S02-Attachment_Pharmacy Photos.pdf

PDF 6 MB Posted

Attached to
Z1DA--Project # 593-18-104 Remodel of Main Pharmacy Compounding Spaces
Solicitation number
36C26123R0035
Issued by

About this file

This document includes a solicitation for a construction project and supporting files. The solicitation is for upgrading pharmacy areas at the North Las Vegas VA Medical Center to meet USP 800 compounding standards. Offerors must furnish all labor, materials, and equipment for the firm-fixed price project with a period of performance of 180 days after notice to proceed. The total project value is undisclosed. Supporting files provide 20 pages of photos outlining demolition requirements within existing pharmacy spaces. Offerors must be verified SDVOSB contractors and submit proposals by May 4, 2023 to the contracting staff listed. The work is a total SDVOSB set-aside awarded based on price to the Department of Veterans Affairs VHA VISN 21.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Photos of Rooms 1D353 (current Vestibule), 1D354 (IV Clean Room), and 1D1355 (Chemo Prep).

Notes pertaining to the demolition within the spaces are:

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS

SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS AND

ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

2. ALL DEMOLITION WORK SHALL BE CONDUCTED AFTER HOURS (5:30 PM PST - 6:00

AM PST)

3. REFER TO HAUL ROUTE AND ICRA PLAN FOR FURTHER INFORMATION.

4. CONTRACTORS TO BE ESCORTED TO AND FROM LOADING DOCK AND AREA OF

CONSTRUCTION, COORDINATE w/ COR. CONSTRUCTION ACCESS IN AND OUT OF THE SPACE WILL BE FROM ID342 TO C1-89, COORDINATE w/ COR.

5. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS, IF CONDITIONS DO NOT

REFLECT WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO

NOTIFY THE ARCHITECT.

6. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF

CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND

COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO THE

OVERALL PROJECT.

7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF

DUMPSTERS TO BE DETERMINED BY OWNER WITH CONTRACTORS INPUT.

8. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS. DO

NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO

ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE OF IN A LEGAL

MANNER. NO ONSITE SALE OR BURNING OR REMOVED ITEMS IS PERMITTED.

9. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE

SAFETY OF THE PUBLIC AND/OR WORKERS ON THE SITE TO PREVENT ACCIDENTS OR

INJURY TO ANY PERSON ON, ABOUT OR ADJACENT TO THE PREMISES. THE

CONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND

REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF ACCIDENTS.

10. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION,

WATERPROOFING, EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR

PART OF ITEMS WHICH ARE TO REMAIN.

11. THE OWNER RESERVES THE RIGHTS TO ANY REMOVED MATERIALS OR ITEMS.

CONTRACTOR TO COORDINATE WITH OWNER.

12. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD

CHANGE THEIR LOAD-CARRYING CAPACITY OR LOADDEFLECTION RATIO.

13. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION, REWORK AS

REQUIRED, PREPARE FOR NEW CONSTRUCTION AS REQUIRED. BLOCK PATCHING

SHALL BE TOOTHEDIN TO MATCH EXISTING COURSING PATTERN.

14. WHERE WALLS & CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITH THE

WALLS &/OR CEILINGS ARE TO BE REMOVED OR REROUTED. REFER TO MECHANICAL,

ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL DEMOLITION NOT SHOWN ON

THIS SHEET.