S02 - RFP - 36C77625R0060 - 05282025 - Rad Reno - W Haven.pdf

PDF 842 KB Posted

Attached to
Y1DA-- 689-CSI-125 | Rad Suite Reno | Minor DB | W. Haven CT
Solicitation number
36C77625R0060
Issued by

About this file

This document is a Request for Proposal (RFP) for a design-build construction project at the West Haven VA Medical Center in Connecticut. The solicitation (36C77625R0060) is a competitive two-phase design-build project set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a total project budget of approximately $4.5 million. The project involves removing, renovating, and upgrading approximately 1,200 square feet of the Interventional Radiology Suite, with work to be completed within 540 calendar days after contract award.

The RFP requires offerors to submit proposals in two phases, with a maximum of five offerors selected to proceed to Phase II. Phase I focuses on evaluating the contractor's technical approach, specialized experience, and past performance, while Phase II will assess the technical solution, management approach, and pricing. Key requirements include designing and constructing the renovation while maintaining hospital operations, handling utility shutdowns and relocations, and implementing robust safety and quality control measures. The solicitation emphasizes the importance of understanding the complexities of working in an operational hospital setting and requires detailed documentation of the contractor's capabilities and proposed approach.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 98

36C77625R0060

X

05-28-2025

TBD

689-CSI-125

36C776

Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

Department of Veterans Affairs Program Contract Activity Central 6100 Oak Tree Blvd, Suite 490

Independence OH 44131

Zachary Penhollow (216) 447-8300 x49708

In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.

This project will be procured using the two-phase design-build procedures.

The Contractor is to provide design and construction services in support of this project to remove, renovate and upgrade approximately 1,200 Square Feet (SF) of existing space within the Interventional Radiology Suite at the West Haven VAMC.

This project is located at:

West Haven VA Medical Center 950 Campbell Avenue West Haven, Connecticut 06516

The current project budget for this NRM project is approximately $4.5 million dollars. The government cannot guarantee that additional funds will be made available for award.

Offerors are under no obligation to approach the budget.

10 (TEN) 540

X X 52.211-10

X 10

0 (zero) 12:00 EST

06-23-2025

X

90 (NINETY)

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

SEE PRICE SCHEDULE

36C776

Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

VAFSC

Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically https://www.fsc.va.gov/einvoice.asp e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429

Joelle Mascarenas

VA-VHA-RPOC-2024-0009

Project No. 689-CSI-125 | Interventional Radiation Renovation | Minor Construction DB | West Haven, CT VAMC

Table of Contents

PART I - THE SCHEDULE ............................................................... Error! Bookmark not defined.

SECTION A - SOLICITATION/CONTRACT FORM ......................... Error! Bookmark not defined.

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) .............................................................................. Error! Bookmark not defined.

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK ................................ Error! Bookmark not defined.

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

1.1 BID MATERIAL:

1.2 BID GUARANTEE:

1.3 PAYMENT & PERFORMANCE BONDS:

1.4 TAXES:

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.14 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

(FEB 1998)

2.15 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

2.16 52.216-1 TYPE OF CONTRACT (APR 1984)

2.17 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY

SITE OF THE WORK (MAY 2014)

2.18 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

2.19 52.228-1 BID GUARANTEE (SEP 1996)

2.20 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.21 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB

1995)

2.22 PARTNERING

2.23 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE

ACQUISITION PLAN (SEP 2019)

2.24 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

2.25 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.26 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY NOTICE (FEB 2023)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)

(DEVIATION FEB 2025)

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES (DEC 2023)

3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

3.6 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

3.7 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR

2019)

3.8 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

GENERAL CONDITIONS

4.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)

4.2 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)

4.3 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

PROHIBITION (DEC 2023)

4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

4.5 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(JAN 2025)

4.6 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (MAY 2024)

4.7 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (MAY 2024)(DEVIATION FEB 2025)

4.8 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT

FOR EPA-DESIGNATED ITEMS (MAY 2008)

4.9 52.223-20 AEROSOLS (MAY 2024)

4.10 52.223-21 FOAMS (MAY 2024)

4.11 52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (MAY 2024)(DEVIATION

FEB 2025)

4.12 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)

4.13 52.228-11 INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021)

4.14 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (DEC

2022)

4.15 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2020)

4.16 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.17 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

4.18 52.236-23 RESPONSIBILITY OF THE ARCHITECT-ENGINEER CONTRACTOR

(APR 1984)

