S02 Drawings - 515-21-102.pdf
PDF 43 MB Posted
- Solicitation number
- 36C25023B0048
About this file
This federal contract opportunity solicitation seeks bids to correct safety deficiencies at buildings 14 through 22 at a Veterans Affairs medical center. The solicitation number is 36C25023B0048 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Bids are due by the date specified in Amendment 0004. The opportunity involves addressing safety issues at several buildings on the medical center campus. The drawings provided in the 43MB PDF file likely contain specifications and details of the required repairs and upgrades.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 14
BUILDING 22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FREDERICK VOLLMERHAUSEN
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
B a tt le C re e k
B n a te .m o u ld s .r v t
/2
/2
:5
:2
P
M
GI000
COVER SHEET
Dept. of Veteran's Affairs
03/29/2023 PQ BL
CORRECT SAFETY DEFICIENCIES
BUILDINGS 14, AND 22
515-21-102
BATTLE CREEK, MICHIGAN
BID DOCUMENTS
14 & 22
BATTLE
CREEK VA
MEDICAL
CENTER
L O C A T I O N M A P
LOCATION OF
BATTLE CREEK
VA MEDICAL
CENTER
BATTLE CREEK VA MEDICAL CENTER
D R A W I N G I N D E X
DEPARTMENT OF VETERANS AFFAIRS
5500 ARMSTRONG RD, BATTLE CREEK, MI 49037
#515-21-102
C A M P U S M A P
MEDICAL CENTER DIRECTOR
ASSISTANT MEDICAL CENTER DIRECTOR
ASSOCIATE MEDICAL CENTER DIRECTOR
CHIEF OF STAFF
AD/PATIENT CARE SERVICES
CHIEF, FACILITIES MANAGEMENT
CHIEF, ENGINEERING SECTION
CHIEF, ENVIRONMENTAL MANAGEMENT
SAFETY SPECIALIST
CHIEF, POLICE SERVICE
INDUSTRIAL HYGIENIST
INFECTION CONTROL
ENERGY MANAGER
SAFETY MANAGER
S I G N A T U R E S
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
CORRECT SAFETY DEFICIENCIES
BUILDING 14, AND 22
GENERAL
GI000 COVER SHEET
GI001 BASEMENT LIFE SAFETY PLAN - BUILDING 14 & CODE NOTES
GI002 FIRST FLOOR LIFE SAFETY PLAN - BUILDING 14
GI003 SECOND FLOOR LIFE SAFETY PLAN - BUILIDNG 14
GI004 FIRST FLOOR LIFE SAFETY PLAN - BUILIDNG 22
GI005 SECOND FLOOR LIFE SAFETY PLAN - BUILDING 22
GI006 PHASING, INTERIM LIFE SAFETY AND ICRA
GI007 PHASING, INTERIM LIFE SAFETY AND ICRA
GI100 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
GI101 STANDARD DETAILS
ARCHITECTURAL
AD101 BASEMENT DEMOLITION PLAN - BUILDING 14
AD102 FIRST FLOOR DEMOLITION PLAN - BUILDING 14
AD103 SECOND FLOOR DEMOLITION PLAN - BUILDING 14
AD104 FIRST FLOOR DEMOLITION PLAN - BUILDING 22
AD105 SECOND FLOOR DEMOLITION PLAN - BUILDING 22
AE101 BASEMENT FLOOR PLAN - BUILDING 14
AE102 FIRST FLOOR PLAN - BUILDING 14
AE103 SECOND FLOOR PLAN - BUILDING 14
AE104 FIRST FLOOR NEW WORK PLAN - BUILDING 22
AE105 SECOND FLOOR NEW WORK PLAN - BUILDING 22
AE123 ENLARGED PLANS AND ELEVATIONS - BUILDING 22
AE124 ENLARGED PLANS AND ELEVATIONS - BUILDING 22
AE125 ENLARGED PLANS AND ELEVATIONS - BUILDING 22
AE126 ENLARGED PLANS AND ELEVATIONS - BUILDING 22
AE127 ENLARGED PLANS AND ELEVATIONS - BUILDING 22
AE128 ENLARGED PLANS AND ELEVATIONS - BUILDING 22
AE129 ENLARGED PLANS AND ELEVATIONS - BUILDING 22
AC141 BASEMENT RCP - BUILDING 14
AC142 FIRST FLOOR RCP - BUILDING 14
AC143 SECOND FLOOR RCP - BUILDING 14
AE401 INTERIOR ELEVATIONS - BUILDING 14
AE402 INTERIOR ELEVATIONS - BUILDING 14
AE403 INTERIOR ELEVATIONS - BUILDING 14
AE404 INTERIOR ELEVATIONS - BUILDING 14
AE405 INTERIOR ELEVATIONS - BUILDING 14
AE406 INTERIOR ELEVATIONS - BUILDING 22
AE407 INTERIOR ELEVATIONS - BUILDING 22
AE601 BASEMENT ROOM FINISH PLAN - BUILDING 14
AE602 FIRST FLOOR ROOM FINISH PLAN - BUILDING 14
AE603 SECOND FLOOR ROOM FINISH PLAN - BUILDING 14
AE604 FIRST FLOOR ROOM FINISH PLAN - BUILDING 22
AE605 SECOND FLOOR ROOM FINISH PLAN - BUILDING 22
AE610 DOOR SCHEDULE AND DETAILS - BUILDING 14
AE611 DOOR SCHEDULE AND DETAILS - BUILDING 22
AE612 FINISH LEGEND - BUILDING 14
AE613 FINISH LEGEND AND DETAILS - BUILDING 22
AW101 BASEMENT FLOOR SIGNAGE
AW102 FIRST FLOOR SIGNAGE
AW103 SECOND FLOOR SIGNAGE
AW401 WAYFINDING ELEVATIONS AND DETAILS
FIRE PROTECTION
FX101 BASEMENT FIRE SUPPRESSION PLAN - BUILDING 14
FX102 FIRST FLOOR FIRE SUPPRESSION PLAN - BUILDING 14
FX103 SECOND FLOOR FIRE SUPPRESSION PLAN - BUILDING 14
PLUMBING
PD101 BASEMENT PLUMBING DEMOLITION PLAN - BUILDING 14
PD102 FIRST FLOOR PLUMBING DEMOLITION PLAN - BUILDING 14
