Summary of Bid Documents for Building 143 Lobby Renovation
This is a comprehensive set of 100% Construction Documents (Bid Documents) for the renovation of Building 143 basement lobby and corridor spaces at Salem VA Medical Center, with a total project scope of approximately 17,500 square feet. The project (No. 658-24-104, Solicitation No. 36C24626B0027) is being solicited by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 6. The renovation includes demolition and reconstruction of lobby areas (CB-5, CB-11), corridors (CB-15, CB-45, CG-25), restrooms, a café space (BA-102), consultation rooms, and waiting areas, with work sequenced across four phased construction periods totaling approximately 365 days. All demolition and construction activities must occur during off-hours and weekends, with each work segment cleaned and reopened by 7:30 AM to maintain 24/7 hospital operations. The project incorporates strict Infection Control Risk Assessment (ICRA) requirements classified as Class III precautions for Type D major demolition and construction activities in low-risk areas, including temporary barriers, negative air pressure systems with HEPA filtration, dust containment mats, and manometer pressure monitoring.
The architectural and systems design includes new terrazzo epoxy flooring in three patterns, porcelain tile in restrooms, new gypsum board partitions with fire-rated assemblies, suspended acoustical ceiling systems, new finishes (paint, wall tile, vinyl wall protection), expanded restroom facilities with ceiling-hung toilet partitions and grab bars compliant with ADA standards, new casework with solid surface countertops, and new interior lighting with LED fixtures. The project incorporates fire protection sprinkler system modifications (served by existing Standpipe #12 in Zone 6-8), plumbing fixture relocations and new installations (water closets, lavatories, drinking fountains, sinks with thermostatic mixing valves), mechanical system modifications with new diffusers and ductwork connections, and electrical work including new branch circuits, receptacles, lighting controls, and connections for equipment such as automated plumbing sensors and door motors. All work must comply with applicable codes including the 2024 editions of the IBC, IPC, NEC, NFPA standards (101 Life Safety Code, 13 Sprinkler Systems, 14 Standpipe Systems, and 72 Fire Alarm Code), VA Design Manuals, and ADA/ABAAS accessibility standards. Specific deduct alternates are identified for café renovation scope and vinyl wall protection options, and the contractor must coordinate extensively with the facility's infection control, fire safety, and operations teams throughout construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FAR 52.222-90.pdf | ||
| S06 36C24626B0027 0002.pdf | ||
| S05 658-24-104 Mob Area sheets A101. A111. A112.pdf | ||
| S05 ICRA Requirements _ Renovate Main Lobby.pdf | ||
| S05 658-24-104 Questions and Answer_ Renovate Main Lobby.pdf | ||
| S06 36C24626B0027 0001.pdf | ||
| S04 Site Visit 4-17-2026_ Main Lobby.pdf | ||
| S02 36C24626B0027 Renovate Main Lobby.pdf | ||
| 36C24626B0027.docx | DOCX document | |
| VAAR 852.204-70_PIV of Contractor Personnel.pdf | ||
| S02 Salem Lobby Renovation - Bid Documents - Specifications.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING WALL
SECTION
ELEVATION
INTERIOR
ELEVATION
DOORS
ROOM NUMBER
PLAN & SECTION
DETAIL REFERENCE
LOCATION ON DRAWING
SHEET
SHEET DETAIL IS
LOCATED REFERS TO NUMBER ON DOOR
SCHEDULE, SEE SHEET A601
REFERS TO NUMBER ON
FLOOR PLAN
LOCATION ON
DRAWING SHEET
ARROW INDICATES DIRECTION OF ELEVATION
SHEET LOCATION WHERE ELEVATION IS
LOCATED
Room name
A101
SIM
NUMBER INDICATES ELEVATION
ON SHEET
LOCATION ON
DRAWING SHEET
AA-123D
A101
A101
PARTITION
TYPES
REFERS TO INTERIOR PARTITIONS,
SEE SHEET G008
REVISION
REVISIONS ARE SHOWN WITHIN
"CLOUDED" AREA REVISION
NUMBER & DATE WILL APPEAR IN
TITLE BLOCK SPACE SO LABELED
SHEET LOCATION WHERE
ELEVATION IS LOCATED
A101
DEMOLITION NOTE REFERS TO DEMOLITION
NOTES ON SHEET SPECIFIEDX
REFERS TO EXISTING GRID
LINES IN PROJECT
REFERS TO NEW GRID LINES
EXISTING GRID LINE
NEW GRID LINE
SCOPE OF WORK
N
TRUE
NORTH
DIVISION NAME
CONCUR
SUBMISSION APPROVAL LOG:
DO NOT CONCUR
DIVISION NAME
CONCUR DO NOT CONCUR
DIVISION NAME
CONCUR DO NOT CONCUR
DIVISION NAME
CONCUR DO NOT CONCUR
DIVISION NAME
CONCUR DO NOT CONCUR
DIVISION NAME
CONCUR DO NOT CONCUR
DIVISION NAME
CONCUR DO NOT CONCUR
DATE
DATE
DATE
DATE
DATE
DATE
DATE
SITE MAP SYMBOLS
IMAGE: GOOGLE EARTH
Drawing File Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
JCRD
Au to de sk
D oc s:
//2
V A
Sa le m L ob by
/2
V
A Sa le m
L ob by .rv t 2/
4/
:5 3:
P
M
G001
COVER SHEET BUILDING 143 LOBBY
RENOVATION
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD, SALEM, VA 24153-6406
09 JANUARY 2026
100% CONSTRUCTION
DOCUMENTS
BUILDING 143 LOBBY RENOVATION
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD, SALEM, VA 24153-6406
658-24-104
SHEET 1 OF 59
DRAWING LIST
SHEET # SHEET TITLE
GENERAL
G001 COVER SHEET
G002 INTERIM LIFE SAFETY MEASURES, NOTES, & ABBREVIATIONS
G003 INFECTION CONTROL RISK ASSESSMENT
G004 OVERALL PHASING AND STAGING
G005 PHASE 1 & 2
G006 PHASE 3 & 4
G007 INFECTION CONTROL DETAILS
G008 PARTITION TYPES & SECTION DETAILS
STRUCTURAL
S-001 GENERAL NOTES AND ABBREVIATIONS
SS101 STRUCTURAL PLANS AND DETAILS
ARCHITECTURAL
AD101 BASEMENT LOBBY DEMOLITION PLAN
AD102 BASEMENT CORRIDORS DEMOLITION PLAN
AD111 BASEMENT DEMOLITION RCP
AD112 BASEMENT CORRIDORS DEMOLITION RCP
A101 BASEMENT PLAN - LOBBY
A102 BASEMENT PLAN - CORRIDORS
A111 BASEMENT RCP - LOBBY