4.19 52.236-24 WORK OVERSIGHT IN ARCHITECT-ENGINEER CONTRACTS (APR

1984)

4.20 52.236-25 REQUIREMENTS FOR REGISTRATION OF DESIGNERS (JUNE

2003)

4.21 52.244-6DEV SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (JAN 2025) (DEVIATION FEB 2025)

4.22 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

4.23 MANDATORY WRITTEN DISCLOSURES

4.24 IT CONTRACT SECURITY

4.25 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.26 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

4.27 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.28 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020)

4.29 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020) 81

4.30 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-

OWNED SMALL BUSINESS EVALUATION FACTORS (OCT 2019)

4.31 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (OCT 2019)

4.32 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

4.33 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

4.34 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899.

(DEVIATION) (APR 2025)

4.35 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)

4.36 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.37 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)

4.38 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.39 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.40 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.41 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY (FEB 2023)

4.42 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) .. 95

ATTACHMENTS

4.43 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES

4.44 OWNERSHIP OF ORIGINAL DOCUMENTS

4.45 RETENTION OF REVIEW DOCUMENTS

4.46 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED

PLANNING INFORMATION

4.47 COORDINATION WITH MEDICAL CENTER

4.48 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR

LIST OF ATTACHMENTS

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBE

R

DESCRIPTION OF

SUPPLIES/SERVI

CES

QUANTI

TY

UNI

T UNIT PRICE AMOUNT

1.00 JB _______________

Line Item 1: AE Services:

A/E Services includes but is not limited to; site visits, field investigation, studies, and user interviews to prepare drawings, specifications, and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to complete site preparation and implementation.

Contract Period: Base POP Begin:

POP End:

1.00 JB _______________

Line Item 2: Construction Services Construction Services - Construction for the removal and/or relocation of existing IR equipment, interior finishes, HVAC, utilities, and medical gas and a redesign and upgrade of approximately 1200 square feet of existing IR Suite space on the first floor of Building 1.

Contract Period: Base POP Begin:

POP End:

GRAND TOTAL _______________

NOTICE

1. Line Item 0001 (Design) and Line Item 0002 (Construction) contain all the work for this project.

2. Offerors must provide a lump sum price for Line Item 0001 (Design) and Line Item 0002 (Construction). Failure to do so may render their offeror as unacceptable.

3. Award will be made on Grand Total (Line Item 0001 Design and Line Item 002 Construction).

4. Pricing shall be submitted in whole dollar values. Please do NOT include pricing in cents.

5. Contractor is required to fill in their Unique Entity Identifier number associate with SAM.gov in Block No. 14 on Standard Form (SF) 1442.

6. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE

AND BONDS

1.1 BID MATERIAL:

Proposal materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Request For Proposal (RFP). The VA will not provide printed copies of drawings or specifications. It is the responsibility of the offeror to obtain the proposal materials in a time and manner sufficient to respond to this solicitation by the specified due date.

1.2 BID GUARANTEE:

A Bid Guarantee, Standard Form 24 (SF 24), is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for receipt of proposals, may result in the proposal being deemed unacceptable. Copies of the SF 24 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.

1.3 PAYMENT & PERFORMANCE BONDS:

The offeror to whom award is made will be required to furnish two bonds. A Payment Bond shall be provided on Standard Form 25A (SF 25A) and a Performance Bond shall be provided on Standard Form 25 (SF 25). Both bonds shall be submitted in accordance with FAR 52.228-15 Performance and Payment Bonds - Construction. Copies of SFs 25A and 25 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.

1.4 TAXES:

Contractor must take into account FAR 52.229-3; “Federal, State and Local Taxes” and its Special Note in their pricing. The FAR clause and its Special Note provide guidance on taxes being applied to pricing.

http://www.gsa.gov/portal/forms/type/TOP http://www.gsa.gov/portal/forms/type/TOP

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:

All solicitation related documents will be published to: https://sam.gov/.

2.2 PRE-PROPOSAL SITE VISIT:

A formal site visit has been scheduled for this project during Phase II. There will be no site visit for Phase I.

All potential offerors, subcontractors and suppliers are strongly encouraged to attend this site visit.

2.3 TECHNICAL QUESTIONS:

Questions of a technical nature must be submitted by prospective offerors via e-mail to BOTH:

CS, Zachary Penhollow (Zachary.Penhollow@va.gov) and CO, Joelle Mascarenas at (Joelle.Mascarenas@va.gov).The subject line of each e-mail must read: Rad Reno DB - West Haven - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF PHASE I QUESTIONS IS 05 June 2025 at 12:00 PM EST.

