S05_RFI Phase Two_Fire Suppression System Bldg 38.pdf

PDF 103 KB Posted

Attached to
J012--FY23 Tier 1 (PROJ: 673-23-102) DB Repair Fire Suppression System Bldg 38
Solicitation number
36C24823R0096
Issued by

View the file

Other files

File Type Posted
S02_SOW_PN 673_23_102 Repair Fire Supression System Bldg 38_Updated.docx DOCX document
36C24823R0096 0004.docx DOCX document
36C24823R0096 0003.docx DOCX document
36C24823R0096 0002.docx DOCX document
S05_Phase One RFI.pdf PDF
36C24823R0096 0001.docx DOCX document
S02_RFP Attachment_SPEC 010000 General Requirements 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Suppression System.docx DOCX document
S02_RFP Attachment_SPEC VA 21 13 13 Wet_Pipe Sprinkler Systems 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
36C24823R0096_1.docx DOCX document
S02_RFP Attachment_SPEC VA 01 32 16 17 Project Schedules 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_Drawing PolyTrauma Fire Protection Riser Diagram.pdf PDF
S02_RFP Attachment_SPEC VA 01 33 23 _ Shop Drawings 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_EMR.docx DOCX document
S05_RFI Phase One_Fire Suppression System Bldg 38.xlsx XLSX spreadsheet
S02_RFP Attachment_SPEC 001121 RFP to Design Build 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_Past Performance Questionaire.pdf PDF
S02_RFP Attachment_Site Map 673_23_102 Repair Fire Suppression System Bldg 38.pdf PDF
S02_RFP Attachment_Drawing PolyTrauma Fire Pump Schematic.pdf PDF
S02_RFP Attachment_SPEC VA 331000 Water Utilities 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_Price Matrix.xlsx XLSX spreadsheet
S02_RFP Attachment_Drawing PolyTrauma Fire Protection Legend.pdf PDF
S02_RFP Attachment_SPEC VA 07 84 00 Firestopping 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_SPEC 014219 Reference Standards 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_WD FL20230208 13Jan2023.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM # SECTION or

ATTACHMENT #

DOCUMENT

NAME

COMMENT TYPE

(Select from drop down)

Received Date

QUESTIONS / COMMENTS

(With justification of why considered source selection sensitive if applicable) VA Response

Response Date

VA

Response

From Company Name

1 SOW 05/31/23

On this jockey pump controller, we found out from the company that is associated with this equipment that we cannot change just the switch it will require the whole controller to be replaced. Will this be added to the SOW to account for this?

The pressure switch is an integral part of the controller and the controller will have to be replaced as a result. Please see updated SOW. 6/1/2023 COR

Midwestern Construction Services, Inc.