale, are not sufficient and will not be considered an appropriate response.
It is the offeror’s responsibility to insure the completeness of the proposal.
5.7. Offers that do not propose to perform all the work required by the solicitation will not be considered.
5.8. Proprietary Data: Each page of the offeror’s proposals must be reviewed and marked as to proprietary data content by the offeror in strict compliance with FAR 52.215-1. Also, see FAR 3.104-4. A single blanket statement at the front of the proposal is not acceptable. Failure to mark every page will subject the proposal to public release through Freedom of Information Act (FOIA) requests.
5.9. Proposals submitted in response to this solicitation shall be signed by the SDVOSB 51% owner and dated.
PHASE ONE – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS
6. PHASE ONE – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s proposal:
PHASE ONE – FIRST PACKAGE:
(a) Cover Page with: Phase One - Design Build Project, Solicitation Number, Project Title and Project Number, Company Information (Principal points of contact, email, address, phone numbers (including area code), Unique Entity Identifier (UIE) number, Cage code, etc.)
(b) Table of Contents
(c) Signed SF 1442 by the SDVOSB, with Blocks 14-20C completed including acknowledgement of any Amendments issued for Phase One.
(d) Completed Experience Modification Rate (EMR) Form
(e) Verification of the annual form VETS-4212, Federal Contractor Veterans’ Employment Report. (Refer to General Information Section, paragraph 17 on page 8.)
(f) Copy of current SDVOSB certification
(g) Completed Mandatory (LOS) Certification VAAR 852.219-77 VA NOTICE OF
LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR
SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) shall be signed and submitted. (Refer to General Information Section, paragraph 12 & 12.1 on page 2.)
PHASE ONE – SECOND PACKAGE (TECHNICAL PROPOSAL):
TAB A. General Information
Cover Page with Solicitation Number, Project Title Table of Contents Signed offer/Acknowledgement of Amendments (SF1442) Copy of current SDVOSB certification DUNS Number Cage Code Tax ID number Principle points of contact, address, phone numbers, etc.
TAB B: Technical Approach
TAB C: Technical Qualifications
a. Sub Factor 1 (a): Specialized Experience and Technical Competence
b. Sub Factor 1 (b): Key Personnel and Management Approach
TAB D: Relevant and Recent Past Performance
TAB E: Project Planning/Safety
7. PHASE TWO PROPOSAL PREPARATION AND SUBMISSION: Phase Two require submission of technical and price proposal, which shall be evaluated independently. Technical Proposal shall not include pricing data.
DO NOT SUBMIT PHASE TWO PROPOSALS UNLESS SPECIFICALLY INSTRUCTED BY THE
CO.
8. Technical factors consist of Factor 1 – Design Concepts, Factor 2 – Construction Methods, Factor 3
– Coordination and Safety, Factor 4 - Project Schedule and Factor 5 - Management Approach, Key Personnel, Quality Control, and Warranty Support. Each factor shall have equal importance, and when combined are approximately equal to Price.
PHASE TWO – PRICE PROPOSAL PREPARATION INSTRUCTIONS
9. PHASE TWO – PRICE PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s technical proposal:
PHASE TWO - PRICE PROPOSAL
(a) Cover Page with: Phase Two - Design Build Project, Solicitation Number, Project Title and
(c) Bid Bond-SF24 “legible scan copy in pdf format” The bid bond will be submitted with Phase
Two Price Proposal in a separate PDF document (do not combine/save with other documents) and shall be named “BID BOND – OFFEROR COMPANY NAME”.
(d) Copy of current SDVOSB certification.
(e) Signed SF 1442, with Blocks 14-20C completed including acknowledgement of any Amendments (Phase One and Phase Two) issued.
(f) Completed Price Schedule (Total of Proposed Price of CLIN 0001).
(g) Price Proposal Breakdown to support price proposed.
(h) Completed Mandatory (LOS) Certification VAAR 852.219-77 VA NOTICE OF
LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR
SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) shall be signed on the SF 1442 and submitted.
10. The proposed prices will be analyzed for fairness and reasonableness. Include copy of the Pricing
Schedule of the solicitation. Provide a detailed price breakdown for the purpose of evaluating price.
