S02-Price Breakdown Worksheet1.pdf

PDF 147 KB Posted

Attached to
Z1DA--Project # 593-18-104 Remodel of Main Pharmacy Compounding Spaces
Solicitation number
36C26123R0035
Issued by

About this file

This document contains a price breakdown worksheet and solicitation for a federal construction contract to remodel pharmacy compounding spaces at a VA medical center. The solicitation is a total SDVOSB set-aside for a firm-fixed price construction project to upgrade pharmacy areas and comply with new USP standards at the North Las Vegas VA Medical Center. Offerors must provide all labor, materials, transportation, overhead and profit to complete the work outlined in the statement of work, specifications and drawings by the period of performance of 180 days from notice to proceed. Proposals are due no later than May 4, 2023 at 2:00pm PDT and shall be submitted to the identified contracting specialist and contracting officer. The basis for award is price only and price-related factors.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 36C26123R0035 Attachment - Price Breakdown (28Mar2023)

DESCRIPTION MATERIAL LABOR EQUIPMENT OTHER TOTAL

Division 01 -General Requirements Division Total $ $ $ $ $ Division 02 – Existing Conditions MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total $ $ $ $ $ Division 03 - CONCRETE MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total $ $ $ $ $ Division 04 - Masonry MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total $ $ $ $ $ Division 05 – Metals MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total Division 06 – Wood, Plastic, and Composites

MATERIAL LABOR EQUIPMENT OTHER TOTAL

Division Total $ $ $ $ $

Division 07 – Thermal and Moisture Protection

MATERIAL LABOR EQUIPMENT

OTHER

TOTAL

Division Total $ $ $ $ $ Division 08 – Openings MATERIAL LABOR EQUIPMENT OTHER TOTAL

Division Total $ $ $ $ $ Division 09 – Finishes MATERIAL LABOR EQUIPMENT OTHER TOTAL

Division Total $ $ $ $ $

Division 10 – Specialties MATERIAL LABOR EQUIPMENT OTHER TOTAL

Division Total $ $ $ $ $

Division 21 – Fire Suppression MATERIAL LABOR EQUIPMENT OTHER TOTAL

Division Total $ $ $ $ $ Division 22 – Plumbing MATERIAL LABOR EQUIPMENT OTHER TOTAL

Division Total $ $ $ $ $ Division 23 – Heating, Ventilating and Air Conditioning (HVAC)

MATERIAL LABOR EQUIPMENT OTHER TOTAL

Division Total $ $ $ $ $ Division 26 – Electrical MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total $ $ $ $ $ Division 27 - Communications MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total $ $ $ $ $ Division 28 – Electronic Safety and Security

MATERIAL LABOR EQUIPMENT OTHER TOTAL

Division Total $ $ $ $ $

SUB TOTAL $ $ $ $ $

Overhead $ $ $ $ $ Profit $ $ $ $ $ Bonds and Insurance $ $ $ $ $ TOTAL Proposal $ $ $ $ $

NOTE: All other costs may be included as a separate item and shall be specified in this breakdown.

File details come from the government source that posted it. Updated .