S02_Drawings_Ft Harrison Exterior Stairs.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25924R0128
About this file
This document is a federal contract opportunity for a project to replace the exterior stairs at Building 141 at the Fort Harrison VA Medical Center in Montana. The key details are:
The project involves removing and replacing the masonry brick stairs, brick cheek walls, stone capped columns, and associated landings and handrails at the east entrance of Building 141, which is on the historical register. The project also includes adding new exterior lighting, landscaping, and heated concrete stairs with an electric heating system. A bid alternate is included for adding a new canopy over the east entry. The work must be completed within 120 calendar days and follow strict infection control and safety requirements. No work can begin until a Notice to Proceed is issued. The government will not provide any labor or equipment, and the contractor is responsible for any damage to government property. All work must comply with relevant codes, regulations, and VA standards. A pre-bid walkthrough is scheduled, and proposals are due by an unspecified deadline. Award will be made to the responsible offeror whose proposal is most advantageous to the government.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAIN ENTRANCE
PATRIOTS WAY
HONOR DR.
VETERANAS DR.
PATRIOTS WAY
VE
TE
R A
N A
S W
A Y
LIBERTY LANE
INDEPENDENCE WAY
PROJECT SITE
BLDG 141
GI001
JME RJF
COVER
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
EXTERIOR STAIR
REPLACEMENT
FORT HARRISON, MT
436-20-118
APPROVED: COR
AUGUST 2023REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
FINAL CONSTRUCTION
DOCUMENTS (RTA)
DWG. OF
JOSEPH BILODEAU
Joseph.Bilodeau@va.gov
VA MEDICAL CENTER
FT. HARRISON, MONTANA
ELT CHIEF, OIT
CHIEF, ENGINEERING SERVICE CHIEF, LOGISTICS SERVICE
CHIEF, EHRM SAFETY
CHIEF, POLICE INFECTION CONTROL
VA SIGNATORIES
EAST EXTERIOR IMAGE B141
BUILDING 141 EXTERIOR
STAIR REPLACEMENT
CAMPUS PLAN
N
TRUE N
SHEET LIST
Sheet Number Sheet Title
GENERAL
GI001 COVER
GI002 GENERAL PRECONSTRUCTION INFECTION CONTROL RISK ASSESSMENT
LANDSCAPING
LP100 LANDSCAPE PLAN
STRUCTURAL
SI000 STRUCTURAL ABBREVIATIONS AND LEGEND
SI001 GENERAL NOTES
S-101 STAIR FRAMING PLAN
S-501 SECTIONS & DETAILS
S-502 SECTIONS & DETAILS
S-503 SECTIONS & DETAILS
ARCHITECTURAL
AI001 ABBREVIATIONS, SYMBOLS, LEGENDS, AND GENERAL NOTES
AE100 BASEMENT PLAN - OVERLALL
AE101 FIRST FLOOR - OVERALL
AE111 FLOOR PLANS - EAST STAIR
AE112 FLOOR PLANS - SOUTH STAIR
AE201 EXTERIOR ELEVATIONS
AE401 ENLARGED STAIR PLAN AND SECTIONS
AE501 DETAIL, WALL TYPE, & DOOR SCHEDULE
MECHANICAL
MI001 MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES
MP100 OVERALL MECHANICAL BASEMENT PLAN
MP200 ENLARGED MECHANICAL BASEMENT PLAN
MH500 MECHANICAL DETAILS - SNOWMELT SYSTEMS
MH501 MECHANICAL DETAILS
MH600 MECHANICAL SCHEDULES
ELECTRICAL
EI001 ABBREVIATIONS, SYMBOLS, LEGENDS, AND GENERAL NOTES
EP100 ELECTRICAL BASEMENT PLAN
EL100 ELECTRICAL BASEMENT LIGHTING PLAN
EL101 ELECTRICAL FIRST FLOOR LIGHTING PLAN
EP500 ELECTRICAL DETAILS
EP600 ONE LINE DIAGRAM - PARTIAL
EP610 SCHEDULES
08252023
GI002
GENERAL PRECONSTRUCTION
INFECTION CONTROL RISK
ASSESSMENT
JME RJF
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
EXTERIOR STAIR
REPLACEMENT
FORT HARRISON, MT
436-20-118
APPROVED: COR
AUGUST 2023REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
FINAL CONSTRUCTION
DOCUMENTS (RTA)
DWG. OF
JOSEPH BILODEAU
Joseph.Bilodeau@va.gov
VHA Infection Control Risk Assessment for Construction, Renovation and Maintenance
Introductory Information and Instructions Use this template as a baseline for performing facility Infection Control Risk Assessments (ICRAs) for construction, renovation, and maintenance work (referred to as the “activity” in this document). The template provides minimum requirements for categorizing activity types and patient risk to determine the level of precautions needed to prevent infection risks. Facilities may customize this template to incorporate site-specific information and/or to add more stringent criteria.
NOTE: This VHA ICRA template pertains specifically to infection prevention. It must be used in conjunction with the required Pre-Construction Risk Assessment (PCRA) for the activity which addresses other activity-related safety concerns (e.g., vibration, noise) outside the scope of the ICRA.
To complete the template:
1. Use Table 1 to identify the category of the construction, renovation and/or maintenance activity.
2. Use Table 2 to identify the areas affected by the activity.
3. Use Table 3 to identify the overall patient risk category that will be affected by the activity.
4. Use Table 4 to determine the level of infection prevention and control precautions needed for the activity.
Once all 4 steps above are completed: Refer to Table 5 for the minimum required control measures for the level of infection prevention and control precautions needed for the activity. Refer to Table 6 for the minimum infection prevention and control measures required on completion of the activity.
PERMIT: See the last page of this document for a fillable permit form to be used for posting at the activity site as needed.
Table 1 - Construction, Renovation, and/or Maintenance Activity Category NOTE: If any of the bulleted criteria in a higher activity category pertains to the work that will be done (even if the other criteria are in a lower category), use the higher activity category for the VHA ICRA.
Activity Category determined from Table 1 (A, B, C, or D):
Category A
Inspection and/or facility upkeep generally defined as follows:
• Work can be completed in a single shift, not to exceed 10 hours.
• Patients and/or employees may be in the area depending on the activity.
• Work that does not create dust or debris.
• Removal of ceiling tile or access to mechanical or electrical chase for visual inspection limited to 1 tile per 50 square feet with limited exposure time (not to exceed an hour for each tile) within the shift.