The breakdown shall separately at a minimum but not limited to (this is not an all-inclusive breakdown list, DO NOT limit your breakdown to this list) include the following cost elements:
Labor (Direct & Indirect), Materials, Material Markups, Material Overhead, Equipment, Subcontractor Cost, Other Direct Costs, Overhead Expenses, Indirect Cost, General & Administrative (G&A) expenses, and Profit. While developing your price proposal please make sure to include all applicable taxes, and government stamps cost.
11. NOTE: Price breakdown shall be indicative of showing at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns in accordance with VAAR 852.219-10.
12. PRICE EVALUATION: The Government will initially review pricing independently from the factor evaluation. Price is not rated but will be analyzed for fairness and reasonableness. The Government may use various price analysis techniques and procedures to make a price reasonableness determination.
PHASE TWO – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS
13. PHASE TWO – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s technical proposal:
PHASE TWO – TECHNICAL PROPOSAL (Technical Proposal shall NOT include pricing data):
(a) Cover Page with: Phase Two - Design Build Project, Solicitation Number, Project Title and
(c) Required Submittals for Factor 1 – Design Methods (20 pages max., excluding schematic)
(d) Required Submittals for Factor 2 – Construction Methods (40 pages max.)
(e) Required Submittals for Factor 3 – Project Coordination and Safety (no page limit)
(f) Required Submittals for Factor 4 - Project Schedule
(g) Required Submittals for Factor 5 - Management Approach, Key Personnel, Quality Control, and Warranty Support
NOTE: Phase 2 Proposal Submission: The Phase 2 proposal should be submitted to the same address as the Phase I proposal and can be submitted though use of the same format and means.
14. PHASE TWO EVALUATION AND SELECTION CRITERIA: Factors will be rated using an adjectival rating system. For evaluation purposes, each technical factor is equal in importance, and when combined are approximately equal to price.
III. EVALUATION FACTORS FOR AWARD
PHASE ONE EVALUATION FACTORS
The evaluation factors for PHASE ONE consist of Factor 1 - Technical Approach, Factor 2 – Technical Qualifications, Factor 3 – Relevant and Recent Past Performance, Factor 4 – Project Planning/Safety.
Each factor shall have equal importance.
PHASE ONE – EVALUATION CRITERIA,
FACTOR 1: TECHNICAL APPROACH
(30 pages max., excluding signed letters of commitments, and copy of licenses)
1. In a narrative format, diagrams and/or drawing, describe in detail how the offeror intends to meet or exceed all performance areas stated in the solicitation/statement of work/attachments that are related to Project 573A4-23-800. Provide technical methods and procedures that reflect a design and construction approach unique to the site and facility. NOTE: Vague, general narratives to include the restatement of the Statement of Work will be rated less favorably.
2. Schedule and minimizing downtime is crucial. Describe a plan to complete the project in a timely manner without causing disruptions to facility during normal business hours. Also, describe actions to be taken by the offeror if completion of work is anticipated to fall behind schedule. It is critical to the VA mission that services remain intact with minimal disruption.
3. Describe any technical difficulties that may be encountered in a project of this type. Provide a narrative of preventative measures or solutions to overcome these issues.
Narrative: 4-page maximum
FACTOR 2 - TECHNICAL QUALIFICATIONS:
• Sub Factor 1 (a): SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE o Describe specialized experience, technical competence, and design expertise in building renovation and other related work performed by the Prime and Subcontractor. Proposals that demonstrate technical qualifications in performing projects very similar or exceeding the scope of this project will be rated more favorable.
o performing projects very similar or exceeding the scope of this project will be rated more favorable.
o Describe ability to obtain the necessary resources to perform this project.
o Disclose all negative licensing information and any pending litigation involving any of the proposed firms that will be either Prime or Sub contractors on this project.
o If there is a Teaming Arrangement, identify the individual firms experience, describe the nature of the association, and clearly identify contractual responsibilities of each firm.
