S05 658-24-104 Mob Area sheets A101. A111. A112.pdf

PDF 5 MB Posted

Attached to
Z1DA--Renovate Main Lobby Federal contract opportunity
Solicitation number
36C24626B0027
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

Summary of Construction Documents - V.A. Medical Center, Salem, VA

This document is a set of architectural construction drawings and specifications for renovation work at the V.A. Medical Center in Salem, VA, specifically the Basement Lobby and Corridor areas. The project includes comprehensive updates to finishes, partitions, ceilings, and building systems. Key construction work involves new terrazzo and ceramic tile flooring, wall painting and vinyl protection, new gypsum board partitions, acoustic ceiling tile installation and grid work, expansion joint sealants, plumbing fixtures including a single water fountain with bottle filler, and coordination with existing DIRTT wall systems. New ceiling-hung toilet partitions, corner guards, handrails, and wall tile installations are also specified. The contractor is responsible for protecting existing construction from damage, coordinating equipment and furniture salvage with the VA upon renovation completion, and verifying all existing dimensions and clearances before proceeding.

The drawings establish specific construction notes and legends for existing versus new construction elements, fire barriers, smoke barriers, and mechanical systems. Notable requirements include code-compliant wood blocking or sheet metal plates for all wall-mounted accessories, matching partition types to existing adjoining walls for flush transitions, and comprehensive coordination with mechanical, electrical, and plumbing systems. The contractor must immediately notify the architect of any discrepancies between existing conditions and contract documents. A detailed phasing sequence is referenced for overall project coordination. The work is divided into basement areas including the lobby and multiple corridors (CB-45, CG-16, CG-28), with construction occurring in phases to maintain facility operations and coordinate with VA stakeholders.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHASAMSwitzW Image

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

DIMENSIONS TO FACE OF STUD UNLESS NOTED OTHERWISE.

ALL PARTITIONS ARE TYPE 2B UNLESS NOTED OTHERWISE.

SEE ENLARGED PLANS OF TOILETS FOR PARTITION TYPES IN THE AREAS

REFERENCED.

DOORS REFERENCED BY A DOOR NUMBER INDICATE A NEW DOOR OR

SOME MODIFICATION TO AN EXISTING DOOR. SEE DOOR SCHEDULE.

DOORS WITHOUT DOOR NUMBER REFERENCES ARE EXISTING DOORS TO

REMAIN, WITH NO WORK OR MODIFICATION REQUIRED.

PROVIDE CODE COMPLIANT WOOD BLOCKING OR SHEET METAL PLATES IN

HOLLOW WALL SYSTEMS FOR ATTACHMENT OF ANY WALL MOUNTED

ACCESSORIES INCLUDING, BUT NOT LIMITED TO, SHELVING, CASEWORK,

TOILET ACCESSORIES, TOILET PARTITIONS, LIGHT FIXTURES, BENCHES,

COAT RODS, AUDIO VISUAL EQUIPMENT, MARKER BOARDS, MIRRORS, ETC.

WALL ACCESSORIES SUCH AS FIRE EXTINGUISHER CABINETS AND PAPER

TOWEL DISPENSERS THAT REQUIRE A SEMI-RECESSED INSTALLATION

SHALL NOT REDUCE THE FIRE RATING OF THE WALL. IF A DETAIL IS NOT

PROVIDED WITHIN THE CONTRACT DOCUMENTS, THE CONTRACTOR

SHALL CONSULT THE ARCHITECT FOR PROPER DETAILS PRIOR TO

INSTALLING THE ACCESSORY.

PARTITION TYPES AT INFILL WALLS SHALL MATCH ADJOINING EXISTING

WALLS PROVIDING FOR A FLUSH, SMOOTH TRANSITION IN THE FINISHED

SURFACE. MATCH BASE IN AREAS WHERE BASE IS OTHERWISE

INDICATED TO REMAIN, RUNNING FROM AN INTERIOR CORNER OR OTHER

DEFINED EDGE.

