3. Questions Answers Information.pdf
PDF 96 KB Posted
- Solicitation number
- 36C24421R0064
About this file
This document contains questions and answers regarding plumbing drawings for construction projects at multiple buildings. The questions seek clarification on existing equipment, scope of work depicted in the drawings, responsibility for ceiling demolition and patching, and whether monitoring stations and sampling locations are included. Answers indicate that an existing booster pump is to remain, key notes on one drawing were disregarded, some drawings are for reference only with no new work, architectural drawings for ceiling openings were not provided, existing plumbing demolition is shown with diagonal lines, and monitoring stations and sampling locations are in the scope of work. Electrical work is needed for monitoring stations and wall demolition and finishes may be required for new plumbing installation. One drawing noted is for reference only with no new work.
The related federal contract opportunity is a Multiple Award Task Order Contract for services at the Corporal Michael J. Crescenz Medical Center to be awarded by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. No further details are provided on required services, response dates, or other contract terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24421R0064 0004.docx | DOCX document | |
| Revised - EXHIBIT F - PPQ.docx | DOCX document | |
| Revision 1 - EXHIBIT C - Subcontractor Information and Consent Form.docx | DOCX document | |
| Revised - EXHIBIT E - PPQ SAMPLE TRANSMITTAL LETTER.docx | DOCX document | |
| 36C24421R0064 0003.docx | DOCX document | |
| Revision 1 - EXHIBIT B Performance Relevancy Questionaire.docx | DOCX document | |
| 4. QUESTIONS with Responses.pdf | ||
| 36C24421R0064 0002.docx | DOCX document | |
| 2. Questions Answers Information.pdf | ||
| 1. Questions Answers Information.pdf | ||
| 36C24421R0064 0001.docx | DOCX document | |
| Site Visit Sign In 9 8 21.pdf | ||
| S02 - EXHIBIT B - Past Performance Relevancy Questionnaire.docx | DOCX document | |
| S02 - EXHIBIT E - PPQ SAMPLE TRANSMITTAL LETTER.docx | DOCX document | |
| S02 - EXHIBIT A.docx | DOCX document | |
| S02 - 8.30.21 - 36C24421R0064.docx | DOCX document | |
| S02 - SEED PROJECT TASK ORDER PACKAGE.zip | ZIP file | |
| S02 - EXHIBIT F - PPQ.docx | DOCX document | |
| S02 - EXHIBIT C.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO DESCRIPTION DRAWING NO.
Sheet P1-2, Building 1 Pipe Basement Plumbing Plan West, Shows
Building #1 Domestic booster pump, we assume it's existing, please clarify.
P1-2
Sheet P2-4, Building 2 Sub-Basement Plumbing Plan Unit 'B', Shows key note tag numbers 1 and 2, but the key note are not shown in plans, please clarify.
P2-4
Sheet P2-10 and P2-12 shows new plumbing fixtures and risers and also shown in the finish schedule. We provided takeoff and cost, however there's a general note that say (drawing for reference only no work on this drawing). Please clarify.
P2-10
Building 2 Sheets P2-1 to P2-25 have general note says (drawing for reference only no work on this drawing) but some of the sheets have new work, and we provided take off for those few sheets P2-4, P2-10 & P2-12. please clarify.
Building 30 Sheets PC-1 to PC-8 have general note (drawing for reference only no work on this drawing) apparently there was no new work
The existing and proposed domestic piping are running in the existing ceiling, but there's no Arch drawings for ceiling demo, opening and patching. Please provide Arch drawings for ceiling openings and patch.
Most drawings show new plumbing piping next to existing plumbing works. But there's no drawing for any existing plumbing demolition.
Please confirm if all plumbing work are new. If replacing the exiting plumbing, please provide drawings for existing plumbing demolition work.
Monitor Station and Sampling Location are shown in plans. Are these in scope of our work, please confirm.
Sections 03 30 53 Cast In Place Concrete, 09 91 00 painting, 26 05 26
Grounding & Bounding, 26 24 16 Panelboards, 26 29 21 Disconnect
Switches, are included in the specification book, but drawings are missing. Please clarify if these sections are part of the scope of work.
Sheet P2-4 has proposed (Bold) plumbing related electrical and plumbing work. Tthere's a note on the drawings that says "Drawing for reference only no work on this drawings". Please clarify.
Sheet P2-4
Answers
1. Booster pump is existing
2. No new work on this drawing. Disregard key not tag numbers 1 and 2
3. No new work on these drawings.
4. Drawings are for reference only. No new work on the drawings P2-1 to P2-25
5. Drawings are for reference only. No new work on the drawings
6. Arch drawings do not exist, so they cannot be provided.
7. Existing plumbing demolition is shown throughout the drawings with a diagonal lines / shading.
8. Yes, in scope of work.
9. Electrical work is needed for the monitoring stations. Wall demolishing and finishes may be needed to install new plumbing.
10. Drawing is for reference only. No new work on the drawing