S02-Price Breakdown Worksheet1.pdf
PDF 147 KB Posted
- Solicitation number
- 36C26123R0035
About this file
This document contains a price breakdown worksheet and solicitation for a federal construction contract to remodel pharmacy compounding spaces at a VA medical center. The solicitation is a total SDVOSB set-aside for a firm-fixed price construction project to upgrade pharmacy areas and comply with new USP standards at the North Las Vegas VA Medical Center. Offerors must provide all labor, materials, transportation, overhead and profit to complete the work outlined in the statement of work, specifications and drawings by the period of performance of 180 days from notice to proceed. Proposals are due no later than May 4, 2023 at 2:00pm PDT and shall be submitted to the identified contracting specialist and contracting officer. The basis for award is price only and price-related factors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI-Answers the Questions Final_17May2023.pdf | ||
| 36C26123R0035 0004.docx | DOCX document | |
| 36C26123R0035 0003.docx | DOCX document | |
| 36C26123R0035 0002.docx | DOCX document | |
| S04-Attachment Site Vistit Present_Pharmacy_12Apr2023.pdf | ||
| S02-Attachment_Pharmacy Photos.pdf | ||
| S04-Site Visit Attendees_12Apr2023.pdf | ||
| 36C26123R0035 0001.docx | DOCX document | |
| S02-NLV Bid Set Combined Drawings - 20220517.pdf | ||
| S02-Wage Rate_NV20230038_17Mar2023.pdf | ||
| 36C26123R0035.docx | DOCX document | |
| S02-ATTACHMENT - Contractor Certification Regarding Safety and Environmental.docx | DOCX document | |
| S02-Request for Information (RFI) Form.docx | DOCX document | |
| S02-NLV Bid Set Combined Specs - 20220517 - 1(28Mar2023).pdf | ||
| S02-SOW - Main Pharmacy_FINAL.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C26123R0035 Attachment - Price Breakdown (28Mar2023)
DESCRIPTION MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division 01 -General Requirements Division Total $ $ $ $ $ Division 02 – Existing Conditions MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total $ $ $ $ $ Division 03 - CONCRETE MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total $ $ $ $ $ Division 04 - Masonry MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total $ $ $ $ $ Division 05 – Metals MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total Division 06 – Wood, Plastic, and Composites
MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division Total $ $ $ $ $
Division 07 – Thermal and Moisture Protection
MATERIAL LABOR EQUIPMENT
OTHER
TOTAL
Division Total $ $ $ $ $ Division 08 – Openings MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division Total $ $ $ $ $ Division 09 – Finishes MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division Total $ $ $ $ $
Division 10 – Specialties MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division Total $ $ $ $ $
Division 21 – Fire Suppression MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division Total $ $ $ $ $ Division 22 – Plumbing MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division Total $ $ $ $ $ Division 23 – Heating, Ventilating and Air Conditioning (HVAC)
MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division Total $ $ $ $ $ Division 26 – Electrical MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total $ $ $ $ $ Division 27 - Communications MATERIAL LABOR EQUIPMENT OTHER TOTAL Division Total $ $ $ $ $ Division 28 – Electronic Safety and Security
MATERIAL LABOR EQUIPMENT OTHER TOTAL
Division Total $ $ $ $ $
SUB TOTAL $ $ $ $ $
Overhead $ $ $ $ $ Profit $ $ $ $ $ Bonds and Insurance $ $ $ $ $ TOTAL Proposal $ $ $ $ $
NOTE: All other costs may be included as a separate item and shall be specified in this breakdown.