S02 Drawings 531-24-108 Upgrade Storm Sewer.pdf
PDF 8 MB Posted
- Attached to
- Y1ND--531-24-108 | UPGRADE STORM SEWER SYSTEM
- Solicitation number
- 36C26025R0035
About this file
This is a set of engineering drawings and specifications for a storm sewer system upgrade project at the Boise VA Medical Center (Project #531-24-108). The drawings detail the installation of new storm drainage infrastructure including catch basins, sediment traps, seepage beds, and associated piping across multiple locations including Parking Lots 1B and 10, as well as the Parade Field area.
The plans include civil site plans, drainage details, plumbing plans, and technical specifications for the storm sewer upgrades. Key components include sediment control catch basins with specified elevations, storm line installations with pipe sizes ranging from 6" to 24", inlet protection systems, MC-4500 infiltration chambers, and detailed requirements for backfill materials and installation methods. The drawings provide comprehensive construction details including pipe penetrations, manhole specifications, tree protection measures, and pavement restoration requirements. Sheet C0.0 shows the overall site plan, while subsequent sheets provide detailed plan views, sections, and specifications for each project area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Roster and RFI.pdf | ||
| 36C26025R0035 0001.docx | DOCX document | |
| S02 EXHIBIT B Past Performance Reference Form.docx | DOCX document | |
| 36C26025R0035_2.docx | DOCX document | |
| S02 Exhibit A Project Information Sheet for Contractors.docx | DOCX document | |
| S02 Specifications 531-24-108 Upgrade Storm Sewer.pdf | ||
| S02 Wage Determination ID20250104_01-03-2025.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ethoscivil.com info@ethoscivil.com 253.414.1989
SITE
LEGEND
WV
12/04/2024
X
X
X
X
X
WV
X ethoscivil.com info@ethoscivil.com 253.414.1989
48" 36"
24"
NOTES:
1. FILTERS SHALL BE INSPECTED AFTER EACH STORM EVENT AND
CLEANED OR REPLACED WHEN 1/3 FULL.
2. INSTALL INLET PROTECTION IN ALL NEW STORM STRUCTURES THAT
WILL COLLECT STORMWATER AS THEY ARE INSTALLED.
ADAPTOR SKIRT RETRIEVAL STRAP
OVERFLOW (TO BYPASS
PEAK STORM VOLUMES)
EXISTING
CATCH BASIN
GEOTEXTILE
FABRIC
SEDIMENT ACCUMULATION
WV
NOTE:
1. NO STEPS ARE REQUIRED WHEN HEIGHT IS 4' OR LESS.
2. THE BOTTOM OF THE PRECAST CATCH BASIN MAY BE SLOPED TO FACILITATE CLEANING.
3. THE RECTANGULAR FRAME AND GRATE MAY BE INSTALLED WITH THE FLANGE UP OR
DOWN. THE FRAME MAY BE CAST INTO THE ADJUSTMENT SECTION.
4. KNOCKOUTS SHALL HAVE A WALL THICKNESS OF 2" MINIMUM TO 2.5" MAXIMUM. PROVIDE
A 1.5" MINIMUM GAP BETWEEN THE KNOCKOUT WALL AND THE OUTSIDE OF THE PIPE.
AFTER THE PIPE IS INSTALLED, FILL THE GAP WITH JOINT MORTAR.
SEPARATE BASE
PRECAST
INTEGRAL BASE
PRECAST WITH RISER
48"
12"
6"
MORTAR (TYP)
6" GRAVEL BACKFILL FOR
PIPE ZONE BEDDING
UPTURNED ELBOW AT
NORTH INLET. TOP OF
UPTURNED ELBOW SHALL BE
MINIMUM 6" ABOVE TOP OF
SEEPAGE BED ELEVATION
OR ELEV: -7.14'
OUTLET TO NEW SEEPAGE
BED
NOTES:
1. SEEPAGE BED DIMENSIONS ARE AT THE BOTTOM OF TRENCH.
2. CONTRACTOR SHALL FIELD SURVEY TO VERIFY THE TOP OF THE
SEEPAGE BED IS 6" BELOW THE TOP OF THE UPTURNED ELBOW
SHOWN IN DETAIL 2. FINAL DEPTH IS CONTROLLED BY
MAINTAINING A 2.18% PIPE SLOPE AND MINIMUM 12" VERTICAL
SEPARATION ATTHE UTILITY CROSSING WITH SEWER NOTED ON
THE PLAN.
