This document outlines requirements for a federal construction contract opportunity with the Department of Veterans Affairs. The contractor will provide all labor, materials, equipment, transportation, supervision, permits, and project management to complete electrical infrastructure upgrades at the Hot Springs VA Medical Center in South Dakota. Scope of work includes replacing an underground electrical duct bank system, installing twenty-four sectionalizers and six transformers, adding a new duct bank, and installing bollards for equipment protection. The estimated cost range for the project is $500,000 to $1,000,000. The solicitation number for the Invitation for Bid is 36C26321B0001 and will be posted on April 2, 2021. Bids are due on May 4, 2021 and the awarded contractor must provide performance and payment bonds within 10 days of notification. The period of performance is 240 calendar days from the notice to proceed date. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26321B0001 0001.docx | DOCX document | |
| S06_Atch_ Site Visit Sign In Sheet (1 Page).pdf | ||
| S02_IFB Atch_Project Specs (236 Pages).pdf | ||
| 36C26321B0001_1.docx | DOCX document | |
| S02_IFB ATCH Project Drawings (51 Pages).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Infection Control Risk Assessment: Correct Electrical deficiencies
Y N CONSTRUCTION ACTIVITY TYPE Y N PATIENT RISK GROUP (may modify as apprpriate))
X
A: Inspection, non-invasive activity-includes, not limited to removal of ceiling tiles for inspection (1/50 sq ft), painting (not sanding), wall covering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
X Low Risk- (ex Office Areas)
X B: Small scale, short duration, moderate to high levels-includes but not limited to installation of telephone/computer cabling, access to chase spaces, cutting of walls or ceiling where dust migration can be controlled.
X Medium Risk-(ex Cardiology, ECHO, Endoscopy, Nuclear Medicine, Physical Therapy, Radiology/MRI, Respiratory Therapy)
X
C: Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. Includes but not limited to sanding of walls for painting or wall covering; removal of floor coverings, ceiling tiles, and casework; new wall construction; minor duct work or electrical work above the ceilings; major cabling activity; any activity which cannot be completed in a single work shift.
X
High Risk-(ex CCU, ER, Labor & Delivery, Laboratories
(specimen), Newborn Nursery, Outpatient Surgery, Pediatrics, Pharmacy, Post Anesthesia care, Surgical Units)
X D: Major duration and construction activities-Includes, but not limited to:
activities that require consecutive work shifts; requires heavy demolition or removal of a complete cabling system; new construction.
X
Highest Risk-(ex Any area caring for
Immunocompromised patients, Burn Unit, Cardiac Cath Lab, Central Sterile Supply, ICU, Medical Unit, Negative pressure isolation rooms, Oncology, Operating rooms including C-section)
Project
Class
Patient Risk Group TYPE A TYPE B TYPE C TYPE D
LOW Risk I II II III/IV
MEDIUM Risk I II III IV
HIGH Risk I II III/IV IV
HIGHEST Risk II III/IV III/IV IV
During Construction Project Upon Completion of Project
CLASS
I
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace any ceiling tile displaced for visual inspection.
CLASS
II
1. Include all items from Class I above
2. Provides active means to prevent air-borne dust from dispersing into atmosphere
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Place dust mat at access points of work area.
7. Contain construction waste before transport in tightly covered containers.
8. Isolate HVAC system in areas where work is being performed to prevent contamination of duct system.
1. Wipe surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.
CLASS
III
1. Include all items from Class I/II above
2. Involve infection control in design/planning before construction begins.
3. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
1. Include all items from Class I/II above
2. Do not remove barriers from work area until completed project is thoroughly cleaned bas required by the owner’s
Safety Department and/or Infection Control Department.
3. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant
CLASS
IV
1. Include all items from Class I/II/III above
2. Involve infection control in design/planning before construction begins.
3. Seal holes, pipes, conduits, and punctures appropriately.
4. If exiting to a patient care area, construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
5. Walk-off mats are recommended to minimize tracking of heavy dirt and dust from construction areas. Shoe covers may be considered in certain areas.
1. Include all items from Class
I/II/III above
Is there a risk to the contractor of T.B. exposure (yes/no): NO
Infection Control Additional Requirements: Class I precautions
| 2020-12-08T14:03:00-0700 | |
| RUSSELL L. SKOVLUND 252996 |