S02-Price Breakdown Worksheet1.docx
DOCX document 19 KB Posted
- Attached to
- Z1DA--Exterior Painting - BLDGs 208, 5, 7, and BLDG 1 Connection | 36C26123R0044 | 662-23-2-6451-0007
- Solicitation number
- 36C26123R0044
About this file
This document contains a price breakdown worksheet and related federal contract opportunity solicitation for exterior painting services. The solicitation seeks a firm-fixed price proposal to provide exterior painting for four buildings at the San Francisco VA Medical Center, with a project completion period of 120 days from notice to proceed. Offerors must be verified in VIP/SBA at the time of submission and prior to award. Proposals are due no later than June 16, 2023 at 2:00pm PDT and shall be submitted to the identified Contract Specialist and Contracting Officer. The opportunity is set aside for verified Service-Disabled Veteran-Owned Small Businesses. The price breakdown worksheet outlines the required format for dividing labor, materials, equipment, overhead, profit, bonds and insurance costs into divisions and a total proposed price.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C26123R0044 Attachment - Price Breakdown (DRAFT 10 Apr 2023)
| DESCRIPTION |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
Division 01 -General Requirements
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 09 – Finishes |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| SUB TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| Overhead |
| $ |
| $ |
| $ |
| $ |
| $ |
| Profit |
| $ |
| $ |
| $ |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| $ |
| $ |
| $ |
| TOTAL Proposal |
| $ |
| $ |
| $ |
| $ |
| $ |
NOTE: All other costs may be included as a separate item and shall be specified in this breakdown.
File details come from the government source that posted it. Updated .