30'
8" SOLID WALL PVC SDR-35
END CAP, TYP.
OBSERVATION WELL WITH
LOCKING LID.
(14) 12"DIA PERFORATED
DISTRIBUTION PIPES @ 24" O.C.
CLEAN 1-1/2" TO
2" DRAIN ROCK
STORMWATER FROM
SEDIMENT TRAP
CATCH BASIN
OBSERVATION WELL WITH
LOCKING LID.
(14) 12"DIA PERFORATED PVC
DISTRIBUTION PIPES @ 24" O.C.
CLEAN 1-1/2" TO
2" DRAIN ROCK
6.
5'
2'
4 OZ/SY GEOTEXTILE (NONWOVEN)
AROUND TOP AND SIDES.
MIN. 18" OVERLAP.
RESTORE GROUND SURFACE
TO MATCH EXISTING
1' MIN.
.3
3'
6.
1.5'
ASTM C33 SAND LAYER REQUIRED IF
GROUNDWATER IS ENCOUNTERED.
SECTIONSECTION
SUBGRADE SHALL BE PREPARED
PER ITD STD. SPEC. 205.03.G
ASPHALT FINISHED SECTION PER ITD
STD. SPEC. SECTION 702
MATCH EXISTING
CRUSHED SURFACING BASE COURSE
PER ITD STD. SPEC. 409.03.E
NOTES:
1. MATCH EXISTING ASPHALT, BASE COURSE, AND SUBBASE
THICKNESSES.
2. HMA SHALL BE COMPACTED TO A TARGET AVERAGE DENSITY OF
92% BASED ON THE RICE THEORETICAL MAXIMUM DENSITY PER
ASTM D-2041. INDIVIDUAL LOCATIONS SHALL BE COMPACTED
NOT LESS THAN 90% NOR MORE THAN 96%.
3. ALL ASPHALT BASE MATERIAL SHALL BE COMPACTED TO A
MINIMUM DENSITY OF 95% BASED ON THE MODIFIED PROCTOR
MAXIMUM DRY DENSITY PER ASTM D-1557.
4. SUBGRADE SHALL BE COMPACTED TO A FIRM AND UNYIELDING
CONDITION PRIOR TO PLACEMENT OF ANY PAVEMENT LAYERS.
ANY LOCALIZED ZONES OF SOFT, ORGANIC-RICH, OR
DEBRIS-LADEN SOILS SHOULD BE OVEREXCAVATED AND
REPLACED WITH STRUCTURAL FILL MATERIAL.
5. RECYCLED CONCRETE IS NOT ACCEPTABLE.
6. SEAL JOINTS WITH EMULSIFIED ASPHALT PER PROJECT
SPECIFICATIONS.
STRUCTURAL SUBBASE PER
ISPWC STD. SPEC. 801, TABLE 1
NOTE
CONSTRUCTION SHALL
CONFORM TO ISPWC
SPEC. 703
FINISH GROUND GRADE
TOP OF CURB
AT APPROACH
PAVEMENT 6"
5-1/2"
1'- 4"
7-3/4"
1/2"
1" R
FINISHED GRADE
OF PAVEMENT
BACKFILL WITH 3500 PSI
CEMENT CONCRETE
6"Ø SCH 40 STEEL PIPE
PAINTED YELLOW, FILLED
WITH CONCRETE AND
CROWNED FOR DRAINAGE3'
3'
3" MIN 1.5' (MIN)
REINSTALL
SALVAGED SIGNS
ON NEW SIGN POST
2" DIA SCHEDULE 40
GALVANIZED METAL PIPE
2 X ROOTBALL
DIAMETER MIN.
