About this file
This is a collection of technical documentation and manufacturing data reports for three (3) watertube boilers (Discovery Series Model DT-2-57) manufactured by Victory Energy Operations, LLC for Protherm Corporation at Jefferson Barracks, St. Louis, Missouri. The boilers were built to ASME Boiler and Pressure Vessel Code Section I standards (2010 Edition with 2011a Addendum), with units designated 11756-1, 11756-2, and 11756-3.
Each boiler has a capacity of 35,000 pounds per hour of saturated steam at 200 PSIG design pressure and 100 PSIG operating pressure. The boilers feature tube and membrane wall construction with a furnace volume of 990 cubic feet, total heating surface of 3,877 square feet, and a single 36-inch diameter steam drum and 30-inch diameter mud drum. Three economizers with vertical counter-flow configuration, 400 PSIG design pressure, and 1,764 square feet of heating surface each were also supplied. The boiler trim package includes safety relief valves set at 130 and 135 PSIG (manufactured by Kunkle), feedwater control valves, level gauges, pressure gauges, multiple isolation and check valves, and blowdown systems. The burner system features a Powerflame low NOx modulating gas/oil burner with a 30 HP motor and Chicago blower. The manufacturing data reports (Forms P-3, P-6, and U-1) document compliance with ASME standards, include detailed specifications for all drums, tubes, headers, and external piping connections with allowable load ratings, and provide boil-out specifications. Project documentation includes comprehensive piping and instrumentation diagrams, general arrangement drawings, and a complete bill of materials identifying manufacturers and model numbers for all components. The installation documents specify foundation requirements, pump mounting details, suction and discharge piping standards, and bypass orifice configurations for the associated feedwater system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25526R0035 0002.docx | DOCX document | |
| 657-26-110JB_Pre-Bid Site Visit Attendance Roster.pdf | ||
| 36C25526R0035 0001.docx | DOCX document | |
| S04 PreProposal Conference Site Visit Agenda Upgrade Boiler.doc | DOC document | |
| S02 ARA RM Contract Language Clause.pdf | ||
| S02 -ATCH 2_Privacy Lan. for Con. no access to comp._2023.pdf | ||
| S02 ATCH 1_NARA RM Contract Language Clause.pdf | ||
| P09 - 657-26-110JB_CONST_100PCT-Specifications 276 pgs.pdf | ||
| 36C25526R0035_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
@ L AIA
�QRR0�8
7. Steam Safety Valve Following PRV [FAIL] wrong metal type per 1810
(SVFPRV) (For Steam Boiler System only)
Item Make Capacity (lb/hr) Range SVFPRV Set Point DA Pres
SVFPRV Kunkle 17972 15 psi 8 psi Pressure Trerice 0-30 psi
Gage
• Setpoint must be 5 psig higher than DA safety set pressure and at least 5 psig below MA WP of DA tank.
Maximum lift pressure shall not exceed 2 psig above set pressure. Reseat pressure shall not exceed 4 psig below set pressure.
Item Make Type Size Pressure Pressure Wide Open
(in) Upstream Downstream Flow Capacity
PRV Spence Spring 2in 98 psi 9 psi Bypass Nibco Gate I in
• SVFPRV is required to relieve largest of wide open flow capacity, PRV (combined total if parallel PRV setup) or bypass valve. Manual valve downstream ofSVFPRV is required. SVFPRV is required to be directly vented outside. Vent line is required not to contact drip pan ell when hot. Any valves with a setpoint of 15 psig or hi_gher must be of steel construction .
llypuo \' ah, •
.Jib,- !>hklup/ Coadtnwa
S\"FPR�
I
Jl11'A(Pl08£) lruku
• Test the drains on the safety valve drip pan ells by pouring water into them and noting that water flows freely. Unstop drains before proceeding.
• Close the manual valve in steam line following the safety valve.
• Slowly open bypass valve to raise pressure until safety lifts. DO NOT RAISE PRESSURE MORE
THAN 2 PSIG ABOVE SETPOINT PRESSURE.
• Use manufacturer data to determine wide open capacity of PRV and bypass valve.
• Open larger of the bypass valve or PRV completely and perform accumulation test. The pressure should rise no more than 6% above the setpoint pressure. After lifting valve, close bypass valve, open manual
Full Steam Ahead !
VICTORY ENERGY OPERATIONS, LLC
10701 E. 126th ST. N, Collinsville, OK 74021 Phone: 918-274-0023 Fax: 918-274-0059
EQUIPMENT DESCRIPTION – Discovery Series Model DT-2-57
Victory Energy Operations, LLC provides three steam generating systems to be utilized by Department of Veteran Affairs, Jefferson Barracks facility in Saint Louis, Missouri. The boilers and economizers have been registered with the National Board for ASME Boiler and Pressure vessels.
The boiler is designed with the following characteristics:
Quantity: One (3) Boiler Capacity 35,000 lbs/hr Saturated Steam Design Pressure: 200 PSIG Operating Pressure: 100 PSIG Operating Temperature: Saturated at the NRV outlet Feedwater Temperature: 228° F to Inlet from DA Primary Fuel: Natural Gas (#2 Oil Secondary Fuel) Boiler Location: Indoors
The VEO boiler design offers the least amount of furnace refractory compared to other designs. The tube and membrane seal welded front and rear walls virtually eliminate all refractory in the furnace, other than localized seals. This design greatly reduces maintenance costs and offers increased unit availability. The furnace sidewalls are tube and membrane construction for the entire length of the furnace to eliminate the possibility of gas bypassing. The outer sidewalls are also tube and membrane design for gas tight construction. This design offers 100% water cooling.
The furnace wall tubes of any boiler encounter the highest heat flux. The VEO boiler design, has the shortest furnace wall tubes in the industry. This advantage removes heat from the furnace quickly and extends boiler life.
The VEO boiler design has a single lower drum which reduces maintenance compared to other designs that may have two lower drums or headers. The single large diameter drum makes it easier to perform inspections and to maintain lower tube connections. The steam drum includes steam separation equipment.
SCOPE OF SUPPLY
Supply
ITEM
Installation VEO Buyer VEO Buyer
X Boiler (Shop Assembled) including insulation, flat, painted lagging, corrugated galvanized lagging X
X Boiler Trim Package (Trim Piping Ships on Boiler) X X Water column, water column drain piping X X Water column relay box X X Steam pressure gauge X X Natural Gas Burner System: X X Burner X X Fuel Trains (incl. pilot line) X X Fuel PRV (Regulator) Shipped Loose X X Burner Management System (BMS) X X Combustion Control System (including instrumentation) X
X Forced Draft Fan (Ships on Burner) X X Forced Draft Fan Drive (Motor ships on FD fan) X X Economizer with Support Steel X X Ducting and Expansion Joints X X Boiler Outlet Transition Insulation and Lagging X X Flue Gas Recirculation Duct Insulation & Lagging X X Boiler Outlet mounted Single Wall Stack (Insulation by Customer) X
X Platforms and Walkways (rear of boiler & side of main steam drum) X
X Interconnecting Piping within Terminal Points X X Interconnecting Piping Insulation and Lagging X X Piping External of Terminal Points X
X Safety Valve Drip Pan Elbows X X Safety Valves X X Foundation, Anchor Bolts, Concrete, Grout X X Chemical Feed Storage and Feed Pump X
SCOPE OF SUPPLY (CONT’D)
Supply
ITEM
Installation
VEO Buyer VEO Buyer X Feedwater Treatment System (Water Soft/ Filter System) X X Blow Down Heat Recovery Tanks (Continuous and Intermittent) X X Deaerator & Feedwater Pump(s) w/ Drives X X Spare Parts (Optional – Available Direct from VEO – priced sep.) X N/A Special Tools
X Economizer By-Pass System X X Sample Cooler System X
X SootBlowers w/ Piping from Drum to SootBlower X N/A Steam Coil Air Heater X
X Loading Equipment at Shop X X Unloading Equipment at Jobsite X X Boil-Out Chemicals X X Site Disposal of Chemicals and Water X X Boiler Room/Site Modifications X X Site Storage Prior to Installation X X Environmental Permit X
X Erection and Start-Up Labor X X Field Balancing and Alignment of Rotating Equipment X X Electrical Power Supply and Lighting Protection X X Interconnecting Wiring or Cabling X X Erection Consultant X X Class Room Training X X Field Testing Labor, Equipment and Consumables X X Start-Up Consultant X
X Documentation X X O & M Manuals X
Heating Surfaces, Design Pressure and Size
Furnace Radiant Heating Surface 659 Sq. Ft.