A112 BASEMENT RCP - CORRIDORS
A131 CAFE & RESTROOMS ENLARGED PLANS & TOILET ACCESSORIES
A301 CONCOURSE/ CAFE ELEVATIONS & 3D VIEW
A401 INTERIOR ELEVATIONS
A501 CASEWORK / HANDRAIL/ WALL PROTECTION DETAILS
A502 EXPANSION JOINT DETAILS
A508 SEISMIC RCP DETAILS
A601 FINISH & DOOR LEGEND, SCHEDULE, NOTES & DETAILS
A602 BASEMENT FINISH PLAN - LOBBY & FINISH BOARD
A603 BASEMENT FINISH PLAN - CORRIDORS
A604 BASEMENT EQUIPMENT PLAN
A801 3D RENDERINGS
FIRE PROTECTION
FP001 FIRE PROTECTION LEGENDS & SYMBOLS
FP100 FIRE PROTECTION - SPRINKLER ZONES - EXISTING
FX101 FLOOR PLAN - FIRE PROTECTION - DEMOLITION - LOBBY
FX102 FLOOR PLAN - FIRE PROTECTION - DEMOLITION - CORRIDORS
FP101 FLOOR PLAN - FIRE PROTECTION HAZARD CLASS. - NEW- LOBBY
FP102 FLOOR PLAN - FIRE PROTECTION - HAZARD CLASS. - NEW - CORRIDORS
FP501 FIRE PROTECTION DETAILS
PLUMBING
P-001 PLUMBING NOTES, LEGEND, & SYMBOLS
P-101 BASEMENT FLOOR PLAN - PLUMBING - NEW WORK
P-401 ENLARGED FLOOR PLAN NORTH - PLUMBING
P-402 ENLARGED FLOOR PLANS NORTHEAST - PLUMBING
P-403 ENLARGED FLOOR PLANS SOUTH - PLUMBING
P-404 ENLARGED FLOOR PLANS CAFE - PLUMBING
P-501 PLUMBING SCHEDULES AND DETAILS
MECHANICAL
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
MD101 FLOOR PLAN - MECHANICAL - DEMOLITION - LOBBY
MD102 FLOOR PLAN - MECHANICAL - DEMOLITION - CORRIDORS
MH101 FLOOR PLAN - MECHANICAL - NEW WORK - LOBBY
MH102 FLOOR PLAN - MECHANICAL - NEW WORK - CORRIDORS
M-501 MECHANICAL SCHEDULES AND DETAILS
ELECTRICAL
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTES
ED101 FLOOR PLAN - LIGHTING - DEMOLITION
ED102 FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMOLITION
EL101 FLOOR PLAN - LIGHTING - NEW WORK
EP101 FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAM
E-801 ELECTRICAL SCHEDULES
E-802 ELECTRICAL SCHEDULES
Grand total: 59
Revisions: Date:
EXISTING EXIT SIGN
LIFESAFETY LEGEND:
SMOKE BARRIER
2 HOUR RATED FIRE PARTITION
EXISTING EXIT ACCESS TRAVEL DISTANCE
EXISTING FIRE EXTINGUISHER CABINETEFEC
EXISTING COMMON ACCESS TRAVEL DISTANCE
HANDICAP ACCESSIBILTY AT
BATHROOMS. REFLECTING
67" DIAMETER CLEARANCE
EXISTING DOOR RATING
EX.
MIN
FURNITURE PLACEMENT PROVIDED/
PLACED BY THE VA
NOT IN SCOPE OF WORK
ABBREVIATIONS:
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
ABV ABOVE
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADH ADHESIVE
ADJ ADJACENT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECT
ASB ASBESTOS
ASPH ASPHALT
ASSN ASSOCIATION
AUTO AUTOMATIC
AUX AUXILIARY
BAT BATTEN
BD BOARD
BEV BEVEL
BKG BACKING
BLDG BUILDING
BOT BOTTOM
BTWN BETWEEN
C TO C CENTER TO CENTER
CAB CABINET
CONC CONCRETE
CIR CIRCLE
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
COL COLUMN
CONC FLR CONCRETE FLOOR
CONSTR CONSTRUCTION
CONT CONTINUE
COORD COORDINATE
CSWK CASEWORK
CT CERAMIC TILE
CTRL CONTROL
DAT DATUM
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DTL DETAIL
DIFF DIFFERENCE
DIM DIMENSION
DIR DIRECTION
DR DOOR, OR DRAIN
DR OPNG DOOR OPENING
E.J. EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ESP ESPECIALLY
EXIST EXISTING
FA FIRE ALARM
FAS FASCIA
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FLR FINISH FLOOR
FIXT FIXTURE
FLR FLOOR
FP FIRE PROTECTION OR FIREPROOF
FRT FIRE RETARDANT TREATED
FRZ FREEZER
FT FEET OR FOOT
FURN FURNISH OR FURNITURE
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL OR GENERATOR
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GT GROUT
GYP GYPSUM
GYP BD GYPSUM BOARD
HB HOSE BIBB
HC HOLLOW CORE
HDWD HARDWOOD
HM HOLLOW METAL
HT HEIGHT
HVAC HEATING, VENTILATING,
AND AIR CONDITIONING
ID IDENTIFICATION
ILLUM ILLUMINATION
INCL INCLUDED
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
JAN JANITOR
J-BOX JUNCTION BOX
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LDR LEADER
LED LIGHT EMITTING DIODE
LT LIGHT
LVD LOUVERED
LVR LOUVER
LVT LUXURY VINYL TILE
LYR LAYER
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMO MEMORANDUM
MEZZ MEZZANINE
MID MIDDLE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MLWK MILLWORK
MO MASONRY OPENING
MTL METAL
MULL MULLION
NA NOT APPLICABLE
NAT NATURAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NUM NUMERAL
OC ON CENTER
OCC OCCUPY
OFF OFFICE
OPNG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY
AND HEALTH ADMINSTRATION
OZ OUNCE
PART PARTIAL
PAT PATTERN
PEN PENETRATE
PERF PERFORATED
PERP PERPENDICULAR
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PRB PROFILE BASE
PRCST PRECAST
PREFAB PREFABRICATE
PRELIM PRELIMINARY
PREP PREPARATION
PREV PREVIOUS
PROP PROPERTY
PTD PAINTED
PVC POLYVINYL CHLORIDE (PLASTIC)
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QT QUARRY TILE
QTB QUARRY TILE BASE
QTR QUARTER
QTY QUANTITY
R RADIUS OR RISER
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REINF REINFORCE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RESIL RESILIENT
RET RETURN
REV REVISION
RF RUBBER FLOORING
RM ROOM
RND ROUND
RO ROUGH OPENING
SALV SALVAGE
SBSTR SUBSTRATE
SCHED SCHEDULE
SCHEM SCHEMATIC
SECT SECTION
SEP SEPARATE
SF SQUARE FOOT (FEET)
SLNT SEALANT
SMK SMOKE
SPEC SPECIFICATION
SPKLR SPRINKLER
SPLY SUPPLY
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SURF SURFACE
SUSP SUSPEND
SVT SOLID VINYL FLOOR TILE
SYS SYSTEM
T&G TONGUE AND GROOVE
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
THK THICKNESS
THRU THROUGH
TMPD TEMPERED
TO TOP OF ___
TRANS TRANSOM
TRTD TREATED
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
UV ULTRAVIOLET
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VOL VOLUME
W/ WITH
W/O WITHOUT
WD WOOD
WSCT WAINSCOT
WSF WELDED SEAM SHEET FLOORING
WT WEIGHT
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
1.