NOTES:
1. WIRE BASKETS WILL BE REMOVED COMPLETELY PRIOR TO COMPLETION OF BACKFILLING.
2.
3.
4. STAKE ALL TREES.
5. DO NOT CUT OR DAMAGE LEADER. PRUNE DAMAGED WOOD IMMEDIATELY PRIOR TO PLANTING.
6. DO NOT BUILD WATER RETAINING BERM AROUND TREES PLANTED IN IRRIGATED TURF AREAS.
7. TREES PLANTED IN NATURAL AREAS WITH TREE DRIP RINGS, SHALL HAVE WATER RETAINING BERMS.
PROTECTION CAPS ON ALL POSTS.
6' STEEL T-POST 4' EXPOSED, MIN. 3 PER TREE
SET ROOTBALL 1" HIGHER THAN FINISH GRADE
3" DEEP MULCH
STAKE TO EXTEND 24" INTO UNDISTURBED SOIL.
UNDISTURBED SUBGRADE.
HOLE SHOULD HAVE ROUGHENED SIDES.
FINISH GRADE
WEED MAT
ANY BROKEN OR CRUMBLING ROOTBALLS WILL BE REJECTED. REMOVING THE WIRE WILL NOT BE AN
EXCUSE FOR DAMAGED ROOTBALLS.
CUT AND REMOVE BURLAP FROM ROOTBALL. REMOVE ALL TWINE AND PLASTIC. IF TREE IS IN FIBER POT, REMOVE PRIOR TO PLANTING.
REMOVE GUY WIRE AFTER ONE GROWING
SEASON.
12 GAUGE GALVANIZED WIRE. DOUBLE STRAND,
TWISTED WITH FLAGGING.
WATER RETAINING BERM INSTALL AT EDGE OF
PLANTING PIT, NO BERM IN IRRIGATED TURF AREAS.
BACKFILL WITH APPROVED TOPSOIL/PLANTING
MEDIUM. REMOVE ALL DEBRIS.
MC-4500 TECHNICAL SPECIFICATIONS
PART # STUB B C
MC4500IEPP06T 6" (150 mm)
42.54" (1081 mm) --- MC4500IEPP06B --- 0.86" (22 mm) MC4500IEPP08T 8" (200 mm)
40.50" (1029 mm) --- MC4500IEPP08B --- 1.01" (26 mm) MC4500IEPP10T 10" (250 mm)
38.37" (975 mm) --- MC4500IEPP10B --- 1.33" (34 mm) MC4500IEPP12T 12" (300 mm)
35.69" (907 mm) --- MC4500IEPP12B --- 1.55" (39 mm) MC4500IEPP15T 15" (375 mm)
32.72" (831 mm) --- MC4500IEPP15B --- 1.70" (43 mm)
MC4500IEPP18T
18" (450 mm) 29.36" (746 mm) ---
MC4500IEPP18TW
MC4500IEPP18B
--- 1.97" (50 mm)
MC4500IEPP18BW
MC4500IEPP24T
24" (600 mm) 23.05" (585 mm) ---
MC4500IEPP24TW
MC4500IEPP24B
--- 2.26" (57 mm)
MC4500IEPP24BW
MC4500IEPP30BW 30" (750 mm) --- 2.95" (75 mm) MC4500IEPP36BW 36" (900 mm) --- 3.25" (83 mm) MC4500IEPP42BW 42" (1050 mm) --- 3.55" (90 mm)
NOTE: ALL DIMENSIONS ARE NOMINAL
NOMINAL CHAMBER SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH) 100.0" X 60.0" X 48.3" (2540 mm X 1524 mm X 1227 mm) CHAMBER STORAGE 106.5 CUBIC FEET (3.01 m³) MINIMUM INSTALLED STORAGE* 162.6 CUBIC FEET (4.60 m³) WEIGHT (NOMINAL) 125.0 lbs. (56.7 kg)
NOMINAL END CAP SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH) 90.0" X 61.0" X 32.8" (2286 mm X 1549 mm X 833 mm) END CAP STORAGE 39.5 CUBIC FEET (1.12 m³) MINIMUM INSTALLED STORAGE* 115.3 CUBIC FEET (3.26 m³) WEIGHT (NOMINAL) 90 lbs. (40.8 kg)
*ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION AND BETWEEN CHAMBERS, 12" (305 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY.
