Attachment 03 -Price Matrix (1 Page).xls

XLS spreadsheet 68 KB Posted

Attached to
DB - Replace CLC3 Finishes - Lake City
Solicitation number
36c24823r0142
Issued by

About this file

This document provides details for a federal contract solicitation to replace finishes at the Community Living Center 3 (CLC3) at the Lake City Veterans Affairs Medical Center. The solicitation is for a design-build project with responses due on July 5, 2023. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 is the contracting agency. Interested parties should note there will be no site visit during the initial phase one response period. The attached price matrix file provides a template for pricing responses but was not included in the file contents.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total Construction Cost

CONSTRUCTION COST PROGRAM - ESTIMATE WORKSHEETDATE:12/31/99
PROJECT NO.PROJECT TITLELOCATIONsDATE:
000$0.00
ESTIMATORTOTAL CONSTRUCTION COST SUMMARYBUILDING NO(S)DRAWING NOs.$0.00
000$0.00
NRMLABOR (w/ equip)MATERIALS
CODECSI #The StartSYSTEMS/SUBSYSTEMQTYUNIT$/UNITTOTAL$/UNITTOTALTOTAL
16 DIV. CONSTRUCTION COST$0
TOTAL CONSTRUCTION COST (Low Bid)$0
$0
Subtotal$0
Impact Cost with R.O.P
Subtotal$0
Subtotal$0
TOTAL PROJECT COSTS$0

&RSHEET NO &P OF &N

Detail Base Offer Cost Breakdown

"FOR OFFICIAL USE ONLY"

ESTIMATE WORKSHEET
Project NumberLocationPROJECT NAMEDATE:
TYPE OF ESTIMATE:ESTIMATOR:BUILDING NO./LOCATION:
LABORMATERIALS/EQUIPMENTTOTAL COST BY ITEM
CODE:The StartSYSTEM/SUBSYSTEMQTYUNIT$/UNITTOTAL$/UNITTOTAL
1GENERAL CONDITIONS$0.00
1Mobilization/Demobilization
2Permits/Environmental Regulations Compliance
3Safety Requirements
4Maintenance of Traffic (MOT)
2Existing Conditionsea$0.00$0.00$0.00
1Removal of Wood Floor Systemea$0.00$0.00$0.00
2Removal of Metal Floor System and Connectionsea$0.00$0.00$0.00
3Paint Removalea$0.00$0.00$0.00
4Chain-Link Fabric Removalea$0.00$0.00$0.00
5Miscellaneous Removal (signs, wiring,conduits, etc.ea'$0.00$0.00$0.00
3CONCRETEea$0.00$0.00$0.00
1Cracks Repairs at Concrete Rampsea$0.00$0.00$0.00
4METALSea$0.00$0.00$0.00
1Retrofit of Existing Structural Connectionsea$0.00$0.00$0.00
2New Floor Systemea$0.00$0.00$0.00
3New Connections for Floor Systemea$0.00$0.00$0.00
5FINISHESea$0.00$0.00$0.00
1Protective Paint Coating (Epoxy)ea$0.00$0.00$0.00
2Finish Paint Coatingea$0.00$0.00$0.00
6SPECIALTIESea$0.00$0.00$0.00
1New Vinyl Coated Chain Link Fabricea$0.00$0.00$0.00
2New Green Chain Link Fence Privacy Slatsea$0.00$0.00$0.00
3New Signageea$0.00$0.00$0.00
7ELECTRICALea$0.00$0.00$0.00
1Electrical Conduits, Wiring, Junctions, Lightingea$0.00$0.00$0.00
8BRIDGE MODIFICATIONSea$0.00$0.00$0.00
1Lightning Protection Systemea$0.00$0.00$0.00
2Structure Adaptations (To comply with current codes)$0.00$0.00$0.00
3Roof Cover$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00
Overhead %
Profit %
Bond %$$
Overhead/Profit Subtotals:$0.00$0.00$0.00
Total Base Offer Cost

&RSHEET NO &P OF &N