S02_RFP Attachment_Price Matrix.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
J012--FY23 Tier 1 (PROJ: 673-23-102) DB Repair Fire Suppression System Bldg 38
Solicitation number
36C24823R0096
Issued by

View the file

Other files

File Type Posted
S02_SOW_PN 673_23_102 Repair Fire Supression System Bldg 38_Updated.docx DOCX document
36C24823R0096 0004.docx DOCX document
S05_RFI Phase Two_Fire Suppression System Bldg 38.pdf PDF
36C24823R0096 0003.docx DOCX document
36C24823R0096 0002.docx DOCX document
S05_Phase One RFI.pdf PDF
36C24823R0096 0001.docx DOCX document
S02_RFP Attachment_SPEC 010000 General Requirements 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Suppression System.docx DOCX document
S02_RFP Attachment_SPEC VA 21 13 13 Wet_Pipe Sprinkler Systems 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
36C24823R0096_1.docx DOCX document
S02_RFP Attachment_SPEC VA 01 32 16 17 Project Schedules 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_Drawing PolyTrauma Fire Protection Riser Diagram.pdf PDF
S02_RFP Attachment_SPEC VA 01 33 23 _ Shop Drawings 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_EMR.docx DOCX document
S05_RFI Phase One_Fire Suppression System Bldg 38.xlsx XLSX spreadsheet
S02_RFP Attachment_SPEC 001121 RFP to Design Build 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_Past Performance Questionaire.pdf PDF
S02_RFP Attachment_Site Map 673_23_102 Repair Fire Suppression System Bldg 38.pdf PDF
S02_RFP Attachment_Drawing PolyTrauma Fire Pump Schematic.pdf PDF
S02_RFP Attachment_SPEC VA 331000 Water Utilities 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_Drawing PolyTrauma Fire Protection Legend.pdf PDF
S02_RFP Attachment_SPEC VA 07 84 00 Firestopping 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_SPEC 014219 Reference Standards 673_23_102 Repair Fire Suppression System Bldg 38.docx DOCX document
S02_RFP Attachment_WD FL20230208 13Jan2023.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Base Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 1Design Requirements
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-