S02 EXHIBIT B - Calculation of Self-Performed Work 36C24420R0086.docx
DOCX document 41 KB Posted
- Attached to
- Z1DA--Replace Automatic Transfer Switches Design-Build Federal contract opportunity
- Solicitation number
- 36C24421R0089
About this file
This exhibit provides a template for calculating self-performed work on a federal construction contract. Offerors must complete the template to identify the minimum 15% of work to be self-performed, including details of owned equipment, materials purchased and installed by own forces, and associated labor and overhead. Additional consideration may be given to offerors that can self-perform major construction elements like prefabricated concrete. Offerors must show the total contract price, subtract non-self-performed specialty trades and overhead, and ensure the self-performed amount is at least 15% of the remainder.
The related federal solicitation is for a design-build project not exceeding $500,000 to replace automatic transfer switches at the Lebanon VA Medical Center in Pennsylvania. A two-phase solicitation will select a contractor to partner with an engineering firm for design and construction. Phase I is open to all qualified 100% SDVOSB offerors to submit for initial evaluation, with Phase II issued to a smaller group for revised proposals. The project is to be completed per VA guidelines and specifications by an anticipated award date between the posted dates.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 Amend A0001 to 36C24421R0089 8-12-21.docx | DOCX document | |
| S02 Dwg. - E707.pdf | ||
| 36C24421R0089 0001_1.docx | DOCX document | |
| S02 SCA 2015-4231 dated 7-21-21.pdf | ||
| S02 Solicitation 36C24421R0089 08-03-21.docx | DOCX document | |
| 36C24421R0089_2.docx | DOCX document | |
| P01 SOW - Replace ATS.doc | DOC document | |
| S02 Wage Determination 7-23-21.pdf | ||
| S02 Records Management Language for Contracts.docx | DOCX document | |
| S02 EXHIBIT A - Project Example.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B - CALCULATION OF SELF-PERFORMED WORK
EXHIBIT B - CALCULATION OF SELF-PERFORMED WORK
SUBMITTED IN RESPONSE TO Request For Proposal 36C24420R0086
Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.
Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work:
B.1 Total Offer Price: $
B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self performed)
B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)
B.4 Remainder is “Total amount of work to be performed under the Contract” = $
B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %
File details come from the government source that posted it. Updated .