This document provides responses to requests for information (RFI) regarding Solicitation Number 36C26123R0044 for exterior painting services at buildings on the San Francisco VA Medical Center campus. The scope of work includes painting the exterior of buildings 208, 7, 5, and the connector between buildings 5 and 1. It confirms the lower tunnel between buildings 208 and 203, the retaining wall and window wall surrounding an area on the south side of building 208, and all exterior surfaces are to be painted. An extension was granted to the proposal due date of June 29, 2023 to allow for accurate quantification of work. Drawings of the buildings and an updated campus map are included in the solicitation. The solicitation is a total SDVOSB set aside and offers are due by June 16, 2023. The contract will be a firm-fixed price award for a period of performance of 120 days after notice to proceed.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
36C26123R0044 - Amendment 0003
RESPONSES TO REQUESTS FOR INFORMATION (RFI)
PROJECT 662-23-123, Exterior Painting - Bldgs. 208, 5, 7 and Connection to Bldg. 1
1. Please confirm the following areas are supposed to be included in this projects scope: the lower tunnel connecting 208 to 203. Are we to include painting the whole exterior of that tunnel both sides all the way to where it connects to BLDG 203? -the concrete retaining wall (to be primed and painted?) with window wall on top of concrete wall (prime and paint all window frames on top concrete wall) surrounding the “yarded area” on the south side of BLDG 208.
-The exterior of BLDG 1 corridor connector from 5 to 1.
VA Response: Yes, the lower tunnel from 208-203 both sides, Bldg.208 (in its entirety), and the exterior connector from 5 to 1 are included in this project’s scope.
2. Please confirm that it will be acceptable to use a spray application as the specs state we need acceptance in writing.
VA Response: Paint application shall be rolled and not sprayed as stated in the scope.
3. Are drawings available for this project? Can the proposal due date be extended to allow for accurate quantification of the work?
VA Response: Amendment 0002 changed the proposal due date to June 29, 2023, at 2 P.M. PDT to allow for quantification of work. Drawings for buildings 5,7, 208 and updated campus map (dated 11.09.19) are incorporated into the solicitation.