S02 IFB Cost Estimate Worksheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Y1PZ--915CM3010 In Ground Cremains Cemetery Expansion at Abraham Lincoln National Cemetery
- Solicitation number
- 36C78625B0037
About this file
The file is an IFB (Invitation for Bid) Cost Estimate Worksheet for a cemetery expansion project at Abraham Lincoln National Cemetery. The document provides a comprehensive divisional cost breakdown template for contractors to complete, covering 25 construction divisions ranging from general requirements (Division 01) to electronic safety and security (Division 28). The project, identified by Solicitation Number 36C78625B0037 and Project Number 915CM3010, is being solicited by the Department of Veterans Affairs National Cemetery Administration for an in-ground cremains cemetery expansion located in Elwood, Illinois.
The worksheet requires contractors to provide lump sum cost estimates for each applicable construction division, with instructions to mark divisions not being utilized as "N/A". The template includes sections for bonds, overhead, and profit, culminating in a grand total cost calculation. Contractors are also advised that they can add additional line items they deem appropriate to the cost estimate. The worksheet serves as a structured method for contractors to submit their comprehensive project cost proposal for the cemetery expansion project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised Davis-Bacon Wage Determination IL20250011 07-04-2025.pdf | ||
| 36C78625B0037 0001.docx | DOCX document | |
| Bid Specifications 915CM3010 IGC Cemetery Expansion at ALNC.pdf | ||
| Bid Drawings 915CM3010 IGC Cemetery Expansion at ALNC.pdf | ||
| VAAR 852.219-75 VA Notice of Limitations On Subcontracting Certificate.docx | DOCX document | |
| 36C78625B0037_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| Solicitation Number | 36C78625B0037 |
| Project Nunber | 915CM3010 |
| Project Name | In Ground Cremains Cemetery Expansion at Abraham Lincoln NC |
| Division | Unit | CLIN 001 | Total |
| Division 0 | |||
| Special Sections | |||
| Division 01 | |||
| General Requirements | |||
| Division 02 | |||
| Existing Conditions | |||
| Division 03 | |||
| Concrete | |||
| Division 04 | |||
| Masonry | |||
| Division 05 | |||
| Metals | |||
| Division 06 | |||
| Wood, Plastic, and Composites | |||
| Division 07 | |||
| Thermal and Moisture Protection | |||
| Division 08 | |||
| Openings (Doors, Windows, etc...) | |||
| Division 09 | |||
| Finishes | |||
| Division 10 | |||
| Specialties | |||
| Division 11 | |||
| Equipment | |||
| Division 12 | |||
| Furnishings | |||
| Division 13 | |||
| Special Construction | |||
| Division 14 | |||
| Fire Suppression | |||
| Division 22 | |||
| Plumbing | |||
| Division 23 | |||
| Heat, Ventilating, and Air Conditioning | |||
| Division 25 | |||
| Integrated Automation | |||
| Division 26 | |||
| Electrical | |||
| Division 27 | |||
| Communications | |||
| Division 28 | |||
| Electronic Safety and Security | |||
| Division 31 | |||
| Earthwork | |||
| Division 32 | |||
| Exterior Improvements | |||
| Division 33 | |||
| Utilities | |||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $
File details come from the government source that posted it. Updated .