2.4 AMENDMENTS:

Amendments to this solicitation will be posted at https://sam.gov/. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable.

2.5 PREPARATION OF PROPOSALS:

The Government will not pay for any costs incurred in preparation and submission of proposals.

2.6 SELECTION PROCEDURES:

This solicitation is issued as a Request For Proposal (RFP) utilizing the two-phase design-build selection procedures in accordance with FAR 36.301. Phase II of the solicitation shall be prepared in accordance with FAR Part 15, with evaluation criteria developed in accordance with FAR 15.304. The Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal represents the best value to the Government. It is the intent of the Government to award without discussions; however, the Government reserves the right to conduct discussions if necessary.

All Phase I and Phase II proposals shall be subject to evaluation by a team of Government personnel. The proposals will be evaluated in accordance with the content provided in the solicitation. In Phase I of the Two-Phase Design-Build process, Offerors will submit a proposal in accordance with the three (3) evaluation factors listed below. Upon receipt of Phase I proposals, the VA team will evaluate and determine the highest qualified Offerors based on their Phase I submissions. A maximum of five (5) Offerors will be selected to provide a proposal for https://sam.gov/ mailto:Zachary.Penhollow@va.gov mailto:Joelle.Mascarenas@va.gov https://sam.gov/

Phase II. Offerors not selected to provide a Phase II proposal will be notified that they are no longer being considered for this project. Phase II proposals will be evaluated in accordance with FAR Part 15, the two (2) Non-Price evaluation factors listed below, and Price for Phase II. The Government intends to award a contract resulting from this solicitation to the responsible Offeror using a Trade- Offs method, after evaluations, in accordance with the factors in the Two-Phase Design-Build solicitation. A responsible determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.

Evaluations will be based on the following evaluation factors; *further information can be found in Section 2.7:

Phase I

1. Technical Approach

2. Specialized Experience

3. Past Performance

Phase II

1. Technical Solution

2. Management Approach

3. Price

2.7 PROPOSAL REQUIREMENTS:

A. GENERAL:

1. Proposals shall be based on solicitation document issued for RFP number

36C77625R0060. Proposals will be in the format stipulated in this document.

2. Proposals shall be received on or before the date and time specified in Block 13 of the

SF 1442. There will be no public opening of the proposals.

3. Proposal Submission:

i. Submit proposals via e-mail to: Zachary.Penhollow@va.gov and Joelle.Mascarenas@va.gov .

ii. Emails are limited to five (5) MB.

iii. Only e-mail proposals will be accepted. Hard-copy proposals will not be accepted.

4. Bid Bond (PHASE II ONLY):

i. The bid bond shall be submitted as part of the electronic proposal submission.

An original hard copy of the bid bond will be requested by the VA, after the award selection.

ii. Failure to furnish the required bid guarantee on the proper form and for the proper amount, by the time specified in Block 13 of SF 1442, shall result in rejection of the proposal. See FAR Provision 52.228-1, Bid Guarantee, contained in the solicitation.

5. Page size for all proposal documents will be 8.5 x 11 inches, with 1-inch margins around the page perimeter. Pages will be single spaced. Each page shall count as one (1) page.

Proposals shall be submitted using Times New Roman, with font no smaller than 11-point with normal proportional spacing.

6. Page formatting restrictions do not apply to drawings, but each page does apply to the page count. Pages submitted in excess of the page count will not be evaluated. *Page count does not apply to Phase II.

mailto:Zachary.Penhollow@va.gov

B. PHASE I PROPOSAL FORMAT AND EVALUATION:

1. Format: The offer, including title page, detailed table of contents, and preface for Phase I shall be submitted in one (1) PDF document and shall not exceed a total of THIRTY- FIVE (35) pages. The Offeror shall not include any price or price related material in the Phase I proposal. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.

Relative Importance:

Phase I: Factors 1 – 3 are of equal importance.

Phase II: Factors 1 - 2 are of descending order of importance.

Price: Proposed pricing is an evaluation factor. All evaluation factors other than price, when combined are significantly more important than price.

Factor Instructions: The Government reserves the right to award without discussions based upon the initial evaluation of the proposals but reserves the right to open discussions if determined to be necessary. All proposals shall be subject to evaluation by a team of Government personnel. The proposals will be evaluated in accordance with the content provided in the solicitation. Using the tradeoff process under best value, it may be in the Government's best interest to consider award to other than the lowest price Offeror or other than highest Technical rated Offeror. The intent is to award to the Offeror that offers the best value to the Government.

