RFI-Answer to Questions Final_8June2023.pdf

PDF 282 KB Posted

Attached to
Z1DA--Exterior Painting - BLDGs 208, 5, 7, and BLDG 1 Connection | 36C26123R0044 | 662-23-2-6451-0007
Solicitation number
36C26123R0044
Issued by

About this file

This document contains responses to requests for information (RFI) and details for a federal solicitation. The solicitation is for exterior painting services at multiple buildings at the San Francisco VA Medical Center, including buildings 208, 7, 5, and the connection between buildings 1 and 5. The solicitation number is 36C26123R0044 and responses are due by June 16, 2023 at 2:00pm PDT. The opportunity is set aside for verified service-disabled veteran-owned small businesses. The contract will be a firm-fixed price agreement for a 120-day period of performance following notice to proceed. Paint application must be rolled and not sprayed per the specifications.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

36C26123R0044 - Amendment 0001

RESPONSES TO REQUESTS FOR INFORMATION (RFI)

PROJECT 662-23-123, Exterior Painting - Bldgs. 208, 5, 7 and Connection to Bldg. 1

1. Please confirm the following areas are supposed to be included in this projects scope: the lower tunnel connecting 208 to 203. Are we to include painting the whole exterior of that tunnel both sides all the way to where it connects to BLDG 203? -the concrete retaining wall (to be primed and painted?) with window wall on top of concrete wall (prime and paint all window frames on top concrete wall) surrounding the “yarded area” on the south side of BLDG 208.

-The exterior of BLDG 1 corridor connector from 5 to 1.

VA Response: Yes, the lower tunnel from 208-203 both sides, Bldg.208 (in its entirety), and the exterior connector from 5 to 1 are included in this project’s scope.

2. Please confirm that it will be acceptable to use a spray application as the specs state we need acceptance in writing.

VA Response: Paint application shall be rolled and not sprayed as stated in the scope.