Boiler Heating Surface 3,218 Sq. Ft.
Total Heating Surface 3,877 Sq. Ft.
Furnace Volume 990 Cu. Ft Overall Width 5’-11” Average Height 9’-0” Weld Line Length 18’-8” Design Pressure 200 PSIG
Drums Submerged arc automatic welded and stress relieved with radiographed welded seams
Drum material is SA-516 Gr. 70 Tubes are rolled and expanded into the drum Mud Drum is provided with a 12” x 16” hinged manway access in each drum head Steam Drum is provided with a 12” x 16” hinged manway access in each drum head
Upper (Steam) Drum
< Inside diameter is 36 inches < External connections consist of the following connections:
< main steam outlet, water column, auxiliary low water cut-off, steam gauge, vent, safety valve, feedwater, and continuous blowdown.
< The upper drum includes a feedwater distribution pipe and a blowdown collection pipe.
Lower (Mud) Drum < Inside diameter is 30 inches < External connections consist of chemical feed and intermittent blowdown < The intermittent blowdown connection is at the lowest point for draining of the unit
Tubes*
All tubes enter the drum radially with full parallel bearing through the drum plate All tubes are full diameter tubes with no swaging < Front Wall 2” O.D., 0.135” M.W., SA-178 A < Rear Wall 2” O.D., 0.135” M.W., SA-178 A < Furnace Floor, Sides & Roof 2” O.D., 0.135” M.W., SA-178 A < Convection: 2” O.D., 0.120” M.W., SA-178 A < Outer Side Wall: 2” O.D., 0.135” M.W., SA-178 A
BOILER (CONT’D)
Boiler Wall Construction The outer lagging of the boiler will have an average surface temperature of 140 Deg. F ambient with 2 MPH wind velocity. The boiler walls include the following:
The furnace sides, roof and floor consists of a tube and membrane design. The wall is constructed with 2” O.D. tubes with 1” wide by ¼” thick steel membranes welded to each tube.
The front wall consists of a tube and membrane design. The first layer is 2” O.D. tubes with 2” exposed width by ¼” thick carbon steel membranes welded to the tubes. The second layer is 3” of 1200 Deg. F.
board insulation. The outer surface is flat carbon steel lagging properly stiffened.
The rear wall consists of a tube and membrane design. The first layer is 2” O.D. tubes with 2” exposed width by ¼” thick carbon steel membranes welded to the tubes. The second layer is 3” of 1200 Deg. F.
board insulation. The outer surface is flat carbon steel lagging properly stiffened.
The outer boiler side wall is a tube and membrane design. The first layer is 2” O.D. tubes with 1” wide by ¼” thick carbon steel membrane welded to the tubes. The second layer is 3” of 1200 Deg. F. board insulation. The outer surface is flat carbon steel lagging properly stiffened.
The drum is insulated with 2” of 1200 Deg. F. blanket insulation. The outer lagging is 16 gauge carbon steel.
Boiler Access and Observation Ports The furnace is accessible through one (1) 15” x 18” rear wall access door. The rear wall also includes three (3) 1 1/2” diameter self closing, air purged observation ports.
Steam Purification The Voyager upper (steam) drum includes steam purifiers to provide 99.5% steam purity, when boiler water quality is in accordance with the ABMA recommendations as indicated in herein.
Structural Base The boiler includes a rigid structural steel base frame designed to distribute the loads onto a flat concrete foundation.
Painting Preparation and painting was done in accordance with the “Base” system shown on the following page. The top coat color is standard Victory Energy Blue.
Piping, Trim and Accessories
Water level piping to water column and auxiliary water cutout Drain piping for water column water gauge glass, auxiliary cutout, and pressure gauge drain Steam pressure piping to pressure gauge Cooling Air piping to the observation ports and flame scanners supplied and installed by others.
The trim included in our scope of supply is listed on page 1 and page 2 within this equipment description.
We have included feed water piping from the feedwater control valve by-pass assembly to the boiler inlet on the steam drum. This piping is shop fabricated to the maximum extent possible with minimal field fit-up joints. Support of this piping will be by others. The control valve by-pass assembly will be mounted at grade, on the feedwater inlet connection side, adjacent to the boiler.
BOILER (CONT’D)
Preparation and Painting Standards
Components Base Drum Openings:
Flanged Coat w/ Rust Inhibitor Screwed Capped Welded Weldable Rust Inhibitor Drum- No Paint Drum Heads Insulated with insulating covers, 16 Gauge C.S., c/w 3-5 Mils
D.F.T. High Temp. VEO Blue Base Frame Surface Preparation-SP3
Primer – 3-5 Mils D.F.T. VEO Blue Exposed Casing Surface Preparation-SP3
Primer – 3-5 Mils D.F.T. VEO Blue Flue Gas Outlet Surface Preparation-SP3
Finish – 3-5 Mils High Temperature Gray Windbox/ Burner Vendor Standard Trim Piping – (subassemblies)
2-3 Mils High Temp. Gray
Boiler Trim Package (Quantities listed for one (1) boiler)
BOILER QUANTITY SIZE MANUFACTURER
Water Column 1 1” VEO Titan Water Column Drain Valve 1 ¾” Vogt Water Column Gauge Drain Valve 2 ¾” Vogt Steam Gauge 1 8 ½” Ashcroft Steam Gauge Siphon 1 ½” VEO Steam Drum Vent Valve 1 1” Vogt Intermittent Blowoff Valve (1st valve) 1 1 1/2” Edwards Intermittent Blowoff Valve (2nd valve) 1 1 1/2” Edwards Continuous Blowdown Shutoff Valve 1 1” Vogt Main Steam Non-Return Valve 1 6” Crane Main Steam Gate Valve 1 8” Crane Continuous Blowdown Flow Control 1 1” Vogt Boiler Safety Valve #1 1 2 1/2” Kunkle Boiler. Safety Valve #2 1 2 1/2” Kunkle Feedwater Control Valve 1 2” Flowserve Feedwater By-pass Valve 1 3” Crane Feedwater Isolation Valve 2 3” Crane Manual Boiler Feedwater Check Valve 1 3” Crane Manual Boiler Feedwater Globe Valve 1 3” Crane
BOILER WATER CHEMISTRY RECOMMENDATIONS
ABMA RECOMMENDED BOILER WATER LIMITS
b Actual values within the range reflect the TDS in the feedwater. Higher values are for high solids; lower values are for low solids in the feedwater.
c Actual values within the range are directly proportional to the actual value of TDS of boiler water. Higher values are for high solids; lower values are for low solids in the boiler water.
d Dictated by boiler water treatment.
e These values are exclusive of silica.
Steam purity is often confused with steam quality. Steam quality is a measure of the amount of moisture in the steam. Steam quality is expressed as the weight of dry steam in a mixture of steam and water droplets. For example, steam with 99% quality contains 1% liquid water.
Steam purity refers to the amount of solid, liquid, or vaporous contamination in the steam. High-purity steam contains very little contamination. Normally, steam purity is reported as the solids content.
Boiler Type Drum pressure, psig
Total dissolved solidsb in boiler water, ppm (max.)
Total Alkalinityc in boiler water, ppm
Suspended solids in boiler water, ppm (max.)