PARTIAL CUT HOLES AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"
PARTIAL CUT HOLES AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"
END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W"
B
C
52.0" (1321 mm)
48.3" (1227 mm)
INSTALLED
60.0" (1524 mm)
100.0" (2540 mm) 90.0" (2286 mm)
61.0" (1549 mm)
32.8" (833 mm)
INSTALLED
38.0" (965 mm)
CUSTOM PREFABRICATED INVERTS
ARE AVAILABLE UPON REQUEST.
INVENTORIED MANIFOLDS INCLUDE
12-24" (300-600 mm) SIZE ON SIZE AND 15-48" (375-1200 mm)
ECCENTRIC MANIFOLDS. CUSTOM
INVERT LOCATIONS ON THE MC-4500
END CAP CUT IN THE FIELD ARE NOT
RECOMMENDED FOR PIPE SIZES
GREATER THAN 10" (250 mm). THE
INVERT LOCATION IN COLUMN 'B'
ARE THE HIGHEST POSSIBLE FOR
THE PIPE SIZE.
UPPER JOINT
CORRUGATION
WEB
CREST
CREST
STIFFENING
RIB
VALLEY
STIFFENING RIB
BUILD ROW IN THIS
DIRECTION
LOWER JOINT
CORRUGATION
FOOT
MC-4500 ISOLATOR ROW PLUS DETAIL
SUMP DEPTH TBD BY
SITE DESIGN ENGINEER
(24" [600 mm] MIN RECOMMENDED)
CATCH BASIN
OR MANHOLE
OPTIONAL INSPECTION PORT
MC-4500 END CAP
24" (600 mm) HDPE ACCESS PIPE REQUIRED
USE FACTORY PARTIAL CUT END CAP PART #:
MC4500IEPP24BC OR MC4500RIEPP24BW
STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM
STRUCTURES WITH OPEN GRATES
COVER PIPE CONNECTION TO END CAP WITH ADS
GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE
ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN
FOUNDATION STONE AND CHAMBERS
10.3' (3.1 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
ELEVATED BYPASS MANIFOLD
MC-4500 CHAMBER
INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE
PART #: MCFLAMP
MC-4500 CROSS SECTION DETAIL
ACCEPTABLE FILL MATERIALS: STORMTECH MC-4500 CHAMBER SYSTEMS
PLEASE NOTE:
1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".
2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.
3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR
COMPACTION REQUIREMENTS.
4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
5. WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS 'A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 6.20 "RECYCLED CONCRETE STRUCTURAL BACKFILL".
NOTES:
1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 60x101
2. MC-4500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION
FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.
4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.
5. REQUIREMENTS FOR HANDLING AND INSTALLATION:
· TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.
· TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3”.
· TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/FT/%.
AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS.
MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL
CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT
D
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE
TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE
PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT
PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER
ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS.
CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. N/A
PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED
INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND
PREPARATION REQUIREMENTS.
C
INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE
TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm)
ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT
SUBBASE MAY BE A PART OF THE 'C' LAYER.
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR
PROCESSED AGGREGATE.
MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS
LAYER.
AASHTO M145¹
A-1, A-2-4, A-3
OR
AASHTO M43¹
3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10
BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVER
THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN
12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR
WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR
PROCESSED AGGREGATE MATERIALS.
B
EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS
FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER
ABOVE.
CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 AASHTO M43¹
3, 357, 4, 467, 5, 56, 57
A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE
SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 AASHTO M43¹
3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3
NO COMPACTION REQUIRED.
7.0' (2.1 m)
MAX
24" (600 mm) MIN*
100" (2540 mm) 12" (300 mm) MIN
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND
CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS
12" (300 mm) MIN
12" (300 mm) MIN 9" (230 mm) MIN
D C
B
A
*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED
INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,
INCREASE COVER TO 30" (750 mm).
DEPTH OF STONE TO BE DETERMINED
BY SITE DESIGN ENGINEER 9" (230 mm) MIN
PERIMETER STONE
(SEE NOTE 4)
EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
MC-4500
END CAP
SUBGRADE SOILS
(SEE NOTE 3)
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
60" (1524 mm)
**THIS CROSS SECTION DETAIL REPRESENTS
MINIMUM REQUIREMENTS FOR INSTALLATION.
PLEASE SEE THE LAYOUT SHEET(S) FOR
PROJECT SPECIFIC REQUIREMENTS.
NOTE: MANIFOLD STUB MUST BE LAID HORIZONTAL
FOR A PROPER FIT IN END CAP OPENING.
12" (300 mm)
MIN SEPARATION
12" (300 mm) MIN INSERTION
12" (300 mm)
MIN SEPARATION
12" (300 mm)
MIN INSERTION
MC-SERIES END CAP INSERTION DETAIL
MANIFOLD HEADER
MANIFOLD STUB
STORMTECH END CAP
MANIFOLD HEADER
MANIFOLD STUB
N O
T
TO
S C
AL
E
AD
VA
N C
ED
D
R
AI
N
AG
E
SY
ST
EM
S, IN
C
"A D
S" ) H
AS
P
R
EP
AR
ED
T H
IS
D
ET
AI
L
BA
SE
D
O N
R
EF
ER
EN
C
ED
S
TA
N D
AR
D
S.
A
D S
H
AS
N O
T
PE
R
FO
R M
ED
A
N Y
EN
G
IN
EE
R
IN
G O
R D
ES
IG
N S
ER
VI
C
ES
F O
R T
H
IS
P R
O
JE
C T, N O
R H
AS
A
D S
IN
D
EP
EN
D
EN
TL
Y
VE
R
IF
IE
D T
H E
IN
FO
R M
AT
IO
N S
U
PP
LI
ED
. T H
E
IN
ST
AL
LA
TI
O N
D
ET
AI
LS
P R
O
VI
D
ED
H
ER
EI
N
A R
E G
EN
ER
AL
R
EC
O
M M
EN
D
AT
IO
N S
AN
D
A R
E N
O T
SP
EC
IF
IC
F O
R T
H
IS
P R
O
JE
C T, U N
LE
SS
T H
E
PL
AN
S
AR
E
SI
G
N
ED
A N
D S
EA
LE
D B
Y
TH
E
SI
TE
D
ES
IG
N E
N G
IN
EE
R . T
H E
SI
TE
D
ES
IG
N
E N
G
IN
EE
R
S H
AL
L
R
EV
IE
W
T H
ES
E
D
ET
AI
LS
P R
IO
R
T O
C O
N
ST
R U
C
TI
O N
A N
D S
EA
LI
N G
T H
E D
O C
U M
EN
T.
IT
IS
T H
E
SI
TE
D
ES
IG
N E
N G
IN
EE
R 'S
R
ES
PO
N
SI
BI
LI
TY
T O
EN
SU
R E
TH
E
D
ET
AI
LS
P R
O
VI
D
ED
H
ER
EI
N
M
EE
TS
O
R E
XC
EE
D S
TH
E
AP
PL
IC
AB
LE
N
AT
IO
N
AL
, S
TA
TE
, O
R L
O C
AL
R
EQ
U
IR
EM
EN
TS
A N
D T
O E
N
SU
R E
TH
AT
T H
E D
ET
AI
LS
P
R O
VI
D
ED
H
ER
EI
N A
R E
AC
C
EP
TA
BL
E
FO
R
T H
IS
P
R O
JE
C
T.
R
EV
IE
W
ED
D R
AW
N
PR
O
JE
C
T N
O
D
AT
E:
SHEET
R
EV
T R
U
EM
AN
B
LV
D
H
IL
LI
AR
D , O
H
Ad va nc ed
D ra in ag e Sy st em s, In c.
St or m Te ch C ha m be r S ys te m
8-
2-
W W
W .S
TO
R
M
TE
C H
.C O
M
M C
-4
ST
AN
D
AR
D
D
ET
AI
LS
JL
M JL
M
/1
0/
Advanced Drainage Systems, Inc.
IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF MC-4500 CHAMBER SYSTEM
1. STORMTECH MC-4500 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A
PRE-CONSTRUCTION MEETING WITH THE INSTALLERS.
2. STORMTECH MC-4500 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500
CONSTRUCTION GUIDE".
3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR EXCAVATOR SITUATED OVER THE CHAMBERS.
STORMTECH RECOMMENDS 3 BACKFILL METHODS:
· STONESHOOTER LOCATED OFF THE CHAMBER BED.
· BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE.
· BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR.
4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS.
5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE.
6. MAINTAIN MINIMUM - 9" (230 mm) SPACING BETWEEN THE CHAMBER ROWS.
7. INLET AND OUTLET MANIFOLDS MUST BE INSERTED A MINIMUM OF 12" (300 mm) INTO CHAMBER END CAPS.
8. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE MEETING THE AASHTO M43
DESIGNATION OF #3 OR #4.
9. STONE SHALL BE BROUGHT UP EVENLY AROUND CHAMBERS SO AS NOT TO DISTORT THE CHAMBER SHAPE. STONE DEPTHS SHOULD NEVER DIFFER BY MORE THAN 12" (300 mm) BETWEEN ADJACENT CHAMBER ROWS.
10. STONE MUST BE PLACED ON THE TOP CENTER OF THE CHAMBER TO ANCHOR THE CHAMBERS IN PLACE AND PRESERVE ROW
SPACING.
11. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIAL BEARING CAPACITIES TO THE
SITE DESIGN ENGINEER.
12. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE
SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF.
NOTES FOR CONSTRUCTION EQUIPMENT
1. STORMTECH MC-4500 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500
CONSTRUCTION GUIDE".
2. THE USE OF EQUIPMENT OVER MC-4500 CHAMBERS IS LIMITED:
· NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS.
· NO RUBBER TIRED LOADER, DUMP TRUCK, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN
ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE".
· WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION
GUIDE".
3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING.
USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY USING THE "DUMP AND PUSH" METHOD ARE NOT COVERED
UNDER THE STORMTECH STANDARD WARRANTY.
CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR
CONSTRUCTION EQUIPMENT.
MC-4500 STORMTECH CHAMBER SPECIFICATIONS
1. CHAMBERS SHALL BE STORMTECH MC-4500.
2. CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENE
COPOLYMERS.
3. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 60x101.
4. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD
IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION.
5. THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH
CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES.
6. CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO
DESIGN TRUCK.
7. REQUIREMENTS FOR HANDLING AND INSTALLATION:
· TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.
· TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE
LESS THAN 3”.
· TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE
GREATER THAN OR EQUAL TO 450 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE
PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS.
8. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE
DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS:
· THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER.
· THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95
FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE
AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE.
· THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN
EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN.
9. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY.
INSPECTION & MAINTENANCE
STEP 1) INSPECT ISOLATOR ROW PLUS FOR SEDIMENT
A. INSPECTION PORTS (IF PRESENT)
A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN
A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED
A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
B. ALL ISOLATOR PLUS ROWS
B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS
B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE
i)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE
B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
STEP 2) CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS
A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED
B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN
C. VACUUM STRUCTURE SUMP AS REQUIRED
STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.
STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.
NOTES
1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS
OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.
2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.
4" PVC INSPECTION PORT DETAIL (MC SERIES CHAMBER)
NOTE:
INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION VALLEY.
STORMTECH CHAMBER
4" (100 mm) INSERTA TEE
TO BE CENTERED ON CORRUGATION VALLEY
CONCRETE COLLAR
ASPHALT OVERLAY FOR
TRAFFIC APPLICATIONS
12" (300 mm) MIN WIDTH
8" (200 mm) MIN THICKNESS OF ASPHALT
OVERLAY AND CONCRETE COLLAR
8" NYLOPLAST UNIVERSAL DRAIN BODY
(PART# 2708AG4IPKIT) OR TRAFFIC RATED
BOX W/SOLID LOCKING COVER
CONCRETE COLLAR / ASPHALT OVERLAY
NOT REQUIRED FOR GREENSPACE OR
NON-TRAFFIC APPLICATIONS
4" (100 mm) SDR 35 PIPE
NYLOPLAST 8" LOCKING SOLID
COVER AND FRAME
UNDERDRAIN DETAIL
A
A
B B
SECTION A-A
SECTION B-B
NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER
4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS 6" (150 mm) TYP FOR SC-740, SC-800, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMS
OUTLET MANIFOLD
STORMTECH
END CAP
STORMTECH
CHAMBERS
STORMTECH
CHAMBER
STORMTECH
END CAP
DUAL WALL
PERFORATED
HDPE
UNDERDRAIN
ADS GEOSYNTHETICS 601T
NON-WOVEN GEOTEXTILE
ADS GEOSYNTHETICS 601T
NON-WOVEN GEOTEXTILE
FOUNDATION STONE
BENEATH CHAMBERS
FOUNDATION STONE
BENEATH CHAMBERS
WELL COVER IN SIDEWALK
PLAN VIEW
WELL SECTION
PLAN VIEW
SECTION
TOP OF CHAMBER
TOP OF FACILITY
BOTTOM OF CHAMBER
BOTTOM OF FACILITY
531-24-108_P0.DWG 12/4/2024
12/02/2024
SCALE:
NORTH
DEMOLITION HVAC PLUMBING HYDRONICS PLAN1 1/4" = 1'-0" SCALE:
DEMOLITION WASTE VENT PLAN2 1/4" = 1'-0"
P1
SCALE:
SITE CONDITIONS3 NTS
531-24-108_P1.DWG
85P0HV.DWG
85P0WV.DWG
12/4/2024
SCALE:
HVAC PLUMBING HYDRONICS PLAN1 1/4" = 1'-0" SCALE:
WASTE VENT PLAN2 1/4" = 1'-0"
531-24-108_P2.DWG
85P0HV.DWG
85P0WV.DWG
12/4/2024
NOTE:
PROVIDE THREE SUPPORT RODS FOR STRUT LONGER THAN 24"
531-24-108_P3.DWG 12/4/2024
| Sheets and Views |
| C0.0 COVER SHEET |
| C1.0 TESC AND DEMO PLANS |
| C2.0 DRAINAGE PLAN |
| C3.0 PAVING PLAN |
| C4.0 PAVING AND DRAINAGE DETAILS |
| SEEPAGE BED DETAIL |
| ASPHALT PATCH DETAIL |
| ASPHALT PAVEMENT |
| CONCRETE SIDEWALK |
| CURB AND GUTTER |
| SEDIMENT TRAP CATCH BASIN |
| TRENCH SECTION |
File details come from the government source that posted it. Updated .