• Minor interior updates (e.g., replacing floor or ceiling tiles, carpentry work to include hanging signage, and painting without sanding) that do not create dust or debris.
• Limited building system maintenance such as plumbing on potable systems limited to faucet replacement etc. and electrical work such as replacement of bulbs, receptacles, or switches.
Category B
General maintenance and repair work generally defined as follows:
• Prolonged inspection and work that may take longer than a single shift but not exceeding a week.
• Patients and employees are not to be in the area until activity is completed.
• Work that creates minimal dust and debris.
VHA Infection Control Risk Assessment for Construction, Renovation and Maintenance
• Interior finish or surface repairs, updates, or modifications such as repair of firewalls and barriers, and new flooring that produces minimal dust and debris. Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
• Plumbing work such as installation or replacement of a single fixture or piping for a single fixture. Any work on sanitary plumbing including snaking of drains.
• Electrical work such as installation of cabling/wiring/conduit for a single device, installation of new device such as a light fixture that produces minimal dust and debris.
• Air Handler and/or fan shutdown/startup and HVAC work such as replacement of a single diffuser, single terminal unit or a single device that produces minimal dust and debris.
Category C
Small-scale construction, renovation, or maintenance generally defined as follows:
• Work requiring longer than a single week to complete but not exceeding 6 months.
• Patients and employees are not to be in the area until activity is completed.
• Demolition/removal of preexisting floor covering, casework, lay-in ceiling, or other architectural elements.
• Demolition/removal of more than 32 ft2 of drywall/framing, hard ceilings, and doors/framing and minimal infrastructure such as electrical circuits and branch piping.
• Installation of new walls, ceilings and doors including framing, drywall/plaster and associated work.
• Plumbing work such as the installation of new sinks, showers and toilets and associated plumbing.
• Shut down of sections of potable water systems.
• Electrical work such as installation of conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc.
• Modification of existing fire alarm and suppression systems.
• Mechanical work such as the installation of ductwork, diffusers, and terminal units for an area.
Category D
Large-scale construction, renovation, or maintenance generally defined as follows:
• Work exceeding 6 months in duration.
• Patients and employees are not to be in the area until activity is completed.
• Large-scale demolition of building components and infrastructure including removal of multiple doors, walls, framing, ceilings, flooring, piping, electrical and HVAC.
• The installation building components such as new walls, ceilings and doors including framing, drywall and associated plaster work.
• Plumbing work such as the installation of:
o new medical gas systems, o steam/heating hot water, condensate systems, o multiple sinks, showers and toilets including associated plumbing.
• Shutdown of potable water, steam/heating hot water, condensate, and medical gas systems.
• Electrical work such as installation of electrical feeders, distribution panels, conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc.
• Installation of fire alarm and suppression systems.
• Electrical shutdown of multiple panels.
• Mechanical work such as the installation of air handling equipment, associated ductwork, diffusers, heat exchangers, terminal units and controls.
VHA Infection Control Risk Assessment for Construction, Renovation and Maintenance
Table 2 - Affected Area Assessment
Identify the areas and associated patients that will be affected by the construction/renovation/maintenance activity (see the Figure for a visual representation of adjacent affected areas).
Figure: Isometric drawing of affected area assessment
Area Service(s)/Type(s) of Area(s) (e.g., OR, Unit/Ward, Sterile
Processing, Administrative, etc.)*
Point of Contact (POC) POC Contact Information
Activity Area**
Area Above
Area Below
Adjacent Area 1
Adjacent Area 2
Adjacent Area 3
Adjacent Area 4
* There may be more than one Service/type of area for each row. List all.
** List the area(s) in which the construction/renovation/maintenance activity will occur. NOTE: When the Activity Category is B, C, or D, the control measures are determined by the Patient Risk in the adjacent affected areas.
VHA Infection Control Risk Assessment for Construction, Renovation and Maintenance
Table 3 - Patient Risk Category
Using Table 3, identify the patient risk category for each area listed in Table 2. Of the patient risk categories identified, select the one with the greatest risk as the overall Patient Risk Category for the activity.
Overall Patient Risk Category determined from Table 3 (Low, Medium, High, or Highest):
Low Risk
Non-patient care areas such as:
Medium Risk
Patient care support areas such as:
High Risk
Patient care areas such as:
Highest Risk
Procedural, invasive, sterile support and highly compromised patient care areas such as:
• Public hallways and gathering areas not in clinical areas
• Office areas not in clinical areas
• Breakrooms not in clinical areas
• Bathrooms or locker rooms not in clinical areas
• Mechanical/electrical rooms not in clinical areas
• Waiting areas
• Clinical engineering (biomedical)
• Materials management
• Sterile processing department – dirty side
• Kitchen, cafeteria, gift shop, coffee shop, and food kiosks
• Patient care rooms and areas, including spinal cord injury units
• All acute care units, including mental health
• All outpatient units and clinics
• Emergency department
• Community Living Centers, domiciliaries, and transitional residences
• Employee health
• Pharmacy – general work zone
• Medication rooms and clean utility rooms
• Imaging suites – diagnostic imaging
• Laboratory
• All transplant units
• All intensive care units
• All oncology units and chemotherapy/infusion centers
• OR theaters and restricted areas
• Hemodialysis units
• Procedural rooms*
• Pharmacy compounding area
• Sterile processing department – clean side
• Transfusion services
• Imaging suites – interventional imaging
• Dedicated isolation wards/units for infectious diseases
* Procedural Rooms are designated for the performance of patient care activities that may require high-level disinfected or sterile instruments and some environmental controls but is not required to be performed with the environmental controls of an operating room (OR). The room is intended for procedures that are performed in an aseptic surgical field and penetrates the protective surfaces of a patient’s body (e.g., subcutaneous tissue, mucous membranes, cornea) or entry into or opening of a sterile body cavity. Examples of these spaces include Cardiac Catheterization Suites, Electrophysiology Suites, Endovascular/GI Suites, Angio Suites and other spaces which may have high risk patient populations.
VHA Infection Control Risk Assessment for Construction, Renovation and Maintenance
Table 4 - Level of Infection Prevention and Control Precautions Match the Overall Patient Risk Category (Low, Medium, High, Highest) determined from Table 3 with the planned Construction/Renovation/Maintenance Activity Category (A, B, C, D) from Table 1 to determine the minimum Level of Infection Prevention and Control Precautions (I, II, III, or IV) using Table 4 below.
Level of Precautions determined from Table 4 (I, II, III, or IV):
An infection prevention and control permit is required for Level III and Level IV. Consult with Infection Prevention and Control for Level I and Level II.
Table 5 - Required Infection Prevention and Control Measures, by Level of Precautions Controls defined below for the Level of Precautions identified for the activity must be in place before the activity begins and maintained until work is completed and the area is activated. Control measures for each Precaution Level must also include the control measures in the preceding Level(s).
As the activity progresses, a full re-evaluation of remaining activity type and patient risk is required prior to downgrading the Level of Precautions.
Level of Precautions
Control Measures
Level I 1. Perform work activity in a manner that does not create dust.
2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.
3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.
Level II All control measures in Level I and the following:
1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).
2. Ensure worker clothing is clean and free of visible dust before leaving the work area.
3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.
Patient Risk Category
Activity Category
A B C D Low Risk I II II III Medium Risk I II III IV High Risk I II IV IV Highest Risk II III IV IV
VHA Infection Control Risk Assessment for Construction, Renovation and Maintenance
4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system.
5. Seal doors to prevent dust migration.
6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.
Level III All control measures in Levels I and II and the following:
1. Ensure availability of equipment for cleaning hands.
2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors (unless a work specific waiver is approved by VHA’s Office of Healthcare Engineering); this must be maintained continuously 24/7 for the duration of the project. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows is not required to be HEPA-filtered. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.
6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
Level IV All control measures in Levels I, II and III and the following:
1. Barriers must be hard barriers unless temporary to install final barrier.
2. Containment must include an anteroom to ensure pressure control. Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.
4. Workers must wear shoe covers or have a method to clean shoes in anteroom.
Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
VHA Infection Control Risk Assessment for Construction, Renovation and Maintenance
Table 6 - Minimum Infection Prevention and Control Measures Required Upon Completion of the Activity Controls defined below shall be completed upon completion of the activity and inspected prior to terminating measures defined in Table 5.
Level of Precautions Measures
Levels I - II Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Water systems:
1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.
Levels III - IV Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
i. Carefully remove screws and painter tape.
ii. If dust will be generated during screw removal, use hand-held HEPA vacuum.
iii. Drywall cutting is prohibited during removal process.
iv. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
v. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminants from the work area.
2. Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications.
Water systems:
1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.
Infection Prevention and Control Construction/Renovation/Maintenance Permit This page must be posted at the entrance to the project area for Level III and Level IV activities.
Unique permit number:
Location of construction/renovation/maintenance Project manager Project start date Contact phone number Completion date Contractor Permit expiration date
Activity Category (A, B, C, or D)
Overall Patient Risk Category (Low, Medium, High, or Highest)
Level of Infection Prevention and Control Precautions (I, II, III, or IV)
Level of Precautions
Control measures to be in place for the duration of the activity (Check the box for the activity’s Level of Precautions to indicate the Control Measures)
Level I
1. Perform work activity in a manner that does not create dust.
2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.
3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.
Level II
All control measures in Level I and the following:
1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).
2. Ensure worker clothing is clean and free of visible dust before leaving the work area.
3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.
4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system
5. Seal doors, to prevent dust migration.
6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.
Level III
All control measures in Levels I and II and the following:
1. Ensure availability of equipment for cleaning hands.
2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors (unless a work specific waiver is approved by VHA’s Office of Healthcare Engineering); this must be maintained continuously 24/7 for the duration of the project. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows is not required to be HEPA-filtered. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.
6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
Level IV
All control measures in Levels I, II and III and the following:
1. Barriers must be hard barriers unless temporary to install final barrier.
2. Containment must include an anteroom to ensure pressure control, Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.
4. Workers must wear shoe covers or have a method to clean shoes in anteroom Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
Additional requirements:
Project Manager signature Date
Infection Preventionist signature Date
08252023 rforster Typewritten Text C rforster Typewritten Text
II
rforster Typewritten Text
EXTERIOR EAST STAIR
rforster Typewritten Text
JOE BILODEAU (COR)
rforster Typewritten Text N/A rforster Typewritten Text
UNDER STAIR (NOT OCCUPIED)
rforster Typewritten Text
FIRST FLOOR
rforster Typewritten Text N/A rforster Typewritten Text N/A rforster Typewritten Text
OIT OFFICE B-29
rforster Typewritten Text
JOE BILODEAU
rforster Typewritten Text
JOE BILODEAU
rforster Typewritten Text
LOW
LP100
ALK GJV
SCALE: 3/4" = 1'-0"
0' 2'1'
SHEET NOTES:
1. CONTRACTOR TO PROVIDE POSITIVE DRAINAGE AWAY FROM
ALL WALLS, FOUNDATIONS, AND STRUCTURES.
2. CONTRACTOR TO PROVIDE DUST CONTROL DURING AND
UPON COMPLETION OF WORK.
3. QUANTITIES PROVIDED ARE FOR REFERENCE ONLY
CONTRACTOR TO VERIFY ALL.
4. PLANT SPACING WILL VARY BASED ON SITE CONDITIONS.
5. CONTRACTOR TO ENSURE EXISTING LANDSCAPE
IRRIGATION IS RELOCATED TO ACCOMMODATE NEW
LANDSCAPE PLAN CONFIGURATION.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
EXTERIOR STAIR
REPLACEMENT
FORT HARRISON, MT
436-20-118
APPROVED: COR
AUGUST 2023REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
FINAL CONSTRUCTION
DOCUMENTS (RTA)
DWG. OF
JOSEPH BILODEAU
Joseph.Bilodeau@va.gov
SCALE:1 LANDSCAPE ENLARGEMENT PLAN
3/4" = 1'-0"
NEW LANDSCAPE AREA
SEE LEGEND FOR
PLANTING LIST.
LEGEND
SYMBOL BOTANICAL NAME / COMMON NAME QUANTITY SIZE
SESLERIA AUTIMNALIS
AUTUMN MOOR GRASS
DELPHINIUM "BLUE MIX"
BLUE MIX LARKSPUR
PAPAVER ORIENTALE "ALLEGRO"
RED DWARF ORIENTAL POPPY
GERANIUM CANTABRIGIENSE "BIOKOVO"
BIOKOVO CRANESBILL
7 1 GAL.
9 1 GAL.
6 1 GAL.
4 1 GAL.
NEW LANDSCAPE AREA
SEE LEGEND FOR
PLANTING LIST.
/SEED
FOOT-TAMPERED COMPACTED
BACKFILL UNDER ROOTBALL
6" MIN
SCALE:2 SHRUB PLANTING DETAIL
NOT TO SCALE
6" M
IN
6" MIN
BACKFILL MIXTURE
FERTILIZER TABLETS
SCARIFY SIDES OF HOLE PRIOR TO
PLANTING
TEMPORARY 3" HIGH BERM (REMOVE
WHEN IRRIGATION IS INSTALLED)
2" GRAVEL MULCH W/ 1/2" ON
ROOTBALL TAPER TO BASE OF TRUNK
PLANT CROWN AT FINISHED GRADE
LANDSCAPE PLAN
PROVIDE 4" WIDE
CONCRETE CURBING.
DEER RESISTANT
DEER RESISTANT
DEER RESISTANT
DEER RESISTANT
PROVIDE 4" WIDE
CONCRETE CURBING.
8/25/2023
AI001
JBE RJF
ABBREVIATIONS, SYMBOLS,
LEGENDS, AND GENERAL NOTES
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
EXTERIOR STAIR
REPLACEMENT
FORT HARRISON, MT
436-20-118
APPROVED: COR
AUGUST 2023REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
FINAL CONSTRUCTION
DOCUMENTS (RTA)
DWG. OF
JOSEPH BILODEAU
Joseph.Bilodeau@va.gov
POT POINT OF TANGENT
PPL PEOPLE
PR PAIR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT CONC POST-TENSIONED CONCRETE
PVC POLYVINYL CHLORIDE
PVDF POLYVINYLIDENE DIFLUORIDE
RAD RADIUS
RB RUBBER BASE
RCP REINFORCED CONCRETE PIPE,
REFLECTED CEILING PLAN
RD ROOF DRAIN
RE REFER TO, REFERENCE
REIN REINFORCE(D)(ING)
RECP RECEPTACLE
RCYL RECYCLE AREA
REFR REFRIGERATOR
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SAFB SOUND ATTENUATION FIRE BATTS
SAN SANITARY
SB SPLASH BLOCK
SC SOLID CORE - SEALED CONCRETE
SCH SCHEDULE
SD STORM DRAIN
SECT SECTION
SEW SEWER
SHT SHEET
SIM SIMILAR
SPF SPRAY APPLIED POLYURETHANE FOAM
INSULATION
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STORM SEWER,
STAINLESS STEEL
STM STORM
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
SWBD SWITCHBOARD
T&G TONGUE AND GROOVE
TCU THIN CLAD UNIT
TEL TELEPHONE
THK THICK(NESS)
THRU THROUGH
TJI TRUSJOIST INCORPORATED
T.O. TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL/TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
ABV ABOVE
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLER UNIT
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AISI AMERICAN IRON & STEEL INSTITUTE
ALUM ALUMINUM
ALM ALARM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATING & AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
AWG AMERICAN WIRE GAGE
AWS AMERICAN WELDING SOCIETY
AWWA AMERICAN WATER WORKS
ASSOCIATION
BL BUILDING LINE
BLDG BUILDING
B.O. BOTTOM OF
BRK BRICK
BR BROCHURE RACK
BUR BUILT UP ROOFING
CAB CABINET
CF CUBIC FOOT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTERLINE
CLOS CLOSET
CLG CEILING
CLR CLEAR(ANCE)
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CRS COURSE(S)
CTR CENTER
CNTR COUNTER
CU IN CUBIC INCH
CU YD CUBIC YARD
CW CLEAR WIDTH
DEMO DEMOLITION
DET DETAIL
DIAM,Ø DIAMETER
DC DISPLAY CASE
DP DAMP PROOFING
DPR DAMPER
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DWG DRAWING
DWS DOMESTIC WATER SUPPLY
E EAST
EA EACH
ELEV ELEVATION
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
EMER EMERGENCY
EP ELECTRICAL PANEL
EPDM ETHYLENE-PROPYLENE-DIENE-
MONOMER
EF EXHAUST FAN
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXH EXHAUST
EXP EXPOSED
EXT EXTERIOR
FLUOR FLUORESCENT
FMS FACILITY MANAGEMENT SERVICES
FND FOUNDATION
FO FACE OF
FOC FACE OF CONCRETE / CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
FT FOOT / FEET
FTG FOOTING
FURR FURRED(ING)
GA GAGE, GAUGE
GALV GALVANIZE(D)
GFCI GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
GFI GROUND FAULT CIRCUIT INTERRUPTER
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GRND GROUND
GRT GROUT
HAC HOUSEKEEPING AIDS CLOSET
HB HOSE BIB
HNDCP HANDICAP
HDW HARDWARE
HJT HEAD JOINT
HM HOLLOW METAL
HORZ HORIZONTAL
HP HORSE POWER / HIGH PRESSURE
HSKP HOUSEKEEPING
HT HEIGHT
HVAC HEATING, VENTILATION, AIR
CONDITIONING
HWS HOT WATER SUPPLY
ID INSIDE DIAMETER
IES ILLUMINATING ENGINEERING SOCIETY
IGU INSULATED GLASS UNIT
IN INCH (“)
INC INCORPORATED
INFO INFORMATION
INSUL INSULATION/INSULATE(D)(ING)
INT INTERIOR
INV INVERT
JT JOINT
K KIP (1,000 LB.)
LDR LADDER
LAM LAMINATE
LAV LAVATORY
LB POUND
LAG LAG SCREW
LG LENGTH / LONG
LTG LIGHTING
LVL LAMINATED VENEER LUMBER
LW CONC LIGHTWEIGHT CONCRETE
M METER(S)
MAX MAXIMUM
MECH MECHANIC(AL)
MED MEDIUM
MTL METAL
MFR MANUFACTURE(R)
MH MANHOLE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MM MILLIMETER
MO MASONRY OPENING
UC UNDERCUT
UG UNDERGROUND
UL UNDERWRITERS'
LABORATORIES, INC.
UNO UNLESS NOTED OTHERWISE
V VOLT
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VENT VENTILATE
VERT VERTICAL
VIF VERIFY IN FIELD
VIT VITREOUS
VS VERSUS
VC VERTICAL CURVE
VOL VOLUME
VPT VERTICAL POINT OF
TANGENT
VPI VERTICAL POINT OF
INTERSECTION
VPC VERTICAL POINT OF
CURVATURE
W WEST / WIDTH / WIDE /
W/ WITH
WC WATER CLOSET
WD WOOD
WG WIRE GLASS
WH WATER HEATER
WDW WINDOW
W/O WITHOUT
WT WEIGHT
WTR WATER
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
XPAN CROSS PAN
XSECT CROSS SECTION
XSTR EXTRA STRONG
YD YARD
YR YEAR
ABBREVIATIONS
FA FIRE ALARM
FB FACE BRICK
FC FOOT-CANDLE
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER BRACKET
FEC FIRE EXTINGUISHER CABINET
FFE FURNITURE, FIXTURES AND EQUIPMENT
FG FIXED GLASS
FIN FL FINISHED FLOOR
FIN FL EL FINISHED FLOOR ELEVATION
FIX FIXTURE
FL FLOOR
FH FIRE HYDRANT
N/A NOT APPLICABLE
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFICE
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPOI OWNER PROVIDED, OWNER INSTALLED
OPP OPPOSITE
ORIG ORIGINAL
OVHD OVERHEAD
PA PUBLIC ADDRESS
PCF POUNDS PER CUBIC FOOT
PLF POUNDS PER LINEAL FOOT
PFN PRE-FINISHED
PH PHASE
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
POC POINT OF CURVE/CONTACT
FRP FIBER GLASS REINFORCED PLASTIC
MPI MASTER PAINTERS
INSTITUTE
HVLS HIGH VOLUME LOW
SPEED
POI POINT OF INTERSECTION
EPS EXPANDED POLYSTYRENE
XPS EXTRUDED POLYSTYRENE
WPIV WALL POST INDICATOR VALVE
LOC LOCAL OPERATOR CONSOLE
FDC FIRE DEPARTMENT CONNECTION
WPIV WALL MOUNTED POST INDICATOR VALVE
UCF UNIFIED FACILITIES CRITERIA
GENERAL NOTES
REM REMOTE EQUIPMENT MODULE
GSF GROSS SQUARE FEET
IBC INTERNATIONAL BUILDING CODE
STC SOUND TRANSMISSION SYSTEM
AFFF AQUEOUS FILM FORMING FOAM
PVMT PAVEMENT
PFAS PER-POLYFLUOROALKYL SUBSTANCES
1. BUILDING 141 IS ON THE HISTORICAL REGISTER AND IS
CONSIDERED TO BE A BUILDING OF HISTORICAL
SIGNIFICANCE AND SHALL FOLLOW THE LIST OF CHARACTER
DEFINING FEATURES THAT THE MONTANA STATE HISTORIC
PRESERVATION OFFICE (SHPO) CONSIDERS TO REPRESENT
THE HISTORIC INTEGRITY OF THE BUILDING, AS WELL AS A
LIST OF RECOMMENDED ACTIONS TO ENSURE THAT THE
BUILDING'S REHABILITATION MEETS THE SECRETARY OF THE
INTERIOR STANDARDS FOR REHABILITATION.
2. BECOME FAMILIAR WITH THE CONSTRUCTION DOCUMENTS
AND NOTIFY VETERANS AFFAIRS COR OF ANY
DISCREPANCIES BEFORE PROCEEDING WITH ANY WORK.
3. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR
TO ORDERING OR INSTALLING ANY MATERIALS OR
EQUIPMENT.
4. DAMAGED AREAS CAUSED DURING CONSTRUCTION MUST BE
REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
REPAIRS MUST MATCH EXISTING CONDITIONS AND FINISHES.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND
DISPOSAL OF DEMOLITION AND/OR CONSTRUCTION DEBRIS
ASSOCIATED WITH THE WORK. DISPOSAL MUST BE IN
COMPLIANCE WITH FEDERAL, STATE, AND LOCAL
REGULATIONS. THE PROJECT SITE MUST BE KEPT CLEAN
AND FREE FROM WASTE MATERIALS.
6. THE OWNER RESERVES THE RIGHT TO SALVAGE ANY
REMOVED MATERIALS.
7. COORDINATE AND INSTALL FIRE-TREATED WOOD BLOCKING
OR SHEET METAL BACKING FOR ANCHORAGE OF
WALL-MOUNTED MECHANICAL AND/OR ELECTRICAL
COMPONENTS IN NEW UTILITY ROOM UNDER EXISTING EAST
STAIR.
8. MAINTAIN TEMPORARY PARTITIONING AND OTHER
MEASURES AS REQUIRED FOR INFECTION CONTROL IN
ORDER TO SEPARATE DAY-TO-DAY BUILDING 141 ACTIVITIES
FROM CONSTRUCTION ACTIVITIES. CONTROL OF
CONSTRUCTION TRAFFIC, NOISE, DUST, AND INCLEMENT
WEATHER BETWEEN THE EXISTING FACILITY AND NEW WORK
SHALL INCLUDE SAFETY, PROTECTIVE BARRIERS, AND
APPROPRIATE HOURS OF WORK BASED ON IMPOSITION OF
WORK ACTIVITY TO LIMIT THE IMPACT OF CONSTRUCTION.
9. UTILITY PENETRATIONS FOR TIE-INS BETWEEN NEW AND
EXISTING SHALL BE PERFORMED WITHOUT AFFECTING
DAY-TO-DAY BUILDING 141 OPERATIONS TO THE GREATEST
EXTENT POSSIBLE. COORDINATE WITH VA PROVIDING
NOTIFICATION AND LEAD TIMES AS REQUIRED BY DIVISION 01
SPECIFICATIONS.
10. COORDINATION IS REQUIRED BETWEEN THE CONTRACTOR
AND THE COR TO ESTABLISH THE MOST EFFICIENT METHOD
FOR BRINGING THE STAIR RENOVATION INTO FULL STAIR
OPERATION. THE INTERFACE OF SYSTEMS AND
INFRASTRUCTURE FOR MECHANICAL AND ELECTRICAL,
BETWEEN THE EXISTING AND NEW SHALL BE IDENTIFIED AND
COORDINATED, INCLUDING NIGHT WORK, PRIOR TO
CONSTRUCTION IN ORDER TO DEVELOP A SPECIFIC
APPROACH TO ALLEVIATE DOWN TIME FOR HOSPITAL AND
AND BUILDING 141 OPERATIONS.
SAB SOUND ATTENUATION BATTS
AE501
AE502
AE405
X
SIM
REVISION CLOUD
SECTION
NUMBER
SHEET
NUMBER
ELEVATION
NUMBER
SHEET
NUMBER
DRAWING TITLE
DRAWING SCALE
VIEW TITLE NUMBER
DETAIL NUMBER
SHEET NUMBER
ROOM NUMBER
GRAPHIC SCALE
0' 16'8'4'
SCALE: 1/8" = 1'-0"
MATCH LINE
SEE XX/X-XXX
LEVEL NAME
9'-0"
ELEVATION HEIGHTS
COLUMN GRID LINE
INTERIOR
ELEVATION MARKER
SECTIONS
EXTERIOR
ELEVATION
REFERENCED VIEW TITLES
DETAIL OR
ENLARGED PLAN
NORTH ARROW
ROOM NAME AND
NUMBER
KEY NOTE
WINDOW OPENING
PARTITION TYPE
TAG
DOOR TAG
REVISION NUMBER
MATCHLINE
SYMBOLS LEGEND
LOBBY
A
AE4019
N
TRUE N
SCALE:
FLOOR PLAN
1/8"=1'-0"1
SHEET
NUMBER
SCOPE OF WORK
THE CONTRACTOR SHALL PROVIDE SERVICES AS OUTLINED IN
THIS SCOPE OF WORK.
BUILDING 141 (EAST)
1. REMOVE THE STEPS AND LANDINGS OF THE TWO
CONTIGUOUS STAIR RUNS (AT THE EAST END OF BUILDING
141) AND REPLACE THEM WITH CAST-IN-PLACE COLORED
CONCRETE STAIRS WHICH ARE TO BE HEATED BY EITHER
GLYCOL HYDRONIC TUBES OR BY ELECTRICAL CABLES (BID
ALTERNATE #1) AS A MEANS OF MELTING ICE AND SNOW.
2. THE STAIRS ARE SUPPORTED BY A COMBINATION OF BRICK,
CONCRETE MASONRY UNITS, AND CAST-IN-PLACE CONCRETE
WALLS WHICH WILL REMAIN AND BE STRENGTHENED WHERE
REQUIRED.
3. LANDINGS WILL BE SAW CUT AND REMOVED AND THEN
REFORMED ON METAL DECKING ATTACHED TO EXISTING
CONCRETE BEAMS WITH STEEL ANGLES.
4. EXPANSION JOINTS WITH STAINLESS STEEL DOWELS AND
PREFORMED EXPANSION MATERIAL WILL CONNECT THE NEW
WORK TO THE EXISTING.
5. NEW BRICK CHEEK WALLS SHALL BE ADDED ON EITHER SIDE
STAIR WITH NEW HANDRAILS THAT MATCH THE EXISTING.
THE BRICK CHEEK WALLS AND STEEL HANDRAILS ARE TO BE
REPLICATED AND MADE HISTORICALLY ACCURATE PER
MONTANA STATE HISTORIC PRESERVATION OFFICE (SHPO)
GUIDELINES.
6. HYDRONIC WATER HEATING SYSTEM WITH HYDRONIC
HEATING WATER BOILER (THAT IS EITHER AN
ELECTRIC-FIRED OR A GAS-FIRED WATER BOILER/HEATER).
ADDITIONALLY, THIS SYSTEM WOULD REQUIRE A SMALL
GLYCOL TREATMENT SYSTEM INCLUDING MULTIPLE
SENSORS AND CONTROLS WITH A SUPPLY PUMP AND AN
INDEPENDENT GLYCOL PUMP.
7. TWO EXTERIOR LIGHT FIXTURE SCONES AT EAST STAIR.
8. NEW BOILER ROOM SHALL HAVE LIGHTING, POWER, NEW
DOOR, WALL GYPSUM BOARD AND METAL STUD WALL INFILL,
SOUND ATTENUATION BATTS, AND SPRAY-FOAM INSULATION
UNDER STAIRS.
9. NEW ARCHED, STEEL CANOPY OVER THE EAST ENTRY (BID
ALTERNATE #2).
10. THE ENTIRE EAST BRICK FAÇADE OF BUILDING 141 AND THE
REMAINING BRICK STAIR WALLS ARE TO BE TUCKPOINTED.
11. THE EXISTING SIDEWALK IS TO REMAIN IN PLACE, AND THE
EXISTING HANDRAILS ON THE CONCRETE STAIRS THAT LEAD
FROM THE SIDEWALK TO THE EAST PARKING LOT SHALL BE
REPLACED WITH SITE STANDARD DOUBLE-RAIL STYLE
HANDRAILS PER CAMPUS STANDARD.
BUILDING 141 (SOUTH)
12. REMOVE EXISTING RAILING AND REPLACE WITH NEW STEEL
RAILING TO MATCH EAST SIDE ENTRY STAIR RAILING.
AE100
JME RJF
BASEMENT PLAN - OVERLALL
0'
SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"
16'8'4'
SCALE:1 BASEMENT PLAN - OVERLALL
1/8" = 1'-0"
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
EXTERIOR STAIR
REPLACEMENT
FORT HARRISON, MT
436-20-118
APPROVED: COR
AUGUST 2023REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
FINAL CONSTRUCTION
DOCUMENTS (RTA)
DWG. OF
JOSEPH BILODEAU
Joseph.Bilodeau@va.gov
AE111
1. PROVIDE SEALANT AT ALL ELECTRICAL OUTLETS, PLUMBING
FIXTURES OR OTHER EQUIPMENT ABUTTING OR
PENETRATING A PARTITION.
2. REFER TO MECHANICAL DRAWINGS FOR ALL HVAC DESIGN
COMPONENTS.
3. REFER TO PLUMBING DRAWINGS FOR ALL DEMOLISHED AND
NEW PLUMBING FIXTURES.
4. REFER TO ELECTRICAL DRAWINGS FOR POWER AND
LIGHTING REQUIREMENTS.
SHEET NOTES:
AE111
08252023
AutoCAD SHX Text B-21
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text B-2
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text B-31
AutoCAD SHX Text
ELEC
AutoCAD SHX Text B-29A
AutoCAD SHX Text
UTILITY
AE201
AE201
AE201
OPP.
SIM.
AE101
JME RJF
FIRST FLOOR - OVERALL
0'
SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"
16'8'4'
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
EXTERIOR STAIR
REPLACEMENT
FORT HARRISON, MT
436-20-118
APPROVED: COR
AUGUST 2023REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
FINAL CONSTRUCTION
DOCUMENTS (RTA)
DWG. OF
JOSEPH BILODEAU
Joseph.Bilodeau@va.gov
SCALE:1 FIRST FLOOR - OVERALL
1/8" = 1'-0"
AE111
1. PROVIDE SEALANT AT ALL ELECTRICAL OUTLETS, PLUMBING
FIXTURES OR OTHER EQUIPMENT ABUTTING OR
PENETRATING A PARTITION.
2. REFER TO MECHANICAL DRAWINGS FOR ALL HVAC DESIGN
COMPONENTS.
3. REFER TO PLUMBING DRAWINGS FOR ALL DEMOLISHED AND
NEW PLUMBING FIXTURES.
4. REFER TO ELECTRICAL DRAWINGS FOR POWER AND
LIGHTING REQUIREMENTS.
SHEET NOTES:
AE111
AE112
N
TRUE N
08252023
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
ELEV
UP
AE111
XXX XXX
FLOOR PLANS - EAST STAIR
0'
SCALE: 1/4" = 1'-0"
8'4'2'
SHEET NOTES:
1. PROTECT ALL EXISTING CONSTRUCTION TO REMAIN FROM
DEMOLITION ACTIVITIES.
2. COORDINATE THE REMOVAL AND/OR RELOCATION OF
FIXTURES, EQUIPMENT AND OTHER APPURTENANCES WITH
THE COR.
3. THE GOVERNMENT WILL BE RESPONSIBLE FOR REMOVING
ALL STORED ITEMS AND EQUIPMENT PRIOR TO
COMMENCEMENT OF WORK.
4. PATCH, REPAIR, REPLACE AND REPAINT ALL AREAS OF
EXISTING CONSTRUCTION AFFECTED BY DEMOLITION TO
NEW CONDITION. MATCH EXISTING ADJACENT
CONSTRUCTION AND MATERIAL TO GREATEST EXTENT.
5. REMOVE MECHANICAL, PLUMBING, AND ELECTRICAL
EQUIPMENT AND DEVICES PER DISCIPLINE DEMOLITION
SHEETS.
KEY NOTES - DEMOLITION:
1. REMOVE EXISTING RAILING AND ASSOCIATED ANCHORS.
2. REMOVE EXISTING STAIRS.
3. REMOVE EXISTING PLANTS AND BEDDING SOIL, AND REMOVE
EXISTING GRASS TO PREPARE FOR NEW SHRUBBERY AREA.
4. EDGE OF EXISTING WALL BELOW TO REMAIN, VERIFY IN FIELD.
5. EXISTING LANDING TO REMAIN.
6. EXISTING STONE CAP AND BRICK COLUMN TO REMAIN.
7. SAWCUT EXISTING CONCRETE LANDINGS AND AFFECTED
EXISTING BEAMS AT THESE AREAS ONLY AND ALIGN CUTS WITH
NEW STAIR RUNS. VERIFY IN FIELD, SEE ARCHITECTURAL
1/AE111 AND STRUCTURAL 1/S-101.
8. EXISTING CIRCULAR STAIRS AND RAILING TO REMAIN.
9. EXISTING BRICK WALL TO REMAIN.
10. REMOVE EXISTING BRICK WALL TO ALLOW NEW VENTILATION
LOUVER, SEE EXTERIOR ELEVATION 1/AE201.
11. REMOVE EXISTING WINDOWS AND ALUMINUM FRAME.
12. REMOVE EXISTING FRAMED WALL TO FINISH FLOOR FOR NEW
3'-0"X7'-0" DOOR.
13. REMOVE EXISTING BRICK AT CHEEK STAIR WALL, TYPICAL.
14. EXISTING SIDEWALK TO REMAIN AND BE PROTECTED DURING
CONSTRUCTION. IF DAMAGED, CONTRACTOR TO
REPAIR/REPLACE, IN KIND, AT THEIR OWN EXPENSE.
15. REMOVE BRICK COLUMN AND RETAIN CAP FOR
FOR REINSTALLATION.
16. EXISTING STAIR FOUNDATION BEARING WALLS TO REMAIN.
17. REMOVE BEAM, SEE 1/AE111 AND VERIFY IN FIELD.
SCALE:3 BASEMENT PLAN
1/4" = 1'-0"
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
EXTERIOR STAIR
REPLACEMENT
FORT HARRISON, MT
436-20-118
APPROVED: COR
AUGUST 2023REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
FINAL CONSTRUCTION
DOCUMENTS (RTA)
DWG. OF
JOSEPH BILODEAU
Joseph.Bilodeau@va.gov
SCALE:4 FIRST FLOOR PLAN
1/4" = 1'-0"
SCALE:1 DEMOLITION BASEMENT PLAN
1/4" = 1'-0" SCALE:2 FIRST FLOOR DEMOLITION PLAN
1/4" = 1'-0"
KEY NOTES - CONSTRUCTION:
1. STEEL RAILING PER SITE RAILING STANDARDS.
2. STEEL RAILING TO MATCH EXISTING TYPE AND COLOR.
3. EXISTING RAILING TO REMAIN; GRIND AND SAND TO SMOOTH
FINISH AND PAINT TO MATCH EXISTING BLACK COLOR.
4. METAL CANOPY ABOVE (BID ALT. #2), SEE EXTERIOR
ELEVATIONS SHEET 3/AE201. NOTE: LIGHTING FIXTURE TO BE
REMOVED FOR THIS OPTION.
5. NEW EXPOSED CONCRETE STAIRS WITH HEATED FLOOR
SYSTEM. THE CONCRETE MUST BE INTEGRALLY COLORED TO
TO MATCH THE COLOR OF THE ADJACENT BRICK.
6. BRICK VENEER CHEEK STAIR WALL. NEW MASONRY TO MATCH
IN KIND THE BRICK PREVIOUSLY REMOVED.
7. 3'-0" X 7'-0" SOLID CORE HOLLOW METAL DOOR AND DOOR
FRAME, SEE SHEET AI001.
8. INFILL WALL: 5/8" TYPE X GYPSUM BOARD ON METAL STUD AT
INTERIOR OFFICE SIDE (PAINTED) WITH MINERAL WOOL SAFB
WITH 5/8" CEMENT BOARD SHEATHING WITH SEALED EDGES ON
STAIR SIDE (UNPAINTED).
9. ACCESS DOOR TO REMAIN.
10. SHRUBBERY AREA WITH HARDY, HIGH-RESISTANT TO DEER
PLANTS AND XERISCAPING, SEE LANDSCAPE PLAN.
11. NEW CONCRETE LANDING WITH HEATED FLOOR SYSTEM,
INTEGRALLY COLORED TO MATCH ADJACENT BRICK AND
POURED EVEN WITH REMAINING BRICK LANDING.
12. ASSUMED EXISTING SUPPORT STRUCTURE FOR CHEEK WALLS
ABOVE, VERIFY IN FIELD, SEE STRUCTURAL 6/S-501.
13. REPLACE DAMAGED LANDING SAILOR COURSE BRICK.
HATCHED AREA
INDICATED AREA OF
DEMOLITION
HATCHED AREA
INDICATED AREA OF
NEW HEATED
CONCRETE
8 8
BOTH
SIDES
BOTH
SIDES
TYP. #
N
TRUE N
BRICK BORDER
TO REMAIN
BRICK BORDER
TO REMAIN
A100
REMOVE
BEAM,
SEE
1/S-502
REMOVE
BEAM,
SEE
1/S-502
A
08252023
AutoCAD SHX Text B-29
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OIT
AutoCAD SHX Text B-29A
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text B-29
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OIT
AutoCAD SHX Text B-29A
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text
DAV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
USPS
AutoCAD SHX Text 143A
AutoCAD SHX Text
AutoCAD SHX Text
USPS
AutoCAD SHX Text
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text
DAV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
USPS
AutoCAD SHX Text 143A
AutoCAD SHX Text
USPS
AE112
JME RJF
FLOOR PLANS - SOUTH STAIR
0'
SCALE: 1/4" = 1'-0"
8'4'2'
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
EXTERIOR STAIR
REPLACEMENT
FORT HARRISON, MT
436-20-118
APPROVED: COR
AUGUST 2023REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
FINAL CONSTRUCTION
DOCUMENTS (RTA)
DWG. OF
JOSEPH BILODEAU
Joseph.Bilodeau@va.gov
SHEET NOTES:
1. WORK FOR THIS PROJECT IS TO BE DONE FIRST ON THE
SOUTH STAIR SO THAT IT CAN BE THE MAIN ENTRY DURING
THE DURATION OF CONSTRUCTION.
2. PROTECT ALL EXISTING CONSTRUCTION TO REMAIN FROM
DEMOLITION ACTIVITIES.
3. COORDINATE THE REMOVAL AND/OR RELOCATION OF
FIXTURES, EQUIPMENT AND OTHER APPURTENANCES WITH
THE COR.
4. PATCH, REPAIR, REPLACE AND REPAINT ALL AREAS OF
EXISTING CONSTRUCTION AFFECTED BY DEMOLITION TO
NEW CONDITION. MATCH EXISTING ADJACENT
CONSTRUCTION AND MATERIAL TO GREATEST EXTENT
POSSIBLE. AT LOCATIONS WHERE HANDRAIL POSTS OR
RAILS HAVE BEEN REMOVED CUT OUT THE AFFECTED
SURROUNDING BRICK, INFILL WITH GROUT TO MAKE
SMOOTH AND REPLACE IN-KIND TO MATCH EXISTING.
KEY NOTES:
1. REMOVE EXISTING ALUMINUM RAILING AND ASSOCIATED
HARDWARE.
2. NEW 1 1/2" ANODIZED ALUMINUM RAILING WITH POSTS AT 4'-0"
MAXIMUM SPACING ON CENTER - ALL HANDRAIL COMPONENTS
TO MEET VETERAN ADMINISTRATION HANDRAIL STANDARDS
FOR TYPE AND ATTACHMENT.
3. DOOR LOCKING MECHANISM SHALL BE UPGRADED TO MEET VA
SECURITY REQUIREMENTS . COMPONENT SELECTION TO BE
COORDINATED BY COR AND VA POLICE.
SCALE:1 FIRST FLOOR DEMOLTION PLAN - SOUTH STAIR
1/4" = 1'-0"
1' -0
3' -1
3/
8"
TR
4' -5
/8
LA
N D
. V
IF
8' -0
/8
TR
EA
D S
AT
1"
1' -0
'-4
/8
EX
IS
TI
N G
S
TA
IR
(V
ER
IF
Y)
7'-6 3/8"7'-6 3/8"
SCALE:2 FIRST FLOOR PLAN - SOUTH STAIR
1/4" = 1'-0"
1' -0
22 2
AE201
JME RJF
EXTERIOR ELEVATIONS
SCALE: 3" = 1'-0"
1'6"0'
SCALE:1 EXTERIOR ELEVATIONS
1/4" = 1'-0"
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
EXTERIOR STAIR
REPLACEMENT
FORT HARRISON, MT
436-20-118
APPROVED: COR
AUGUST 2023REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
FINAL CONSTRUCTION
DOCUMENTS (RTA)
DWG. OF
JOSEPH BILODEAU
Joseph.Bilodeau@va.gov
SHEET NOTES:
1. BUILDING 141 EAST BRICK FACADE MUST BE
TUCK-POINTED, ANY VISIBLE DAMAGE, CRACKING, OR
CRUMBLING OF THE EXISTING BRICK MORTAR JOINTS
MUST BE REPOINTED PER PRESERVATION BRIEF #2:
REPOINTING MORTAR JOINTS IN HISTORIC MASONRY
BUILDINGS.
2. ANY MATERIAL REPLACEMENT MUST BE IN-KIND
REPLACEMENT.
3. ALL NEW COMPONENTS MUST BE HISTORICALLY
ACCURATE AS APPROVED BY MONTANA STATE HISTORIC
PRESERVATION OFFICE (SHPO).
9 9 59
SCALE:2 EXTERIOR ELEVATIONS
1/4" = 1'-0"
12 12
12 12
SCALE:3 CANOPY
1/2" = 1'-0" SCALE:4 CANOPY ATTACHMENT DETAIL
3" = 1'-0"
3' -0
7'-8"
3' -1
/4
SECTION
PLAN
EXISTING EXTERIOR WALL
METAL FLASHING IN SEALANT
PREFINISHED STANDING SEAM
CANOPY - BLACK
PREFINISHED 1 1/2" X 1/8"
ALUMINUM SQUARE TUBE - BLACK
PREFINISHED 1 1/2" 'Z" CLIP - BLACK
5/8" EPOXY ANCHOR BOLT (AT 5 PLACES)
0'
SCALE: 1/2" = 1'-0"
4'2'1'
0'
SCALE: 1/4" = 1'-0"
8'4'2'
NOTE:
BID ALTERNATE - THE CANOPY DRAWINGS ARE
FOR ILLUSTRATION PURPOSES ONLY. THE COR
APPROVED CANOPY VENDOR IS TO PROVIDE
FINAL DESIGN AND ENGINEERING FOR VA
APPROVAL
KEY NOTES:
1. STEEL RAILING TO MATCH EXISTING TYPE AND COLOR.
2. NEW SCONCE LIGHT FIXTURE TO…