Phase I Instructions:

Phase I Proposal Factors:

Factor 1: Technical Approach

Factor 2: Specialized Experience

Factor 3: Past Performance

Factor 1, Technical Approach:

Submission Criteria: Provide a brief narrative (page limitation: ten (10) pages) on the offeror’s proposed technical approach for this design-build project as defined in the solicitation submittal requirements. The assessment of the offeror’s method to manage the project shall be used as a means of evaluating the offeror’s ability to successfully meet the requirements of the solicitation.

If the page limits are exceeded, the pages exceeding the limit will not be read or considered.

The following shall be included in the narrative:

Design Approach: Describe the techniques and methods.

Construction Approach: Describe the techniques and methods for this construction project to include coordination with the design package, projected timelines and phases and coordination of work.

Factor 2, Specialized Experience:

Submission Criteria: Provide a minimum of one (1) and a maximum of three (3) projects completed within the last five years (5) years similar in size, complexity and scope to this project. Projects must demonstrate an offeror’s experience as a prime contractor managing multiple subcontractors to include A-E firms if applicable. If the contractor does not possess

Design-Build (D-B) experience, provide a minimum of (1) and a maximum of two (2) projects completed by the A-E firm similar in size, complexity, and scope to this project in addition to the one (1) to three (3) projects submitted for the prime contractor.

For purposes of this evaluation, a relevant project is further defined as “Design-Build” projects completed for constructing similar Radiology suite and/or structures that includes some or all of the following elements: experiences in large scale demolition and removing radioactive equipment; experiences in setting steel and/or precast structures of similar size and complexity;

knowledge with support the install of high-tech and high-cost equipment, projects that demonstrate the ability to work in a hospital facility while taking proper safety and infection control precautions based on their surroundings.” Projects that contain all or most of the elements identified may be rated higher. Projects shall have a minimum value of $3 million and be 100% completed for designs completed by the A-E firm in support of D-B or project.

For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project. If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by each individual entity, in addition to any work performed by the Joint Venture itself.

For each project identified, include the following information at a minimum:

Project Title

Project Location (Physical Address)

Contract Type (Example: Design-Build, Design-Bid-Build).

Project owner name and telephone number of the owner’s contact person.

Project Description of the scope of work

Project prime contractor and major subcontractors, percentage of self-performance.

Project timeline including start and completion dates (original vs. actual)

Project cost (original vs actual)

*If original vs actual completion dates and project cost differ, please provide an explanation as to why they differ. Offeror should be clear as to whether the delay was attributed to the Government, the offeror, or both.

Factor 3, Past Performance:

Submission Criteria: Each proposal shall provide current and relevant information regarding an Offeror’s actions under previously awarded contracts referenced under Factor 2 – Specialized Experience, from Phase 1. If a completed past performance evaluation is available in the Contractor Performance Assessment Reporting System (CPARS), it shall be submitted with the proposal for each project referenced in Factor 2 – Specialized Experience, from Phase 1. If there is not a completed past performance evaluation available in CPARS, then the Offeror shall submit a Past Performance Questionnaire (PPQ) (reference ATTACHMENT 5- PPQ) for each project referenced in Factor 2 – Specialized Experience, from Phase 1. The Offeror shall notify their client that they PPQ shall be submitted via email to the Government’s point of contact Zachary.Penhollow@va.gov and Joelle.Mascarenas@va.gov. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts mailto:Zachary.Penhollow@va.gov to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires.

End of Phase I Instructions

PHASE II PROPOSAL FORMAT AND EVALUATION:

1. Format: Phase II proposals shall be based on solicitation documents and the instructions provided by the Contracting Officer in the Phase II Notice of Offerors notifying Offerors that they were selected as one of the most qualified Offerors in Phase I. Phase II proposals must be submitted in two (2) Volumes (Volume I: Technical & Management and Volume II: Price. The contractor shall include NO price information in Volume I. Both volumes must be labeled with the Offeror's organization, business address, and VA Solicitation Number.

a. Offeror shall return a signed copy of all amendment(s) that are acknowledged in section 19 of the SF 1442 or on each SF 30.

b. Bid Bond (see FAR Provision 52.228-1, Bid Guarantee, contained in the solicitation).

c. Capability to Perform: The Offeror shall provide a letter from their surety demonstrating the offeror’s total bonding capacity and current available bonding capacity. Total bonding capacity and current available bonding capacity must be outlined in a letter dated no earlier than the solicitation release date.

d. Offeror shall provide their Representations and Certifications or their response to FAR 52.204-8 (2) (i) or (ii) Annual Representations and Certifications.

e. Limitations on Subcontracting: The offeror shall complete and sign the VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction required in VAAR 852.219-75 and return it with their proposal submission attached as a separate document (Attachment 07- Limitations on Subcontracting). The completed and signed form will become part of the official award documentation.

f. Offeror shall provide their response to FAR 52.204-24 (d) Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.

g. Offeror shall provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.

h. Offeror shall provide their response to FAR 52.209-13 (b) (1) or (2) Violation of Arms Controls Treaties or Agreements.

i. Offeror shall provide their response to FAR 52.219-28 items (h)(1), (h)(6), and (h)(7) Post-Award Small Business Program Representations.

Phase II Instructions:

Phase II Proposal Factors-

Volume I:

Factor 1: Technical Solution

Factor 2: Management Approach

Volume II:

Factor 3: Price

Factor 1, Technical Solution (Volume I):

Submission Criteria: Based on the solicitation documents, site visit, and the Offeror’s Phase I Technical Approach, provide a detailed narrative (page limitation: ten (10) pages for detailed narrative plus two (2) pages available for schematic layout suggestions, not including cover pages or table of contents) describing the Offeror’s technical solution to the project to achieve design and construction design objectives as described in the solicitation. If the page limits are exceeded, the pages in excess of the limit will not be read or considered.

The Offeror’s narratives shall include, at minimum, the following technical areas:

•Phasing to ensure uninterrupted medical center operations to include utilities and access to parking.

•Design approach to site management, site preparations, planned construction to be used, along with consideration of the physical connections from the new structure to the existing hospital structure.

•Design approach to handling necessary utility shut-downs, relocations, or new connections throughout the construction phase(s).

•Quality Control management and solutions

•Safety management

The Offeror shall address areas of concern and describe how they will minimize risk in conjunction with the identified areas of concern. The narrative shall indicate that the Design- Build team understands the site complexities and address how their approach offers constructability advantages in an operational hospital setting.

Evaluation Methodology: Technical Solution will be evaluated to determine that the Offeror under-stands the project and can perform all the required elements. The VA will evaluate an Offeror’s specific detail regarding design, constructability, and site-specific considerations.

Factor 2, Management Approach (Volume I):

Submission Criteria: The Offeror shall submit an organizational chart and indicate the prime responsible firm (or firms, if a J/V) and individuals, as well as the roles and responsibilities of individuals proposed as consultants and subcontractors. Provide a list of all consultants and all proposed major subcontractors, including telephone number, address, and name of contact.

Please delineate the approximate percentage of work the prime contractor will perform and the approximate percentage of work the subcontractors (collectively) will perform.

The Offeror shall provide resumes that describes the design build team’s qualifications, to include education and/or certification(s), of the following personnel (page limitation, two (2) pages per requested resume):

a. DB Project Manager

b. Construction Project Management/Site Superintendent

c. Lead Architect

d. Lead Electrical Engineer

e. Lead Mechanical Engineer

f. Registered Communications Distribution Designer (RCDD)

g. Physical Security Specialist (note – must have Certified Protection Professional (CPP) or Physical Security Professional (PSP) certification issued by ASIS International). For each of these “key personnel,” the offeror shall identify if those individuals are currently committed/working on another project and note the anticipated completion date. The Offeror shall describe its approach for managing performance under this solicitation, including techniques for management of work coordination with subcontractors and measures/corrective action that will be taken for substandard performance.

Factor 3, Price (Volume II):

Submission Criteria: Carefully follow “Instructions, Conditions, and Notices to Offerors”, Standard form (SF) 1442 Solicitation, Offer and Award (Construction, Alteration, or Repair) and the price schedule when submitting price offers. The prices shall be Firm Fixed Price. The Offeror shall take care not to include remarks that take exception to the Government’s solicitation and supporting attachments, pricing requirements, or otherwise preclude the Government from evaluating the offer or render the offer as non-responsive or unacceptable. If the Offeror communicates in its proposal any exceptions, exclusions, qualifications, or conditions to the proposed prices not provided for in the Offerors proposal documents, the Contracting Officer shall reject the proposal and exclude the Offeror from further consideration.

The Contracting Officer will evaluate Offers in accordance with the process identified in the Price Schedule. The total evaluated price will be determined by the Offeror’s price for all the Line Items listed.

Note: The VA will look at the total evaluated price and non-price factors to determine the best value.

In addition to the pricing schedule, Offerors shall submit a detailed Breakdown of the Line Item 0001 Design pricing and a detailed Breakdown of the Division Pricing for Line Item 0002 Construction. This detailed pricing will be used to assist the Contracting Officer with the determination of

Evaluation Methodology: Will be evaluated in accordance with the process identified in the Price Schedule. The total evaluated price will be determined by the Offeror’s price for all the Line Items listed.

Note: The VA will look at the total evaluated price and non-price factors to determine the best value. “Best Value” means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirements. The Offeror’s price proposal will be evaluated with consideration to the total number of parking stalls constructed, in addition to all other elements of the scope of work.

End of Phase II Instructions

2.8 DETERMINATION OF RESPONSIBILITY:

In accordance with FAR subpart 9.1, Responsible Prospective Contractors, a responsibility determination will be made for the apparent awardee prior to processing the award. The Contracting Officer reserves the right to request information to assist the Government in determining the apparent successful offeror responsible, including information regarding the offeror’s previous experience (including points of contact), organization (including company officers), technical qualifications, financial resources, and other information deemed necessary.

NOTE: Any information received by the Government that would be cause for a negative determination of responsibility may make the offeror ineligible for award.

2.9 VETS 4212:

Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at:

http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.

2.10 SYSTEM FOR AWARD MANAGEMENT (SAM):

Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Offerors are required to be registered in SAM at the time an offer is submitted in order to comply with the annual representations and certifications requirements. The Offeror shall be registered at time of Phase I submission, Phase II submission, and award. An Offeror is required to be registered in SAM when submitting and offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

2.11 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR

PERFORMANCE ASSESSMENT SYSTEM (CPARS):

As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $700,000, and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS has connectivity with the Past Performance Information Retrieval System (PPIRS) database, which is available to all Federal agencies.

PPIRS is the system used to collect and retrieve performance assessment reports used in source selection determinations and completed CPARS report cards transferred to PPIRS.

CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.

Each contractor whose contract award is estimated to exceed $700,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMM: 207- 438-http://www.dol.gov/vets/vets4212.htm http://www.sam.gov/

1690. Registration should occur no later than thirty days after contract award, and must be kept current should there be any change to the contractor’s registered representative.

For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.

Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.

2.12 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:

All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation commensurate with the level of access needed to perform the statement of work is: Low Risk. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements.

2.13 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER:

Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).”

2.14 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY

REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/

(End of Provision)

2.15 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.

(b) The use in this solicitation of any VAAR Acquisition Regulation (48 CFR Chapter FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

(End of Provision)

FAR

Number

Title Date

52.204-7 SYSTEM FOR AWARD MANAGEMENT NOV 2024

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING

AUG 2020

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR

INFORMATION SYSTEMS

NOV 2021

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JAN 2017

52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE

ACQUISITION

NOV 2021

52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID

GUARANTEE)

FEB 2021

52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION OCT 1997

2.16 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.17 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—

SECONDARY SITE OF THE WORK (MAY 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.18 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.19 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.20 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Joelle Mascarenas

Hand-Carried Address:

Joelle Mascarenas

Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Boulevard, Suite 490 Independence OH 44131 Mailing Address:

Joelle Mascarenas

Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Boulevard, Suite 490 Independence OH 44131

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

2.21 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I

(FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

TBD - Site Visit will be held in Phase II

(c) Participants will meet at—

TBD - Site Visit will be held in Phase II

(End of Provision)

2.22 PARTNERING

(a) In order to most effectively accomplish this contract, the Government proposes to form a cohesive partnership with the Contractor and its subcontractors. This partnership would strive to draw on the strengths of each organization in an effort to achieve a quality project, done right the first time, within the budget and on schedule.

(b) This partnership will be totally voluntary. The focus of partnering is to build cooperative relationships with the private sector and avoid or minimize disputes and to nurture a more collaborative ethic characterized by trust, cooperation and teamwork. Partnering is defined as the creation of a relationship between the owner and contractor that promotes mutual and beneficial goals. It is a non-contractual, but formally structured agreement between the parties.

The ultimate goal is the elimination of the "us" versus "them" thinking, and formation of a "we" mentality for the benefit of the…