Narrative: 5-page maximum
• Sub Factor 1 (b): KEY PERSONNEL AND MANAGEMENT APPROACH
1. Submit an organizational chart
2. Include a narrative which describes the relevant experience of:
a) Firm’s key personnel and experience, to include at least:
Project Manager o Similar projects worked on o Education and /or Certification (s)
Field Superintendent o Similar projects worked on o Education and/or Certification (s)
Other Relevant Firm Employees o Education and/or Certification (s)
a) Over-all Team- Discuss the planned use of:
Subcontractors o Key trades to be subcontracted o Proposed subcontractors if firms already determined o Similar projects worked on
Architect-Engineering (A-E) Firm o SF 330s of key A-E personnel if A-E firm is already determined o Similar projects worked on
Other Consultants
Narrative: 10-page maximum, excluding A-E SF 330s
FACTOR 3 - RELEVANT AND RECENT PAST PERFORMANCE
1. A minimum of three (3) and a maximum of five (5) past performance projects completed by the Prime Contractor shall be submitted to the Government. Each past performance should contain the following:
a) Brief project description.
b) List of subcontractors.
c) Relevance to project stated in RFP.
d) Initial/Final award amount.
e) State any change orders if occurred during the project performance.
f) Pictures of completed work.
g) Project Contracting Officer Representative’s or Client’s name, phone number, and email address.
h) Past Performance Questionnaire/Evaluation (optional but highly recommended).
Note: Teaming Arrangements - Identify any projects that the two contractors have previously contractually teamed together to accomplish.
(i) Constructor/Key Subs and/or Designer: Include examples, within the last 3 years (5 years for design firms), of design/build projects, in which the designer and/or constructor or key trade subcontractors have been involved, if any.
(ii) Teaming Arrangements: If Offeror represents the combining of two or more companies for the purpose of this RFP, then each company must list project examples, related to its role for this project.
2. The projects shall be recently completed (completion date to be within 5 years of the solicitation release date), relevant, and meet or exceed the proposed magnitude and scope of the proposed project 573A4-23-603.
Note: The Evaluation Team may also use information obtained from Past Performance Information Retrieval System PPIRS http://www.ppirs.gov/ as a basis for evaluating this factor.
3. Preferable to discuss similar type projects in excess of $100,000.00.
4. The examples of projects that most closely resemble the project identified in this solicitation will receive higher consideration.
Narrative: 10-page maximum
FACTOR 4 - PROJECT PLANNING/SAFETY/IC/QC
1. Describe your plan for phasing this project
2. Describe approach to construction safety and infection control (IC).
3. Submit Quality Control (QC) monitoring procedures that will ensure a high level of construction quality that is applicable to the Specific and General requirements of the Statement of Work.
4. Develop and include procedures involving key subcontractors in the quality of the construction processes.
5. Provide the precautions the contractor will take to avoid damages to facility buildings (include pre-existing conditions) and surrounding properties and the remediation that will take place if damage is done.
Narrative: 5-page maximum, excluding the EMR documentation
Phase 1 proposals will be evaluated as follows:
A. Factors 1 thru 4, as described above, will be rated using an adjectival rating system. Each factor response will be reviewed and assigned an adjectival rating
For evaluation purposes, each technical factor is equal in importance.
PHASE 2 PROPOSAL PREPARATION AND SUBMISSION:
OFFERORS ARE NOT TO SUBMIT A PHASE 2 PROPOSAL UNLESS INVITED TO DO SO.
PHASE TWO TECHNICAL PROPOSAL
FACTOR 1 – DESIGN METHODS
In a narrative format, diagrams, and/or drawings, describe the process required to ensure that the renovation of the building shall be in compliance with VA design guide and master specifications.
Describe the preliminary tasks required to be completed prior to the start of design.
Narrative: 4-page maximum (diagrams and concept drawings are not counted into page limitation)
FACTOR 2 – CONSTRUCTION METHODS
a) Describe renovation process, including the asbestos and lead testing and abatement that may be needed to ensure proper performance of all tasks.
b) Describe the A/E firm’s responsibility during construction phase and the management’s approach to effectively coordinate with the A/E and solve any issues in the design.
o Narrative: 4-page maximum
FACTOR 3 – PROJECT COORDINATION AND SAFETY
Provide a narrative that effectively describes in detail a technical approach of how the offeror will (a) coordinate all work, (b) remain on schedule, (c) avoid/minimize disturbance to the clinic/facility, and (d) maintain Infection Control, Interim Life Safety Measures, and overall safety.
o Narrative: 4-page maximum
FACTOR 4 –PROJECT SCHEDULE
Submit a preliminary (CPM) Critical Path Method schedule for the design and construction satisfying the requirements of this project. A practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including design, acquiring materials and equipment, mobilization, demolition, installation, commissioning, etc.). The schedule shall be in the form of a progress chart (Gantt chart) of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given point during the period. Most importantly, the schedule should show length of downtime required. The schedule shall show key milestone dates and switchover and start-up of equipment. The schedule is not included in the page limit.