1.
1.
2.
a.
1.
2.
A. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING /
RECONSTRUCTION
THE DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST
EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL
PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION OR
IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW
STRUCTURE.
NFPA 101 LIFE SAFETY CODE, 2024 EDITION
NFPA NATIONAL FIRE CODES (WITH THE EXCEPTION OF NFPA
5000 AND NFPA 900)
NATIONAL ELECTRIC CODE (NEC)
INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
ENERGY POLICY ACT (EPAct)
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS,
VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
VA MENTAL HEALTH DESIGN GUIDE
INTERNATIONAL BUILDING CODE (IBC) - ONLY WHEN
SPECIFICALLY REFERENCE IN VA DESIGN DOCUMENTS
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS
PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL (PSDM)
B. THE CONSTRUCTION CLASSIFICATION IS TYPE II (222). THE MINIMUM FIRE
RATING FOR ALL LOAD BEARING STRUCTURAL ELEMENTS IS 2 HOURS. IF
DURING CONSTRUCTION, ANY DAMAGE TO EXISTING FIREPROOFING IS
OBSERVED OR IF DISCOVERED THAT ANY FIRE PROTECTION IS MISSING, THE
CONTRACTOR SHALL REPAIR TO MAINTAIN FULL PROTECTION.
C. RENOVATION TO EXISTING CORRIDORS IN BUILDING 143. NO CHANGE TO
THE CORRIDOR WALL CONFIGURATIONS, EGRESS OR EXISTING:
NFPA 101 REVIEW
A. CHAPTER 39 EXISTING BUSINESS OCCUPANCIES
(39.1.1.1) THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO
EXISTING BUILDINGS OR PORTIONS THEREOF USED AS BUSINESS
OCCUPANCIES.
B. MEANS OF EGRESS - CHAPTER 39 AND CHAPTER 7
THERE IS NO CHANGE TO THE EXISTING CORRIDOR PLAN
CONFIGURATION AND EXISTING.
C. FIRE PROTECTION EQUIPMENT - CHAPTER 39 AND CHAPTER 9
THE EXISTING CORRIDORS ARE FULLY PROTECTED WITH AN
AUTOMATIC SPRINKLER SYSTEM.
(39.3.5) EXTINGUISHMENT REQUIREMENTS. PORTABLE FIRE
EXTINGUISHERS SHALL BE PROVIDED IN EVERY BUSINESS
OCCUPANCY IN ACCORDANCE WITH SECTION 9.9.
(9.9) WHERE REQUIRED BY ANOTHER SECTION OF THIS CODE,
PORTABLE FIRE EXTINGUISHERS SHALL BE SELECTED,
INSTALLED, INSPECTED, AND MAINTAINED IN ACCORDANCE
WITH NFPA 10, STANDARD FOR PORTABLE FIRE
EXTINGUISHERS.
D. INTERIOR FINISHES - CHAPTER 39 AND SECTION 10.2
(39.3.3.2.1) INTERIOR WALL AND CEILING FINISH MATERIALS
COMPLYING WITH SECTION 10.2 SHALL BE CLASS A OR CLASS B IN
EXITS AND IN EXIT ACCESS CORRIDORS.
(39.3.3.2.2) INTERIOR WALL AND CEILING FINISHES SHALL BE CLASS A,
CLASS B, OR CLASS C IN AREAS OTHER THAN THOSE SPECIFIED IN
39.3.3.2.1..
E. NO DEAD-END CORRIDORS. NOT CHANGE TO EXISTING LAYOUT.
CODE NOTES:
KEY PLAN
PROJECT AREA
N
PROJECT
NORTH
TRUE
NORTH
EXISTING EXIT ACCESS
TRAVEL DISTANCE = 271' 4" WOMEN'S TOILET
BA-100
WOMEN'S TOILET
BB-101
MEN'S TOILET
BA-101
MEN'S TOILET
BB-121
FAMILY TOILET
BB-153
CONSULT
BF-103
CONSULT
BF-102
CONSULT
BF-101
WAITING
CB-10
WAITING
CB-9
LOBBY
CB-11
WAITING
CB-12
WAITING
CB-7
VIRTUAL HEALTH
CB-14
CONCOURSE
CB-15
INFO
CB-4
ENTRANCE
CB-2
VESTIBULE
CB-1
CORRIDOR
CG-25
RECEPTION
CB-8A
RECEPTION
CB-13A
CORRIDOR
CB-15
CAFE
BA-102
LOBBY
CB-5
CORRIDOR
CB-45
EXISTING COMMON ACCESS
TRAVEL DISTANCE = 147' 9"
EFEC
EF
EC
EFEC
EX. FEC
EFEC
PRESCR REC
BF-104
EX.
MIN
EX.
MIN
EX.
MIN
EX.
MIN
EX.
MIN
EX
MI
N
EX
EX
EX. 90 MIN
EX
EX
EXISTING
DIRTT WALL
EX.
MIN
EX
EX
. 20
EX
. 20
EX.
MIN
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RD JC
Drawing File Number
Au to de sk
D oc s:
//2
V A
Sa le m L ob by
/2
V
A Sa le m
L ob by .rv t 2/
4/
:5 3:
P
M
INTERIM LIFE SAFETY MEASURES,
NOTES, & ABBREVIATIONS
BUILDING 143 LOBBY
RENOVATION
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD, SALEM, VA 24153-6406
09 JANUARY 2026
100% CONSTRUCTION
DOCUMENTS
G002
658-24-104
SHEET 2 OF 59
1/16" = 1'-0"
BASEMENT LIFE SAFETY PLAN
Revisions: Date:
EX
STAIR
UP
A.
B.
C.
D.
E.
F.
THE PURPOSE OF INFECTION CONTROL PROCEDURES IS TO MINIMIZE THE POTENTIAL FOR THE SPREAD OF INFECTIONS DUE TO DEGRADED AIR QUALITY, ENVIRONMENTAL CONTAMINATION, OR CONTAMINATION OF WATER. IT IS THE POLICY OF THIS MEDICAL CENTER THAT A SYSTEMATIC APPROACH BASED ON ASSESSMENT AND PLANNING WILL EFFECTIVELY MANAGE THE ISSUE OF TRANSMISSION OF INFECTIOUS DISEASES AND THE AGGRAVATION OF ALLERGIES. THE OVERALL APPROACH RELIES ON PRE-CONSTRUCTION ASSESSMENT, MANAGEMENT OF HVAC SYSTEMS, AND AGGRESSIVE USE OF A VARIETY OF BARRIERS. CONTRACTOR IS TO WORK CLOSELY WITH THE VA FACILITY MANAGEMENT SERVICE CENTER, THE INFECTION CONTROL PROGRAM STAFF AND THE SAFETY AND OCCUPATION HEALTH MANAGER TO HAVE IN PLACE A MONITORING PROGRAM
TO ASSURE RIGOROUS IMPLEMENTATION OF THE REQUIRED MEASURES, REFER TO PROJECT
SPECIFICATIONS.
THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL
INFECTION CONTROL REQUIREMENTS WITH THE DEMOLITION AND NEW CONSTRUCTION. THE
CONTRACTOR SHALL REPORT ALL DISCOVERIES TO THE OWNERS' REPRESENTATIVE FOR RESOLUTION
PRIOR TO BEGINNING.
CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES. CONSTRUCTION BARRIER DOOR(S)
MUST BE SELF-CLOSING. PROVIDE DUST CONTROL AND CONTAINMENT STICKY MATS ON ALL ACCESS
DOORS INTO CONSTRUCTION AREA. ANTE-ROOM REQUIRED AT CONSTRUCTION ENTRY. PROVIDE
MANOMETER MONITORS FOR ALL CONSTRUCTION BARRIERS.
CONTRACTOR TO DISPOSE OF MATERIALS BEFORE 8:00 AND OR AFTER 4:00 PM UNLESS ARRANGED WITH THE VA TO DISPOSE OF DURING NORMAL HOURS. USE ROUTE AGREED UPON BY ICRA TEAM AND
COTR FOR TRANSPORT OF TRANSPORT CONTAINERS THROUGH THE FACILITY. CONTRACTORS CAN
ONLY DEVIATE TO NORMAL HOURS WITH THE APPROVAL OF THE INFECTION CONTROL NURSE AND COR DUE TO PARTICULAR CIRCUMSTANCES THAT MAY OBSTRUCT PROGRESS. A CLEAR PLAN WILL
HAVE TO BE SUBMITTED AND PRECAUTIONARY INFECTION CONTROL MEASURES IMPLEMENTED.
CONTRACTOR TO COVER CARTS AND WEAR BOOTIES WHEN DISPOSING MATERIALS.
CONTRACTOR TO CHANGE MATS MULTIPLE TIMES A DAY AS NEEDED AND MOP FLOORS BEHIND THEM
MULTIPLE TIMES A DAY.
CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN THE WORK SITE UTILIZING
WINDOW EXHAUST FANS STRATEGICALLY LOCATED OR PROVIDED NEGATIVE PRESSURE AIR HEPA
UNITS AND EXHAUST TO EXTERIOR OF THE BUILDING. CONTRACTOR TO INCLUDE MONITORING
MANOMETER AT ANTEROOM SO THE NEGATIVE PRESSURE CAN BE INSPECTED.
INFECTION CONTROL NOTES:
INFECTION CONTROL RISK ASSESSMENT
STEP ONE: Using the following table, identify the Type of Construction Project Activity (Type A-D)
TYPE A
Inspection and Non-Invasive Activities Includes, but is not limited to:
removal of ceiling tiles for visual inspection only e.g., limited to 1 tile per 50 square feet with limited exposure time.
Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
Clean plumbing activity limited in nature.
Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation
TYPE B •
Small scale, short duration activities that create minimal dust and debris.
Includes, but is not limited to:
Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
Fan shutdown/startup.
Installation of electrical devices or new flooring that produces minimal dust and debris.
The removal of drywall where minimal dust and debris is created.
Controlled sanding activities (e.g., wet, or dry sanding) that produce minimal dust and debris.
TYPE C
Large-scale, longer duration activities that create a moderate amount of dust and debris.
Includes, but is not limited to:
Removal of preexisting floor covering, walls, casework, or other building components.
New drywall placement.
Renovation work in a single room.
Non-existing cable pathway or invasive electrical work above ceilings.
The removal of drywall where a moderate amount of dust and debris is created.
Dry sanding where a moderate amount of dust and debris is created.
Work creating significant vibration and/or noise.
Any activity that cannot be completed in a single work shift.
TYPE D •
Major demolition and construction activities Includes, but is not limited to:
Removal or replacement of building system component(s).
Removal/installation of drywall partitions.
Invasive large-scale new building construction.
Renovation work in two or more rooms.
STEP 1 - Activity Type: TYPE D
Minimum Required Infection Control Precautions by Class | Before and During Work Activity
CLASS I
1.
2.
3.
4.
Perform noninvasive work activity as to not block or interrupt patient care.
Perform noninvasive work activities in areas that are not directly occupied with patients.
Perform noninvasive work activity in a manner that does not create dust.
Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
1.
2.
3.
Perform only limited dust work and/or activities designed for basic facilities and engineering work.
Perform limited dust and invasive work following standing precautions procedures approved by the organization.
This Class of Precautions must never be used for construction or renovation activities.
CLASS II
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Provide active means to prevent airborne dust dispersion into the occupied areas.
Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
Remove or isolate the supply air diffusers to avoid positive pressurization of the space, If work area is contained, then it must be neutrally to negatively always pressurized.
Seal all doors with tape that will not leave residue.
Contain all trash and debris in the work area.
Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy. Adhesive mats must be changed routinely and when visibly soiled.
Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
CLASS III
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
Construct and complete critical barriers meeting NFPA 241 requirements including: Barriers must extend to the ceiling or, if ceiling tile is removed, to the deck above, and all penetrations through the barrier shall meet the appropriate fire rating requirements.
All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release.
Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
Remove or isolate return air diffusers to avoid dust entering the HVAC system.
Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
Install device on exterior of work containment to continually monitor negative pressurization. To assure proper pressure is continuously maintained, it is recommended that the device(s) have a visual pressure indicator.
Contain all trash and debris in the work area.
Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
Worker clothing must be clean and free of visible dust before leaving the work area. HEPA vacuuming of clothing or use of cover suits is acceptable.
Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy. Adhesive mats must be changed routinely and when visibly soiled.
Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
CLASS IV
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Construct and complete critical barriers meeting NFPA 241 requirements including: Barriers must extend to the ceiling, or if ceiling tile is removed, to the deck above, and all penetrations through the barrier shall meet the appropriate fire rating requirements.
All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release.
Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage.
Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
Personnel will be required to wear disposable coveralls at all times during Class V work activities. Disposable coveralls must be removed before leaving the anteroom.
Remove or isolate return air diffusers to avoid dust entering the HVAC system.
Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors.
Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows do not require HEPA-filtered air.
If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
Install device on exterior of work containment to continually monitor negative pressurization. To assure proper pressure is continuously maintained, it is recommended that the device(s) have a visual pressure indicator.
Contain all trash and debris in the work area.
Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy. Adhesive mats must be changed routinely and when visibly soiled.
Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
CLASS V
STEP TWO: Using the following table, identify the Patient Risk Groups that will be affected. If more than one risk group will be affected, select the higher risk group.
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
Non-patient care areas:
Outbuildings Office Areas, meeting Rooms Environmental Services Prosthetis Canteen Store Chapel Morgue Elevators Warehouse Police Boiler Plant Facilities Maintenance Shop
Respiratory Therpy Outpatient Clinics CBOS's Adult Day Care Psychiatry Echocardiography Physical Therapy
EEG
EKG
Occupational Health Animal Research Laboratories Dental Excluding Dental Operating Suites Canteen Food Areas Behavorial Health
Emergency Room Phlebotomy Research Laboratories, Laboratories (Patient) Pharmacy Post Anesthesia Care Unit Endoscopy Surgical Unit Medical Unit Community Living Center Pulmonary, Renal and Infectious Disease Clinic Sleep Lab Nuclear Mediciine (Building 27) Any Sterile Supply Room Radiology/MRI/CT Logistics Storage Laundry/Linen Areas
Dialysis Cardiac Cath Lab Steril Processing and Distribution Intensive Care Unit Oncology Radiation Therapy/Building 26 Operating Rooms (including Dental Operating Suite) VIR Suite Urology Procedure Room Ophthalmology Procedure Room Women's Health Procedure Room Stratton Inn Microbiology Lab Pharmacy (USP 797/800 Compounding Areas
STEP 2 - Patient Risk Group: LOW RISK
Match the Patient Risk Group (Low, Medium, High, Highest) from Step Two with the planned Construction Activity Project Type (A, B, C, D) from Step one using the table to find the Class of Precautions (I, II, III, IV or V) or level of infection control activities required.
TYPE A TYPE B TYPE C TYPE D
I II II III
I
I
II
III
III
III
IV
VIV
IV
V
V
LOW Risk Group
MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
Patient Risk Group
Construction Project Type
Infection control permit and approval will be required when Class of Precautions III (Type C) and all Class of Precautions IV or V are necessary.
Environmental conditions that could affect human health, such as sewage, mold, asbestos, gray water and black water will require Class of Precautions IV for LOW and MEDIUM Risk Groups and Class of Precautions V for HIGH and HIGHEST Risk Groups.
*Type C [Medium Risk Groups] and Type D [Low Risk Groups] work areas [Class III precautions] that cannot be sealed and completely isolated from occupied patient care spaces should be elevated to include negative air exhaust requirements as listed in Class IV Precautions.
STEP 3 - Class of Precautions: CLASS III
STEP FOUR: Assess potential risk to areas surrounding the project. Using Table 4, identify the surrounding areas that will be affected and the type of impact that will occur. If more than one risk group will be affected, select the higher risk group using Table 2 - Patient Risk Group.
SURROUNDING AREA ASSESSMENT
Unit Below: Unit Above: Unit Lateral: Unit Behind: Unit in Front:
Risk Group:
Contact:
Phone:
Risk Group:
Contact:
Phone:
Risk Group:
Contact:
Phone:
Risk Group:
Contact:
Phone:
Risk Group:
Contact:
Phone:
Additional Controls:
Noise Vibration Dust Control Ventilation Pressurization Vertical Shafts Elevator/Stairs
Noise Vibration Dust Control Ventilation Pressurization Vertical Shafts Elevator/Stairs
Noise Vibration Dust Control Ventilation Pressurization Vertical Shafts Elevator/Stairs
Noise Vibration Dust Control Ventilation Pressurization Vertical Shafts Elevator/Stairs
Noise Vibration Dust Control Ventilation Pressurization Vertical Shafts Elevator/Stairs
System Impacted:
Data Mechanical Med Gases Hot/Cold Water
System Impacted:
Data Mechanical Med Gases Hot/Cold Water
System Impacted:
Data Mechanical Med Gases Hot/Cold Water
System Impacted:
Data Mechanical Med Gases Hot/Cold Water
System Impacted:
Data Mechanical Med Gases Hot/Cold Water
Additional Controls: Additional Controls: Additional Controls: Additional Controls:
Noise & Vibration Mitigation Strategies
Use diamond drills instead of powder-actuated fastners.
Schedule noise-making periods with adjacent spaces.
Use beam clamps instead of shot.
Prefab where possible.
Use tim snips to cut metal studs instead of using a chop saw.
Install metal decking with vent tabs, then use cellar floor deck hangers.
Consider compression style fittings instead of soldering, brazing, or welding.
Wet core drill instead of dry core or percussion.
Instead of jackhammering concrete, use wet diamond saws.
Use HEPA vacuums instead of standard wet/dry vacuums.
Use mechanical joining system sprinkler fittings instead of threaded.
Where fumes are tolerated, use chemical adhesive remover (floor glue) instead of mechanical.
To remove flooring, consider abrasive blasting instead of using a floor scraper.
Use electronic sheers instead of reciprocating saw for ductwork cutting.
Install exterior man/material lifts.
Ventilation & Pressurization Mitigation Strategies
HEPA to exterior.
Install temporary ductwork.
Utilize temporary HVAC equipment.
Vacate the area.
Install temporary partitions.
Use carbon filtration odors.
Impact to Other Systems Mitigation Strategies Schedule outages.
Provide temporary systems.
Back-feed electrical or medical gases.
STEP THREE:
Minimum Required Infection Control Precautions | Upon Completion of Work Activity
CLASSE
S
I, II, & III
1.
2.
1.
2.
Cleaning:
Perform Clean work areas including all environmental surfaces, high horizontal surfaces, and flooring materials.
Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
Verify the HVAC systems meet original airflow and air exchange design specifications.
CLASSES
IV & V
1.
2.
1.
2.
A.
B.
C.
D.
E.
1.
2.
1.
2.
3.
Class III (Type C Activities only), IV, and V precautions require inspection and documentation for downgraded ICRA precautions. Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces, and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
Clean Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
Carefully remove screws and painter tape.
If dust will be generated during screw removal, use hand-held HEPA vacuum.
Drywall cutting is prohibited during removal process.
Clean all stud tracks with HEPA vacuum before removing outer hard barrier Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
The use of negative air must be designed to remove contaminates from the work area.
Negative air devices must always remain operational and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
Verify that HVAC systems are clean and operational.
Verify the HVAC systems meets original airflow and air exchange design specifications.
Attachment A: Infection Control Construction Permit Location of Construction:
Project Coordinator:
Constractor Performing Work:
Supervisor:
Permit Request Signature:
Permit Authorized Signature:
Project No:
Project Start Date:
Estimated Duration:
Permit Expiration Date:
Telephone:
Date:
Date:
YES NO CONSTRUCTION ACTIVITY INFECTION CONTROL RISK GROUPYES NO
GROUP 3: HIGH RISK
GROUP 2: MEDIUM RISK
GROUP 1: LOW RISKTYPE A: Inspection, non-invasive activity.
TYPE B: Small scale, short duration.
TYPE C: Activity generates moderate to high levels of dust.Requires consecutive work shifts.
GROUP 4: HIGHEST RISK
TYPE D: Major demolition and construction activities. Requires concesecutive work shifts.
Assigned CLASS CLASS I *See below for mandatory CLASS requirements
CLASS II CLASS III CLASS IV CLASS
V
CLASS I
2. Perform noninvasive work activities in areas that are not directly occupied with patients.
1. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activity in a manner that does not create dust.
4. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
5. Clean work areas including all environmental surfaces, high horizontal surfaces, and flooring materials.
6. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
7. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
8. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
2. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
3. This Class of Precautions must never be used for construction or renovation activities.
1. Provide active means to prevent airborne dust dispersion into the occupied areas.
CLASS II
**Implement all activities from CLASS I in addition to:
2. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
CLASS III
**Implement all activities from CLASS I & II in addition to:
3. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
4. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
5. If work area is contained, then it must be neutrally to negatively pressurized at all times.
6. Seal all doors with tape that will not leave residue.
7. Contain all trash and debris in the work area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy. Adhesive mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
11. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
12. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers: Carefully remove screws and painter tape, if dust will be generated during screw removal, use hand-held HEPA vacuum. Drywall cutting is prohibited during removal process. Clean all stud tracks with HEPA vacuum before removing outer hard barrier. Use a plastic barrier to enclose area if dust could be generated.
13. The use of negative air must be designed to remove contaminates from the work area.
14. Negative air devices must always remain operational and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
1. Construct and complete critical barriers meeting NFPA 241 requirements including: Barriers must extend to the ceiling or, if ceiling tile is removed, to the deck above, and all penetrations through the barrier shall meet the appropriate fire rating requirements.
2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
3. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
4. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
5. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
6. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
7. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
8. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
9. Install device on exterior of work containment to continually monitor negative pressurization. To assure proper pressure is continuously maintained, it is recommended that the device(s) have a visual pressure indicator.
10. Worker clothing must be clean and free of visible dust before leaving the work area. HEPA vacuuming of clothing or use of cover suits is acceptable.
11.Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
12. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
1. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
2. Personnel will be required to always wear disposable coveralls during Class V work activities. Disposable coveralls must be removed before leaving the anteroom.
CLASS IV
**Implement all activities from CLASS I, II, & III in addition to:
CLASS V
**Implement all activities from CLASS I, II, III, & IV in addition to:
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RD JC
Drawing File Number
Au to de sk
D oc s:
//2
V A
Sa le m L ob by
/2
V
A Sa le m
L ob by .rv t 2/
4/
:5 3:
P
M
INFECTION CONTROL RISK
ASSESSMENT
BUILDING 143 LOBBY
RENOVATION
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD, SALEM, VA 24153-6406
09 JANUARY 2026
100% CONSTRUCTION
DOCUMENTS
G003
658-24-104
SHEET 3 OF 59Revisions: Date:
KEY PLAN
PROJECT AREA
N
PROJECT
NORTH
TRUE
NORTH
THE PROJECT SCOPE OF WORD INCLUDES THE CONCOURSE AND CORRIDORS ON
THE BASEMENT IN BUILDING 143 DURING WHICH TIME THE HOSPITAL WILL REMAIN
OPERATIONAL 24/7. ALL DEMOLITION AND CONSTRUCTION ACTIVITY IS TO OCCUR
DURING OFF-HOURS AND WEEKENDS WHEN HOSPITAL OCCUPANCY IS AT ITS LOWEST
LEVELS. WHERE DEPARTMENT AREAS CANT BE VACATED AND CORRIDORS MUST
REMAIN OPEN, WORK SHALL BE BROKEN DOWN INTO SMALL SEGMENTS SUCH THAT
EACH WORK AREA CAN BE CLEANED BY THE NEXT MORNING AT 7:30AM AND OPENED
BACK UP TO VA USE. WORK AT ELEVATOR LOBBIES ON EACH FLOOR WILL REQUIRE
ADDITIONAL PHASING SUCH THAT AT LEAST ONE ELEVATOR CAN REMAIN
OPERATIONAL AND ACCESSIBLE DURING CONSTRUCTION. CONTRACTOR IS TO
FOLLOW ALL ICRA REQUIREMENTS AND WORK CLOSELY WITH THE VA COR AND VA
INFECTION CONTROL STAFF TO MAINTAIN A SAFE ENVIRONMENT. GC TO REVIEW AND
COORDINATE ALL ABATEMENT REQUIREMENTS INTO PROPOSED PHASING. REFER TO
VA-PROVIDED ABATEMENT DOCUMENTATION. IF DIFFERENT PHASES ARE
PERFORMED CONCURRENTLY, THEN THIS MUST BE COORDINATED WITH THE VA, AND
ACCESS TRAVEL AND REQUIRED CLEARANCES MUST BE MAINTAINED THORUGHOUT
THE ENTIRETY OF CONSTRUCTION. SEE SPEC 010000 GENERAL REQUIREMENTS FOR
FACILITY HOURS OF OPERATION.
PHASING PLANS SHOW SUGGESTED SEGMENTS OF WORK FOR EACH
AREA. INDIVIDUAL PHASES SHOWN MAY BE REQUIRE TO BE BROKEN DOWN INTO
SMALLER SEGMENTS AS PER GC STAFFING AND THE AMOUNT OF WORK THAT CAN BE
ACCOMPLISHED IN THE OFF-HOURS WITH THE NEED TO BE OPENED TO THE STAFF
AND PUBLIC DURING NORMAL BUSINESS DAYS. IN ADDITION TO TEMPORARY
BARRIERS, ACTIVE SPACES ARE TO BE PROTECTED AND MAINTAINED DURING
NORMAL HOSPITAL BUSINESS HOURS BY USING ZIP WALLS, CORRUGATED BOARD,
PLASTIC SHEETS, AND HEPA FILTER EXHAUST BOXES WITH PARTICULATE COUNT
MONITORING AS NECESSARY.
IN AREAS THAT CANNOT BE FULLY VACATED OR BLOCKED OFF, EGRESS ACCESS
MUST BE MAINTAINED AT ALL TIMES. WHERE NECESSARY, GC SHALL PROVIDE STAFF
TO ESCORT VA STAFF AND PATIENTS THROUGH AN ACTIVE CONSTRUCTION ZONE
DURING THE AFTER-HOUR WORK. 5' MINIMUM CLEARANCE IS REQUIRED FOR EGRESS
ACCESS THROUGHOUT.
PHASING NOTES
THE PURPOSE OF INFECTION CONTROL PROCEDURES IS TO MINIMIZE THE POTENTIAL
FOR THE SPREAD OF INFECTIONS DUE TO DEGRADED AIR QUALITY, ENVIRONMENTAL
CONTAMINATION, OR CONTAMINATION OF WATER. IT IS THE POLICY OF THE VA THAT
A SYSTEMATIC APPROACH BASED ON ASSESSMENT AND PLANNING WILL
EFFECTIVELY MANAGE THE ISSUE OF TRANSMISSION OF INFECTIOUS DISEASES AND
THE AGGRAVATION OF ALLERGIES DURING CONSTRUCTION. THE OVERALL
APPROACH RELIES ON PRE-CONSTRUCTION ASSESSMENT, MANAGEMENT OF HVAC
SYSTEMS, AND AGGRESSIVE USE OF A VARIETY OF BARRIERS. CONTRACTOR IS TO
WORK CLOSELY WITH THE VA FACILITY MANAGEMENT SERVICE CENTER, THE
INFECTION CONTROL PROGRAM STAFF AND THE SAFETY AND OCCUPATION HEALTH
MANAGER TO HAVE IN PLACE A MONITORING PROGRAM TO ASSURE RIGOROUS
IMPLEMENTATION OF THE REQUIRED MEASURES.
A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND
COORDINATE ALL INFECTION CONTROL REQUIREMENTS WITH THE DEMOLITION AND
NEW CONSTRUCTION. THE CONTRACTOR SHALL REPORT ALL DISCOVERIES TO THE
OWNER'S REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING.
B. CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES TO CONTROL
CONSTRUCTION DEBRIS. BARRIERS MAY CONSIST OF FIELD CONSTRUCTED HARD
WALL BARRIERS, MODULAR WALL SYSTEMS (STARC WALL OR SIMILAR), AND FIRE
RATED PLASTIC SHEETING WHERE AGREED TO BY THE VA INFECTION CONTROL
PROGRAM STAFF.CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-CLOSING.
PROVIDE DUST CONTROL AND CONTAINMENT STICKY MATS AN ALL ACCESS INTO
CONSTRUCTION AREA. ANTE-ROOM, WHERE REQUIRED, SHALL BE AT THE
CONSTRUCTION ENTRY.
C. CONTRACTOR TO DISPOSE OF MATERIALS PRIOR TO END OF WORK DAILY . USE
ROUTE AGREED UPON BY ICRA TEAM AND COTR FOR TRANSPORT OF TRANSPORT
CONTAINERS THROUGH THE FACILITY.
D. CONTRACTOR TO USE HARD COVER CARTS AND WEAR BOOTIES WHEN
DISPOSING OF MATERIALS.
E. CONTRACTOR TO CHANGE MATS AND MOP FLOORS BEHIND THEM MULTIPLE
TIMES A DAY, AS OFTEN AS NEEDED TO PREVENT TRACKING OF CONSTRUCTION
DUST AND DEBRIS .
F. CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN THE
WORK SITE UTILIZING WINDOW EXHAUST FANS STRATEGICALLY LOCATED OR
PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND EXHAUST TO EXTERIOR OF THE
BUILDING. WHERE REQUIRED, CONTRACTOR TO INCLUDE MONITORING MANOMETER
AT ANTEROOM SO THE NEGATIVE PRESSURE CAN BE INSPECTED.
G. MEASURES REQUIRED TO BE TAKEN FOR THE TYPE OF WORK (SEE CHART) WILL
VARY BY DEPARTMENT ADJACENCIES PER FLOOR THROUGHOUT THE HOSPITAL.
REFERENCE THE ICRA CLASS IV CHART AT RIGHT FOR THE MINIMUM REQUIREMENTS
TO BE FOLLOWED IN EACH AREA.
H. CONTRACTOR TO COORDNIATE ALL WORK WITH THE VA AND OTHER
CONTRACTORS PERFORMING WORK IN THE AREA.
I. ALL RATED WALL AND FLOOR PENETRATIONS SHALL BE SEALED IN ACCORDANCE
WITH FIRESTOPPING SPECIFICATIONS 078400.
J. AFTER THE COMPLETION OF A PHASE, THE GC IS TO COORDINATE WITH THE VA
FOR FINAL PUNCHLIST OF COMPLETION. THE FINAL PUNCHLIST WILL NEED TO BE
SIGNED PRIOR TO PROCEEDING WITH THE NEXT PHASE. ICRA OFFICIALS TO SIGN OFF
ON PHASING, LIFESAFETY PATH, CONSTRUCTION STORAGE AND CONTRUCTION
DUMPSTER.