Total dissolved solidsc,e in steam, ppm (max.
expected value)
Drum-type boiler 0-300 700-3500 140-700 15 0.2-1.0
Drum-type boiler 301-450 600-3000 120-600 10 0.2-1.0
Drum-type boiler 451-600 500-2500 100-500 8 0.2-1.0
Drum-type boiler 601-750 200-2000 40-400 3 0.1-0.5
Drum-type boiler 751-900 150-1500 30-300 2 0.1-0.5
Drum-type boiler 901-1000 125-1250 25-250 1 0.1-0.5
Drum-type boiler 1001-1800 100 variabled 1 0.1
Drum-type boiler 1801-2350 50 variabled N/A 0.1
Drum-type boiler 2351-2600 25 variabled N/A 0.05
Drum-type boiler 2601-2900 15 variabled N/A 0.05
Once-through boiler 1400 & above 0.05 N/A N/A 0.05
VICTORY ENERGY CUSTOMER SPEC SHEET
Customer: VA Jefferson Date: 02/14/2013 Reference: DT-2-57 SAT Quote Number: JVE 11756 NG Rev4
PREDICTED PERFORMANCE
LOAD DESIGN LOAD 1 LOAD 2 LOAD 3
Outlet Steam Flow, (lbs/hr) 35000 26250 17500 8750
Fuel/Firing Conditions - Fuel Fired Natural Natural Natural Natural Gas Gas Gas Gas Excess Air, (%) 10.00 10.00 10.00 10.00 Flue Gas Recirc., (%) 15.00 15.00 15.00 15.00
Steam/Water Conditions - Steam Temp @ NRV Outlet (deg F) 340.2 339.2 338.5 338.0 Steam Pres @ NRV Outlet (psig) 100.0 100.0 100.0 100.0 Boiler Saturation Temp. (deg F) 344.2 341.5 339.5 338.3 Boiler Operating Press. (psig) 110.0 105.6 102.5 100.6 Econ. Water Exit Temp, (deg F) 275.8 268.8 261.8 256.1 Feedwater Inlet Temp, (deg F) 228.0 228.0 228.0 228.0
Flow Quantities - Percent Blowdown, (%) 1.00 1.00 1.00 1.00 Blowdown Flow, (lbs/hr) 354 265 177 88 Feedwater Flow, (lbs/hr) 35,354 26,515 17,677 8,838 Fuel Flow, (lbs/hr) 1,924 1,437 958 485 Combustion Air Flow, (lbs/hr) 33,728 25,197 16,794 8,505 Flue Gas Flow LVG System,(lbs/hr) 35,652 26,634 17,752 8,990 Flue Gas Recirc. Flow, (lbs/hr) 5,348 3,995 2,663 1,349 Flue Gas Flow w/Recirc., (lbs/hr) 41,000 30,629 20,415 10,339
Air/Gas Temperatures - Ambient Air Temp., (deg F) 80.0 80.0 80.0 80.0 Comb. Air/FGR Mixture, (deg F) 115.3 111.9 108.9 106.5 Adiabatic Flame Temp, (deg F) 3,372.4 3,370.7 3,369.3 3,368.1 Flame Temp w/ Recirc., (deg F) 3,026.2 3,021.8 3,018.0 3,014.9 Effec. Furnace Gas Temp, (deg F) 2,006 1,876 1,698 1,416 Furnace Exit Gas Temp, (deg F) 1,888 1,745 1,551 1,242 Boiler Exit Gas Temp, (deg F) 473 429 386 351 Gas Temp. LVG Economizer, (deg F) 320 297 277 261 Flue Gas Recirc. Temp. (deg F) 320 297 277 261
System Efficiency - Dry Gas Losses, (%) 4.32 3.91 3.54 3.25 Water From Fuel Fired, (%) 10.70 10.60 10.51 10.44 Moisture in Air Losses, (%) 0.12 0.11 0.10 0.09 Radiation Loss, (%) 0.78 1.03 1.53 2.98 Manufactures Margin, (%) 1.00 1.00 1.00 1.00 Total Heat Losses, (%) 16.92 16.65 16.67 17.75 Boiler Efficiency, (%) 83.08 83.35 83.33 82.25 HHV Heat Input By Fuel,(mmbtu/hr) 41.963 31.348 20.895 10.582
System Draft Losses - Fan Inlet:
Silencer, (inwc) 1.50 0.88 0.41 0.11 Fan Inlet Ducts, (inwc) 0.50 0.29 0.14 0.04
Fan Outlet:
Fan Outlet Ducts, (inwc) 0.50 0.29 0.14 0.04 Burner, (inwc) 6.50 3.81 1.78 0.48 Convection Zone, (inwc) 1.46 0.80 0.35 0.09 Economizer, (inwc) 0.61 0.34 0.15 0.04 Outlet Gas Ducts, (inwc) 0.50 0.29 0.14 0.04 Total Draft Losses, (inwc) 11.58 6.70 3.09 0.82
Furnace Performance - Heat Available, (mmbtu/hr) 37.473 28.026 18.699 9.477 Heat Absorbed in Furn, (mmbtu/hr) 15.772 13.125 9.920 5.870 Liberation Rate, (btu/hr-ft^3) 42388 31666 21107 10689 *** Liberation Rate, (btu/hr-ft^3) 49266 36796 24530 12419 Furnace Release Rate,(btu/hr-ft2) 57308 42828 28557 14466 Residence Time, (sec) 1.486 2.100 3.410 7.745
Convection Zone Performance - Gas Mass Velocity (lb/hr-ft2) 3,047 2,277 1,517 768 Gas Velocity at Inlet, (ft/sec) 52.39 36.75 22.34 9.57 Heat Absorbed in Conv.,(mmbtu/hr) 17.73 12.17 7.06 2.67
Economizer Performance - Gas Mass Velocity (lb/hr-ft2) 5,511 4,117 2,744 1,390 Gas Velocity at Inlet (ft/sec) 37.65 26.79 17.00 8.25 Water Flow Through Econ, (lb/hr) 35,354 26,515 17,677 8,838 Water Mass Velocity, (lb/sec-ft2) 212.14 159.11 106.07 53.04 Feedwater Pressure Drop, (psi) 4.19 2.38 1.08 0.29 Heat Absorbed in Econ.,(mmbtu/hr) 1.71 1.10 0.61 0.25
PHYSICAL DESIGN
Furnace Design Data - Proj. Radiant HT, (ft2) 659 Effective Radiant HT, (ft2) 581
Convection Zone Design Data - Conv. Heating Surface (ft2) 3219
Economizer Design Data - Economizer Heating Surface (ft2) 1771
Fuel Analysis - Fuel Type Gaseous Fuel Name Natural Gas Mol. Weight (lb/mol) 17.37 Specific Gravity 0.5998 Density (lb/ft3) 0.0451
Fuel Constituents - By Volume By Weight
CH4 (%) 90.0000 83.1042
C2H6 (%) 5.0000 8.8339 N2 (%) 5.0000 8.0619
High Heating Value (btu/lb) 21,813.1 Low Heating Value (btu/lb) 19,667.0
Note:
*** Liberation rate based on effective furnace length before first plane of entry into convection tubes.
VICTORY ENERGY CUSTOMER SPEC SHEET
Customer: VA Jefferson Date: 02/14/2013 Reference: DT-2-57 SAT Quote Number: JVE 11756 #2 Oil Rev4
PREDICTED PERFORMANCE
LOAD DESIGN LOAD 1 LOAD 2 LOAD 3
Outlet Steam Flow, (lbs/hr) 35000 26250 17500 8750
Fuel/Firing Conditions - Fuel Fired No.2 No.2 No.2 No.2 Fuel Fuel Fuel Fuel Excess Air, (%) 10.00 10.00 10.00 10.00 Flue Gas Recirc., (%) 15.00 15.00 15.00 15.00
Steam/Water Conditions - Steam Temp @ NRV Outlet (deg F) 340.2 339.2 338.5 338.0 Steam Pres @ NRV Outlet (psig) 100.0 100.0 100.0 100.0 Boiler Saturation Temp. (deg F) 344.2 341.5 339.5 338.3 Boiler Operating Press. (psig) 110.0 105.6 102.5 100.6 Econ. Water Exit Temp, (deg F) 271.5 265.2 259.0 254.0 Feedwater Inlet Temp, (deg F) 228.0 228.0 228.0 228.0
Flow Quantities - Percent Blowdown, (%) 1.00 1.00 1.00 1.00 Blowdown Flow, (lbs/hr) 354 265 177 88 Feedwater Flow, (lbs/hr) 35,354 26,515 17,677 8,838 Fuel Flow, (lbs/hr) 1,955 1,462 975 494 Combustion Air Flow, (lbs/hr) 31,930 23,871 15,920 8,062 Flue Gas Flow LVG System,(lbs/hr) 33,885 25,333 16,895 8,556 Flue Gas Recirc. Flow, (lbs/hr) 5,083 3,800 2,534 1,283 Flue Gas Flow w/Recirc., (lbs/hr) 38,967 29,133 19,429 9,839
Air/Gas Temperatures - Ambient Air Temp., (deg F) 80.0 80.0 80.0 80.0 Comb. Air/FGR Mixture, (deg F) 113.5 110.4 107.7 105.5 Adiabatic Flame Temp, (deg F) 3,603.7 3,602.1 3,600.7 3,599.6 Flame Temp w/ Recirc., (deg F) 3,226.7 3,222.6 3,219.1 3,216.2 Effec. Furnace Gas Temp, (deg F) 2,027 1,889 1,704 1,413 Furnace Exit Gas Temp, (deg F) 1,889 1,739 1,536 1,217 Boiler Exit Gas Temp, (deg F) 466 423 382 349 Gas Temp. LVG Economizer, (deg F) 314 293 274 259 Flue Gas Recirc. Temp. (deg F) 314 293 274 259
System Efficiency - Dry Gas Losses, (%) 4.37 3.97 3.61 3.34 Water From Fuel Fired, (%) 6.82 6.76 6.71 6.66 Moisture in Air Losses, (%) 0.11 0.10 0.09 0.09 Radiation Loss, (%) 0.78 1.03 1.53 2.98 Manufactures Margin, (%) 1.00 1.00 1.00 1.00 Total Heat Losses, (%) 13.09 12.87 12.94 14.07 Boiler Efficiency, (%) 86.91 87.13 87.06 85.93 HHV Heat Input By Fuel,(mmbtu/hr) 40.111 29.988 20.000 10.128
System Draft Losses - Fan Inlet:
Silencer, (inwc) 1.50 0.88 0.41 0.11 Fan Inlet Ducts, (inwc) 0.50 0.29 0.14 0.04
Fan Outlet:
Fan Outlet Ducts, (inwc) 0.50 0.29 0.14 0.04 Burner, (inwc) 6.50 3.81 1.78 0.47 Convection Zone, (inwc) 1.28 0.70 0.30 0.07 Economizer, (inwc) 0.53 0.29 0.13 0.03 Outlet Gas Ducts, (inwc) 0.50 0.29 0.14 0.04 Total Draft Losses, (inwc) 11.31 6.56 3.03 0.80
Furnace Performance - Heat Available, (mmbtu/hr) 37.376 27.961 18.659 9.453 Heat Absorbed in Furn, (mmbtu/hr) 17.231 14.186 10.588 6.164 *** Liberation Rate, (btu/hr-ft^3) 47086 35212 23483 11898 Liberation Rate, (btu/hr-ft^3) 40518 30292 20202 10230 Furnace Release Rate,(btu/hr-ft2) 57116 42700 28478 14421 Residence Time, (sec) 1.612 2.282 3.715 8.474
Convection Zone Performance - Gas Mass Velocity (lb/hr-ft2) 2,896 2,165 1,444 731 Gas Velocity at Inlet, (ft/sec) 47.91 33.53 20.30 8.64 Heat Absorbed in Conv.,(mmbtu/hr) 16.42 11.20 6.44 2.39
Economizer Performance - Gas Mass Velocity (lb/hr-ft2) 5,238 3,916 2,611 1,322 Gas Velocity at Inlet (ft/sec) 34.14 24.35 15.49 7.54 Water Flow Through Econ, (lb/hr) 35,354 26,515 17,677 8,838 Water Mass Velocity, (lb/sec-ft2) 212.14 159.11 106.07 53.04 Feedwater Pressure Drop, (psi) 4.19 2.38 1.08 0.29 Heat Absorbed in Econ.,(mmbtu/hr) 1.56 1.00 0.55 0.23
PHYSICAL DESIGN
Furnace Design Data - Proj. Radiant HT, (ft2) 659 Effective Radiant HT, (ft2) 546
Convection Zone Design Data - Conv. Heating Surface (ft2) 3219
Economizer Design Data - Economizer Heating Surface (ft2) 1771
Fuel Analysis - Fuel Type Oil Fuel Name No.2 Fuel Oil
Fuel Constituents - By Weight By Volume H2 (%) 13.6000 48.3271 N2 (%) 0.0070 0.0018 S (%) 0.1000 0.0223 C (%) 86.6000 51.6487
ASH (%) 0.0100 0.0000
High Heating Value (btu/lb) 20,517.4 Low Heating Value (btu/lb) 19,229.5
Note:
*** Liberation rate based on effective furnace length before first plane of entry into convection tubes.
VEO PROJECT: VE-11756
PROTHERM - JEFFERSON BARRACKS
PACKAGE BOILER SYSTEM
PROJECT DATA AND EQUIPMENT LIST
VICTORY ENERGY OPERATIONS, LLC
JEFFERSON BARRACKS - PROTHERM
PACKAGE BOILER SYSTEM
PROTHERM P.O. # 412107301
ELEVATION: 700 FEET ABOVE SEA LEVEL
DATE: March 25, 2013
REVISION
(3) "D" STYLE WATERTUBE BOILERS
DISCOVERY SERIES DT-2-57
VICTORY ENERGY OPERATIONS SALES ORDER JVE-11756
UNITS 11756-1, -2, -3
PROJECT MANAGER - GREG McNUTT
JEFFERSON BARRACKS - PROTHERM
PACKAGE BOILER SYSTEM
PHYSICAL DATA: BOILER
CAPACITY (PPH): 35,000
DESIGN PRESSURE (PSIG): 200
DRY WEIGHT (LB): 57,800
FLOODED WEIGHT (LB): 82,500
OPERATING CAPACITY (GALS): 2,300
FLOODED CAPACITY (GALS): 3,000
SUPERHEATER HTG SURFACE (SQ.FT) N/A
CONVECTIVE HTG SURFACE (SQ. FT.) 3,218
RADIANT HTG SURFACE (SQ. FT.) 659
TOTAL HTG SURFACE (SQ. FT.) 3,877
FURNACE VOLUME (CU. FT) 990
NO. UNITS REQUIRED: 3
STEAM DRUM 36" ID 5/8" SA516-70
STEAM DRUM HEAD 36" ID 1/2" SA516-70
WATER DRUM 30" ID 5/8" SA516-70
WATER DRUM HEAD 30" ID 1/2" SA516-70
FURNACE MEMBRANE "D" TUBES 2" OD 0.135 MW SA-178-A
FURNACE/MEMBRANE TUBES 2" OD 0.135 MW SA-178-A
CONVECTION TUBES 2" OD .120 MW SA-178-A
DESIGN NOTES: MEMBRANE FRONT AND REAR WALLS
BOILER DESIGN NOTES: CONSTRUCTION PER ASME SECT I, 2010 EDITION 2011a ADDENDUM
ECONOMIZER PHYSICAL DATA:
ORIENTATION:
DESIGN PRESSURE (PSIG): 400
DESIGN TEMPERATURE (DEG. F.): 700
HEAT TRANSFERRED (mmBTU/HR): 1.7900
TOTAL HTG SURFACE (SQ. FT.) 1,764
DRY WEIGHT (LB): 3,700 OPERATING
ECONOMIZER HEADER 3" SCH 40 SA-312-TP316L
ECONOMIZER TUBES 1.9" OD .109 MW SA-312-TP316L
NO. UNITS REQUIRED: 3
AREA CLASSIFICATION: NON-HAZARDOUS
INSTALLATION: INDOORS
ECONOMIZER DESIGN NOTES: CONSTRUCTION PER ASME SECT VIII Div I, 2010 EDITION 2011a ADDENDA
VERTICLE - COUNTER
PACKAGE BOILER SYSTEM
BOILER DRUM CONNECTIONS: QTY. SIZE (NPS) TYPE
CONNECTION
DESCRIPTION
MAIN STEAM 1 10" FLG 300# RFLWN
SAFETY VALVE 1 2 1/2" FLG 300# RFLWN
SAFETY VALVE 1 2 1/2" FLG 300# RFLWN
FEEDWATER INLET 1 *2" FLG 300# RFWN
INTERMITTENT BLOW-OFF 1 1.5" FLG 300# RFWN
WATER COLUMN 2 1" FLG 300# RFWN
DRUM LEVEL 2 1" FLG 300# RFWN
VENT 1 1" FLG 300# RFWN
CONTINUOUS BLOWDOWN 1 1" FLG 300# RFWN
CHEMICAL FEED 1 *1" FLG 300# RFWN
AUX. LOW WATER CUT-OUT 2 1" FLG 300# RFWN
SOOT BLOWER STEAM SUPPLY 1 2" FLG 300# RFWN
DRUM HEATING COIL CONNECTION 1 1.5" FLG 300# RFWN
* CONNECTIONS BELOW WATER LEVEL PROVIDED WITH THERMALSLEEVES
AXIAL (LB)
TANGENT
(LB) MOMENT (FT-LB)
MAIN STEAM -1,210 -4,885 30,025 PER FIG. 6 ON MP702
SAFETY VALVE 395 180 605
SAFETY VALVE 395 180 605
FEEDWATER INLET 225 105 349
INTERMITTENT BLOW-OFF 110 50 176
WATER COLUMN 45 20 72
DRUM LEVEL 45 20 72
VENT 45 20 72
CONTINUOUS BLOWDOWN 45 20 72
CHEMICAL FEED 45 20 72
AUX. LOW WATER CUT-OUT 45 20 72
SOOT BLOWER STEAM SUPPLY 225 105 349
DRUM HEATING COIL CONNECTION 110 50 176
ALLOWABLE LOADS
PACKAGE BOILER SYSTEM
TAG # QTY EA SERVICE DESCRIPTION MODEL NUMBER SHIPPING
METHOD
SPECIFICATION
REFERENCE
LE-001 1 WATER COLUMN (3 PROBES) TITAN WATER COLUMN 21-11756-99 P 23 52 33 / 2.2.D
RP-001 1 WATER COLUMN RELAY PANEL TITAN WATER COLUMN RELAY PANEL CR# EC2384A L 23 52 33 / 2.2.D
ALE-001 1 AUXILARY LOW DRUM LEVEL SHUT-
DOWN
CLARK RELIANCE LOW LEVEL SHUTDOWN
FLOAT TYPE CR# EA100D P
23 52 33 / 2.2.E
LG-001 1 DRUM LEVEL SITE GAGE CLARK RELIANCE LEVEL GAUGE WITH 7.87"
VISABILITY CR# C5 L
23 52 33 / 2.2.D
GI-001 1 LEVEL GAUGE ILLUMINATOR CLARK RELIANCE PRISMATIC TILT VIEW LEVEL
GAUGE ILLUMINATOR GL53 L
23 52 33 / 2.2.D
GV-001 2 LEVEL GAUGE VALVES CLARK RELIANCE LEVEL GAUGE VALVES TG603RS I
23 52 33 / 2.2.D
HS-001 1 LOW WATER CUTOUT BY-PASS
PUSHBUTTON
VEO CONTROLS STANDARD DRUM LEVEL BY-
PASS SWITCH ASSEMBLY VEO 63-11756-03 I
23 52 33 / 2.2.F
PI-001 1 STEAM DRUM PRESSURE GAUGE ASHCROFT PRESSURE GAUGE - 8 1/2" FACE, 0 -
400PSIG W/ 2 VALVE MANIFOLD 85-1379 SS 04L L
23 52 33 / 2.2.C
PSA-001 1 STEAM DRUM PRESSURE HIGH
ALARM
STEAM PRESSURE SWITCH, ASHCROFT 0 - 400
PSIG RANGE
B420VXFS,X07,XFM
120 INCRS L
23 52 33 / 2.2.G
PSH-002 1 STEAM DRUM PRESSURE HIGH
SHUTDOWN
STEAM PRESSURE SWITCH, ASHCROFT 0 - 400
PSIG RANGE
B420VXFS,X07,XFM
125 INCRS L
23 52 33 / 2.2.G
HV-403 5 FEEDWATER BY-PASS ISOLATION
VALVES CRANE 3" GATE VALVE, CL300, RF 33 L
23 21 11 / 2.14
HV-405 1 FEEDWATER BYPASS GLOBE
VALVE CRANE 3" GLOBE VALVE, CL300, RF 151 P
23 21 11 / 2.14
CV-401 1 FEEDWATER CHECK VALVE CRANE 3" CHECK VALVE, CL300, RF 159 L 23 21 11 / 2.14
ST-400 1 FEEDWATER STRAINER MUELLER, Y STRAINER, 3" CL 300 RF 782 L 24 21 11 / 2.14
BOILER TRIM BILL OF MATERIALS
PACKAGE BOILER SYSTEM
TAG # QTY EA SERVICE DESCRIPTION MODEL NUMBER SHIPPING
METHOD
SPECIFICATION
REFERENCE
BOILER TRIM BILL OF MATERIALS
FCV-401 1 FEEDWATER CONTROL VALVE
FLOWSERVE VALTEK CONTROL VALVE - 2",
CLASS 300 CAST STEEL, GLOBE TYPE W/
LOGIX 3000 POSITIONER
VALTEK MARK 1 L
23 52 33 / 2.2.H
HV-401 4 FEEDWATER DRAIN VALVE VOGT 3/4" CL800 GATE VALVE, THREADED X
SW ENDS TSW12111 P
23 21 11 / 2.14
HV-402 1 FEEDWATER VENT VALVE VOGT 1" CL800 GATE VALVE, THREADED X SW
ENDS TSW12111 P
23 21 11 / 2.14
PSV-401 1 ECONOMIZER PRESSURE RELIEF
VALVE
KUNKLE SFETY RELIEF VALVE 3/4" MPT X 1"
FPT CONNECTIONS, SET AT 300 PSIG 927BEDM06ABE L
23 52 33 / 2.5.E
SB-002 1 ECONOMIZER SOOT BLOWER CLYDE BERGMAN, MODEL D5, MANUAL
ROTARY PRESSURIZED, SOOT BLOWER D5 L
23 52 39 / 2.3.E
HV-002 6 DRUM LEVEL DRAIN VALVES VOGT 3/4" CL800 GATE VALVE, SW ENDS SW12111 P 23 21 11 / 2.14
HV-003 2 DRUM LEVEL ISOLATION VALVES VOGT 1" CL800 GATE VALVE, SW ENDS SW12111 P 23 21 11 / 2.14
HV-004 1 DRUM PRESSURE TEST VALVE KF 1/2" FNPT X FNPT, SUT-OFF / TEST VALVE KF-N24-12 P 23 21 11 / 2.14
HV-005 1 STEAM DRUM VENT VALVE VOGT 1" CL800 GATE VALVE, THRADED X SW
ENDS TSW12111 P
23 21 11 / 2.14
PSV-001 1 BOILER SAFETY RELIEF VALVE KUNKLE SAFETY RELIEF VALVE 2 1/2"-250# RF
X 4" FPT CONNECTIONS SET AT 130 PSIG 6252FLJ-AS0130 L
23 52 33 / 2.2.B
PSV-002 1 BOILER SAFETY RELIEF VALVE KUNKLE SAFETY RELIEF VALVE 2 1/2"-250# RF
X 4" FPT CONNECTIONS SET AT 135 PSIG 6252FLJ-AS0135 L
23 52 33 / 2.2.B
DP-001 1 SAFETY VALVE DRIP PAN ELBOW KUNKLE DRIP PAN ELBOW, 4" FPT
CONNECTION 0299-M L
23 52 33 / 2.2.B
DP-002 1 SAFETY VALVE DRIP PAN ELBOW KUNKLE DRIP PAN ELBOW, 4" FPT
CONNECTION 0299-M L
23 52 33 / 2.2.B
PACKAGE BOILER SYSTEM
TAG # QTY EA SERVICE DESCRIPTION MODEL NUMBER SHIPPING
METHOD
SPECIFICATION
REFERENCE
BOILER TRIM BILL OF MATERIALS
HV-006 1 CONTINUOUS BLOW DOWN
ISOLATION VALVE VOGT 1" CL800 GATE VALVE, SW ENDS SW12111 P
23 21 11 / 2.14
HV-007 1 CONTINUOUS BLOW DOWN
METERING VALVE
VOGT 1" CL800 GLOBE METERING VALVE, SW
ENDS SW12443 P 23 21 11 / 2.14
HV-008 1 INTERMITTENT BLOW-OFF VALVE
(ANGLE)
EDWARD - 1443, 1 1/2" CL300 BLOW-OFF
VALVE, FLANGED 1443 L
23 21 11 / 2.14
HV-009 1 INTERMITTENT BLOW-OFF VALVE
(STRAIGHT)
EDWARD - 1441, 1 1/2" CL300 BLOW-OFF
VALVE, FLANGED 1441 L
23 21 11 / 2.14
HV-010 1 CHEMICAL FEED ISOLATION VALVE VOGT 3/4" CL800 GATE VALVE, SW ENDS SW12111 P 23 21 11 / 2.14
CV-010 1 CHEMICAL FEED CHECK VALVE VOGT 3/4" CL800 CHECK VALVE, SW ENDS SW701 P 23 21 11 / 2.14
HV-601 1 MAIN STEAM NON-RETURN VALVE CRANE 6", CL300, RF, ANGLED NON-RETURN
VALVE 30 L
23 21 11 / 2.14
HV-603 1 MAIN STEAM STOP VALVE CRANE 8" CL300, RF, MAIN STEAM STOP VALVE 33 L
23 21 11 / 2.14
HV-604 1 MAIN STEAM WARM UP GLOBE
VALVE VOGT, 1" CL 800 GLOBE VALVE, SW ENDS SW12141 P
23 21 11 / 2.14
HV-602 1 STEAM DRAIN VALVE VOGT, 3/4" CL800 GATE VALVES, THREADED X
SW ENDS TSW12111 P
23 21 11 / 2.14
N/A 3 OBSERVATION PORTS
WALLING CO. 1 1/2" OBSERVATION PORTS, AIR
COOLED w/QUARTZ GLASS (ONE CLEAR AND
ONE TINTED) WITH BLAST GATE
CIPBGQ1.5-1-1/2 I
23 52 33 / 2.3.E.5
HV-610 2 SOOT BLOWER VALVES VOGT, 2" CL800 GATE VALVE, SW ENDS SW12111 P
22 52 39 / 2.3.E
SB-001 1 ECONOMIZER SOOT BLOWER CLYDE BERGMAN, MODEL D5, MANUAL
ROTARY PRESSURIZED, SOOT BLOWER D5 L
23 52 39 / 2.3.E
PACKAGE BOILER SYSTEM
TAG # QTY EA SERVICE DESCRIPTION MODEL
NUMBER
SHIPPING
METHOD
SPECIFICATION
REFERENCE
BURNER 1 GAS / OIL BURNER
POWERFLAME LOW NOx, TYPE CMAX, HIGH CAPACITY, MODULATING GAS & OIL BURNER WREFRACTORY FRONT
PLATE
CM11A-G(0)-30 I 23 52 33 /2.3
SCANNER 1 FLAME SCANNER HONEYWELL I/R SELF CHECK FLAME SCANNER
MOUNTED ON BURNER C7061 I 23 09 11 / 2.2.A
MOTOR 1 ELECTRIC MOTOR 30 H.P., 3450 R.P.M. HIGH EFFICIENCY BLOWER MOTOR
FOR 460/3 PH/60 Hz VOLTAGE 30H.P.-460/3/60 I 23 52 33 / 2.3.E
BLOWER 1 BLOWER CHICAGO BLOWER CB XXX I 23 52 33 / 2.3.E
MAIN GAS 1 MAIN GAS FUEL TRAIN
3" MAIN GAS TRAIN W/ HONEYWELL MODULATING GAS
CONTROL VALVE, AARELL 5510 FEEDBACK ASSEMBLY,
MAXON SHUT-OFF VALVES, FISHER MAIN GAS
REGULATOR, 1 1/4" MAXON VENT VALVE, HIGH/LO
PRESSURE SWITCHES, GAS PRESSURE GAUGES, AND
GAS STRAINER WITH 10 MICRON MESH
POWERFLAME I 23 52 33 / 2.3.F
PILOT GAS 1 PILOT GAS FUEL TRAIN
GAS PILOT ASSEMBLY W/ IGNITION TRANSFORMER,
ASCO MAIN GAS & AUXILLARY SOLENOID VALVE, ASCO
VENT VALVE, REGULATOR, LOW GAS PRESSURE
SWITCH, PRESSURE GAUGE, STRAINER WITH 10 MICRON
MESH, AND THREE WAY PILOT COCK FOR N.G. OR L.P.
POWERFLAME I 23 52 33 / 2.3.I
#2 OIL 1 #2 OIL FUEL TRAIN
#2 FUEL TRAIN ASSEMBLY W/ SAFETY SHUT-OFF VALVES,
MANUAL SHUT-OFF VALVE, PRESSURE GAUGE,
HIGH/LOW PRESSURE SWITCHES, MODULATING
CONTROL VALVE, AARELL 5510 FEEDBACK
ASSEMBLY,PRESSURE REGULATOR, RELIEF VALVE,
FILTER WITH ROTATION HANDLE, AND CHECK VALVE
POWERFLAME I 23 52 33 / 2.3.G
ATOMIZING 1 ATOMIZING AIR/STEAM TRAIN
AUTOMATIC AND MANUAL SAFETY SHUT-OFF VALVES,
ATOMIZING AIR PRESSURE GAUGE, LOW ATOMIZING
PRESSURE SWITCH, ATOMIZING AIR CHECK VALVE,
STRAINER WITH 10 MICRON SCREEN, PRESSURE
REGULATOR, AND STEAM PURGE VALVE
POWERFLAME I 23 52 33 / 2.3.H
71-11756-01 1 ECONOMIZER SUPPORT
STRUCTURE ECONOMIZER SUPPORT STRUCTURE 71-11756-01 L 23 52 33 / 2.5
BURNER, COMBUSTION, AIR AND DUCTING BILL OF MATERIALS
PACKAGE BOILER SYSTEM
TAG # QTY EA SERVICE DESCRIPTION MODEL
NUMBER
SHIPPING
METHOD
SPECIFICATION
REFERENCE
BURNER, COMBUSTION, AIR AND DUCTING BILL OF MATERIALS
72-11756-01 1 BOILER OUTLET FLUE GAS DUCT
BOILER FLUE GAS OUTLET "L" DUCT W/ PROCESS TAP
CONNECTIONS (4"-150RF O2 ANALYZER, 3/4"
TEMPERATURE INDICATOR AND 1/2" PRESSURE)
72-11756-01 L 24 51 00 / 2.1
73-11756-01 1 ECONOMIZER OUTLET FLUE GAS
DUCT
ECONOMIZER OUTLET TRANSITION INCLUDES FGR DUCT
W/ PROCESS TAP CONNECTIONS (3/4" TEMPERATURE
INDICATOR AND 1/2" PRESSURE)
73-11756-01 L 25 51 00 / 2.1
74-11756-01 1 FLUE GAS RECIRCULATION DUCT FLUE GAS RECIRCULATION DUCT 74-11756-01 L 26 51 00 / 2.1
74-11756-02 1 FGR BUTTERFLY DAMPER FGR BUTTERFLY DAMPER, MANUAL W/LOCKING ARM 74-11756-02 L 26 51 00 / 2.1
75-11756-01 1 STACK
STACK 24" DIAMETER W/ CEMS CONNECTIONS (QTY 2, 4" -
150# RF), ROOF LINE RAIN SKIRT AND A DOUBLE CONE
RAIN CAP
75-11756-01 L 26 51 00 / 2.1
FGR - EJ 1 FGR EXPANSION JOINT FGR EXPANSION JOINT 9" FACE TO FACE AFS L 29 51 00 / 2.2
BOILER - EJ 1 BOILER OUTLET EXPANTION JOINT BOILER OUTLET EXPANSION JOINT 12" FACE TO FACE AFS L 30 51 00 / 2.2
REVISION DATE BY
1 12/3/2012 G. MCNUTT
2 3/25/2013 G. MCNUTT
SHIPPING METHOD L - LOOSE P - IN PIPING I - INSTALLED
REVISIONS
DESCRIPTION
CHANGED SFATEY VALVE SET PRESSURE
CHANGED STEAM OUTLET FLANGE TO 10" AND ADDED A TINTED OBSERVATION PORT GLASS
VA JEFFERSON BARRACKS
SAINT LOUIS, MO
DRAWING INDEX
J-VE-11756
VA JEFFERSON BARRACKS
TAB DRAWING NUMBER PROJECT DRAWINGS
00-11756-00 BOILER GENERAL ARRANGEMENT
00-11756-01 BOILER GENERAL ARRANGEMENT - FRONT VIEW
00-11756-02 BOILER GENERAL ARRANGEMENT - PLAN VIEW
14-STD-010 TYP. ACCESS DOOR BRICK INSTALLATION
21-11756-01 WATER TUBE BOILER P&ID
21-11756-98 DRUM LEVEL ARRANGEMENT UNIT 2
21-11756-99 DRUM LEVEL ARRANGEMENT UNITS 1 & 3
30-11756-00 ECONOMIZER GENERAL ARRANGEMENT
50-11756-01 PIPING GENERAL ARRANGEMENT
63-11756-01 TITAN WATER COLUMN JUNCTION BOX
63-11756-02 TITAN PUSH BUTTON BY-PASS STATION
63-11756-03 WATER COLUMN RELAY PANEL
63-11756-04 WATER COLUMN RELAY PANEL SCHEMATIC
71-11756-01 BOILER OUTLET TRANSITION
73-11756-01 FGR ASSEMBLY - UNITS 1 & 3
74-11756-01 FGR ASSEMBLY - UNIT 2
75-11756-01 BURNER STAND
80-11756-01 BOILER LADDER & PLATFORMS - PLAN VIEW
80-11756-02 BOILER LADDER & PLATFORMS - FRONT & REAR VIEWS
90-11756-00 FOUNDATION PLAN & ANCHOR BOLT LAYOUT
90-11756-10 BOILER SHIPPING ARRANGEMENT
90-11756-11 ECONOMIZER SHIPPING ARRANGEMENT
PACKAGE BOILER SYSTEM
TAG # QTY EA SERVICE DESCRIPTION MODEL NUMBER SHIPPING
METHOD
SPECIFICATION
REFERENCE
BOILER TRIM BILL OF MATERIALS
FCV-401 1 FEEDWATER CONTROL VALVE
FLOWSERVE VALTEK CONTROL VALVE - 2",
CLASS 300 CAST STEEL, GLOBE TYPE W/
LOGIX 3000 POSITIONER
VALTEK MARK 1 L
23 52 33 / 2.2.H
HV-401 4 FEEDWATER DRAIN VALVE VOGT 3/4" CL800 GATE VALVE, THREADED X
SW ENDS TSW12111 P
23 21 11 / 2.14
HV-402 1 FEEDWATER VENT VALVE VOGT 1" CL800 GATE VALVE, THREADED X SW
ENDS TSW12111 P
23 21 11 / 2.14
PSV-401 1 ECONOMIZER PRESSURE RELIEF
VALVE
KUNKLE SFETY RELIEF VALVE 3/4" MPT X 1"
FPT CONNECTIONS, SET AT 300 PSIG 927BEDM06ABE L
23 52 33 / 2.5.E
SB-002 1 ECONOMIZER SOOT BLOWER CLYDE BERGMAN, MODEL D5, MANUAL
ROTARY PRESSURIZED, SOOT BLOWER D5 L
23 52 39 / 2.3.E
HV-002 6 DRUM LEVEL DRAIN VALVES VOGT 3/4" CL800 GATE VALVE, SW ENDS SW12111 P 23 21 11 / 2.14
HV-003 2 DRUM LEVEL ISOLATION VALVES VOGT 1" CL800 GATE VALVE, SW ENDS SW12111 P 23 21 11 / 2.14
HV-004 1 DRUM PRESSURE TEST VALVE KF 1/2" FNPT X FNPT, SUT-OFF / TEST VALVE KF-N24-12 P 23 21 11 / 2.14
HV-005 1 STEAM DRUM VENT VALVE VOGT 1" CL800 GATE VALVE, THRADED X SW
ENDS TSW12111 P
23 21 11 / 2.14
PSV-001 1 BOILER SAFETY RELIEF VALVE KUNKLE SAFETY RELIEF VALVE 2 1/2"-250# RF
X 4" FPT CONNECTIONS SET AT 130 PSIG 6252FLJ-AS0130 L
23 52 33 / 2.2.B
PSV-002 1 BOILER SAFETY RELIEF VALVE KUNKLE SAFETY RELIEF VALVE 2 1/2"-250# RF
X 4" FPT CONNECTIONS SET AT 135 PSIG 6252FLJ-AS0135 L
23 52 33 / 2.2.B
DP-001 1 SAFETY VALVE DRIP PAN ELBOW KUNKLE DRIP PAN ELBOW, 4" FPT
CONNECTION 0299-M L
23 52 33 / 2.2.B
DP-002 1 SAFETY VALVE DRIP PAN ELBOW KUNKLE DRIP PAN ELBOW, 4" FPT
CONNECTION 0299-M L
23 52 33 / 2.2.B
6. Installing the pump
6.1 Pump location
The pump should be located in a dry, well-ventilated area which is not subject to freezing or extreme variation in temperature.
Care must be taken to ensure the pump is mounted at least 6 inches (150 mm) clear of any obstruction or hot surfaces.
The motor requires an adequate air supply to prevent overheating and adequate vertical space to remove the motor for repair.
For open systems requiring suction lift the pump should be located as close to the water source as possible to reduce piping losses.
6.2 Foundation
Concrete or similar foundation material should be used to provide a secure, stable mounting base for the pump.
See table of bolt hole center line dimensions for the various pump types.
Secure the pump to the foundation using all four bolts and shim pump base to assure the pump is vertical and all four pads on the base are properly supported (uneven surfaces can result in pump base breakage when mounting bolts are tightened).
Fig. 4 Pump position
The pump can be installed vertically or horizontally; see fig. 4.
Ensure that an adequate supply of cool air reaches the motor cooling fan. The motor must never fall below the horizontal plane.
Arrows on the pump base show the direction of flow of liquid through the pump.
To minimize possible noise from the pump, it is advisable to fit expansion joints on either side of the pump and anti-vibration mountings between the foundation and the pump.
Note: Care should be taken to ensure that the vent plug is located in the uppermost position.
Isolating valves should be fitted either side of the pump to avoid draining the system if the pump needs to be cleaned, repaired or replaced.
Warning Do not energize pump until properly installed.
TM
TM
Pump type L1 L2 B1 B2 ø in mm in mm in mm in mm in mm
CR 1s, 1, 3, 5 3 15/16 100 5 11/16 145 7 1/16 180 8 11/16 220 1/2 13
CRI, CRN 1s 1, 3, 5 3 15/16 100 5 7/8 150 7 1/16 180 8 11/16 220 1/2 13
CR 10, 15, 20 5 1/8 130 6 15/16 176 8 7/16 215 10 1/16 256 9/16 13.5
CRN 10, 15, 20 5 1/8 130 7 7/8 200 8 7/16 215 9 3/4 248 1/2 13
CR 32 6 11/16 170 8 3/4 223 9 7/16 240 11 3/4 298 9/16 14
CRN 32 6 11/16 170 8 7/8 226 9 7/16 240 11 3/4 298 9/16 14
CR 45,64 7 1/2 190 9 3/4 248 10 1/2 266 13 1/16 331 9/16 14
CRN 45,64 7 1/2 190 9 7/8 251 10 1/2 266 13 1/16 331 9/16 14
CR(N) 90 7 13/16 199 10 1/4 261 11 280 13 11/16 348 9/16 14
CR(N) 120, 150 10 13/16 275 13 9/16 344 14 15/16 380 18 9/16 472 11/16 18
L L
B
4 x ø
B
Grundfos.bk Page 10 Wednesday, March 18, 2009 10:38 AM
6.3 Pump mounting
6.3.1 Recommended installation torques
6.4 Suction pipe
The suction pipe should be adequately sized and run as straight and short as possible to keep friction losses to a minimum (minimum of four pipe diameters straight run prior to the suction flange). Avoid using unnecessary fittings, valves or accessory items. Butterfly or gate valves should only be used in the suction line when it is necessary to isolate a pump because of a flooded suction condition.
This would occur if the water source is above the pump; see fig. 5 and fig. 6. Flush piping prior to pump installation to remove loose debris.
Fig. 5 Flooded suction
Fig. 6 Suction lift*
*The suction pipe should have a fitting on it for priming.
CRN-SF pumps cannot be used for suction lift.
6.5 Minimum suction pipe sizes
The following recommended suction pipe sizes are the smallest sizes which should be used with any specific CR pump type.
The suction pipe size should be verified with each installation to ensure good pipe practices are being observed and excess friction losses are not encountered.
High temperatures may require larger diameter pipes to reduce friction and improve NPHSA.
6.6 Discharge piping
It is suggested that a check valve and isolation valve be installed in the discharge pipe.
Pipe, valves and fittings should be at least the same diameter as the discharge pipe or sized in accordance with good piping practices to reduce excessive fluid velocities and pipe friction losses.
Note: Pipe, valves and fittings must have a pressure rating equal to or greater than the maximum system pressure.
Before the pump is installed it is recommended that the discharge piping be pressure checked to at least the maximum pressure the pump is capable of generating or as required by codes or local regulations.
Whenever possible, avoid high pressure loss fittings, such as elbows or branch tees directly on either side of the pump. The piping should be adequately supported to reduce thermal and mechanical stresses on the pump.
Good installation practice recommends the system be thoroughly cleaned and flushed of all foreign materials and sediment prior to pump installation. Furthermore, the pump should never be installed at the lowest point of the system due to the natural accumulation of dirt and sediment. If there is excessive sediment or suspended particles present, it is advised a strainer or filter be used. Grundfos recommends that pressure gauges be installed on inlet and discharge flanges or in pipes to check pump and system performance.
Warning CR, CRI, CRN pumps are shipped with covered suction and discharge. The covers must be removed before the final pipe flange to pump connections are made.
Model Recommended foundation torque (ft - lbs)
Recommended flange torque
(ft - lbs)
CR, CRI, CRN
1s/1/3/5, and
CRT 2/4
30 37 - 44
CR, CRI,
CRN 10/15/20, and
CRT 8/16
37 44 - 52
CR, CRN
32/45/64/90/ 120/150
52 52 - 59
TM
TM
Reservoir
Butterfly
Valve
Butterfly
Valve
Strainer Check
Valve
Expansion Joint
Butterfly
Valve
Check
Valve
Eccentric
Reducer
Suction
Pipe
Reservior
Foot
Valve
Model Min. suction pipe size
CR(I)(N) 1s, 1, 3; CRT 2 1" Nominal diameter sch 40 pipe
CR(I)(N) 5;
CRT 4 1-1/4" Nominal diameter sch 40 pipe
CR(I)(N) 10, 15, 20;
CRT 8, 16 2" Nominal diameter sch 40 pipe
CR(N) 32 2-1/2" Nominal diameter sch 40 pipe
CR(N) 45 3" Nominal diameter sch 40 pipe
CR(N) 64, 90 4" Nominal diameter sch 40 pipe
CR(N) 120, 150 5" Nominal diameter sch 40 pipe
Warning To avoid problems with waterhammer, fast closing valves must not be used in CRN-SF applications.
Grundfos.bk Page 11 Wednesday, March 18, 2009 10:38 AM
6.7 Bypass orifice
A bypass should be installed in the discharge pipe if there is any possibility the pump may operate against a closed valve in the discharge line. Flow through the pump is required to ensure adequate cooling and lubrication of the pump is maintained. See
6.9 Minimum continuous duty flow rates for minimum flow rates.
Elbows should be a minimum of 12” from the orifice discharge to prevent erosion.
Fig. 7 Recommended bypass arrangement
Fig. 8 Optional bypass arrangement
Fig. 9 Optional bypass arrangement for CR(N) 32, 45, 64, and CR 90, 120, and 150 only
6.8 Nozzle loads
If not all loads reach the maximum permissible value stated in the forces and moments tables included here with fig. 10, one of these values may exceed the normal limit. Contact Grundfos for further information.
Fig. 10 Nozzle forces and moments
TM
TM
TM
By-pass line
Nipple
Orifice
Inlet Outlet
Inlet Outlet
By-Pass Line Nipple
Orifice
OutletInlet
Nipple
Orifice By-Pass Line
TM
Flange CR, CRI, CRN
Forces
Y-direction [lb]
Z-direction [lb]
X-direction [lb]
1-1/4" 1s to 5 171 263 175
2" 10, 15 and 20 303 371 337
2-1/2" 32 382 466 422 3" 45 461 562 506 4" 64 and 90 607 753 674
5" & 6" 120 and 150 607 753 674
Flange CR, CRI, CRN
Moments
Y-direction [ft-lb]
Z-direction [ft-lb]
X-direction [ft-lb]
1-1/4" 1s to 5 605 715 900
2" 10, 15 and 20 738 848 1,033
2-1/2" 32 793 904 1,106 3" 45 848 959 1,180 4" 64 and 90 922 1,069 1,291
5" & 6" 120 and 150 922 1,069 1,291
Y-direction: Direction of chamber stack Z-direction: 90 ° from inlet/outlet X-direction: Inlet/outlet
Grundfos.bk Page 12 Wednesday, March 18, 2009 10:38 AM
6.9 Minimum continuous duty flow rates
* Grundfos Cool-Top® is only available in the following pump types.
6.10 Check valves
A check valve may be required on the discharge side of the pump to prevent the pump’s inlet pressure from being exceeded.
For example, if a pump with no check valve is stopped because there is no demand on the system (all valves are closed), the high system pressure on the discharge side of the pump will “find” its way back to the inlet of the pump.
If the system pressure is greater than the pump’s maximum inlet pressure rating, the limits of the pump will be exceeded and a check valve needs to be fitted on the discharge side of the pump to prevent this condition. This is especially critical for CRN-SF applications because of the very high discharge pressures involved. As a result, most CRN-SF installations require a check valve on the discharge piping.
6.11 Temperature rise
It may sometimes be necessary to stop the flow through a pump during operation.
At shut-off, the power to the pump is transferred to the pumped liquid as head, causing a temperature rise in the liquid.
The result is risk of excess heating of and consequent damage to the pump. The risk depends on the temperature of the pumped liquid and for how long the pump is operating without flow; see the following temperature rise chart.
6.12 Conditions/Reservations
The listed times are subject to the following conditions/ reservations:
• No exchange of heat with the surrounding.
• The pumped liquid is water with a specific heat of 1.0 Btu/lb. °F
(4.18 kJ/kg °C).
• Pump parts (chambers, impellers and shaft) have the same thermal capacity as water.
• The water in the base and the pump head is not included.
These reservations should give sufficient safety margin against excessive temperature rise.
The maximum temperature must not exceed the pump maximum rating.
Pump Type min °F to 176 °F (min °C to 80 °C) at 210°F (at 99°C) at 248°F (at 120°C) at 356°F (at 180°C)
CR, CRI, CRN 1s 0.5 0.7 1.2 1.2*
CR, CRI, CRN 1 0.9 1.3 2.3 2.3*
CR, CRI, CRN 3 1.6 2.4 4.0 4.0*
CR, CRI, CRN 5 3.0 4.5 7.5 7.5*
CR, CRI, CRN 10 5.5 8.3 14 14*
CR, CRI, CRN 15 9.5 14 24 24*
CR, CRI, CRN 20 11 17 28 28*
CR, CRN 32 14 21 35 35*
CR, CRN 45 22 33 55 55*
CR, CRN 64 34 51 85 85*
CR, CRN 90 44 66 110 110*
CR, CRN 120 60 90 N/A N/A
CR, CRN 150 75 115 N/A N/A
CRT 2 1.3 2.0 3.3 N/A
CRT 4 3.0 4.5 7.5 N/A
CRT 8 4.0 6.0 10 N/A
CRT 16 8.0 0.7 20 N/A
Pump Type CR 1s CR 1 CR 3 CR 5 CR 10 CR 15 CR 20 CR 32 CR 45 CR 64 CR 90
Standard (CR) • • • • I Version (CRI) • • • • • • • N Version (CRN) • • • • • • • • • • •
Pump type Time for temperature rise of 18 °F (10 °C)
Seconds Minutes
CR 1s, 1, 3 210 3.5
CR 5 240 4.0
CR 10 210 3.5
CR 15 150 2.5
CR 20 120 2.0
CR 32, 45, 64, 90,
120, 150 60 1.0
Grundfos.bk Page 13 Wednesday, March 18, 2009 10:38 AM
File details come from the government source that posted it. Updated .