S02 - SHELVING_FLOORING_LAYOUT_FINAL_20230830.pdf
PDF 240 KB Posted
- Solicitation number
- 36C25923Q0834
About this file
This document provides a floor plan and specifications for warehouse shelving and floor repairs for the Department of Veterans Affairs. The project involves three phases of work to replace shelving and repair floors across approximately 12,000 square feet of warehouse space. Phase 1 will address the south half, Phase 2 the north half, and Phase 3 the shipping and receiving area. Work includes demolishing existing shelving and levelers, infilling voids, installing new steel racks and levelers, repairing floor discrepancies using epoxy resinous flooring, replacing roll up doors and seals, and installing a new workstation. Bids are due by August 21, 2023 under Solicitation 36C25923Q0834 issued by the VA Veterans Health Administration VISN 19 for project number 442-23-006. The specifications indicate coordination is required for rack layouts and maintaining access to the mailroom during work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04 - Site Visit Meeting Doc_Warehouse.pdf | ||
| S05 - RFIs - Warehouse Shelving and Floor Repair.pdf | ||
| S04 - Site Visit Attendance_Warehouse 20230907.pdf | ||
| 36C25923Q0834 0001.docx | DOCX document | |
| S02 - Past Performance Questionnaire.docx | DOCX document | |
| S02 - WORKSTATION_PLANS_FINAL_20230830.pdf | ||
| 36C25923Q0834_1.docx | DOCX document | |
| S02 - SPECIFICATIONS_FINAL_20230830.pdf | ||
| S22- 852.219-75 LOS Certificate - GC.docx | DOCX document | |
| S02 - SITE_PLAN_FINAL_20230830.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
Revisions: Date:
G
H
Local I.D.As-Built By:
Project Director
BUILDING 12 OUT-BUILDINGS AS-BUILT
WAREHOUSE
ARCHITECTURAL
FIRST FLOOR
1/27/23 - DJM
#442
SCALE: 116" = 1'-0"
0 4'-0" 8'-0" 16'-0"
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
AutoCAD SHX Text
RAMP
AutoCAD SHX Text 12.1-104
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 12.1-102
AutoCAD SHX Text
MED.
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 12.1-103
AutoCAD SHX Text
AMMS
AutoCAD SHX Text
MAILROOM
AutoCAD SHX Text 12.1-103A
AutoCAD SHX Text
AMMS
AutoCAD SHX Text
COLD STORAGE
AutoCAD SHX Text 12.1-103B
AutoCAD SHX Text
IT
AutoCAD SHX Text 12.1-103C
AutoCAD SHX Text
AMMS
AutoCAD SHX Text
VAULT
AutoCAD SHX Text 12.1-103D
AutoCAD SHX Text
HAC
AutoCAD SHX Text 12.1-103E
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 12.1-101
AutoCAD SHX Text
SHIPPING/
AutoCAD SHX Text
RECIEVING
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Callout
ANTICIPATED RACK LAYOUT FOR REFERENCE
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Callout
PHASE 1
VHACHYKellyB Callout
PHASE 2
VHACHYKellyB Rectangle
VHACHYKellyB Callout
PHASE 3
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Callout
SOUTH DOCK LEVELER TO BE REMOVED AND DISPOSED OF. VOID SPACE TO BE IN-FILLED.
VHACHYKellyB Callout
SOUTH DOCK DOOR AND SEAL TO BE REMOVED AND REPLACED.
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Callout
NORTH DOCK LEVELER TO BE REMOVED AND REPLACED.
VHACHYKellyB Callout
NORTH DOCK DOOR AND SEAL TO BE REMOVED AND REPLACED.
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Callout
WORKSTATION TO BE REMOVED AND REPLACED.
VHACHYKellyB Snapshot
VHACHYKellyB Text Box
PHASE 1: SOUTH HALF OF THE WAREHOUSE STORAGE AREA:
PLACED DUST MITIGATION TO ISOLATE THE WORK AREA.
KEEP ACCESS TO MAILROOM DURING FLOOR PREP.
DEMO AND DISPOSE OF SPACE SAVER
SHELVING SYSTEM.
CORRECT FLOOR DISCREPANCIES ON THE
PHASE 1 WORK AREA AND PROVIDE EPOXY RESINOUS
FLOOR.
INSTALL VA PROVIDED STEEL RACKS. COORDINATE
LAYOUT WITH COR PRIOR TO INSTALLATION.
PHASE 2: NORTH HALF OF THE WAREHOUSE STORAGE AREA:
PLACED DUST MITIGATION TO ISOLATE THE WORK AREA.
CORRECT FLOOR DISCREPANCIES ON THE
PHASE 2 WORK AREA AND PROVIDE EPOXY RESINOUS
FLOOR.
INSTALL VA PROVIDED STEEL RACKS. COORDINATE
LAYOUT WITH COR PRIOR TO INSTALLATION.
PHASE 3: SHIPPING AND RECEIVING AREA OF THE WAREHOUSE:
PLACED DUST MITIGATION TO ISOLATE THE WORK AREA.
DEMO AND DISPOSE OF NORTH DOCK LEVELER.
DEMO AND DISPOSE OF SOUTH DOCK LEVELER.
INFILL VOID SPACE OF SOUTH DOCK
LEVELER LOCATION WITH CONCRETE FLUSH WITH
ADJACENT FLOOR.
REMOVE EXISTING WORKSTATION.
CORRECT FLOOR DISCREPANCIES ON THE
PHASE 3 WORK AREA AND PROVIDE EPOXY RESINOUS
FLOOR.
DEMO AND REMOVE NORTH AND SOUTH
ROLL UP DOORS AND TRACKS.
INSTALL NEW NORTH DOCK LEVELER.
INSTALL NEW AUTOMATION DOCK ROLL UP DOORS.
INSTALL NEW DOCK SEALS.
INSTALL NEW WORKSTATION.
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Text Box A-001
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Text Box
BID REVIEW
VHACHYKellyB Rectangle
VHACHYKellyB Text Box
WAREHOUSE SHELVING & FLOOR REPAIRS
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Text Box
BJK
VHACHYKellyB Text Box
BJK
VHACHYKellyB Text Box 442-23-006
VHACHYKellyB Rectangle
VHACHYKellyB Text Box 08/21/23
VHACHYKellyB Rectangle
VHACHYKellyB Text Box
SHELVING FLOORING LAYOUT
VHACHYKellyB Line
VHACHYKellyB Rectangle
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Rectangle
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Rectangle
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Rectangle
VHACHYKellyB Line
VHACHYKellyB Line
VHACHYKellyB Callout
ANTICIPATED RACK LAYOUT FOR REFERENCE
VHACHYKellyB Callout
SPACE SAVER TO BE REMOVED AND DISPOSED OF
VHACHYKellyB Rectangle
VHACHYKellyB Callout AREA TO REMAIN OPEN FOR ACCESS TO AND FROM MAIL ROOM. COORDINATE FINAL FLOOR FINISH DURING CLOSE OF BUILDING HOURS.
VHACHYKellyB Text Box PLAN AND NOTES ARE PROVIDED FOR CLARITY. REFER TO SOW AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
VHACHYKellyB
SURFACE PANELBOARD
VHACHYKellyB Callout
ELECTRICAL PANEL '12A'
| Sheets and Views |
| ARCH-COVER |
| ARCH-B4-L |
| ARCH-B4-1 |
| ARCH-B4-2 |
| ARCH-B5-L |
| ARCH-5-1 |
| ARCH-6-L |
| ARCH-6-1 |
| ARCH-7-L |
| ARCH-7-1 |
| ARCH-7-2 |
| ARCH-8-L |
| ARCH-8-1 |
| ARCH-11-1 |
| ARCH-11-2 |
| ARCH-12-L |
| ARCH-12-1 |
| ARCH-13-L |
| ARCH-13-1 |
| ARCH-13-M |
| ARCH-19-1 |
| ARCH-23-1 |
| ARCH-23A-1 |
| ARCH-31-1 |
| ARCH-41-1 |
| ARCH-42-1 |
File details come from the government source that posted it. Updated .