PATCH AND REPAIR ALL GYPSUM BOARD SURFACES WHERE DEMOLITION

OF ADJOINING OR INTERSECTING PARTITIONS HAS RESULTED IN LESS

THAN A FINISHED CONDITION. PATCHES SHALL BE FLUSH AND SMOOTH.

EXISTING ROOMS THAT ARE NOT INDICATED TO BE AFFECTED BY THE

WORK ARE TO BE PROTECTED FROM DAMAGE AND/OR PAINT

DEGRADATION. SHOULD THE GENERAL CONTRACTOR AFFECT THE

CONDITION OR FINISH OF THESE ROOMS, THE SURFACE OR SPACE SHALL

BE RESTORED TO ORIGINAL CONDITION.

REFERENCE DEMOLITION DRAWINGS FOR GENERAL DEMOLITION PLANS.

WHERE NEW CONSTRUCTION ABUTS EXISTING CONSTRUCTION IN THE

SAME PLANE, FINISHES SHALL BE FLUSH. VERIFY ALL DIMENSIONS TO

EXISTING ELEMENTS.

NOTIFY THE ARCHITECT OF ANY AND ALL DISCREPANCIES BETWEEN

EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS BEFORE

PROCEEDING WITH THAT PORTION OF THE WORK. FAILURE TO NOTIFY

THE ARCHITECT WILL NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY TO PERFORM THE WORK AS INTENDED BY THE

CONTRACT DOCUMENTS.

VERIFY EXISTING DIMENSIONS, CONDITIONS AND CLEARANCES PRIOR TO

THE SUBMISSION OF SHOP DRAWINGS.

GC IS REPONSIBLE FOR COORDINATING WITH VA WHAT EXISTING

EQUIPMENT AND FURNITURE TO BE TAGGED SALVAGED AND RETURNED

ONCE AN AREA HAS COMPLETED RENOVATION.

PHASING SEQUENCE - REFER TO G004 FOR OVERALL PHASING FOR

DETAILS AND COORDINATION FOR SCOPE.

GENERAL FLOOR PLAN NOTES:

8.6

SRQP

6.2

A131

ONML R.8R.5

9.3

8.2

7.5

6.8

T U

V

W

X

A301

A301

A301

A131

A131

MATCH LINE 01 MATCH LINE 01

/2 A102

M

AT

C H

L

IN

E

M

AT

C H

L

IN

E

A1

/1 A102 /1 A102

MATCH LINE 03 MATCH LINE 03

A131

WAITING

CB-10

WAITING

CB-9

WAITING

CB-8

WAITING

CB-7

RECEPTION

CB-8A

VIRTUAL HEALTH

CB-14

WAITING

CB-13

RECEPTION

CB-13A

WAITING

CB-12

FAMILY TOILET

BB-153

MEN'S TOILET

BB-121

WOMEN'S TOILET

BB-101

CORRIDOR

CB-15

INFO

CB-4

LOBBY

CB-5

CAFE

BA-102

MEN'S TOILET

BA-101 WOMEN'S TOILET

BA-100

ENTRANCE

CB-2

VESTIBULE

CB-1

LOBBY

CB-11

CONCOURSE

CB-15

CORRIDOR

CB-45

3 3

FE

C

555555555

5 5 5 5

5 5

5 5

33 3 3 3

3 3

8 8

9 9

10 10

10 8

6" 5'

- 0

9'- 8"

4"

A501

A501

A501

/2 A102

A1

14 14 14

4 4

4 4

4 4

10 10

108 9

10 10 8

CG

CGCGCGCGCGCGCG

CGCGCGCGCGCGCGCG

CG

CG

CG

CG

3 3

CGCG

CG CG CG CG

CG

CG CG

CG

CGCG

CG

CG

CONSULT

BF-103

CONSULT

BF-102

CONSULT

BF-101

CGCG

EXISTING

DIRTT WALL

/2 A10

MATCH LIN

E

BA-102D

1 1 1

EXISTING CONSTRUCTION TO REMAIN

NEW CONSTRUCTION LEGEND:

NEW DOOR LEAF

NEW PARTITON

4 NEW CONSTRUCTION NOTE

EXISTING 2 HR FIRE RATED FIRE BARRIER

EXISTING SMOKE BARRIER

DEDUCT ALTERNATE AREA.

