S02 IFB Cost Estimate Worksheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1PZ--915CM3010 In Ground Cremains Cemetery Expansion at Abraham Lincoln National Cemetery
Solicitation number
36C78625B0037
Issued by

About this file

The file is an IFB (Invitation for Bid) Cost Estimate Worksheet for a cemetery expansion project at Abraham Lincoln National Cemetery. The document provides a comprehensive divisional cost breakdown template for contractors to complete, covering 25 construction divisions ranging from general requirements (Division 01) to electronic safety and security (Division 28). The project, identified by Solicitation Number 36C78625B0037 and Project Number 915CM3010, is being solicited by the Department of Veterans Affairs National Cemetery Administration for an in-ground cremains cemetery expansion located in Elwood, Illinois.

The worksheet requires contractors to provide lump sum cost estimates for each applicable construction division, with instructions to mark divisions not being utilized as "N/A". The template includes sections for bonds, overhead, and profit, culminating in a grand total cost calculation. Contractors are also advised that they can add additional line items they deem appropriate to the cost estimate. The worksheet serves as a structured method for contractors to submit their comprehensive project cost proposal for the cemetery expansion project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IFB Contractor Cost Estimate Worksheet
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

Solicitation Number36C78625B0037
Project Nunber915CM3010
Project NameIn Ground Cremains Cemetery Expansion at Abraham Lincoln NC
DivisionUnitCLIN 001Total
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

Overhead

Profit

GRAND TOTALS $ $