About this file
This document contains a federal solicitation and project description for replacement of automatic transfer switches. The solicitation will utilize a two-phase design-build process to select a prime contractor teaming with an engineering firm. Phase I will evaluate offerors with the selected Phase II respondents receiving a request for proposal. The project scope involves design and construction services for replacement of automatic transfer switches at the Lebanon, Pennsylvania VA Medical Center. The project budget ranges from $250,000 to $500,000 and will be awarded as a firm-fixed-price contract. The solicitation is designated for SDVOSB offerors and will follow Federal Acquisition Regulation procedures for design-build acquisition and best value source selection. Evaluation factors and additional Phase II submission requirements will be provided in a subsequent amendment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 Dwg. - E707.pdf | ||
| 36C24421R0089 0001_1.docx | DOCX document | |
| S06 Amend A0001 to 36C24421R0089 8-12-21.docx | DOCX document | |
| 36C24421R0089_2.docx | DOCX document | |
| S02 Records Management Language for Contracts.docx | DOCX document | |
| P01 SOW - Replace ATS.doc | DOC document | |
| S02 Wage Determination 7-23-21.pdf | ||
| S02 SCA 2015-4231 dated 7-21-21.pdf | ||
| S02 EXHIBIT B - Calculation of Self-Performed Work 36C24420R0086.docx | DOCX document | |
| S02 Solicitation 36C24421R0089 08-03-21.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A PROJECT EXAMPLE
PART 1: Prepare a minimum of one (1) and a maximum of two (2) projects that closely match the Scope of Work requirements.
Provide the following information requested in this format for each of the project(s)/contract(s) being described. Projects may be on going and cannot have been completed any later than 5 years prior to the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use additional space as required.
A. Offeror (Your) Name (Company/Division):
B. Project/Contract Title:
C. Contract Specifics:
1. Description of Effort as Prime or _Subcontractor
2. Contract Number
3. Original Contract $ Value Current/Final Contract $ Value
4. If amounts in 3 above are different, provide a brief description of the reason:
5. Completion Date:
1. Original Date:
2. Current Schedule: _____________________
3. Estimate/Final Completion Date:
4. Primary cause for Contract Modifications
D. Provide detailed description of the work performed under the contract and describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)
In addition, address the following:
1. Describe the specific elements of the work performed by your firm.
2. Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on projects awarded under this solicitation. Should you intend to use these same subcontractors, please list their company names and described their principal areas of work that they will perform.
3. Address any technical areas about this project you consider uniquely relevant to this solicitation.
E. Point of Contact for Owner/Government agency Contracting Officer and or inspector (COR / COTR); include a current phone number and email address for each.
Part 2, Additional offeror information required.
A. Name subcontractors and/or Teaming Partners to be utilized on this contract. Multiple subcontractors may be named for the same discipline but are limited to a maximum of three (3) subcontractors per discipline.