REFER TO G001 FOR DETAILS.

CORNER GUARDS

CG

HANDRAIL

NOT IN SCOPE

OF WORK

KEY PLAN

PROJECT AREA

N

PROJECT

NORTH

TRUE

NORTH

VESTIBULE

CB-1

EXTENT OF PRESSURE

WASHING EXTERIOR ENTRY

/1 A10

MATCH LI

NE

1/8" = 1'-0"

BASEMENT PLAN - LOBBY

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RD JC

Drawing File Number

Au to de sk

D oc s:

//2

V A

Sa le m L ob by

/2

V

A Sa le m

L ob by .rv t 4/

/2

3:

:2

PM

BASEMENT PLAN - LOBBY BUILDING 143 LOBBY

RENOVATION

SALEM VA MEDICAL CENTER

1970 ROANOKE BLVD, SALEM, VA 24153-6406

09 JANUARY 2026

100% CONSTRUCTION

DOCUMENTS

A101

658-24-104

SHEET 15 OF 59

CONSTRUCTION NOTES

(APPLY TO THIS SHEET ONLY)

1 NEW TERAZZO FLOOR FINISH. SEE FINISH PLAN A601 FOR PATTERN.

2 NEW CERAMIC TILE FLOOR. SEE FINISH PLAN A601 FOR PATTERN.

3 NEW WALL PAINT. SEE FINISH SCHEDULE.

4 NEW VINYL WALL PROTECTION 4' HEIGHT. SEE FINISH SCHEDULE. DEDUCT

ALTERNATE 2A, 2B

5 NEW VINYL COLUMN COVER. SEE 9/A501.

7 CONTRACTOR TO COORDINATE WITH BANK AND VA TO REMOVE AND

REPLACE ATM MACHINE.

8 NEW PLUMBING FIXTURE. SEE PLUMBING DRAWINGS.

9 NEW CEILING HUNG TOILET PARTITION. SEE DETAIL 2/A111.

10 NEW WALL TILE. SEE PARTITION 1A/ G008 & SECTION DETAILS SHEET.

11 NEW EXPANSION JOINT SEALANT AND COVER TO BE FLUSH WITH

ADJACENT SURFACE. SEE DETAILS ON A502.

12 NEW HANDRAIL. SEE DETAILS A501.

14 NEW WALL PROTECTION UP TO 4'-0". SEE 9/A501.

16 PROTECT EXISTING WALL FINISH FROM DAMAGE

17 INFILL FLOOR SLAB. SEE STRUCTURAL .

18 NEW PARTITION SEE 2A/ 2B ON G008

19 NEW SINGLE WATER FOUNTAIN WITH BOTTLE FILLER. SEE PLUMBING

SCHEDULE.

20 REMOVE EXISTING DIRTT WALL SYSTEM AND REINSTALL PANELS AFTER

INSTALLATION OF TERRAZZO FLOORING WITHIN THE DURATION OF PHASE

2D. COORDINATE WITH MEP FOR DEMOLITION AND REINSTALLATION.

COORDINATE WITH DIRTT WALL MANUFACTURE FOR DIRTT-PANEL

REMOVAL INSTRUCTIONS AS NECESSARY. REINSTALLATION TO BE IN THE

SAME LOCATION.

1/8" = 1'-0"

ENTRY PRESSURE WASHING PLAN

Revision Number

Date: Revisions:

1 5/1/2026 PreBid

C.

D.

E.

F.

