This document provides details for a federal contract solicitation to replace finishes at the Community Living Center 3 (CLC3) at the Lake City Veterans Affairs Medical Center. The solicitation is for a design-build project with responses due on July 5, 2023. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 is the contracting agency. Interested parties should note there will be no site visit during the initial phase one response period. The attached price matrix file provides a template for pricing responses but was not included in the file contents.
View the file
Other files for this federal contract opportunity
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Construction Cost
| CONSTRUCTION COST PROGRAM - ESTIMATE WORKSHEET | DATE: | 12/31/99 | ||||||||
| PROJECT NO. | PROJECT TITLE | LOCATIONs | DATE: | |||||||
| 0 | 0 | 0 | $0.00 | |||||||
| ESTIMATOR | TOTAL CONSTRUCTION COST SUMMARY | BUILDING NO(S) | DRAWING NOs. | $0.00 | ||||||
| 0 | 0 | 0 | $0.00 | |||||||
| NRM | LABOR (w/ equip) | MATERIALS | ||||||||
| CODE | CSI # | The Start | SYSTEMS/SUBSYSTEM | QTY | UNIT | $/UNIT | TOTAL | $/UNIT | TOTAL | TOTAL |
| 16 DIV. CONSTRUCTION COST | $0 | |||||||||
| TOTAL CONSTRUCTION COST (Low Bid) | $0 | |||||||||
| $0 | ||||||||||
| Subtotal | $0 | |||||||||
| Impact Cost with R.O.P | ||||||||||
| Subtotal | $0 | |||||||||
| Subtotal | $0 | |||||||||
| TOTAL PROJECT COSTS | $0 |
&RSHEET NO &P OF &N
Detail Base Offer Cost Breakdown
"FOR OFFICIAL USE ONLY"
| ESTIMATE WORKSHEET | ||||||||||
| Project Number | Location | PROJECT NAME | DATE: | |||||||
| TYPE OF ESTIMATE: | ESTIMATOR: | BUILDING NO./LOCATION: | ||||||||
| LABOR | MATERIALS/EQUIPMENT | TOTAL COST BY ITEM | ||||||||
| CODE: | The Start | SYSTEM/SUBSYSTEM | QTY | UNIT | $/UNIT | TOTAL | $/UNIT | TOTAL | ||
| 1 | GENERAL CONDITIONS | $0.00 | ||||||||
| 1 | Mobilization/Demobilization | |||||||||
| 2 | Permits/Environmental Regulations Compliance | |||||||||
| 3 | Safety Requirements | |||||||||
| 4 | Maintenance of Traffic (MOT) | |||||||||
| 2 | Existing Conditions | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Removal of Wood Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Removal of Metal Floor System and Connections | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | Paint Removal | ea | $0.00 | $0.00 | $0.00 | |||||
| 4 | Chain-Link Fabric Removal | ea | $0.00 | $0.00 | $0.00 | |||||
| 5 | Miscellaneous Removal (signs, wiring,conduits, etc. | ea' | $0.00 | $0.00 | $0.00 | |||||
| 3 | CONCRETE | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Cracks Repairs at Concrete Ramps | ea | $0.00 | $0.00 | $0.00 | |||||
| 4 | METALS | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Retrofit of Existing Structural Connections | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | New Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | New Connections for Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 5 | FINISHES | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Protective Paint Coating (Epoxy) | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Finish Paint Coating | ea | $0.00 | $0.00 | $0.00 | |||||
| 6 | SPECIALTIES | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | New Vinyl Coated Chain Link Fabric | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | New Green Chain Link Fence Privacy Slats | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | New Signage | ea | $0.00 | $0.00 | $0.00 | |||||
| 7 | ELECTRICAL | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Electrical Conduits, Wiring, Junctions, Lighting | ea | $0.00 | $0.00 | $0.00 | |||||
| 8 | BRIDGE MODIFICATIONS | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Lightning Protection System | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Structure Adaptations (To comply with current codes) | $0.00 | $0.00 | $0.00 | ||||||
| 3 | Roof Cover | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Subtotal | $0.00 | $0.00 | $0.00 | |||||||
| Overhead % | ||||||||||
| Profit % | ||||||||||
| Bond % | $$ | |||||||||
| Overhead/Profit Subtotals: | $0.00 | $0.00 | $0.00 | |||||||
| Total Base Offer Cost |