FAMILY TOILET
BB-153
WAITING
CB-12
WAITING
CB-13
VIRTUAL HEALTH
CB-14
RECEPTION
CB-13A
MEN'S TOILET
BB-121
WOMEN'S TOILET
BB-101
CORRIDOR
CB-15
INFO
CB-4
LOBBY
CB-5
ENTRANCE
CB-2
VESTIBULE
CB-1
CORRIDOR
CG-25
WOMEN'S TOILET
BA-100
M
EN
'S T
O
IL
ET
BA
-1
CAFE
BA-102
WAITING
CB-7
WAITING
CB-8
RECEPTION
CB-8A
WAITING
CB-9
WAITING
CB-10
CONSULT
BF-102
CONSULT
BF-101
CONSULT
BF-103
CONCOURSE
CB-15LOBBY
CB-11
CORRIDOR
CB-45
EF
EC EFEC
EFEC
EFEC
PHASE 1A
PHASE 1B
PHASE 1C
PHASE 1D
PHASE 1E
PHASE 1F
PHASE 2A PHASE 2B
PHASE 2C
PHASE 2D
PHASE 2E
PHASE 2F
PHASE 2G
PHASE 2I
PHASE 2H
PHASE 3A
PHASE 3B
PHASE 3C
PHASE 3D
PHASE 3E
PHASE 3F
PHASE 3G
PHASE 3H
PHASE 3I
PHASE 3J
PHASE 3K
PHASE 3L
PHASE 4A
PHASE 4B
PHASE 4C
PHASE 4D
PHASE 4E
(POWER
WASH
ONLY)
EXISTING
DIRTT WALL
EXISTING EXIT ACCESS
TRAVEL DISTANCE = 271' 4"
EXISTING COMMON ACCESS
TRAVEL DISTANCE = 147' 9"
SCOPE OF WORK
RECOMMENDED
CONTRACTOR DUMPSTER
AND STORAGE AREA
TRUE
NORTH
N
PHASE AREA OF WORK
AREA OUTSIDE
CONSTRUCTION ZONE
1 HR TEMPORARY CONSTRUCTION
BARRIER. TYPE 10 / SEE SHEET G008
REMOVE EXISITING DEMOLITION AS
REQUIRED FOR INSTALLTION OF FULL
HEIGHT BARRIER
PHASE 1
PHASE 2
PHASE 3
PHASE 4
EXISTING 2 HR FIRE RATED
FIRE BARRIER
EXISTING SMOKE BARRIER
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RD JC
Drawing File Number
Au to de sk
D oc s:
//2
V A
Sa le m L ob by
/2
V
A Sa le m
L ob by .rv t 2/
4/
:5 3:
P
M
OVERALL PHASING AND STAGING BUILDING 143 LOBBY
RENOVATION
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD, SALEM, VA 24153-6406
09 JANUARY 2026
100% CONSTRUCTION
DOCUMENTS
G004
658-24-104
SHEET 4 OF 59
1" = 20'-0"
BASEMENT OVERALL PHASING PLAN
1/64" = 1'-0"
CONSTRUCTION STAGING
KEY PLAN
PROJECT AREA
N
PROJECT
NORTH
TRUE
NORTH
FAMILY TOILET
BB-153
WAITING
CB-12
WAITING
CB-13
VIRTUAL HEALTH
CB-14
RECEPTION
CB-13A
MEN'S TOILET
BB-121
WOMEN'S TOILET
BB-101
CORRIDOR
CB-15
INFO
CB-4
LOBBY
CB-5
ENTRANCE
CB-2
VESTIBULE
CB-1
CORRIDOR
CG-25
WOMEN'S TOILET
BA-100
MEN'S TOILET
BA-101
CAFE
BA-102
WAITING
CB-7
WAITING
CB-8
RECEPTION
CB-8A
WAITING
CB-9
WAITING
CB-10
CONSULT
BF-102
CONSULT
BF-101
CONSULT
BF-103
CONCOURSE
CB-15LOBBY
CB-11
CORRIDOR
CB-45
CL
EA
R 4'
MI
N
3' 6"
M
IN
8' MIN
EF
EC EFEC
EFEC
EFEC
PHASE 1A
PHASE 1B
PHASE 1C
PHASE 1D
PHASE 1E
PHASE 1F
1 1
EXISTING
DIRTT WALL
EXISTING EXIT ACCESS
TRAVEL DISTANCE = 271' 4"
EXISTING COMMON ACCESS
TRAVEL DISTANCE = 147' 9"
FAMILY TOILET
BB-153
WAITING
CB-12
WAITING
CB-13
VIRTUAL HEALTH
CB-14
RECEPTION
CB-13A
MEN'S TOILET
BB-121
WOMEN'S TOILET
BB-101
CORRIDOR
CB-15
INFO
CB-4
LOBBY
CB-5
ENTRANCE
CB-2
VESTIBULE
CB-1
CORRIDOR
CG-25
WOMEN'S TOILET
BA-100
MEN'S TOILET
BA-101
CAFE
BA-102
WAITING
CB-7
WAITING
CB-8
RECEPTION
CB-8A
WAITING
CB-9
WAITING
CB-10
CONSULT
BF-102
CONSULT
BF-101
CONSULT
BF-103
CONCOURSE
CB-15
LOBBY
CB-11
CORRIDOR
CB-45
5'
MI
N
4' MIN CLEAR
5'
MI
N
8' MIN CLEAR
' M
IN
C
LE
AR
7' M
IN CLE
AR
EF
EC EFEC
EFEC
EFEC
PHASE 2A PHASE 2B
PHASE 2C
PHASE 2D
PHASE 2E
PHASE 2F
PHASE 2G
PHASE 2I
PHASE 2H
STAIR 6
1 1
1 1
1 1
EXISTING
DIRTT WALL
EXISTING EXIT ACCESS
TRAVEL DISTANCE = 271' 4"
EXISTING COMMON ACCESS
TRAVEL DISTANCE = 147' 9"
A.
B.
C.
D.
E.
F.
THE PURPOSE OF INFECTION CONTROL PROCEDURES IS TO MINIMIZE THE POTENTIAL FOR THE SPREAD OF INFECTIONS DUE TO DEGRADED AIR QUALITY, ENVIRONMENTAL CONTAMINATION, OR CONTAMINATION OF WATER. IT IS THE POLICY OF THIS MEDICAL CENTER THAT A SYSTEMATIC APPROACH BASED ON ASSESSMENT AND PLANNING WILL EFFECTIVELY MANAGE THE ISSUE OF TRANSMISSION OF INFECTIOUS DISEASES AND THE AGGRAVATION OF ALLERGIES. THE OVERALL APPROACH RELIES ON PRE-CONSTRUCTION ASSESSMENT, MANAGEMENT OF HVAC SYSTEMS, AND AGGRESSIVE USE OF A VARIETY OF BARRIERS. CONTRACTOR IS TO WORK CLOSELY WITH THE VA FACILITY MANAGEMENT SERVICE CENTER, THE INFECTION CONTROL PROGRAM STAFF AND THE SAFETY AND OCCUPATION HEALTH MANAGER TO HAVE IN PLACE A MONITORING PROGRAM
TO ASSURE RIGOROUS IMPLEMENTATION OF THE REQUIRED MEASURES, REFER TO PROJECT
SPECIFICATIONS.
THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL
INFECTION CONTROL REQUIREMENTS WITH THE DEMOLITION AND NEW CONSTRUCTION. THE
CONTRACTOR SHALL REPORT ALL DISCOVERIES TO THE OWNERS' REPRESENTATIVE FOR RESOLUTION
PRIOR TO BEGINNING.
CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES. CONSTRUCTION BARRIER DOOR(S)
MUST BE SELF-CLOSING. PROVIDE DUST CONTROL AND CONTAINMENT STICKY MATS ON ALL ACCESS
DOORS INTO CONSTRUCTION AREA.