IN ANY UNBRACED AREA OF CEILING WHICH IS LESS THAN 1000 SF, IT IS

REQUIRED THAT SPRINKLER HEADS AND OTHER PENETRATIONS BE

INSTALLED WITH A 2" OVERSIZED RING, SLEEVE, OR ADAPTER THROUGH

THE CEILING TILE TO ALLOW FOR ONE INCH OF FREE MOVEMENT IN ALL

HORIZONTAL DIRECTIONS.

HEIGHT OF CEILING ABOVE FINISH FLOOR IS TAKEN FROM FLOOR

SURFACE DIRECTLY BELOW.

SUSPENSION GRIDS SHALL BE CENTERED IN ALL SPACES UNLESS

INDICATED OTHERWISE ON ARCHITECTURAL RCP.

ALL DEVICES MOUNTED IN ACOUSTICAL CEILING TILES SUCH AS LIGHTS,

SPEAKERS, EXHAUST GRILLES, SPRINKLER HEADS, SMOKE DETECTORS,

REMOTE TEST SWITCHES FOR DUCT DETECTORS, ETC. SHALL BE

CENTERED IN THE ACOUSTICAL CEILING TILE U.N.O. ALL DEVICES SHALL

BE INDEPENDENTLY SUPPORTED.

SPRINKLER HEADS IN GYPSUM BOARD CEILINGS SHALL BE CENTERED

AND ALIGN WITH RECESSED LIGHT FIXTURES IF APPLICABLE.

PROVIDE CEILING ACCESS PANELS IN GWB CEILINGS TO PROVIDE ACCESS

TO ELECTRICAL, MECHANICAL AND PLUMBING DEVICES THAT REQUIRE

SERVICE FOR MAINTENANCE. CONFER WITH A/E PRIOR TO PLACEMENT.

GENERAL RCP NOTES:

EXISTING 1' X 4' LIGHT FIXTURE

EXISTING 6" RECESSED CAN LIGHT

NEW 12" PENDANT LIGHT

EXISTING 12" EXHAUST GRILLE, SEE

MECHANICAL DRAWINGS

1 HOUR RATED FIRE BARRIER

2 HOUR RATED FIRE BARRIER

RATED SMOKE BARRIER

RCP LEGEND:

EXISTING ACT 2' x 2' - ACOUSTIC CEILING TILE

EXISTING ACT 2' x 4' - ACOUSTIC CEILING TILE

EXISTING GYP BOARD CEILING

EXISTING EXIT SIGN

EXISTING RECESSED CAN

FLUORESCENT LIGHT FIXTURE

EXISTING SPRINKLER HEAD

EXISTING 2 X 4 FIXTURE

EXISTING SUPPLY 2X2 DIFFUSER GRILL

EXISTING RETURN GRILL

EXISTING SPEAKER

EXISTING SMOKE DETECTOR

EXISTING MECHANICAL DIFFUSER

EXISTING 2 X 2 FIXTURE

EXISTING EXPANSION JOINT COVER

SD

NEW ACT 2' x 2' - ACOUSTIC CEILING TILE

NEW MECHANICAL DIFFUSER

NEW RECESSED CAN FLUORESCENT

LIGHT FIXTURE

EXISTING 2 X 4 FIXTURE

NEW 2 X 2 FIXTURE

NEW SUPPLY 2X2 DIFFUSER GRILL

A301

A301

A301

/1 A102 /1 A102

MATCH LINE 03 MATCH LINE 03

/2 AD102

MATCH LINE 01 MATCH LINE 01

/2 AD102

AD

M

AT

C H

L

IN

E

M

AT

C H

L

IN

E

AD

SD

SD

SD

21 21

21 21

9'-8"

9'-8" 9'-8"

9'-8"

WOMEN'S TOILET

BA-100

WOMEN'S TOILET

BB-101

MEN'S TOILET

BA-101

MEN'S TOILET

BB-121

FAMILY TOILET

BB-153

CONSULT

BF-103

CONSULT

BF-102

CONSULT

BF-101

WAITING

CB-10 WAITING

CB-9

LOBBY

CB-11

WAITING

CB-12

WAITING

CB-13

WAITING

CB-8

WAITING

CB-7

VIRTUAL HEALTH

CB-14

CONCOURSE

CB-15

INFO

CB-4

ENTRANCE

CB-2

VESTIBULE

CB-1

RECEPTION

CB-8A

RECEPTION

CB-13A

CORRIDOR

CB-15

CAFE

BA-102

LOBBY

CB-5

CORRIDOR

CB-45

8'-6"

8'-6"

9'-0"

8'-6"

8'-6"

8'-8" 8'-8"

8'-8"

232323

2323 3 G008

G008

SIM.

25 25

26 26 26

25 25

25 25

25 25

25 25

A111

A111

A111

A111

A111

A111

A111

A111

8'-8"

TYP.

EX. CEILING

ACCESS PANEL

9'-0"

8'-0"

8'-0"

9'-0"1 A502

A502

A502

15151515 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15

27 TYP.27 TYP.27 TYP.27 TYP.27 TYP.27 TYP.

27 TYP. 27 TYP.

27 TYP.

36' - 7"

3B G008

9'-0"

9'-0"

3B G008

KEY PLAN

PROJECT AREA

N

PROJECT

NORTH

TRUE

NORTH

12 GA PERIMETER HANGER

WIRE AT ALL TEES. INSTALL.

EITHER SLOPED TO WALL

(1:6 MAX) OR VERICALLY

STRUCTURE

2" PERIMETER CLOSURE

MOLDING. ATTACHED TO WALL

AND CONNECTED TO GRID

INTERIOR PARTITION WALL

BRACED OR EXTENDED TO

UNDERSIDE OF STRUCTURE

WALL MOLDING - SEE

SPECIFICATIONS FOR TYPE.

8" MAX.

U.S. OF DECK

1/2" DIA. THREADED ROD

WITH HEAVY HEX NUTS AT

EACH PARTITION

CONNECTION (3 MINIMUM)

STEEL CHANNEL.

SEE STRUCTURAL.

TOP OF TOILET PARTITION.

SEE MANUFACTURER'S DETAIL

METAL CLIP

3/8" STUD BOLT

TOILET PARTITION. SEE FINISH

SCHEDULE.

SUSPENDED CEILING TILE

LATERALLY BRACED STEEL

CHANNEL. SEE STRUCTURAL

2 1/2" x 2 1/2" x 1/4" ANGLE

SPACED AT 3'-0" O.C.

SEE STRUCTURAL.

2 1/2" x 2 1/2" x 1/4"

CONTINUOUS ANGLE. SEE

STRUCTURAL.

0.157" DIA. PAF SPACED

AT 16" O.C.

NOTE: SEE STRUCTURAL DETAILS.

EXISITING GYP

BD CEILING SEE A111 FOR

ELEVATION HEIGHT

LOWER THE WALL MOLD BY THE

HEIGHT OF TEGULAR REVEAL

SPACE BLOCK BY TEG TEB AT

ALL PERIMETER TILES

TEGULAR CEILING TILE

( PERMIETER TILE TO BE CUT TO SQUARE )

ACUSTICAL GRID

HANGER TO STRUCTURE 21

CAFE

BA-102

LOBBY

CB-5

G008

G008

SIM.

9'-0"

8'-0"

8'-0"

9'-0"

27 TYP. 27 TYP.

27 TYP.

12'-0 3/8"

12'-0 3/8"

EXISTING WALL

TO REMAIN ABOVE

CEILING

EXISTING

WALL

TO REMAIN

ABOVE

CEILING

3B G008

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RD JC

Drawing File Number

Au to de sk

D oc s:

//2

V A

Sa le m L ob by

/2

V

A Sa le m

L ob by .rv t 4/

/2

3:

:2

PM

BASEMENT RCP - LOBBY BUILDING 143 LOBBY

RENOVATION

SALEM VA MEDICAL CENTER

1970 ROANOKE BLVD, SALEM, VA 24153-6406

09 JANUARY 2026

100% CONSTRUCTION

DOCUMENTS

A111

658-24-104

SHEET 17 OF 59

1/8" = 1'-0"

BASEMENT RCP - LOBBY

CONSTRUCTION NOTES

(APPLY TO THIS SHEET ONLY)

9 NEW CEILING HUNG TOILET PARTITION. SEE DETAIL 2/A111.

11 NEW EXPANSION JOINT SEALANT AND COVE R TO BE FLUSH

WITH ADJACENT SURFACE. SEE DETAILS ON A502.

15 NEW PENDANT LIGHT. B.O.D. SEQUENCE PENDANT LIGHT

CP2024 4" x 48"

21 NEW ACOUSTICAL CEILING GRID AND CEILING TILES.

23 NEW CEILING AND WALL EXTENSION. SEE DETAIL 2/G008.

24 NEW ACOUSTICAL WALL PANELS. SEE DETAIL 2/G008.

25 NEW MECHANICAL GRILLS. SEE MECHANICAL DRAWINGS

26 EXISTING LIGHT TO BE MOVED TO CENTER OF CORRIDOR PER

REVISED CEILING GRID LAYOUT.

27 GC TO INSPECT AND RESEAL ALL EXISTING WINDOWS AND

SKYLIGHTS IN ATRIUM. CONTRACTOR RESPONSIBLE TO

REMOVE ANY CAULKING AND PREP SURFACE FOR NEW

CAULKING RE APPLICATION TO BE SEALED WITH

WEATHER-RESISTANT TO FULLL ANY GAPS FOR WATERTIGHT

CONDITIONS.

28 LRP PANELS TO REMAIN. CONTRACTOR TO COORDINATE NEW

ACT AND EXISTING LRP PANELS. 3" = 1'-0"

ACOUSTICAL CEILING END ANGLE

MOLDING DETAIL 1 1/2" = 1'-0"

TYP. CEILING HUNG TOILET PARTITION

DETAIL

1/8" = 1'-0"

BASEMENT RCP - LOBBY

Revision Number

Date: Revisions:

1 5/1/2026 PreBid

C.

D.

E.

F.

IN ANY UNBRACED AREA OF CEILING WHICH IS LESS THAN 1000 SF, IT IS

REQUIRED THAT SPRINKLER HEADS AND OTHER PENETRATIONS BE

INSTALLED WITH A 2" OVERSIZED RING, SLEEVE, OR ADAPTER THROUGH

THE CEILING TILE TO ALLOW FOR ONE INCH OF FREE MOVEMENT IN ALL

HORIZONTAL DIRECTIONS.

HEIGHT OF CEILING ABOVE FINISH FLOOR IS TAKEN FROM FLOOR

SURFACE DIRECTLY BELOW.

SUSPENSION GRIDS SHALL BE CENTERED IN ALL SPACES UNLESS

INDICATED OTHERWISE ON ARCHITECTURAL RCP.

ALL DEVICES MOUNTED IN ACOUSTICAL CEILING TILES SUCH AS LIGHTS,

SPEAKERS, EXHAUST GRILLES, SPRINKLER HEADS, SMOKE DETECTORS,

REMOTE TEST SWITCHES FOR DUCT DETECTORS, ETC. SHALL BE

CENTERED IN THE ACOUSTICAL CEILING TILE U.N.O. ALL DEVICES SHALL

BE INDEPENDENTLY SUPPORTED.

SPRINKLER HEADS IN GYPSUM BOARD CEILINGS SHALL BE CENTERED

AND ALIGN WITH RECESSED LIGHT FIXTURES IF APPLICABLE.

PROVIDE CEILING ACCESS PANELS IN GWB CEILINGS TO PROVIDE ACCESS

TO ELECTRICAL, MECHANICAL AND PLUMBING DEVICES THAT REQUIRE

SERVICE FOR MAINTENANCE. CONFER WITH A/E PRIOR TO PLACEMENT.

GENERAL RCP NOTES:

EXISTING 1' X 4' LIGHT FIXTURE

EXISTING 6" RECESSED CAN LIGHT

NEW 12" PENDANT LIGHT

EXISTING 12" EXHAUST GRILLE, SEE

MECHANICAL DRAWINGS

1 HOUR RATED FIRE BARRIER

2 HOUR RATED FIRE BARRIER

RATED SMOKE BARRIER

RCP LEGEND:

EXISTING ACT 2' x 2' - ACOUSTIC CEILING TILE

EXISTING ACT 2' x 4' - ACOUSTIC CEILING TILE

EXISTING GYP BOARD CEILING

EXISTING EXIT SIGN

EXISTING RECESSED CAN

FLUORESCENT LIGHT FIXTURE

EXISTING SPRINKLER HEAD

EXISTING 2 X 4 FIXTURE

EXISTING SUPPLY 2X2 DIFFUSER GRILL

EXISTING RETURN GRILL

EXISTING SPEAKER

EXISTING SMOKE DETECTOR

EXISTING MECHANICAL DIFFUSER

EXISTING 2 X 2 FIXTURE

EXISTING EXPANSION JOINT COVER

SD

NEW ACT 2' x 2' - ACOUSTIC CEILING TILE

NEW MECHANICAL DIFFUSER

NEW RECESSED CAN FLUORESCENT

LIGHT FIXTURE

EXISTING 2 X 4 FIXTURE

NEW 2 X 2 FIXTURE

NEW SUPPLY 2X2 DIFFUSER GRILL

KEY PLAN

PROJECT AREA

N

PROJECT

NORTH

TRUE

NORTH

/1 A101 /1 A101

MATCH LINE 03 MATCH LINE 03

WOMEN'S TOILET

BB-101

CORRIDOR

CB-15

8'-6"

8'-8"

A502

/1 A101 /1 A101

MATCH LINE 01 MATCH LINE 018

CORRIDOR

CB-45

8'-0"

A502

A502

A502

A502

A502

A502

A1

A1

M

AT

C H

L

IN

E

M

AT

C H

L

IN

E

8CORRIDOR

CG-25

9'-0" 16 17 17 17 1716 16 16 16

1/8" = 1'-0"

BASEMENT RCP CORRIDOR CB-15

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RD JC

Drawing File Number

Au to de sk

D oc s:

//2

V A

Sa le m L ob by

/2

V

A Sa le m

L ob by .rv t 4/

/2

3:

:2

PM

BASEMENT RCP - CORRIDORS BUILDING 143 LOBBY

RENOVATION

SALEM VA MEDICAL CENTER

1970 ROANOKE BLVD, SALEM, VA 24153-6406

09 JANUARY 2026

100% CONSTRUCTION

DOCUMENTS

A112

658-24-104

SHEET 18 OF 59

1/8" = 1'-0"

BASEMENT RCP CORRIDOR CB-45

1/8" = 1'-0"

BASEMENT RCP CORRIDOR CG-25

CONSTRUCTION NOTES

(APPLY TO THIS SHEET ONLY)

8 NEW ACOUSTICAL CEILING.

9 NEW CEILING HUNG TOILET PARTITION. SEE DETAIL 2/A111.

11 NEW EXPANSION JOINT SEALANT AND COVER.

16 NEW MECHANICAL GRILLS. SEE MECHANICAL DRAWINGS

17 EXISTING LIGHT TO BE MOVED TO CENTER OF CORRIDOR.

28 LRP PANELS TO REMAIN. CONTRACTOR TO COORDINATE NEW

ACT AND EXISTING LRP PANELS.

Revision Number

Date: Revisions:

1 5/1/2026 PreBid

A101 - BASEMENT PLAN - LOBBY
A111 - BASEMENT RCP - LOBBY
A112 - BASEMENT RCP - CORRIDORS

File details come from the government source that posted it. Updated .