To be considered technically acceptable, the proposed “draft” project schedule shall not exceed the project duration stated on the solicitation and include divisions of work required to successfully complete the project.
o Narrative: 5-page maximum (shall be Gantt chart).
FACTOR 5 – MANAGEMENT APPROACH, KEY PERSONNEL, QUALITY CONTROL, AND
WARRANTY SUPPORT
a) Describe any changes to management approach, key personnel, and quality assurance/control procedures that have occurred or will occur since Phase 1 proposals for this requirement were submitted.
b) Describe the organization, process, and procedures to be established, implemented, and carried out for warranty support.
Narrative - 2 page maximum
Phase 2 Proposal Submission: The Phase 2 proposal should be submitted to the same address as the Phase I proposal and can be submitted though use of the same format and means.
1. Phase 2 Evaluation and Selection Criteria:
Phase 2 proposals will be evaluated as follows:
a) The technical factors consist of the Factors 1 thru 5, described above and will be rated using the same combination system used for the Phase 1 proposal evaluation.
b) For evaluation purposes, each technical factor is equal in importance.
Phase 2 Evaluation and Award Determination
a) This is a competitive Phase 2, Request for Proposal (RFP) that represents the best value to the Government conducted under FAR Part 15 101-1, Tradeoff Process.
b) In accordance with FAR 15.101-1, all evaluation factors, other than cost or price, when combined, are approximately equal in importance to cost or price.
c) Thus, award will be made to the firm whose Phase 1 proposal was initially ranked in the top 5 and who now offers a Phase 2 proposal, which based on both its technical and pricing proposals, offers the overall best value to the Government.
d) Each pricing element indicated in TAB B will be evaluated to determine its reasonableness. The Government may use various price analysis techniques and procedures to make a price reasonableness determination. Offerors should assure that their ability to meet or exceed the minimum needs of the Government is adequately described in the offer. The Government reserves the right to evaluate proposals and award a contract without discussions (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
e) Evaluation Overview: The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The proposals must conform to the RFP's requirements and judged to represent the Best Value to the Government. The Best Value is the most advantageous offer, price and other factors considered, and consistent with the Government's stated importance of evaluation criteria. This may result in award being made to a high-rated, higher-priced offeror where the Contracting Officer determines that the technical capability of the higher-priced offeror outweighs the price.
f) SDVOSB Verification: The Government will review VetBiz
(https://www.vip.vetbiz.gov/) to confirm Service-Disabled Veteran-owned Small Business (SDVOSB) status verification for the submitted proposals. Evaluations will be performed on proposals submitted by verified SDVOSBs only. Subsequent confirmation of SDVOSB verification status will be performed for the apparent award.
Safety or Environmental Violations and Experience Modification Rate (EMR)
A. “All Offerors shall submit the following information pertaining to their past Safety and
Environmental record. The information shall contain, at a minimum, a certification that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violations(s) in the past three years.
B. All Offerors shall submit information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the offeror’s insurance company and be furnished on the insurance carrier’s letterhead.
C. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc.
(NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.
D. A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases will be used to make the Determination of Responsibility. If the apparent awardee fails to provide required documentation, then the matter will be referred to the Small Business Administration (SBA) office for a certificate of competency or a determination of responsibility from SBA.
E. This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors. “ (Offerors to refer to EMR)
PHASE TWO EVALUATION AND SELECTION CRITERIA: Factors will be rated using an adjectival rating system. For evaluation purposes, each technical factor is equal in importance.
- - - END OF EVALUATION FACTORS PHASE TWO
https://www.vip.vetbiz.gov/
PART II - CONTRACT CLAUSES
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade Goals for female participation for each trade
22.4 % 6.9 %
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor.
(2) Employer's identification number of the subcontractor.
(3) Estimated dollar amount of the subcontract.
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .