S02_IFB ATCH Project Drawings (51 Pages).pdf

PDF 13 MB Posted

Attached to
Z1DA--PN: 568A4-19-204, Correct Electrical Deficiencies (HS) Invitation For Bid (IFB)
Solicitation number
36C26321B0001
Issued by

About this file

This document outlines a federal contract opportunity for electrical infrastructure upgrades at the Hot Springs VA Medical Center in South Dakota. The Department of Veterans Affairs seeks a contractor to replace an underground electrical duct bank system consisting of two loops, install sectionalizers and new transformers totaling twenty-four and six respectively, add a new duct bank near buildings 20 and 24, and install bollards at transformer locations. The construction cost is estimated between $500,000 to $1,000,000. The solicitation number is 36C26321B0001 and will be posted on April 2nd, 2021, containing specifications, drawings and submission details. Bids are due on May 4th, 2021 and the successful bidder must provide bid and performance bonds within ten days of award notification. The period of performance is 240 calendar days from notice to proceed. This opportunity is set aside for service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
36C26321B0001 0001.docx DOCX document
S06_Atch_ Site Visit Sign In Sheet (1 Page).pdf PDF
S02_IFB_ATCH_ICRA (1 Page).pdf PDF
S02_IFB Atch_Project Specs (236 Pages).pdf PDF
36C26321B0001_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

IV

ER

S

TR

EE

T

EN

TR

AN

C E

TO NATIONAL CEMETERY

7 6

A B

C

TELE.

FUEL

STORAGE

TANKS

LOT

GRAND

STAIRCASE

CO

UR

T

CO

UR

T

PATIO

S

PA

CE

S

PA

TIE

NT

/V

ISI

TO

R

BU

ILD

ING

PL

AN

TBO

ILE

R

PARKING

AMB. C

ARE

N O

R

TH

D

X X

X X

X X

X X

X

X

X

X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X X

X X

CARWASH PAD

DO

WNBL

OW

DE

AE

RA

TO

R

5 SPACES - EMP.

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

AREA OF WORKVICINITY MAP SHEET INDEX

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS, SD

VAMC PROJECT #: 568A4-19-204

CORRECT ELECTRICAL DEFICIENCIES

12/07/2020 TL RW

GI001

NA

COVER SHEET

Pl an

N or th

True N orth

Pl an

N or th

True N orth rwwhe Image

NEUT OR N

NC

NEUTRAL

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OL OVERLOAD

P

POLE

PA PUBLIC ADDRESS

PB PULL BOX OR PANEL BOARD

PBPU PREFABRICATED BEDSIDE PATIENT UNIT

PCB POLYCHLORINATED BIPHENYL

PEC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PNL PANEL

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

REQ REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

SCC SHORT CIRCUIT CAPACITY

SES SERVICE ENTRANCE SECTION

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SURF SURFACE

SW SWITCH

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

VA VOLT·AMPERE

VAR VOLT AMPERE REACTIVE

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

W WATT

WH WATER HEATER

WP WEATHERPROOF

XFER TRANSFER

XFMR TRANSFORMER

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

DWG DRAWING

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMCP EMERGENCY MONITORING CONTROL PANEL

EMER EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

EPRF EXPLOSION PROOF

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXST EXISTING

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FABL FIRE ALARM BELL

FABX FIRE ALARM BOX

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FIXT FIXTURE

FLA FULL LOAD AMPS

FLEX FLEXIBLE METALLIC CONDUIT

FLT FLOODLIGHT

FLUOR FLUORESCENT

FLUOR

FIX

FLUORESCENT FIXTURE

FOUTT TELEPHONE FLOOR OUTLET

FP FIRE PROTECTION

FT FEET OR FOOT

FU SW FUSED SWITCH

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

G OR GND ELECTRICAL GROUND

GEN GENERATOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GTB GROUND TERMINAL BOX

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HZ HERTZ

IESNA ILLUMINATION ENGINEERING SOCIETY OF

NORTH AMERICA

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT AMPERE

KVAH KILOVOLT AMPERE PER HOUR

KVAR KILOVOLT AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

KWHM KILOWATT HOUR METER

LED LIGHT EMITTING DIODE

LM LUMEN

LP LIGHT POLE

LPS LOW PRESSURE SODIUM

LRA LOCKED ROTOR AMPS

LT LIGHT

LTG LIGHTING

LTG PNL LIGHTING PANEL

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MLO MAIN LUGS ONLY

MOCP MAXIMUM OVERCURRENT PROTECTION

MT MOUNT

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

MVA MEGAVOLT·AMPERE

MW MEGAWATT

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

SINGLE POLE

1PH SINGLE PHASE

2/C TWO-CONDUCTOR

3/C THREE-CONDUCTOR

3PH THREE PHASE

4/C FOUR-CONDUCTOR

4W FOUR WIRE

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT / ENGINEER

AAP ALARM ANNUNCIATOR PANEL

AC ALTERNATING CURRENT OR ARMORED

CABLE

ACC ACCESSIBLE

ADDL ADDITIONAL

ADJ ADJACENT OR ADJOINING

ADO AUTOMATIC DOOR OPENER

AMPERE FRAME OR AMP FUSE

AFC ABOVE FINISHED COUNTER, AUTOMATIC

FREQUENCY CONTROL, OR AVAILABLE

FAULT CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AH AMPERE·HOUR

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

ALT ALTERNATE

AMB OR A AMBIENT

AMP AMPERE

ARCH ARCHITECT

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

BAT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISHED FLOOR

BIL BASIC INSULATION LEVEL

BLDG BUILDING

BPIP BOILER PLANT INSTRUMENTATION PANEL

BRKR BREAKER

BYP BYPASS

CONDUIT

CAB CABINET

CALC CALCULATE

CAP CAPACITY

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

CD CANDELA OR CONSTRUCTION DOCUMENTS

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED / CONTRACTOR

INSTALLED

CF/OI CONTRACTOR FURNISHED / OWNER

INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

CLF CURRENT LIMITING FUSE

CLG CEILING

CMU CONCRETE MASONRY UNIT

COAX COAX CABLE

COMM COMMUNICATION

COMPT COMPARTMENT

CONC CONCRETE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

CU FT CUBIC FEET

CUR CURRENT

DB DECIBEL

DC DIRECT CURRENT

DCP DIMMER CONTROL PANEL

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISC DISCONNECT

DISTR DISTRIBUTION

DISTR

PNL

DISTRIBUTION PANEL

DMR SW DIMMER SWITCH

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

NORMALLY CLOSED

1P

AF

C

ELECTRICAL ABBREVIATIONS

A. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES,

CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP

CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE CONDUIT WITHIN THE

WORK AREA, DISCONNECT WIRING AT THE OVERCURRENT PROTECTIVE DEVICE AND

REMOVE WIRING COMPLETELY FROM THE ABANDONED CONDUITS.

B. DISCONNECT AND REMOVE ALL WIRES AND CONDUIT BACK TO THE OVERCURRENT

DEVICE AND RELABEL AS A SPARE. REUSE EXISTING CONDUIT IN COMPLIANCE WITH

NEC.

C. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS

PASSING THROUGH RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.

D. REMOVE ALL ACCESSIBLE ABANDONED WIRING OF ALL TYPES, OR CAP AND LABEL IN

JUNCTION BOX FOR RE-USE, IN COMPLIANCE WITH THE SPECIFICATION.

E. REPLACE ALL EXISTING MULTI-PHASE BRANCH CIRCUIT BREAKERS WITH HANDLE TIE

BREAKERS ON ALL MULTI-PHASE CIRCUITS.

KEY NOTE.

NEW LINE TYPE.

EXISTING LINE TYPE.

ELECTRICAL GENERAL NOTES:

ELECTRICAL GENERAL NOTES - DEMOLITION:

KEY NOTES:

NEW - EXISTING & DEMO LINE TYPES:

A. SEE VA. BARRIER FREE DESIGN GUIDE PG-18-13

COMMUNICATION GENERAL NOTES:

A. SPECIFICATION TAKES PRECEDENT OVER DRAWINGS.

B. CORE DRILL AND SAW CUT, AS REQUIRED, FOR FLOOR AND WALL PENETRATIONS. SEAL

REMAINING ANULUS WITH FIRE CAULK.

C. PROVIDE ALL ELECTRICAL WORK IN ACCORDANCE WITH SPECIFICATIONS.

D. COORDINATE ALL OUTAGES WITH VHA COR PER SPECS PRIOR TO WORK BEING DONE.

E. ALL "CONFINED SPACE" ENTRY WILL COMPLY WITH VA-BHHCS-FAC-105, CFR 1926

SUBPART AA. OSHA 29 CFR 1910 AND PROCEDURES AND OSHA/CFR LAWS.

F. ALL "DIGGING PERMITS" WILL COMPLY WITH VA-BHHCS-FAC-114 POLICIES AND

PROCEDURES AND OSHA/CFR LAWS.

G. G.C TO FIELD VERIFY MEASUREMENT OF ELECTRICAL WIRES.

DEMO HATCH.

AFC

CO CONTRACTING OFFICER

COR CONTRACTING OFFICER'S REP.

SWBD SWITCHBOARD

SWGR SWITCHGEAR

LF LINEAR FEET (FOOT)

T.F TRANSFOMER

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL BWW

E-001

NA

ELECTRICAL ABBREVIATIONS &

GENERAL NOTES

TF-65

A. SEE SHEET E-001 FOR ELECTRICAL GENERAL NOTES.

B. SEE SHEET E-615 FOR DUCT BANK AND TRANSFORMER SCHEDULE.

C. PLAN SHOWS MANHOLES, TRANSFORMER LOCATIONS AND DUCT

BANK SCHEDULE.

D. CONTRACTOR SHALL VERIFY AND UPDATE DUCT BANK SCHEDULE

E. ALL OUTAGES DONE ON WEEKDAYS, WEEKENDS AND/OR FEDERAL

HOLIDAYS TO BE PLANNED & COORDINATED WITH VHA COR.

F. M.H 8B CONTAINS ONLY LOW VOLTAGE CABLE. CONTRACTOR SHALL

NOT BID.

G. PRELIMINARY FIELD REPORT SHOWS THAT M.H 3 DOES NOT EXIST.

ELECTRICAL GENERAL NOTES:

SCALE: NO SCALE

EXISTING UNDERGROUND DUCT BANK SYSTEM

ELECTRICAL SITE PLAN - WITH BUILDINGS

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

TF-64

TF-27

J-BOX

TF-10A

TF-10B

TF-43

TF-18

TF-17

TF-53

M.H. 1

TF- 23

TF- 24

TF-20

12/07/2020 TL RW

ES101

NA

ELECTRICAL SITE PLAN - WITH

BUILDINGS

TF-66

Pl an

N or th

True N ort h

TRANSFORMER

MAN HOLE

JUNCTION BOX

LEGEND:

M.H. T2BM.H. 2B M.H. 2A

M.H. 2

M.H. T3 M.H. 4

M.H. T4 M.H. 4A

M.H. 4B

M.H.T 5

M.H. 4C

M.H. 19

M.H. 7A

M.H. 7

M.H. T6B

M.H. T8 M.H. 8

M.H. 9

M.H. T8A2 M.H. T8A1

M.H. T10 M.H. 10M.H. 10A

M.H. 8B M.H. 11

M.H. T12 M.H. 12

M.H. 13M.H. T13

M.H. T6 M.H. T6A

BUILDING 12

M.H. T11

M.H. 6M.H. 5

M.H. 3

M.H. T1

M.H. T2A

M.H. T2

M.H. T9

M.H. T8B

M.H. 18

4.4

EXIST. MH 4C

4.8

4.5

4.3 4.6

4.7

TF -12XR

TF-12A

TF-12B

M.H. T19

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

CARWASH PAD

AutoCAD SHX Text

5 SPACES - EMP.

AutoCAD SHX Text

DOWN

AutoCAD SHX Text

BLOW

AutoCAD SHX Text

DEAERATOR

AutoCAD SHX Text

HOSPITAL

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text

FIFTH STREET

AutoCAD SHX Text

MAIN PARKING LOT

AutoCAD SHX Text

RIVER STREET ENTRANCE

AutoCAD SHX Text

TO NATIONAL CEMETERY

AutoCAD SHX Text

OXYGEN TANK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FUEL

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TANKS

AutoCAD SHX Text

LOT

AutoCAD SHX Text

GRAND

AutoCAD SHX Text

STAIRCASE

AutoCAD SHX Text

COURT

AutoCAD SHX Text

COURT

AutoCAD SHX Text

PATIO

AutoCAD SHX Text

AutoCAD SHX Text

10 SPACES

AutoCAD SHX Text

PATIENT/VISITOR

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

AutoCAD SHX Text

PLANT

AutoCAD SHX Text

BOILER

AutoCAD SHX Text

CEMETARY

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

AMB. CARE

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

EMPLOYEE PARKING

AutoCAD SHX Text

FIBER DOES NOT

AutoCAD SHX Text

RUN TO BLDG. 68

AutoCAD SHX Text

J-BOX IN

AutoCAD SHX Text

CRAWL SPACE

AutoCAD SHX Text

DETAIL #1

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text J

TF-65

A. SEE SHEET E-001 FOR ELECTRICAL GENERAL NOTES.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

C. PLAN SHOWS THAT MEDIUM VOLTAGE LINES LOOPS A & B SHALL

BE REPLACED WITH NEW OF SIMILAR KIND. SEE ONE-LINE FOR

APPROXIMATE MEASUREMENTS. CONTRACTOR TO FIELD VERIFY.

D. M.H 8B AND DUCTBANK 8.1 & 8.9 CONTAINS ONLY LOW VOLTAGE

CABLE. CONTRACTOR SHALL NOT BID.

ELECTRICAL GENERAL NOTES:

SCALE: NO SCALE

UNDERGROUND DUCT BANK SYSTEM

ELECTRICAL SITE PLAN - WITHOUT BUILDINGS

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

1.6 1.7

4.13

1.4

TF-64

TF-27

10.1

8.7 8.3

8.2 8.4

9 8.1

J-BOX

8.9

TF-10A

TF-10B

TF-43

TF-18

TF-17

7.1

TF-53

13.3

8.8

13.2

12.2

7.3

14.7

14.8

1.1

1.3

2.7 2.7 2.6

2.1 2.2

TF- 23

2.5

TF- 24 4.10

4.11

4.1 4.2

4.3

TF-20

12/07/2020 TL RW

ES102

NA

ELECTRICAL SITE PLAN - WITHOUT

BUILDINGS

M.H.18

M.H.19 TF-66

M.H. 3

M.H.T6A2 M.H.T6A1

M.H. 7A

M.H. T6B

M.H. 7

M.H.T9 M.H.T8

M.H. T8A1

M.H. 4

M.H. 6

M.H. T5

M.H. T8A2

M.H. T10

M.H. 8B

M.H.T11

M.H.T12

M.H.T13

M.H. 10

M.H. 13

M.H.12

M.H. 4BM.H. 4A

M.H. T2A

M.H. 2

M.H. T2B

Pl an

N or th

True N ort h

4.4

4.7

4.8

TF-12A

TF-12B

TF-12XR

TRANSFORMER

MAN HOLE

JUNCTION BOX

LEGEND:

M.H. #2B

BLDG #12

M.H. 4C

M.H. T2 M.H. T3

M.H. T1

M.H. 5

1.2

4.12

M.H. T4

M.H. T6

7.2

4.3

4.5

4.6

M.H. 4C

M.H. T8B

10.2

10.3

M.H.11

12.3

M.H. 8

14.6

12.1

M.H. 9

M.H. 2A 2.4

M.H. 1

15.1

10.5 10.6

M.H. 10A

3 3.1

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text

J-BOX IN

AutoCAD SHX Text

CRAWL SPACE

AutoCAD SHX Text

DETAIL #1

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text J

T

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND

TRANSFORMER SCHEDULE.

DEMO WALK WAY AND/OR LANDSCAPING AREA FOR ROUTING

OF UNDERGROUND CONDUITS FOR SECTIONALIZERS.

CONTRACTOR SHALL VERIFY EXACT DEMOLITION REQUIRED

AT EACH LOCATION.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A & B LOOPS.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMERS TF-10A, TF-10B DEMOLITION POWER PLAN

TF-10A

TF-10B

MH T10

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED101

TRANSFORMERS TF-10A, TF-10B

DEMOLITION POWER PLAN

True N ort h

BUILDING 10

T10.1

T10

10.3

MH 10

MH 10A

10.4

10.4

10.5

10.6

T

Plan North

SCALE:

2' 4' 8' 16' 32'

1/8" = 1'-0"

TRANSFORMERS TF-12A, TF-12B, TF-12XR POWER PLAN

MH 4C

TF-12XR

12,470V/480

TF-12A

12,470V/208V

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED102

12 & 65

TRANSFORMERS TF-12A, TF-12B,

TF-12XR DEMOLITION POWER PLAN

True N ort h

MH 4B

4.2

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

DEMO AREA FOR ROUTING OF UNDERGROUND CONDUIT FOR

SECTIONALIZERS. CONTRACTOR SHALL VERIFY EXACT

DEMOLITION REQUIRED AT EACH LOCATION.

ALL SHRUBS AND TREES SHALL BE REMOVED TO PROVIDE

ADEQUATE WORK SPACE AND CLEARANCES AROUND NEW

SECTIONALIZERS.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A & B LOOPS.

T- TAP CONNECTIONS TO THE PRIMARY OF TRANSFORMER

12A,12B, 12XR AND T.F 65 ARE ALL MADE IN M.H 4C FOR LOOP

A & B. THIS SHALL BE REPLACED WITH NEW.

BUILDING 12

4.3

SPS MECH ROOM

MAIL ROOM

TO BLDG. 65

SCALE: NO SCALE

MANHOLE 4B DISTRIBUTION ENLARGED PLAN

ED102

FR

O

M M

.H

A

4" CONDUIT

4" CONDUIT

4" CONDUIT

4" CONDUIT

TO T.F 65.

4" C

ON

DU

IT

4" C

ON

DU

IT

TO

T .F

TO

M

.H . 4

C.

DI

SC

ON

NE

CT

A

ND

RE

MO

VE

LO

OP

A

B

CA

BL

ES

F

RO

M

XF

MR

'S

P

RI

MA

RY

4" C

ON

DU

IT

4" C

ON

DU

IT

M.H 4B

TF-12B

12,470V/208V

4.4

4.6

4.7

4.5

CO

ND

UI

T

HA

S

GR

OU

ND

IN

G W

IR

E

4.84.41

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TF-17

MH-11

MH 12

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-17 DEMOLITION POWER PLAN

BUILDING 17

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED103

17 & QUAN C

TRANSFORMER TF-17 DEMOLITION

POWER PLAN

12,470V/208V

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

12.2

12.1

MH T12

MH-T11

T 11

T12.2

12.3

DEMO AREA FOR ROUTING OF UNDERGROUND CONDUIT FOR

SECTIONALIZERS. CONTRACTOR SHALL VERIFY EXACT

DEMOLITION REQUIRED AT EACH LOCATION.

BOLLARDS ARE TOO CLOSE TO THE TRANSFORMER DOOR

OPENING. RELOCATE BOLLARDS SO DOOR SWING HAVE THE

ADEQUATE CLEARANCE.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A & B LOOPS.

NEW FIRE TRUCK BLDG.

MH-T13

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-18 DEMOLITION POWER PLAN

TF-18

BUILDING 18

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED104

TRANSFORMER TF-18 DEMOLITION

POWER PLAN

12,470v/208v

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND

TRANSFORMER SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

T13

T13.1

MH-13

13.

DEMO AREA FOR ROUTING OF UNDERGROUND CONDUITS FOR

SECTIONALIZERS. CONTRACTOR SHALL VERIFY EXACT

DEMOLITION REQUIRED AT EACH LOCATION.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A & B LOOPS.2

13.2

MH-4

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-20 DEMOLITION POWER PLAN

TF-20

MH-T4

MH-T3

BUILDING 20

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED105

20 & 21

TRANSFOMER TF-20 DEMOLITION

POWER PLAN

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND

TRANSFORMER SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

1 DEMO AREA FOR ROUTING OF UNDERGROUND CONDUITS,

LOCATION OF NEW TRANSFORMER. CONTRACTOR SHALL

VERIFY EXACT DEMOLITION REQUIRED AT EACH LOCATION.

ALL SHRUBS, TREES, AND OR LANDSCAPING SHALL BE

REMOVED TO PROVIDE ADEQUATE WORK SPACE.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A OR B LOOPS.

T.F 20 SHALL BE REMOVED AND REPLACED. BOLLARDS SHALL BE

REMOVED AND RELOCATE WHERE NEW TRANSFORMER WILL BE

PLACED.

REMOVE LOW VOLTAGE CABLE FROM THE SECONDARY OF THE

TRANSFORMER TO PANEL SERVING BLDG. 20.

DEMO AREA FOR THE ROUTING OF NEW DUCT BANK FROM M.H

2- M.H 4.

4.13

4.1

4.11

MH-3

4.12

T3

BUILDING 21

4.10

MH-T2A

BUILDING 23

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-23 DEMOLITION POWER PLAN

TF-23

MH-2B

MH-T2B

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED106

TRANSFORMER TF-23 DEMOLITION

POWER PLAN

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

1 DEMO AREA FOR ROUTING OF UNDERGROUND CONDUITS,

LOCATION OF NEW TRANSFORMER 23. CONTRACTOR SHALL

VERIFY EXACT DEMOLITION REQUIRED AT EACH LOCATION.

TRANSFORMER 23 SHALL REMOVED AND REPLACED WITH

NEW.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A OR B LOOPS.

REMOVE LOW VOLTAGE CABLE FROM THE SECONDARY OF

THE TRANSFORMER TO PANEL SERVING BLDG. 23.

T2.2 2.1

T2.5

2.5

MH-2A2.2

2.4 3

MH-3

BUILDING 24

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-24 DEMOLITION POWER PLAN

TF-24

MH-T2

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED107

24 & 25

TRANSFORMER TF-24 DEMOLITION

POWER PLAN

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

BUILDING 44

BUILDING 42

BUILDING 25

2.7

2.1

2.6

MH-T3

MH-2

T2

2.3

T4

T2.1

T3

1 DEMO AREA FOR ROUTING OF UNDERGROUND CONDUITS,

LOCATION OF NEW TRANSFORMER 24. CONTRACTOR SHALL

VERIFY EXACT DEMOLITION REQUIRED AT EACH LOCATION.

TRANSFORMER 24 SHALL REMOVED AND REPLACED.

BOLLARDS SHALL BE REMOVED AND RELOCATE WHERE NEW

TRANSFORMER WILL BE PLACED.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A OR B LOOPS.

REMOVE LOW VOLTAGE CABLE FROM THE SECONDARY OF

THE TRANSFORMER TO PANEL SERVING BLDG. 24 & 25.

DEMO AREA FOR THE ROUTING OF NEW DUCT BANK FROM

M.H 2- M.H 4.

TT

BUILDING 27

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-27 DEMOLITION POWER PLAN

TF-27

MH-1

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED108

26 & 27

TRANSFOMER TF-27 DEMOLITION

POWER PLAN

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

1.1

1.2

BUILDING 26

MH-T1

1.3

T1.3

3 4 T1

BLDG 27 PANEL

BLDG 26 PANEL

1 DEMO AREA FOR ROUTING OF UNDERGROUND CONDUITS,

LOCATION OF SECTIONALIZERS & NEW TRANSFORMER 27.

CONTRACTOR SHALL VERIFY EXACT DEMOLITION REQUIRED

AT EACH LOCATION.

TRANSFORMER 27 SHALL REMOVED AND REPLACED.

BOLLARDS SHALL BE REMOVED AND RELOCATE WHERE NEW

TRANSFORMER WILL BE PLACED.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A OR B LOOPS.

REMOVE LOW VOLTAGE CABLE FROM THE SECONDARY OF

THE TRANSFORMER TO PANEL SERVING BLDG. 26 & 27.

BUILDING 43

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-43 DEMOLITION POWER PLAN

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED109

13,14,30,31,43

TRANSFORMER TF-43 DEMOLITION

POWER PLAN

MH-10

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND

TRANSFORMER SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

8.38.7

T10 10.3

MH-T10

QUAN A

2 TF-43

T10.1

10.1

DEMO AREA FOR ROUTING OF UNDERGROUND CONDUITS,

LOCATIONS FOR SECTIONALIZERS SERVING TRANSFORMER

43. CONTRACTOR SHALL VERIFY EXACT DEMOLITION

REQUIRED AT EACH LOCATION.

ALL SHRUBS, TREES, AND OR LANDSCAPING SHALL BE

REMOVED TO PROVIDE ADEQUATE WORK SPACE.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A & B LOOPS.

7.3

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-53 DEMOLITION POWER PLAN

TF-53

MH-7A

BUILDING 53

7.2

M.H T6A

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED110

TRANSFORMER TF-53 DEMOLITION

POWER PLAN

True N ort h

7.1

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND

TRANSFORMER SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

BUILDING 12

T6.3

14.6

T6.2

T6.4

DEMO AREA FOR ROUTING OF UNDERGROUND CONDUITS,

LOCATION FOR SECTIONALIZERS SERVING TRANSFORMER 53.

CONTRACTOR SHALL VERIFY EXACT DEMOLITION REQUIRED

AT EACH LOCATION.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A & B LOOPS.

PRI. SWITCHGEAR

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-64 DEMOLITION POWER PLAN

TF-64

BUILDING 50

BUILDING 45

BUILDING 28

BUILDING 29

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

ED111

28, 29 & 64

TRANSFORMER TF-64 DEMOLITION

POWER PLAN

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

1.6

1.7

1.4

M

DP

PRI. SWITCHGEAR

MI

MII

1.5

BUILDING 64

1 DEMO AREA FOR ROUTING OF UNDERGROUND CONDUITS,

LOCATION OF SECTIONALIZERS AND NEW TRANSFORMER 64.

CONTRACTOR SHALL VERIFY EXACT DEMOLITION REQUIRED

AT EACH LOCATION.

TRANSFORMER 64 SHALL REMOVED AND REPLACED.

BOLLARDS SHALL BE REMOVED AND RELOCATE WHERE NEW

TRANSFORMER WILL BE PLACED.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A & B LOOPS.

LIGHT TO BE DISCONNECTED, REMOVED AND RE INSTALLED.

REMOVE LOW VOLTAGE CABLES FROM THE SECONDARY OF

THE TRANSFORMER TO PANEL SERVING BLDG. 64. ALSO,

REMOVE CABLE FROM BLDG 64 MDP TO BLDG 28 & 29 METER

BOX.

BUILDING 65

IT DEPARTMENT

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-65 DEMOLITION POWER PLAN

BUILDING 62

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

True N ort h

12/07/2020 TL RW

ED112

TRANSFORMER TF-65 DEMOLITION

POWER PLAN

TF-65

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND

TRANSFORMER SCHEDULE.

ELECTRICAL GENERAL NOTES:

15.1

KEY NOTES:

1 REMOVE ALL MEDIUM VOLTAGE CABLE FOR A & B LOOPS.

FR

OM

M .H

4B

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-66 DEMOLITION POWER PLAN

TF-66

MH-19

BUILDING 66

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

12470V/208V 3Ø

True N ort h

12/07/2020 TL RW

ED113

66 & 68

TRANSFORMER TF-66 DEMOLITION

POWER PLAN

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

1 DEMO AREA FOR ROUTING OF UNDERGROUND CONDUITS FOR

LOCATION OF SECTIONALIZERS AND NEW TRANSFORMER 66.

CONTRACTOR SHALL VERIFY EXACT DEMOLITION REQUIRED

AT EACH LOCATION.

TRANSFORMER 66 SHALL REMOVED AND REPLACED.

BOLLARDS SHALL BE REMOVED AND RELOCATE WHERE NEW

TRANSFORMER WILL BE PLACED.

REMOVE ALL MEDIUM VOLTAGE CABLE FOR A & B LOOPS.

14.8

14.7

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

PROVIDE ONE MEDIUM VOLTAGE SECTIONALIZER AND PAD

PER FEEDER AT EACH LOCATION FOR TF-10A & TF-10B WHILE

MAINTAINING POWER TO BUILDING 10 DOM.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A

AND B LOOPS. REFER TO ONE LINE FOR APPROX. CABLE

LENGTH.

CREATE NEW DUCT BANK OF 4(4") FROM M.H TO

SECTIONALIZERS PAD (STUB UP) TO ACCOMMODATE CABLES.

INSTALL POSITIVE PRESSURE SYSTEM, OPERATING GAUGES

FOR TEMPERATURE AND PRESSURE ON XFMR.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMERS TF-10A, TF-10B POWER PLAN

TF-10A

MH 10

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

12/07/2020 TL RW

EP101

TRANSFORMERS TF-10A, TF-10B

POWER PLAN

True N ort h

TF-10B MH 10A

BUILDING 10

T10

10.3

10.1

T10.1

MH T10

10.4

10.4

10.5

10.6

10.03

AutoCAD SHX Text

AutoCAD SHX Text

T

Plan North

SCALE:

2' 4' 8' 16' 32'

1/8" = 1'-0"

TRANSFORMERS TF-12A, TF-12B, TF-12XR POWER PLAN

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

EP102

12 & 65

TRANSFORMERS TF-12A, TF-12B,

TF-12XR POWER PLAN

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND

TRANSFORMER SCHEDULE.

INSTALL NEW SECTIONALIZERS FOR BOTH LOOP A & LOOP B.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A AND B

LOOPS. REFER TO ONE LINE FOR APPROXIMATE CABLE LENGTH.

CREATE NEW DUCT BANK OF:

- 4 (4") FROM M.H 4B TO SECTIONALIZERS PAD.

INSTALL POSITIVE PRESSURE SYSTEM, OPERATING GAUGES FOR

TEMPERATURE AND PRESSURE ON XFMR.

RUN NEW CABLES IN VACANT CONDUIT TO MANHOLE 4B FROM

SECTIONALIZERS AS SHOWN ON ONE LINE AND DETAIL 1 ON THIS

SHEET.

INSTALL NEW BOLLARDS WITH PROPER CLEARANCES FOR THE

NEW SECTIONALIZERS.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

4.3

MH 4B

4.2

FR

O

M M

.H

A 4" CONDUIT

4" CONDUIT

SCALE: NO SCALE

MANHOLE 4B & SECTIONALIZERS ENLARGED PLAN

TO

M

.H 4C

SP

AR

E

CO

ND

UI

T (4

TO M.H 4C

M.H 4B

TO M.H 4B

TO SECTIONALIZER PAD

LOOP A OR LOOP B SECTIONALIZER

2 TO BLDG. 65

MH 4C

TF-12XR

12,470V/480

TF-12A

12,470V/208V

MAIL ROOM

TF-12B

12,470V/208V

4.4

4.6

4.7

4.8 4.5

CO

ND

UI

T

HA

S

GR

OU

ND

IN

G W

IR

E

EP102

4.31

4.41

TO T.F 65

TO M.H 4B

TO SECTIONALIZER PAD

LOOP A OR LOOP B SECTIONALIZER

OUTPUT

INPUT

OUTPUT

INPUT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

12.1

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-17 POWER PLAN

TF-17 MH-12

MH-T12

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

EP103

17 & QUAN C

TRANSFORMER TF-17 POWER PLAN

12,470V/208V

True N ort h

BUILDING 17

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND

TRANSFORMER SCHEDULE.

PROVIDE ONE MEDIUM VOLTAGE SECTIONALIZER AND PAD PER

FEEDER AT EACH LOCATION FOR TF-17.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A

AND B LOOPS. REFER TO ONE LINE FOR APPROXIMATE CABLE

LENGTH.

RE-INSTALL ANY BOLLARDS REMOVED DURING DEMOLITION.

ENSURE DOOR SWING HAVE THE ADEQUATE CLEARANCE.

PROVIDE NEW BOLLARDS PER E-501 TO PROTECT

SECTIONALIZERS.

INSTALL POSITIVE PRESSURE SYSTEM, OPERATING GAUGES

FOR TEMPERATURE AND PRESSURE ON XFMR.

CREATE NEW DUCT BANK OF 4(4") FROM M.H TO

SECTIONALIZER PAD (STUB UP) TO ACCOMMODATE CABLES TO

AND FROM M.H.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

12.2

12.3

T12.2

MH-T11

MH-11

12.1

NEW FIRE TRUCK BLDG.

12.01

AutoCAD SHX Text C

AutoCAD SHX Text

North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-18 POWER PLAN

MH-T13

BUILDING 18

TF-18

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

EP104

TRANSFORMER TF-18 POWER PLAN

12,470v/208v

OLD

UNDERGROUND

COUDUITS

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND

TRANSFORMER SCHEDULE.

PROVIDE ONE MEDIUM VOLTAGE SECTIONALIZER AND PAD

PER FEEDER AT EACH LOCATION.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A

AND B LOOPS. REFER TO APPLICABLE ONE-LINE FOR

APPROXIMATE CABLE LENGTH.

PROVIDE NEW BOLLARDS PER E-501 TO PROTECT

SECTIONALIZERS.

CREATE NEW DUCT BANK OF 4(4") FROM M.H TO

SECTIONALIZER PAD(S) (STUB UP) TO ACCOMMODATE CABLES

TO AND FROM M.H.

INSTALL POSITIVE PRESSURE SYSTEM, OPERATING GAUGES

FOR TEMPERATURE AND PRESSURE ON XFMR.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

T13

MH-13T13.1

13.3

13.2

13.01

North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMERS TF-20 POWER PLAN

NEW TF-20

MH-T4

MH-T3

BUILDING 20

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

EP105

20 & 21

TRANSFOMER TF-20 POWER PLAN

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

LOCATION OF NEW TRANSFORMER 20.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A

AND B LOOPS. REFER TO ONE-LINE FOR APPROXIMATE CABLE

LENGTH.

REINSTALL ANY BOLLARDS REMOVED DURING DEMO.

M.H 3 DOES NOT EXIST BASED ON PRELIMINARY FIELD REPORT.

ADD NEW DUCT BANK FROM M.H 2 TO M.H 4. REFER TO SHEET

E-501, DETAIL 3. INSTALL NEW CABLE LOOPS A & B OF SIMILAR

KIND. REFER TO ONE LINE FOR APPROX. CABLE LENGTH.

CONDUITS TO BE STUB UP FROM M.H 4 TO TRANSFORMER PAD.

PROVIDE NEW LOW VOLTAGE CABLE OF SIMILAR KIND FROM

THE SECONDARY OF XFMR TO PANEL BOARD IN BLDG. 20.

EXISTING TRANSFORMER PAD. CONDUITS NOT IN USE TO BE

CAPPED.

PROVIDE TRANSFORMER WITH POSITIVE PRESSURE SYSTEM,

OPERATING GAUGES FOR TEMPERATURE AND PRESSURE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

4.11

4.1

4.12

4.13

MH-3

T3

BUILDING 21

4.10

3.1

4.01

4.04

FROM M.H 2

North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-23 POWER PLAN

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

EP106

TRANSFORMER TF-23 POWER PLAN

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

LOCATION OF NEW TRANSFORMER 23.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A

AND B LOOPS. REFER TO ONE-LINE FOR APPROX. CABLE

LENGTH.

PROVIDE NEW LOW VOLTAGE CABLE OF SIMILAR KIND FROM

THE SECONDARY OF XFMR TO PANEL BOARD IN BLDG. 23.

PROVIDE NEW BOLLARDS PER E-501 TO PROTECT

TRANSFORMER.

EXISTING TRANSFORMER PAD. CONDUITS NOT IN USE TO BE

CAPPED.

PROVIDE TRANSFORMER WITH POSITIVE PRESSURE SYSTEM,

OPERATING GAUGES FOR TEMPERATURE AND PRESSURE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

2 2

MH-T2A

BUILDING 23

MH-2B

MH-T2B T2.2

2.1

T2.5

2.5

MH-2A2.2

2.412

2.43

NEW T.F 23

North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-24 POWER PLAN

NEW TF-24

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

EP107

24 & 25

TRANSFORMER TF-24 POWER PLAN

BUILDING 24

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

LOCATION OF NEW TRANSFORMER 24.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A AND B

LOOPS. REFER TO APPLICABLE ONE-LINE FOR APPROX. CABLE

LENGTH.

REINSTALL ANY BOLLARDS REMOVED DURING DEMOLITION FOR

XRMR.

PROVIDE NEW LOW VOLTAGE CABLE OF SIMILAR KIND FROM THE

SECONDARY OF TRANSFORMER TO PANEL BOARDS IN BLDG. 24 & 25.

ADD NEW DUCT BANK FROM M.H 2 TO M.H 4. REFER TO SHEET E-501,

DETAIL 3. INSTALL NEW CABLE LOOPS A & B OF SIMILAR KIND. REFER

TO ONE LINE FOR CABLE APPROX. LENGTH.

EXISTING TRANSFORMER PAD. CONDUITS NOT IN USE TO BE CAPPED.

PROVIDE TRANSFORMER WITH POSITIVE PRESSURE SYSTEM,

OPERATING GAUGES FOR TEMPERATURE AND PRESSURE.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

MH-T2

2.1

2.7

2.3 2.6

BUILDING 44

BUILDING 42

BUILDING 25

MH-2

2.1

T2

3.1

T2.1

T4T3

MH-T3

MH-3

2.01

2.03

2.04

AutoCAD SHX Text

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

EP108

26 & 27

TRANSfORMER TF-27 POWER PLAN

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND

TRANSFORMER SCHEDULE.

ELECTRICAL GENERAL NOTES:

BUILDING 27

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-27 POWER PLAN

MH-1

True N ort h

1.2

BUILDING 26

MH-T1

T1.3

T1

BLDG 27 PANEL

BLDG 26 PANEL

BUILDING 27

NEW TF-27

MH-1

1.1

1.2

BUILDING 26

MH-T1

1.3

T1.3

BLDG 27 PANEL

BLDG 26 PANEL

PROVIDE ONE MEDIUM VOLTAGE SINGLE PHASE SECTIONALIZER AND

PAD PER FEEDER AT EACH LOCATION. THESE SECTIONALIZERS WILL

SERVE TRANSFORMERS 27,24,23 & 20.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A AND B

LOOPS. REFER TO APPLICABLE ONE-LINE FOR APPROX. CABLE

LENGTH.

REINSTALL ANY BOLLARDS REMOVED DURING DEMOLITION FOR

XRMR. PROVIDE NEW BOLLARDS PER E-501 TO PROTECT

SECTIONALIZERS.

PROVIDE NEW LOW VOLTAGE CABLE OF SIMILAR KIND FROM THE

SECONDARY OF TRANSFORMER TO PANEL BOARDS IN BLDG. 26 & 27.

EXISTING TRANSFORMER PAD. CONDUITS NOT IN USE TO BE CAPPED.

PROVIDE TRANSFORMER WITH POSITIVE PRESSURE SYSTEM,

OPERATING GAUGES FOR TEMPERATURE AND PRESSURE.

KEY NOTES:

Plan North True

N ort h

1.03

1.01

1.04

1.02

4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

EP109

13,14,30,31,43

TRANSFORMER TF-43 POWER PLAN

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

ELECTRICAL GENERAL NOTES:

BUILDING 43

Plan North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-43 POWER PLAN

MH-10

True N ort h

8.38.7

T10 10.3

MH-T10

QUAN A

TF-43

10.1

T10.1

PROVIDE ONE MEDIUM VOLTAGE SECTIONALIZER AND PAD

PER FEEDER FOR T.F 43 WHILE MAINTAINING POWER TO

BUILDINGS.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A

AND B LOOPS. REFER TO ONE LINE FOR APPROX. CABLE

LENGTH.

CREATE NEW DUCT BANK OF 4(4") FROM M.H TO

SECTIONALIZERS PAD (STUB UP) TO ACCOMMODATE CABLES.

PROVIDE NEW BOLLARDS AS PER SHEET E-501 TO PROTECT

SECTIONALIZERS.

INSTALL POSITIVE PRESSURE SYSTEM, OPERATING GAUGES

FOR TEMPERATURE AND PRESSURE ON XFMR.

KEY NOTES:

10.01

North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-53 POWER PLAN

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

EP110

TRANSFORMER TF-53 POWER PLAN

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

C. CONDUITS TO BE STUBBED UP FROM M.H 7A TO SECTIONALIZERS.

PROVIDE ONE MEDIUM VOLTAGE SECTIONALIZER AND PAD

PER FEEDER AT EACH LOCATION.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A

AND B LOOPS. REFER TO ONE LINE FOR APPROX. CABLE

LENGTH.

PROVIDE NEW BOLLARDS AS PER SHEET E-501 TO PROTECT

SECTIONALIZER.

INSTALL POSITIVE PRESSURE SYSTEM, OPERATING GAUGES

FOR TEMPERATURE AND PRESSURE ON XFMR.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

7.3

TF-53

MH-7A

BUILDING 53

7.2

M.H T6A

7.1

BUILDING 12

T6.3

14.6

T6.2

T6.4

7.11

North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-64 POWER PLAN

NEW TF-64

BUILDING 64

BUILDING 50

BUILDING 45

BUILDING 28

BUILDING 29

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O N

D S

IN

C

H

O N

E

FO

O T

O N

E H

AL

F

IN

C

H

O N

E

FO

O T

O N

E

IN

C H

T

W

EN

TY

F

EE

T

O N

E

IN

C H

F

IF

TY

F

EE

T

STAMP:

Issued: VEG 19.18

BLACK HILLS HEALTH CARE SYSTEM

HOT SPRINGS CAMPUS (VAMC)

500 N. 5TH St. HOT SPRINGS, SD 57747

568A4-19-204

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM 12/07/2020 TL RW

EP111

28, 29, & 64

TRANSFORMER TF-64 POWER PLAN

True N ort h

A. FOR ELECTRICAL GENERAL NOTES SEE SHEET E-001.

B. SEE SHEET ES101 & E-615 FOR DUCT BANK AND TRANSFORMER

SCHEDULE.

PROVIDE ONE MEDIUM VOLTAGE SINGLE PHASE

SECTIONALIZER AND PAD PER FEEDER AT EACH LOCATION.

PROVIDE NEW IN KIND ALL MEDIUM VOLTAGE CABLES FOR A

AND B LOOPS. REFER TO ONE LINE FOR APPROX. CABLE

LENGTH.

REINSTALL ANY BOLLARDS REMOVED DURING DEMOLITION FOR

XFMR. PROVIDE NEW BOLLARDS PER E-501 TO PROTECT

SECTIONALIZERS.

EXISTING TRANSFORMER PAD. CONDUITS NOT IN USE TO BE

CAPPED.

INSTALL POSITIVE PRESSURE SYSTEM, OPERATING GAUGES

FOR TEMPERATURE AND PRESSURE ON XFMR.

PROVIDE FOUR (4) NEMA 3R JUNCTION BOXES TO TRANSITION

FROM INTERIOR TO EXTERIOR TO ACCOMMODATE M.V & L.V

CABLES.

TAP A & B LOOPS FROM THE PRIMARY SWITCH GEAR TO J BOX

ON THE INSIDE THEN TO THE M.V NEMA 3R J-BOX ON THE

EXTERIOR AS SHOWN IN DETAIL 2 ON THIS SHEET. THESE

CABLES WILL THEN BE ROUTED IN THE NEW DUCT BANK TO THE

SECTIONALIZERS THEN TO NEW TRANSFORMER 64.

PROVIDE NEW SECONDARY CONDUCTORS AS EXISTING.

FROM THE SECONDARY OF TRANSFORMER TO BUILDINGS'

METER BOX.

ELECTRICAL GENERAL NOTES:

KEY NOTES:

1.6

1.7

M

DP

M.V J-BOX

FASCIA OF BLDG. 64

SCALE: NO SCALE

ELEVATION DETAIL FOR BUILDING 64

(1) - 4" FROM LOOP A CKT. BREAKER

(1) - 4" FROM LOOP B CKT. BREAKER

EP111

CONDUITS TO UNDERGROUND DUCT

BANK TO SECTIONALIZER.

(1) - 4" LOOP A TO SECTIONALIZER.

(1) - 4" LOOP B TO SECTIONALIZER.

PRI. SWITCHGEAR

MI

MII

1.4

1.5

1.31 1.32

1.33

1.31

1.33

L.V J-BOX

(1) - 3" TO XFMR. PAD.

CONDUITS TO UNDERGROUND DUCT

BANK TO TRANSFORMER SECONDARY.

(1) - 3" TO BLDG. 64 MDP PANEL

North

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

TRANSFORMER TF-65 POWER PLAN

BUILDING 65

BUILDING 62

TF-65

8' 4'

0' 2'

8' 0'

4'

0'

8' 4'

0' 2'

0'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Date

ARCHITECT/ENGINEERS:CONSULTANTS:

VA FORM 08-6231

B

A

C

D

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

B

A

C

D

E

O N

E Q

U

AR

TE

R

IN

C

H

O N

E

FO

O T

O N

E

EI

G H

TH

IN

C H

O

N E

FO

O

T

TH

R

EE

T H

IR

TY

S

EC

O…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .