S02 - EXHIBIT A.docx
DOCX document 20 KB Posted
- Solicitation number
- 36C24421R0064
About this file
This document contains technical proposal questions for a multiple award task order contract to provide construction services at the Corporal Michael J. Crescenz Medical Center. Offerors are asked to provide details on their experience and capability managing similar construction dollar levels and disciplines. They must also describe how they will meet short notice requirements for site visits and proposal meetings within 2 days or 120 minutes. Offerors are asked to attach an organizational chart identifying key personnel roles and lines of authority. They must also provide a list of in-house trades and personnel numbers. Offerors are requested to discuss scheduling methodology and construction approach, including timelines and responsible parties. Details on quality control, testing laboratories, and contract closeout procedures are also solicited. Offerors must discuss safety programs, training, documentation, OSHA compliance plans and certify safety incidents. Current EMR ratings must also be provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24421R0064 0004.docx | DOCX document | |
| Revised - EXHIBIT F - PPQ.docx | DOCX document | |
| Revision 1 - EXHIBIT C - Subcontractor Information and Consent Form.docx | DOCX document | |
| Revised - EXHIBIT E - PPQ SAMPLE TRANSMITTAL LETTER.docx | DOCX document | |
| 36C24421R0064 0003.docx | DOCX document | |
| Revision 1 - EXHIBIT B Performance Relevancy Questionaire.docx | DOCX document | |
| 4. QUESTIONS with Responses.pdf | ||
| 36C24421R0064 0002.docx | DOCX document | |
| 2. Questions Answers Information.pdf | ||
| 1. Questions Answers Information.pdf | ||
| 36C24421R0064 0001.docx | DOCX document | |
| Site Visit Sign In 9 8 21.pdf | ||
| 3. Questions Answers Information.pdf | ||
| S02 - EXHIBIT B - Past Performance Relevancy Questionnaire.docx | DOCX document | |
| S02 - EXHIBIT E - PPQ SAMPLE TRANSMITTAL LETTER.docx | DOCX document | |
| S02 - 8.30.21 - 36C24421R0064.docx | DOCX document | |
| S02 - SEED PROJECT TASK ORDER PACKAGE.zip | ZIP file | |
| S02 - EXHIBIT F - PPQ.docx | DOCX document | |
| S02 - EXHIBIT C.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A – Technical Proposal Data Offerors are strongly encouraged to review the evaluation information located in the solicitation as they complete their Exhibit A.
Each question should be covered in sufficient detail, to clearly address all required information. Answer questions in the order presented. You are NOT limited to the space provided (However, there is an overall technical proposal page limit). Use as much space as necessary to provide answers. It is advisable to state the question then give the answer. This will aid in the evaluation.
In the event you reference another document or part of the proposal, you must be clear as to where the information can be found to answer the particular question(s). Such statements as see Company profile or see Safety Plan are not acceptable. You must indicate on what page of the proposal the answer can be found in the referenced document. Failure to do so may make your proposal non-compliant.
The Project Management data is obtained for the purpose of evaluating technical capability in performance of future task order projects. The offeror is required to provide required information to show experience and capability to manage multiple disciplined projects.
1 CAPABILITY AND EXPERIENCE:
1A. Describe your experience and capability in managing construction projects for the dollar level, and disciplines needed to accomplish this project. (Why are you a good candidate for receiving an award?)
1B. This contract requires short notice site visits/proposal meetings, normally within 2 calendar days, but can be as short as 2 hours (120 minutes). How will you ensure compliance with these requirements?
2. ORGANIZATION AND SPECIFIC PERSONNEL:
2A. Provide as an attachment an Organizational Chart listing company personnel and their roles. Provide names, duties and levels of responsibility of key personnel to include the Project Manager, Site Superintendent(s), Quality Control Manager, Safety Manager and Infection Control Manager. Indicate to whom the Quality Control, Safety and Infection Control Managers report. (Lines of authority) (Refer to “Attachments to your Exhibit A” #1 below.)
2B. Provide a list of the in-house trades that you employ. Provide the number (not names) of these employees and if they are full-time, part-time etc.
3. SCHEDULING METHODOLOGY & CONSTRUCTION APPROACH:
Adequate scheduling processes are necessary to ensure completion and control of the project from beginning to the end of the project.
3A. Discuss your tentative schedule, including a timeline for major features of work. In addition, please identify the person responsible for ensuring the schedule is met (ex. Project manager). (Refer to “Attachments to your Exhibit A” #2 below.)
4. QUALITY CONTROL:
(In addition to the information required in this question, information on personnel, duties, responsibilities and lines of authority provided in response to questions 2 and 3 will be used in the evaluation of Quality Control.)
4A. Discuss how quality issues will be dealt with on this construction project. (Refer to “Attachments to your Exhibit A” #3 below).
4B. Provide the names of testing laboratories to be used and the procedures for test data reporting 4C. Discuss your procedures for contract closeout.
5. SAFETY
5A: Discuss your Safety Program in general, and provide as a minimum, details on training, documentation, and your plan to ensure adherence to OSHA Standards (Refer to “Attachments to your Exhibit A” #4 below).
5B: Discuss the steps you took to promote safety during construction during the past five (5) years.
5C: Provide a certification that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If the number exceeds the criteria listed, explain why?
5D: Offerors shall submit their current EMR rating. EMR rating should be less than or equal to 1.0. If the number exceeds the criteria listed, explain why?
Attachments to your Exhibit A:
1. Organization Chart with brief relevant details of individual experiences/qualifications
2. Tentative Schedule
3. Quality Control Plan Synopsis
4. Safety Plan Synopsis
File details come from the government source that posted it. Updated .