S02_RFP Attachment_SPEC VA 21 13 13 Wet_Pipe Sprinkler Systems 673_23_102 Repair Fire Suppression System Bldg 38.docx

DOCX document 31 KB Posted

Attached to
J012--FY23 Tier 1 (PROJ: 673-23-102) DB Repair Fire Suppression System Bldg 38
Solicitation number
36C24823R0096
Issued by

View the file

Other files

File Type Posted
S02_SOW_PN 673_23_102 Repair Fire Supression System Bldg 38_Updated.docx DOCX document
36C24823R0096 0004.docx DOCX document
S05_RFI Phase Two_Fire Suppression System Bldg 38.pdf PDF
36C24823R0096 0003.docx DOCX document
36C24823R0096 0002.docx DOCX document
S05_Phase One RFI.pdf PDF
36C24823R0096 0001.docx DOCX document
S02_RFP Attachment_SPEC 010000 General Requirements 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Suppression System.docx DOCX document
36C24823R0096_1.docx DOCX document
S02_RFP Attachment_SPEC VA 01 32 16 17 Project Schedules 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_Drawing PolyTrauma Fire Protection Riser Diagram.pdf PDF
S02_RFP Attachment_SPEC VA 01 33 23 _ Shop Drawings 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_EMR.docx DOCX document
S05_RFI Phase One_Fire Suppression System Bldg 38.xlsx XLSX spreadsheet
S02_RFP Attachment_SPEC 001121 RFP to Design Build 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_Past Performance Questionaire.pdf PDF
S02_RFP Attachment_Site Map 673_23_102 Repair Fire Suppression System Bldg 38.pdf PDF
S02_RFP Attachment_Drawing PolyTrauma Fire Pump Schematic.pdf PDF
S02_RFP Attachment_SPEC VA 331000 Water Utilities 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_Price Matrix.xlsx XLSX spreadsheet
S02_RFP Attachment_Drawing PolyTrauma Fire Protection Legend.pdf PDF
S02_RFP Attachment_SPEC VA 07 84 00 Firestopping 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_SPEC 014219 Reference Standards 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_WD FL20230208 13Jan2023.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Fire Suppression System Bldg 38 673-23-102

SECTION 21 13 13

WET-PIPE SPRINKLER SYSTEMS

PART 1 - GENERAL

1.1 Description

A. Design, installation and testing shall be in accordance with

NFPA 13.

B.The design and installation of a hydraulically calculated automatic wet-pipe system complete and ready for operation, for all portions of Building 38, including the penthouse.
C.Modification of the existing sprinkler system as indicated on the drawings and as further required by these specifications.

1.2 RELATED WORK

A.Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B.Section 33 10 00, WATER UTILITIES.
C.Section 07 84 00, FIRESTOPPING.
G.Section 21 30 13, ELECTRIC-DRIVEN FIRE PUMPS.

1.3 Design Criteria

A.Design Basis Information: Provide design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system in accordance with the requirements of NFPA 13.
1.Perform hydraulic calculations in accordance with NFPA 13 utilizing the Area/Density method. Do not restrict design area reductions permitted for using quick response sprinklers throughout by the required use of standard response sprinklers in the areas identified in this section.
2.Sprinkler Protection: Sprinkler hazard classifications shall be in accordance with NFPA 13. The hazard classification examples of uses and conditions identified in the Annex of NFPA 13 shall be mandatory for areas not listed below. Request clarification from the Government for any hazard classification not identified. To determining spacing and sizing, apply the following coverage classifications:
a.Light Hazard Occupancies: Patient care, treatment, and customary access areas.
b.Ordinary Hazard Group 1 Occupancies: Laboratories, Mechanical Equipment Rooms, Transformer Rooms, Electrical Switchgear Rooms, Electric Closets, and Repair Shops.
c.Ordinary Hazard Group 2 Occupancies: Storage rooms, trash rooms, clean and soiled linen rooms, pharmacy and associated storage, laundry, kitchens, kitchen storage areas, retail stores, retail store storage rooms, storage areas, building management storage, boiler plants, energy centers, warehouse spaces, file storage areas for the entire area of the space up to 140 square meters (1500 square feet) and Supply Processing and Distribution (SPD).
3.Hydraulic Calculations: Calculated demand including hose stream requirements shall fall no less than 10 percent below the available water supply curve.
4.Water Supply: Base water supply on a flow test of:
a.Location __TBD__
b.Elevation Static Test Gauge __ TBD _ m (_____ ft)
c.Elevation Residual Test Gauge _ TBD m (_____ ft)
d.Static pressure: _ TBD _ kPa ( _____ psi)
e.Residual pressure: _ TBD _ kPa ( ____ psi)
f.Flow: _ TBD _ L/s ( ____ gpm)
g.Date: __ TBD _ Time ____
5.Zoning:
a.For each sprinkler zone provide a control valve, flow switch, and a test and drain assembly with pressure gauge. For buildings greater than two stories, provide a check valve at each control valve
b.Sprinkler zones shall conform to the smoke barrier zones shown on the drawings.

1.4 submittals

A.Submit as one package in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in Paragraphs 1.4(A)1 through 1.4(A)5 electronically in pdf format on a compact disc or as directed by the COR. Submittals shall include, but not be limited to, the following:
1.Qualifications:
a.Provide a copy of the installing contractors fire sprinkler and state contractor’s license.
b.Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering.
c.Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
2.Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA 13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test location.
3.Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.
4.Calculation Sheets:
a.Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of the Plans and Calculations chapter of NFPA 13.
5.Valve Charts: Provide a valve chart that identifies the location of each control valve. Coordinate nomenclature and identification of control valves with COR. Where existing nomenclature does not exist, the chart shall include no less than the following: Tag ID No., Valve Size, Service (control valve, main drain, aux. drain, inspectors test valve, etc.), and Location.
6.Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include, but not be limited to, the following:
a.A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.
1)One full size (or size as directed by the COR) printed copy.
2)One complete set in electronic pdf format.
3)One complete set in AutoCAD format or a format as directed by the COR.
b.Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA 13. Certificates shall be provided to document all parts of the installation.
c.Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine maintenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address and telephone number, for each item of equipment.
d.One paper copy of the Material and Testing Certificates and the Operations and Maintenance Manuals above shall be provided in a binder. In addition, these materials shall be provided in pdf format on a compact disc or as directed by the COR.
e.Provide one additional copy of the Operations and Maintenance Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser or as directed by the COR.

1.5 QUALITY ASSURANCE

A.Installer Reliability: The installer shall possess a valid State of Florida fire sprinkler contractor's license. The installer shall have been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
B.Materials and Equipment: All equipment and devices shall be of a make and type listed by UL or approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicated otherwise on the contract drawings.

1.6 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B.National Fire Protection Association (NFPA):
13-13Installation of Sprinkler Systems
25-14Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems
101-15Life Safety Code
170-15Fire Safety Symbols
C.Underwriters Laboratories, Inc. (UL):

Fire Protection Equipment Directory (2011) D. Factory Mutual Engineering Corporation (FM):

Approval Guide

PART 2 - PRODUCTS

2.1 PIPING & FITTINGS

A.Piping and fittings for private underground water mains shall be in accordance with NFPA 13.
1.Pipe and fittings from inside face of building 300 mm (12 in.) above finished floor to a distance of approximately 1500 mm (5 ft.) outside building: Ductile Iron, flanged fittings and 316 stainless steel bolting.
B.Piping and fittings for sprinkler systems shall be in accordance with NFPA 13.
1.Plain-end pipe fittings with locking lugs or shear bolts are not permitted.
2.Piping sizes 50 mm (2 inches) and smaller shall be black steel Schedule 40 with threaded end connections.
3.Piping sizes 65 mm (2 ½ inches) and larger shall be black steel Schedule 10 with grooved connections. Grooves in Schedule 10 piping shall be rolled grooved only.
4.Use nonferrous piping in MRI Scanning Rooms.
5.Plastic piping shall not be permitted except for drain piping.
6.Flexible sprinkler hose shall be FM Approved and limited to hose with threaded end fittings with a minimum inside diameter or 1-inch and a maximum length of 6-feet.

2.2 VALVES

A. N/A

2.3 FIRE DEPARTMENT SIAMESE CONNECTION

A. N/A

2.4 SPRINKLERS

A. N/A

2.5 SPRINKLER CABINET

A. N/A

2.6 sprinkler system signage N/A

2.7 SWITCHES:

A. N/A

2.8 GAUGES

Provide gauges as required by NFPA 13. Provide gauges where the normal pressure of the system is at the midrange of the gauge.

2.9 PIPE hangers, SUpports and Restraint of System PIping

Pipe hangers, supports, and restraint of system piping shall be in accordance with NFPA 13.

2.10 WALL, FLOOR AND CEILING PLATES

Provide chrome plated steel escutcheon plates.

2.11 ANTIFREEZE SOLUTION

Antifreeze solution shall be in accordance with NFPA 13 and shall be compatible with use in a potable water supply.

2.12 Valve Tags

Engraved black filled numbers and letters not less than 15 mm (1/2 inch) high for number designation, and not less than 8 mm (1/4 inch) for service designation on 19 gage, 40 mm (11/2 inches) round brass disc, attached with brass "S" hook, brass chain, or nylon twist tie.

PART 3 - EXECUTION

3.1 INSTALLATION

A.Installation shall be accomplished by the licensed contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.
B.Installation of Piping: Accurately cut pipe to measurements established by the installer and work into place without springing or forcing. In any situation where bending of the pipe is required, use a standard pipe-bending template. Concealed piping in spaces that have finished ceilings. Where ceiling mounted equipment exists, such as in operating and radiology rooms, install sprinklers so as not to obstruct the movement or operation of the equipment. Sidewall heads may need to be utilized. In stairways, locate piping as near to the ceiling as possible to prevent tampering by unauthorized personnel and to provide a minimum headroom clearance of 2250 mm (seven feet six inches). Piping shall not obstruct the minimum means of egress clearances required by NFPA 101. Pipe hangers, supports, and restraint of system piping, shall be installed accordance with NFPA 13.
C.Welding: Conform to the requirements and recommendations of NFPA 13.
D.Drains: Provide drips and drains, including low point drains, in accordance with NFPA 13. Pipe drains to discharge at safe points outside of the building or to sight cones attached to drains of adequate size to readily carry the full flow from each drain under maximum pressure. Do not provide a direct drain connection to sewer system or discharge into sinks. Install drips and drains where necessary and required by NFPA 13. The drain piping shall not be restricted or reduced and shall be of the same diameter as the drain collector.
E.Supervisory Switches: Provide supervisory switches for sprinkler control valves.
F.Waterflow Alarm Switches: Install waterflow alarm switches and valves in stairwells or other easily accessible locations.
G.Inspector's Test Connection: Install and supply in accordance with NFPA 13, locate in a secured area, and discharge to the exterior of the building.
H.Affix cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connections to the respective waterflow switch or pipe connection near to the pipe from where they were cut.
I.Provide escutcheon plates for exposed piping passing through walls, floors or ceilings.
J.Clearances: For systems requiring seismic protection, piping that passes through floors or walls shall have penetrations sized 50 mm (2 inches) nominally larger than the penetrating pipe for pipe sizes 25 mm (1 inch) to 90 mm (3 ½ inches) and 100 mm (4 inches) nominally larger for penetrating pipe sizes 100 mm (4 inches) and larger.
K.Sleeves: Provide for pipes passing through masonry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fire stop material in accordance with Section 07 84 00, FIRESTOPPING. Where core drilling is used in lieu of sleeves, also seal space. Seal penetrations of walls, floors and ceilings of other types of construction, in accordance with Section 07 84 00, FIRESTOPPING.
L.Where dry pendent sprinklers are used for freezers or similar spaces and they are connected to the wet pipe system, provide an EPDM boot around the dry pendent sprinkler on the heated side and securely seal to the pipe and freezer to prevent condensation from entering the freezer.
M.Provide pressure gauges at each water flow alarm switch location and at each main drain connection.
N.For each fire department connection, provide the symbolic sign given in NFPA 170 and locate 2400 to 3000 mm (8 to 10 feet) above each connection location. Size the sign to 450 by 450 mm (18 by 18 inches) with the symbol being at least 350 by 350 mm (14 by 14 inches).
O.Firestopping shall be provided for all penetrations of fire resistance rated construction. Firestopping shall comply with Section 07 84 00, FIRESTOPPING.
P.MRI Suite: Provide no more than one penetration of the MRI shield enclosure.
Q.Painting of Pipe: In finished areas where walls and ceilings have been painted, paint primed surfaces with two coats of paint to match adjacent surfaces, except paint valves and operating accessories with two coats of gloss red enamel. Exercise care to avoid painting sprinklers. Painting of sprinkler systems above suspended ceilings and in crawl spaces is not required. Painting shall comply with Section 09 91 00, PAINTING. Any painted sprinkler shall be replaced with a new sprinkler.
R.Sprinkler System Signage: Provide rigid sprinkler system signage in accordance with NFPA 13 and NFPA 25. Sprinkler system signage shall include, but not limited to, the following:
1.Identification Signs:
a.Provide signage for each control valve, drain valve, sprinkler cabinet, and inspector’s test.
b.Provide valve tags for each operable valve. Coordinate nomenclature and identification of operable valves with COR. Where existing nomenclature does not exist, the Tag Identification shall include no less than the following: (FP-B-F/SZ-#) Fire Protection, Building Number, Floor Number/Smoke Zone (if applicable), and Valve Number. (E.g., FP-500-1E-001) Fire Protection, Building 500, First Floor East, Number 001.)
2.Instruction/Information Signs:
a.Provide signage for each control valve to indicate valve function and to indicate what system is being controlled.
b.Provide signage indicating the number and location of low point drains.
3.Hydraulic Placards:
a.Provide signage indicating hydraulic design information. The placard shall include location of the design area, discharge densities, required flow and residual pressure at the base of riser, occupancy classification, hose stream allowance, flow test information, and installing contractor. Locate hydraulic placard information signs at each alarm check valve.
S.Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler system by the installer at no additional expense to the Government.

T. Interruption of Service: There shall be no interruption of the existing sprinkler protection, water, electric, or fire alarm services without prior permission of the Contracting Officer. Contractor shall develop an interim fire protection program where interruptions involve occupied spaces. Request in writing at least one week prior to the planned interruption.

3.2 INSPECTION AND TEST

A.Preliminary Testing: Flush newly installed systems prior to performing hydrostatic tests in order to remove any debris which may have been left as well as ensuring piping is unobstructed. Hydrostatically test system, including the fire department connections, as specified in NFPA 13, in the presence of the Contracting Officers Representative (COR) or his designated representative. Test and flush underground water line prior to performing these hydrostatic tests.
B.Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections have been accomplished, advise COR to schedule a final inspection and test. Connection to the fire alarm system shall have been in service for at least ten days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labor and materials required for the tests and provide the services of the installation foreman or other competent representative of the installer to perform the tests. Correct deficiencies and retest system as necessary, prior to the final acceptance. Include the operation of all features of the systems under normal operations in test

3.3 INSTRUCTIONS

Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation and maintenance of the system, on the dates requested by the COR.

- - - E N D - - - 21 13 13 - 1