PD103 SECOND FLOOR PLUMBING DEMOLITION PLAN - BUILDING 14
PD104 FIRST FLOOR PLUMBING DEMOLITION PLAN - BUILDING 22
PD105 SECOND FLOOR PLUMBING DEMOLITION PLAN - BUILDING 22
PL101 BASEMENT PLUMBING NEW WORK PLAN - BUILDING 14
PL102 FIRST FLOOR PLUMBING NEW WORK PLAN - BUILDING 14
PL103 SECOND FLOOR PLUMBING NEW WORK PLAN - BUILDING 14
PL104 FIRST FLOOR PLUMBING NEW WORK PLAN - BUILDING 22
PL105 SECOND FLOOR PLUMBING NEW WORK PLAN - BUILDING 22
ELECTRICAL
E001 LEGEND, ABBREVIATIONS & ELECTRICAL DETAILS
ED101 BASEMENT ELECTRICAL DEMOLITION PLAN - BUILDING 14
ED102 FIRST FLOOR ELECTRICAL DEMOLITION PLAN - BUILDING 14
ED103 SECOND FLOOR ELECTRICAL DEMOLITION PLAN - BUILDING 14
ED104 FIRST FLOOR ELECTRICAL DEMOLITION PLAN - BUILDING 22
ED105 SECOND FLOOR ELECTRICAL DEMOLITION PLAN - BUILDING 22
EE101 BASEMENT ELECTRICAL NEW WORK PLAN - BUILDING 14
EE102 FIRST FLOOR ELECTRICAL NEW WORK PLAN - BUILDING 14
EE103 SECOND FLOOR ELECTRICAL NEW WORK PLAN - BUILDING 14
EE104 BASEMENT ELECTRICAL NEW WORK PLAN - BUILDING 22
EE105 FIRST FLOOR ELECTRICAL NEW WORK PLAN - BUILDING 22
EE106 SECOND FLOOR ELECTRICAL NEW WORK PLAN - BUILDING 22
E500 ELECTRICAL DETAILS
No. Revisions: Date:
BID DOCUMENTS 03/29/2023
APPROVED: DATE:
UPUP
UP
5678910111213
3.1
3.1
3.9
3.9
2.6
2.6
4.9
4.95.96.97.911.112.113.1
14.1
14.1
15.1
15.1
16.5
16.5
6.16.7
8.910.1
15.9
15.9
A
B
C
D
E
F
G
H
CL
N/S
CL
N/S
J
K
L
M
N
O
CL
E/W
CL
E/W
E.8
D.7
C.6
K.9
EX
EX
EX
STORAGE
CORRIDOR
C01
OFFICE
SOILED LINEN
VENDING
OFFICE
OFFICE
WAITING
TRANSFORMER
ROOM
008E
DATA
005A
BREAK ROOM
009A
STORAGE
009B
OFFICE
009C
OFFICE
009D
SOCIAL WORK
OFFICE
009F
OFFICE
009G
CONFERENCE
009H
OFFICE
009I
OFFICE
009J
OFFICE
009K
STAIR
TOILET STAFF
CHASE
010E
MENS TOILET
STORAGE
STORAGE
OFFICE
OFFICE
WOMENS TOILET
CORRIDOR
C03
CORRIDOR
C02
CHASE
015E
CHASE
016E
SHOWER ROOM
016A
STAIR
MECH
S01E
OFFICE
CONFERENCE
OFFICE
OFFICE
H.A.C.
CLOSET
019A
CLOSET
019B
BREAK ROOM
017A
OFFICE
017B
OFFICE
017C
OFFICE
017D
MECH
017E
OFFICE
017F
OFFICE
017G
OFFICE
017H
OFFICE
017I
OFFICE
017J
OFFICE
017K
OFFICE
017L
OFFICE
017M
PCT CLINIC
CORRIDOR
C05
MECH
007I
OFFICE
007A
OFFICE
007B
CONFERENCE
ROOM
007C
OFFICE
007D
OFFICE
007F
OFFICE
007G
OFFICE
007H
ELEV
S3
CORRIDOR
C04
EX
EGRESS FROM FLOOR ABOVE
EX
EGRESS FROM FLOOR ABOVE
HALLWAY TO
BUILDING 3
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
PROJECT LIMITS
NOT IN SCOPE
REMOTE POINT
PATH OF EGRESS
FE FIRE EXTINGUISHER TO REMAIN
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING
CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE
EGRESS.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS
C. SEE SHEET GI001 FOR CODE NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FREDERICK VOLLMERHAUSEN
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
B a tt le C re e k
B n a te .m o u ld s .r v t
/2
/2
:3
:5
P
M
GI001
BASEMENT LIFE SAFETY PLAN -
BUILDING 14 & CODE NOTES
Dept. of Veteran's Affairs
03/29/2023 PQ DB
CORRECT SAFETY DEFICIENCIES
BUILDINGS 14, AND 22
515-21-102
BATTLE CREEK, MICHIGAN
BID DOCUMENTS
BATTLE
CREEK VA
MEDICAL
CENTER
1/8" = 1'-0"
BASEMENT FLOOR PLAN
L I F E S A F E T Y L E G E N D
G E N E R A L N O T E S C O D E N O T E S
2018 NFPA 101 LIFE SAFETY CODE REVIEW
EXISTING FLOORS ARE EXISTING BUSINESS OCCUPANCY (BUILDING 14
BASEMENT) AND HEALTH CARE OCCUPANCY (ALL OTHER FLOORS BOTH
BUILDINGS)- CHAPTER 19 AND 39
CHAPTER 3 - DEFINITIONS
3.3.283.4 PATIENT CARE SLEEPING SUITE (HEALTH CARE OCCUPANCIES)
CHAPTER 6 - CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENT
6.1.11 RENOVATED AREA REVIEWED UNDER BUSINESS (CHAPTER 39)
6.2.2 HAZARD CLASSIFICATION: ORDINARY - NO CHANGE
CHAPTER 7- MEANS OF EGRESS: NO CHANGE
T7.3.1.2 OCCUPANT LOAD OF SPACE:
BUILDING 14 AREA = 16,788 GSF - 112 OCCUPANTS
BUILDING 14 1ST & 2ND AREA = 33,576 GSF - 280 OCCUPANTS
BUILDING 22 AREA = 23,611 GSF - 197 OCCUPANTS
CHAPTER 8 - FEATURES OF FIRE PROTECTION: NO CHANGE
EXISTING BUILDINGS 14 AND 22 ARE SPRINKLERED THROUGHOUT WITH AN
AUTOMATIC SPRINKLER SYSTEM IN COMPLIANCE WITH NFPA 13.
CHAPTER 9 - BUILDING SERVICE AND FIRE PROTECTION EQUIPMENT: NO
CHANGE
CHAPTER 10 - INTERIOR FINISH, CONTENTS, AND FURNISHES
10.2.3.1
INTERIOR WALL AND CEILING FINISH MATERIALS TESTED IN
ACCORDANCE WITH NFPA 286.
10.2.3.1
INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE CLASSIFIED
IN ACCORDANCE WITH NFPA 286 AND COMPLY WITH 10.2.3.2.
10.2.3.1.2
MATERIALS TESTED IN ACCORDANCE WITH 10.2.3.1.1 AND COMPLYING
WITH 10.2.3.2 SHALL BE CONSIDERED ALSO TO COMPLY WITH THE
REQUIREMENTS OF CLASS A, CLASS B, OR CLASS C IN ACCORDANCE
WITH 10.2.3.3
10.2.3.2.
(1) DURING THE 40 KW EXPOSURE, FLAMES SHALL NOT SPREAD TO THE
CEILING.
(2) THE FLAME SHALL NOT SPREAD TO THE OUTER EXTREMITY OF THE
SAMPLE ON ANY WALL OR CEILING.
(3) FLASHOVER, AS DESCRIBED IN NFPA 286, SHALL NOT OCCUR.
(4) THE PEAK HEAT RELEASE RATE THROUGHOUT THE TEST SHALL NOT
EXCEED 800 KW.
(5) FOR NEW INSTALLATIONS, THE TOTAL SMOKE RELEASED THROUGH-
OUT THE TEST SHALL NOT EXCEED 1000 M2.
10.2.3.3
WALL AND CEILING- CLASSIFICATIONS CHARACTERISTICS.
(1) CLASS A: FLAME SPREAD: 0-25; SMOKE DEV. : 0-450.
(2) CLASS B: FLAME SPREAD: 26-75; SMOKE DEV. : 0-450
(3) CLASS C: FLAME SPREAD: 76-200; SMOKE DEV. : 0-450
10.2.7.2
INTERIOR FLOOR- CLASSIFICATIONS CHARACTERISTICS:
(1) CLASS I: RAD FLUX: FIN .45 W/CM2
(2) CLASS II: RAD FLUX: FIN .22 W/CM2, AND MAX. .45 W/CM2
10.2.7.3
INTERIOR FLOOR FINISH- SHALL BE CLASSIFIED BASED ON NFPA 253 OR
ASTM E 648.
10.2.8.1
WALL AND CEILING FINISHES, WHERE SPRINKLED:
CLASS C PERMITTED IN ANY LOCATION WHERE CLASS B IS REQ’D.
CLASS B PERMITTED IN ANY LOCATION WHERE CLASS A IS REQ’D.
10.2.8.2
FLOOR FINISHES, WHERE SPRINKLED:
CLASS II PERMITTED IN ANY LOCATION WHERE CLASS I IS REQ’D.
NO CRITICAL RAD. FLUX PERMITTED IN ANY LOCATION WHERE CLASS II
IS REQ’D
20.3.5.3
AND NFPA 10 SECTION 9.9 FIRE EXTINGUISHERS ARE REQUIRED WITHIN
75’ OF ANY POINT IN THE SPACE.
- MAINTAIN ACCESSIBILITY TO EXISTING FIRE EXTINGUISHERS DURING
CONSTRUCTION
CHAPTER 19 - EXISTING HEALTH CARE OCCUPANCIES:
19.1.1.1.1
THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO EXISTING
BUILDINGS OR PORTIONS THEREOF CURRENTLY OCCUPIED AS HEALTH
CARE OCCUPANCIES, UNLESS THE AUTHORITY HAVING JURISDICTION HAS
DETERMINED EQUIVALENT SAFETY HAS BEEN PROVIDED IN ACCORDANCE
WITH SECTION L.4.
19.2.2.2.2
LOCKS SHALL NOT BE PERMITTED ON PATIENT SLEEPING ROOM DOORS,
UNLESS OTHERWISE PERMITTED BY ONE OF THE FOLLOWING:
(1) KEY-LOCKING DEVICES THAT RESTRICT ACCESS TO THE ROOM FROM
THE CORRIDOR AND THAT ARE OPERABLE ONLY BY STAFF FROM THE
CORRIDOR SIDE SHALL BE PERMITTED, PROVIDED THAT SUCH DEVICES
DO NOT RESTRICT EGRESS FROM THE ROOM.
(2) LOCKS COMPLYING WITH 19.2.2.2.S SHALL BE PERMITTED.
19.2.3.4*
ANY REQUIRED AISLE, CORRIDOR, OR RAMP SHALL BE NOT LESS THAN 42
IN. (1220 MM) IN CLEAR WIDTH WHERE SERVING AS MEANS OF EGRESS
FROM PATIENT SLEEPING ROOMS,
19.2.5.2*
DEAD-END CORRIDORS. EXISTING DEAD-END CORRIDORS NOT EXCEEDING
30 FT (9.1 M) SHALL BE PERMITTED. EXISTING DEAD-END CORRIDORS
EXCEEDING 30 FT (9.1 M) SHALL BE PERMITTED TO CONTINUE IN USE IF IT IS
IMPRACTICAL AND UNFEASIBLE TO ALTER THEM.
19.2.6.2.1
THE TRAVEL DISTANCE BETWEEN ANY POINT IN A ROOM AND AN EXIT
SHALL NOT EXCEED 150 FT (46 M), UNLESS OTHERWISE PERMITTED BY
19.2.6.2.2.
19.2.9.1
EMERGENCY LIGHTING SHALL BE PROVIDED IN ACCORDANCE WITH
SECTION 7.9.
19.3.1
PROTECTION OF VERTICAL OPENINGS. ANY VERTICAL OPENING
SHALL BE ENCLOSED OR PROTECTED IN ACCORDANCE WITH SECTION 8.6,
UNLESS OTHERWISE MODIFIED BY 19.3.1.1 THROUGH 19.3.1.8.
19.3.3.1
GENERAL. INTERIOR FINISH SHALL BE IN ACCORDANCE WITH SECTION 10.2.
19.3.3.2*
INTERIOR WALL AND CEILING FINISH. EXISTING INTERIOR
WALL AND CEILING FINISH MATERIALS COMPLYING WITH SECTION 10.2
SHALL BE PERMITTED TO BE CLASS A OR CLASS B.
19.3.4.1
GENERAL. HEALTH CARE OCCUPANCIES SHALL BE PROVIDED WITH A FIRE
ALARM SYSTEM IN ACCORDANCE WITH SECTION 9.6.
19.3.4.2.1
INITIATION OF THE REQUIRED FIRE ALARM SYSTEMS SHALL BE BY MANUAL
MEANS IN ACCORDANCE WITH 9.6.2 AND BY MEANS OF ANY REQUIRED
SPRINKLER SYSTEM WATERFLOW ALARMS, DETECTION DEVICES,
OR DETECTION SYSTEMS, UNLESS OTHERWISE PERMITTED BY 19.3.4.2.2
THROUGH 19.3.4.2.5.
19.3.5.12
PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN ALL
HEALTH CARE OCCUPANCIES IN ACCORDANCE WITH SECTION 9.9.
No. Revisions: Date:
5678910111213
3.1
3.1
3.9
3.9
2.6
2.6
4.9
4.95.96.97.911.112.113.1
14.1
14.1
15.1
15.1
16.5
16.5
6.16.78.910.1
15.9
15.9
A
B
C
D
E
F
G
H
CL
N/S
CL
N/S
J
K
L
M
N
O
CL
E/W
CL
E/W
E.8
D.7
C.6
K.9
EX
CORRIDOR
C11
TOILET
WAITING
OFFICE
CLEAN LINEN
SOILED LINEN
CMS
1 BED
IT CLOSET
1 BED
1 BED
EXAM
2 BED
3 BED
4 BED
1 BED
LAUNDRY
H.A.C.
SHOWERS
115A
MENS TOILET
CHASE
117E
1 BED
CORRIDOR
C13
1 BED
2 BED
121A
2 BED
121C
BREAKROOM
CONFERENCE
H.A.C.
1 BED
1 BED
MED
RECEPTION
STAIR
S1
CORRIDOR
C12
BEDROOM
CORRIDOR
C15
CORRIDOR
C14
BEDROOM
TOILET
BEDROOM
WOMEN'S LOUNGE
TOILET
ICE MACHINE
STORAGE
OFFICE
OFFICE
OFFICE
H.A.C.
OFFICE
OFFICE
142A
DAY ROOM
142B
OFFICE
142D
LUNDRY
MENS TOILET
CHASE
145E
H.A.C.
SHOWER
OFFICE
148A
CORRIDOR
C17
OFFICE
148B
CONFERENCE
148C
OFFICE
148D
OFFICE
148F
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
MED ROOM
CORRIDOR
C16
STAIR
S2
TOILET
101A
DIRTY LINEN
CHASE
135E
CHASE
143E
SHOWER
147A
TOILET
OFFICE
1 BED
DAY ROOM
121B
PORCH
142C
TOILET
FE
FE
FE
FE
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
PROJECT LIMITS
NOT IN SCOPE
REMOTE POINT
PATH OF EGRESS
FE FIRE EXTINGUISHER TO REMAIN
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING
CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE
EGRESS.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS
C. SEE SHEET GI001 FOR CODE NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FREDERICK VOLLMERHAUSEN
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
B a tt le C re e k
B n a te .m o u ld s .r v t
/2
/2
:3
:0
P
M
GI002
FIRST FLOOR LIFE SAFETY PLAN -
BUILDING 14
Dept. of Veteran's Affairs
03/29/2023 PQ DB
CORRECT SAFETY DEFICIENCIES
BUILDINGS 14, AND 22
515-21-102
BATTLE CREEK, MICHIGAN
BID DOCUMENTS
BATTLE
CREEK VA
MEDICAL
CENTER
1/8" = 1'-0"
FIRST FLOOR PLAN
G E N E R A L N O T E S
L I F E S A F E T Y L E G E N D
5678910111213
3.1
3.1
3.9
3.9
2.6
2.6
4.9
4.95.96.97.911.112.113.1
14.1
14.1
15.1
15.1
16.5
16.5
8.910.1
15.9
15.9
A
B
C
D
E
F
G
H
CL
N/S
CL
N/S
J
K
L
M
N
O
CL
E/W
CL
E/W
E.8
D.7
C.6
K.9
CORRIDOR
C2-1
FAMILY WAITING
OFFICE
LINEN
SOILED LINEN
1 BED
1 BED
ANTEROOM
1 BED
1 BED
QUIET ROOM
2 BED
3 BED
3 BED
1 BED
SHOWER
H.A.C.
CHASE
217E
CORRIDOR
C23
TOILET
3 BEDS
2 BEDS
4 BEDROOM
2 BEDS
3 BEDS
H.A.C.
1 BED
1 BED
MED
RECEPTION
BEDROOM
BEDROOM
WOMENS LOUNGE
WOMEN
STAFF BREAK
TOILET
STORAGE
STORAGE
OFFICE
EXAM
OFFICE
H.A.C.
OFFICE
DAYROOM
CORRIDOR
C26
CORRIDOR
C22
CORRIDOR
C27
PORCH
242A
STAIR
S2-02
CORRIDOR
C28
LAUNDRY
MENS TOILET
CHASE
245E
STORAGE
OFFICE
GROUP ROOM
248A
GROUP ROOM
248C
GROUP ROOM
248B
OFFICE
CORRIDOR
C29
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
254A
STAIR
S1-02
TOILET
CHASE
219E
CHASE
235E
CHASE
243E
VENDING
246A
CORRIDOR
TOILET
207A
FE
FE
FE
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
PROJECT LIMITS
NOT IN SCOPE
REMOTE POINT
PATH OF EGRESS
FE FIRE EXTINGUISHER TO REMAIN
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING
CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE
EGRESS.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS
C. SEE SHEET GI001 FOR CODE NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FREDERICK VOLLMERHAUSEN
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
B a tt le C re e k
B n a te .m o u ld s .r v t
/2
/2
:3
:0
P
M
GI003
SECOND FLOOR LIFE SAFETY
PLAN - BUILIDNG 14
Dept. of Veteran's Affairs
03/29/2023 PQ DB
CORRECT SAFETY DEFICIENCIES
BUILDINGS 14, AND 22
515-21-102
BATTLE CREEK, MICHIGAN
BID DOCUMENTS
BATTLE
CREEK VA
MEDICAL
CENTER
1/8" = 1'-0"
SECOND FLOOR PLAN
G E N E R A L N O T E S
L I F E S A F E T Y L E G E N D
DN
EX
EX
CORRIDOR
C101
STAIRS
NURSE
OFFICE
STAIRS
STAIRS
PATIENT/EDUCATION/
CONFERENCE
ROOM
EXIST ELEV
LOADING
ELEC
STORAGE
TOILET
106A
PORCH
P11
DOMICILARY
MANAGER
OFFICE
PHYSICIAN
OFFICE
CLERICAL
OFFICE
COUNSELOR
OFFICE
COPY/MAIL/SPD
SUPPLIES
ELEC
144E
STAFF
LOUNGE
OFFICE
SOCIAL
WORK
OFFICE
SOCIAL
WORK
OFFICE
SOCIAL
WORK
OFFICE
STAFF
TOILET
STAFF
TOILET
ELEV
MACHINE
RM
PATIENT/EDUCATION/
GROUP
ROOM
VENDING
H.A.C.
SPD
SUPPLY
STORAGE
PATIENT
CLOTHING
WAITING
PRIVATE
ROOM
VESTIBULE
C107
TOILET
100A
STORAGE
NURSE
STATION
EXAM
ROOM
TOILET
125A
SELF MEDS
ELEC
123E
CLOSET
122EQUIPMENT
STORAGE
TOILET
107A
PRIVATE
ROOM
PRIVATE
ROOM
PRIVATE
ROOM
TOILET
105A TOILET
104A
PRIVATE
ROOM
SCHEDULER/
INTERVIEW
OFFICE
CONSULT/
LOUNGE
SEMI-PRIVATE
ROOM
TOILET
103A
TOILET
102A
SEMI-PRIVATE
ROOM
CLOSET
114A
SEMI-PRIVATE
ROOM
PRIVATE
ROOM
TOILET
112A
TOILET
111A
PRIVATE
ROOM
SEMI-PRIVATE
ROOM
TOILET
110A
COMPUTER/
PATIENT
LOUNGE
TOILET
113A
PANTRY
MED ROOM
TOILET
HAC
SOILED
LINEN
CLEAN
LINEN
TOILET
LAUNDRY
CORRIDOR
C102
CORRIDOR
C103
CORRIDOR
C104
ELEV
C24
CORRIDOR
C105
FE
FE
FE FE
FE
FE
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
PROJECT LIMITS
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
FE FIRE EXTINGUISHER TO REMAIN
ELEC
B24
EXISTING
BASEMENT
STORAGE
B22
MECHANICAL
B21
STORAGE
B20
STAIRS
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION.
CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
C. SEE SHEET GI001 FOR CODE NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FREDERICK VOLLMERHAUSEN
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
B a tt le C re e k
B n a te .m o u ld s .r v t
/2
/2
:5
:2
P
M
GI004
FIRST FLOOR LIFE SAFETY PLAN -
BUILIDNG 22
Dept of Veteran's Affairs
03/29/2023 PQ DB
CORRECT SAFETY DEFICIENCIES
BUILDINGS 14, AND 22
515-21-102
BATTLE CREEK, MICHIGAN
BID DOCUMENTS
BATTLE
CREEK VA
MEDICAL
CENTER
1/8" = 1'-0"
FIRST FLOOR PLAN
1/8" = 1'-0"
BASEMENT FLOOR PLAN
L I F E S A F E T Y L E G E N D
G E N E R A L N O T E S
D R A W I N G N O T E S
SEMI-PRIVATE
ROOM
TOILET
207A SEMI-PRIVATE
ROOM
TOILET
208A
PRIVATE
ROOM
TOILET
209A
ELECT
210E
CLEAN
LINEN
STORAGE
SOILED
LINEN
TOILET
214A
BF PRIVATE
ROOM
PATIENT
LOUNGE
TOILET
WOMEN'S
LOUNGE
SEMI-PRIVATE
ROOM
PANTRY
TOILET
205A
STAIRS
S1
PRIVATE
ROOM
TOILET
203A
TOILET
202A
SEMI-PRIVATE
ROOM
TOILET
201A
PRIVATE
ROOM
DATA
MONUMENTAL
STAIRS 3
S3
CORRIDOR
C2-2
C202
CORRIDOR
C20
PRIVATE
ROOM
TOILET
219A
SEMI-PRIVATE
ROOM
TOILET
222A SEMI-PRIVATE
ROOM
222 BF PRIVATE
ROOM
MECH
TOILET
223A
SEMI-PRIVATE
ROOM
H.A.C.
TOILET
224A
STAIRS 2
S2
SEMI-PRIVATE
ROOM
TOILET
227A
TOILET
226A
SEMI-PRIVATE
ROOM
TOILET
228A
BF PRIVATE
ROOM
NURSE
STATION
CORRIDOR
C23
TOILET
220A
OFFICE
ELEVATOR
P-1
P201
ELEC
221E
MECH
201M
EXERCISE
ROOM
FEFE
FE
FE
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
PROJECT LIMITS
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
FE FIRE EXTINGUISHER TO REMAIN
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION.
CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
C. SEE SHEET GI001 FOR CODE NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FREDERICK VOLLMERHAUSEN
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
B a tt le C re e k
B n a te .m o u ld s .r v t
/2
/2
:5
:3
P
M
GI005
SECOND FLOOR LIFE SAFETY
PLAN - BUILDING 22
Dept of Veteran's Affairs
03/29/2023 PQ DB
CORRECT SAFETY DEFICIENCIES
BUILDINGS 14, AND 22
515-21-102
BATTLE CREEK, MICHIGAN
BID DOCUMENTS
BATTLE
CREEK VA
MEDICAL
CENTER
N.T.S.Scale:
SECOND FLOOR PLAN
L I F E S A F E T Y L E G E N D
G E N E R A L N O T E S
F
FF
UPUP
UP
F F
UP
UP
F
UP
PHASE 2B PHASE 2A
PHASE 2B PHASE 2A
PHASE 1
PHASE 1
PHASE 4B PHASE 4A
PHASE 4B
PHASE 3
PHASE 4A PHASE 3
PHASE 6B PHASE 6A
PHASE 6B PHASE 6A
PHASE 5
PHASE 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FREDERICK VOLLMERHAUSEN
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
B a tt le C re e k
B n a te .m o u ld s .r v t
/2
/2
:3
:1
P
M
GI006
PHASING, INTERIM LIFE SAFETY
AND ICRA
Dept. of Veteran's Affairs
03/29/2023 PQ TD
CORRECT SAFETY DEFICIENCIES
BUILDINGS 14, AND 22
515-21-102
BATTLE CREEK, MICHIGAN
BID DOCUMENTS
BATTLE
CREEK VA
MEDICAL
CENTER
N.T.S.Scale:
BASEMENT FLOOR PLAN
N.T.S.Scale:
FIRST FLOOR PLAN
N.T.S.Scale:
SECOND FLOOR PLAN
P H A S E 2 B - B A S E M E N T P H A S E 2 A - B A S E M E N T
P H A S E 4 B - F I R S T F L O O R
P H A S E 4 A - F I R S T F L O O R
P H A S E 6 B - S E C O N D F L O O R
P H A S E 6 A - S E C O N D F L O O R
• 1,300 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 6,700 SQUARE FEET).
• USE EXISTING FIRE RATED WALL AND DOOR AS CONSTRUCTION BARRIER.
• 3 ACTIVE PATHS OF EGRESS.
• ELEVATOR BECOMES ACTIVE.
• 800 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 3,400 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 1 AND 2A.
• 2 ACTIVE PATHS OF EGRESS.
• ELEVATOR ON THIS FLOOR TEMPORARILY DEACTIVATED.
• ALL WORK IN THIS AREA MUST BE COMPLETED ON NIGHTS AND WEEKENDS WITH
DAILY CLEAN-UP TO ALLOW ACCESS BY STAFF AND VETERANS TO THE LOBBY
ELEVATOR.
P H A S E 1 - B A S E M E N T
• 3,000 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 7,000 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 1 AND 2A.
• 3 ACTIVE PATHS OF EGRESS.
• ELEVATOR REMAINS ACTIVE.
• 930 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 6,700 SQUARE FEET).
• USE EXISTING FIRE RATED WALL AND DOOR AS CONSTRUCTION BARRIER.
• 2 ACTIVE PATHS OF EGRESS.
• NURSE STATION AND ELEVATOR BECOME ACTIVE ON THIS FLOOR.
• 1900 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 3,400 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 3 AND 4A.
• 1 ACTIVE PATH OF EGRESS.
• NURSE STATION AND ELEVATOR ON THIS FLOOR TEMPORARILY DEACTIVATED.
• SECOND FLOOR NURSE STATION USED FOR PATIENTS ON THIS FLOOR.
P H A S E 3 - F I R S T F L O O R
• 3370 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 7,000 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 3 AND 4A.
• 2 ACTIVE PATHS OF EGRESS.
• NURSE STATION AND ELEVATOR REMAIN ACTIVE.
• 870 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 6,700 SQUARE FEET).
• USE EXISTING FIRE RATED WALL AND DOOR AS CONSTRUCTION BARRIER.
• 1 ACTIVE PATH OF EGRESS.
• NURSE STATION AND ELEVATOR BECOME ACTIVE ON THIS FLOOR.
• 1680 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 3,400 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 5 AND 6A.
• 1 ACTIVE PATH OF EGRESS.
• NURSE STATION AND ELEVATOR ON THIS FLOOR TEMPORARILY DEACTIVATED.
• FIRST FLOOR NURSE STATION USED FOR PATIENTS ON THIS FLOOR.
• 5030 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 7,000 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 5 AND 6A.
• 2 ACTIVE PATHS OF EGRESS.
• NURSE STATION AND ELEVATOR REMAIN ACTIVE.
P H A S E 5 - S E C O N D F L O O R
P H A S I N G N O T E S
I N T E R I M L I F E S A F E T Y N O T E S
A. BUILDING 14 MUST BE COMPLETED BEFORE BUILDING 22.
B. CONTRACTOR TO DETERMINE PHASING AND PRESENT A PLAN TO THE COR.
C. DURING EACH PHASE OF CONSTRUCTION, THE CONTRACTOR IS GIVEN
HALF OF EACH FLOOR AT A TIME. B14-0 EAST, B14-0 WEST, B14-1 EAST,
B14-1 WEST, B14-2 EAST, B14-2 WEST, B22-1 EAST, B22-1 WEST, B22-2 EAST,
AND B22-2 WEST.
D. THE CONTRACTOR SHALL GIVE THE VA TWO (2) MONTHS' NOTICE BEFORE
THE START OF THE NEXT PHASE OF CONSTRUCTION. VA NEEDS THIS TIME
TO COORDINATE PATIENT MOVES.
E. PHASE "A" AND "B" ARE A PART OF THE SAME PHASE AND ARE TO BE SHUT
DOWN SIMULTANEOUSLY UNTIL THE COMPLETION OF PHASE "A".
F. SECURITY CAMERAS MUST REMAIN ACTIVE DURING EACH PHASE.
G. TEMPORARY CONSTRUCTION BARRIERS MUST BE 1-HOUR FIRE RATED.
H. REMOVE CONSTRUCTION BARRIERS AT THE COMPLETION OF EACH PHASE.
I. NEGATIVE AIR PRESSURE REQUIRED FOR ALL PHASES.
I C R A L E V E L I V N O T E S
A. SEE SHEET GI001 FOR CODE NOTES.
B. NFPA 101 - 19.2.6.2.1 - THE TRAVEL DISTANCE BETWEEN ANY POINT IN A
ROOM AND AN EXIT SHALL NOT EXCEED 150 FT (46 M), UNLESS OTHERWISE
PERMITTED BY 19.2.6.2.2.
C. ALL EGRESS ROUTES MEET THE REQUIRED TRAVEL DISTANCE.
D. NFPA 101 - 4.13.4.2 - BARRIERS IN BUILDINGS PROTECTED THROUGHOUT
WITH APPROVED, AUTOMATIC SPRINKLER SYSTEMS THAT ARE NOT
IMPAIRED IN ACCORDANCE WITH NFPA 25 SHALL BE PERMITTED TO BE
NONCOMBUSTIBLE MATERIAL, LIMITED-COMBUSTIBLE MATERIAL, OR
FABRIC OR PLASTIC FILMS MEETING REQUIREMENTS OF 4.13.1.
E. TURN UP SPRINKLER HEADS DURING CONSTRUCTION WHERE CEILINGS
ARE BEING REPLACED.
F. EGRESS PATHS TO ALL STAIRWAYS SHALL REMAIN ACCESSIBLE AT ALL
TIMES.
G. TEMPORARY SIGNAGE - "CAUTION - CONSTRUCTION AREA - AUTHORIZED
PERSONNEL ONLY - EMERGENCY EXIT ONLY".
1. REFER TO SAFETY REQUIREMENT SPECIFICATION - 01 35 26.
2. REMOVE OR ISOLATE HVAC SYSTEM IN AREA OF WORK.
3. INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY
OUTSIDE OF NORMAL WORK HOURS.
4. MAINTAIN NEGATIVE AIR PRESSURE.
5. INSTALL CONSTRUCTION BARRIERS FLOOR TO CEILING.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
7. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
8. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY THE COR.
9. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND DEBRIS OUTSIDE OF NORMAL
WORKING HOURS.
10. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
11. WET MOP AREA WITH CLEANER/DISINFECTANT.
12. RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
E X E C U T I V E S U M M A R Y
A. REPLACING DOORS AND FRAMES CONNECTED TO THE CORRIDOR.
B. ADDING PACS TO PATIENT ROOMS AND OFFICES.
C. REPLACING FLOORING IN CORRIDORS AND PATIENT ROOMS.
D. REMOVING CORRIDOR WALL ITEMS, PAINTING WALLS, AND REINSTALLING.
E. CEILINGS ARE TO BE REPLACED IN CORRIDORS.
F. SEE ARCHITECTURE DEMOLITION AND NEW WORK FOR MORE DETAILS.
DN
UP
UP
PHASE 2
PHASE 1B
PHASE 1A PHASE 1B
PHASE 1A
PHASE 2 PHASE 1A
NOT A FIRE
RATED STAIR
HOT AND COLD
WATER SHUT OFF
HOT AND COLD
WATER SHUT OFF
PHASE 4 PHASE 3A PHASE 3B
PHASE 4 PHASE 3A PHASE 3B
NOT A FIRE
RATED STAIR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FREDERICK VOLLMERHAUSEN
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
B a tt le C re e k
B n a te .m o u ld s .r v t
/2
/2
:5
:4
P
M
GI007
PHASING, INTERIM LIFE SAFETY
AND ICRA
Dept of Veteran's Affairs
03/29/2023 PQ TD
CORRECT SAFETY DEFICIENCIES
BUILDINGS 14, AND 22
515-21-102
BATTLE CREEK, MICHIGAN
BID DOCUMENTS
BATTLE
CREEK VA
MEDICAL
CENTER
P H A S I N G N O T E S
I N T E R I M L I F E S A F E T Y N O T E S
A. BUILDING 14 MUST BE COMPLETED BEFORE BUILDING 22.
B. CONTRACTOR TO DETERMINE PHASING AND PRESENT A PLAN TO THE COR.
C. DURING EACH PHASE OF CONSTRUCTION, THE CONTRACTOR IS GIVEN
HALF OF EACH FLOOR AT A TIME. B14-0 EAST, B14-0 WEST, B14-1 EAST,
B14-1 WEST, B14-2 EAST, B14-2 WEST, B22-1 EAST, B22-1 WEST, B22-2 EAST,
AND B22-2 WEST.
D. THE CONTRACTOR SHALL GIVE THE VA TWO (2) MONTHS' NOTICE BEFORE
THE START OF THE NEXT PHASE OF CONSTRUCTION. VA NEEDS THIS TIME
TO COORDINATE PATIENT MOVES.
E. PHASE "A" AND "B" ARE APART OF THE SAME PHASE AND ARE TO BE SHUT
DOWN SIMULTANEOUSLY UNTIL THE COMPLETION OF PHASE "A".
F. SECURITY CAMERAS MUST REMAIN ACTIVE DURING EACH PHASE.
G. TEMPORARY CONSTRUCTION BARRIERS MUST BE 1-HOUR FIRE RATED.
H. REMOVE CONSTRUCTION BARRIERS AT THE COMPLETION OF EACH PHASE.
I. NEGATIVE AIR PRESSURE REQUIRED FOR ALL PHASES.
N.T.S.Scale:
FIRST FLOOR PLAN
N.T.S.Scale:
SECOND FLOOR PLAN
P H A S E 1 B
P H A S E 2
P H A S E 3 B
P H A S E 4
• 650 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 3,550 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 1A AND 1B.
• 3 ACTIVE PATHS OF EGRESS.
• ELEVATOR BECOMES ACTIVE.
• 4,850 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 7,100 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 1A AND 2.
• 2 ACTIVE PATHS OF EGRESS.
• ELEVATOR REMAINS ACTIVE.
P H A S E 1 A
• 1,400 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 2,900 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 1A AND 1B.
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 1A AND 2.
• 2 ACTIVE PATHS OF EGRESS.
• ELEVATOR ON THIS FLOOR TEMPORARILY DEACTIVATED.
• 2,550 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 3,050 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 3A AND 3B.
• 1 ACTIVE PATH OF EGRESS.
• NURSE STATION AND ELEVATOR BECOME ACTIVE ON THIS FLOOR.
• 3,000 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 5,000 SQUARE FEET).
• USE EXISTING FIRE RATED WALL AND DOOR AS CONSTRUCTION BARRIER.
• 1 ACTIVE PATH OF EGRESS.
• NURSE STATION AND ELEVATOR REMAIN ACTIVE.
P H A S E 3 A
• 750 SQUARE FEET IN SCOPE (TOTAL FLOOR OCCUPANCY = 1,050 SQUARE FEET).
• TEMPORARY FIRE RATED BARRIER AND DOOR BETWEEN PHASE 3A AND 3B.
• 1 ACTIVE PATH OF EGRESS.
• NURSE STATION AND ELEVATOR ON THIS FLOOR TEMPORARILY DEACTIVATED.
• FIRST FLOOR NURSE STATION USED FOR PATIENTS ON THIS FLOOR.
I C R A L E V E L I I I N O T E S
A. SEE SHEET GI001 FOR CODE NOTES.
B. NFPA 101 - 19.2.6.2.1 - THE TRAVEL DISTANCE BETWEEN ANY POINT IN A
ROOM AND AN EXIT SHALL NOT EXCEED 150 FT (46 M), UNLESS OTHERWISE
PERMITTED BY 19.2.6.2.2.
C. ALL EGRESS ROUTES MEET THE REQUIRED TRAVEL DISTANCE.
D. NFPA 101 - 4.13.4.2 - BARRIERS IN BUILDINGS PROTECTED THROUGHOUT
WITH APPROVED, AUTOMATIC SPRINKLER SYSTEMS THAT ARE NOT
IMPAIRED IN ACCORDANCE WITH NFPA 25 SHALL BE PERMITTED TO BE
NONCOMBUSTIBLE MATERIAL, LIMITED-COMBUSTIBLE MATERIAL, OR
FABRIC OR PLASTIC FILMS MEETING REQUIREMENTS OF 4.13.1.
E. TURN UP SPRINKLER HEADS DURING CONSTRUCTION WHERE CEILINGS
ARE BEING REPLACED.
F. EGRESS PATHS TO ALL STAIRWAYS SHALL REMAIN ACCESSIBLE AT ALL
TIMES.
G. TEMPORARY SIGNAGE - "CAUTION - CONSTRUCTION AREA - AUTHORIZED
PERSONNEL ONLY - EMERGENCY EXIT ONLY".
1. REFER TO SAFETY REQUIREMENT SPECIFICATION - 01 35 26.
2. REMOVE OR ISOLATE HVAC SYSTEM IN AREA OF WORK.
3. INSTALL CONSTRUCTION BARRIERS AND CEILING Protection CAREFULLY
OUTSIDE OF NORMAL WORK HOURS.
4. MAINTAIN NEGATIVE AIR PRESSURE.
5. INSTALL CONSTRUCTION BARRIERS FLOOR TO CEILING.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
7. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
8. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY THE COR.
9. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND DEBRIS OUTSIDE OF NORMAL
WORKING HOURS.
10. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
11. WET MOP AREA WITH CLEANER/DISINFECTANT.
12. RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
E X E C U T I V E S U M M A R Y
A. REPLACING DOORS AND FRAMES CONNECTED TO THE CORRIDOR.
B. ADDING PACS TO PATIENT ROOMS AND OFFICES.
C. REPLACING FLOORING IN CORRIDORS AND PATIENT ROOMS.
D. RENOVATING PATIENT RESTROOMS.
E. REMOVING CORRIDOR WALL ITEMS, PAINTING WALLS, AND REINSTALLING.
F. CEILINGS ARE TO REMAIN.
G. SEE ARCHITECTURE DEMOLITION AND NEW WORK FOR MORE DETAILS.
C1
10'-0"AFF
A101
SIM
A101
SIM
A101
SIM
A101
SIM
A B B R E V I A T I O N S
LEVEL NAME W/ ELEVATION
GRID HEAD
CALL OUT HEAD W/ SHEET NUMBER
ROOM NAME W/ ROOM NUMBER,
AREA & OCCUPANCY
BUILDING SECTION NUMBER W/
SHEET NUMBER
WALL SECTION NUMBER W/
SHEET NUMBER
DOOR NUMBER
WALL TAG
KEYNOTE
REVISION TAG
CEILING TAG WITH HEIGHT
DETAIL SECTION NUMBER W/
SHEET NUMBER
NORTH ARROW
A.D.
A.C.T.
ACOUS.
A/C
A.C.P.
A.B.
AREA DRAIN
ACOUSTICAL CEILING TILE
ACOUSTIC
AIR CONDITIONING
ASPHALT CONCRETE
ANCHOR BOLT
PAVING
POUND OR NUMBER
PROPERTY LINE
FLOOR LINE
ANGLE
DIAMETER
CENTERLINE
AT
AND
BD.
APPROX.
ARCH.
ASPH.
ALT.
AL.
AGG.
BLDG.
BLK.
BLKG.
BM.
BRG.
BRK.
BOT.
BITUM.
CEM.
C.B.
CARP.
CAB.
B.U.R.
BTWN.
CLKG.
CLG.J.
CLG.
C.J.
CIR.
C.I.
CER.T.
CER.
BRZ.
COMB.
COL.
C.O.
CNTR.
CMU
CLS.
CLR.
C.W.
CTR.
CONV.O.
CONT.
CONST.
CONN.
CONC.
COMP.
DF.
D.F.
DIAG.
DIA.
DIM.
DISP.
DET.
DN.
D.O.
DR.
D.S.
D.T.
D.W.
DWR.
DIV.
CLO.
DOUGLAS FIR
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIMENSION
DISPOSAL
DIVISION
DOWN
DOOR OPENING
DOOR
DOWN SPOUT
DRAIN TILE
DISHWASHER
DRAWER
DETAIL
COLD WATER
CENTER
CONVECTION OVEN
CONTINUOUS
CONSTRUCTION
CONNECTION
CONCRETE
COMPOSITION
BENCH MARK or BEAM
BOARD
BITUMINOUS
BUILDING
BLOCK
BLOCKING
APPROXIMATE
ARCHITECT
ASPHALT
CONCRETE MASONRY
COMBINATION
COLUMN
CLEAN OUT
COUNTER
CLOSURE
CLEAR
CLOSET
CAULKING
CEILING JOIST
UNIT
CEILING
BRICK
BEARING
CONSTRUCTION JOINT
CIRCLE
CAST IRON
CERAMIC TILE
CERAMIC
CEMENT
CATCH BASIN
CARPET
CABINET
BUILT-UP ROOFING
BETWEEN
BRONZE
BOTTOM
ALTERNATE
ALUMINUM
AGGREGATE
EA.
E.E.
E.F.
E.J.
ELEC.
ELEV.
E.N.
EXISTING
EACH
EACH END
EXHAUST FAN
EXPANSION JOINT
ELECTRICAL
ELEVATION
EDGE NAIL
(E)
ADJUSTABLEADJ.
LP
LC
LF
Ø
ABOVE FINISH FLOORAFF
CONTRACTOR FURNISH/
OWNER INSTALL
C.F.O.I.
C.F.C.I. CONTRACTOR FURNISH/
CONTRACTOR INSTALL
E.C. ELECTRICAL CONTRACTOR
C.HK. COAT HOOK
C.B.B. CEMENTITIOUS BACKER
BOARD
A.C.M. ASBESTOS CONTAINING
MATERIALS
CW. CURTAINWALL
DWG(S). DRAWING(S)
FACE OF BUILDINGF.O.B.
FIXTURE
FACE OF CONCRETE
FLOOR
FLOOR JOIST
FLOOR LINE
FLASHING
FACE NAIL
GAUGE
FOOTING
FUTURE
FACE OF STUD
FIRE RETARDANT
TREATED WOOD
FACE OF MASONRY
FACE OF FINISH
F.O.S.
F.R.T.W.
FTG.
FUT.
GA.
FIXT.
F.J.
F.L.
FLASH.
FLR.
F.N.
F.O.C.
F.O.F.
F.O.M.
BEAM
GLASS
GLUE LAMINATED
GALVANIZED IRON
GRATE ELEVATION
GRAB BAR
GARBAGE DISPOSAL
GRADE
HOSE BIB
SHEET METAL
GYPSUM BOARD
HANDICAPPED
GALVANIZED
GROUND
HC.
GYP.BD.
H.B.
G.B.
G.D.
G.S.M.
GR.
GND.
GLB.
GL.
G.I.
G.E.
HEIGHT
HOUR
HEATING
HIGH POINT
HORIZONTAL
HOLLOW METAL
HARDWARE
HARDWOOD
INTERIOR
INVERT
HOT WATER
INSULATION
INSIDE DIAMETER
& AIR CONDITIONING
HEATING, VENTILATION
H.W.
INV.
INT.
INSUL.
I.D.
HDWE.
HDWD.
H.V.A.C.
HTG.
HR.
H.P.
HORIZ.
H.M.
HGT.
HDR. HEADER
JOIST
JANITOR
KITCHEN
JOINT
LABORATORY
JOIST HANGER
LAG BOLT
LAVATORY
LAMINATE
J.H.
JAN.
L.B.
LAV.
LAM.
LAB.
KIT.
JT.
JST.
EQUIV.
E.S.
E.W.
EXP.
EXP.B.
EXPO.
EXT.
F.
ENCL.
F.B.
F.BD.
F.BELL
F.B.O.
F.D.
FDN.
F.E.
FH.M.S.
F.HORN
F.F.
F.G.
FGL.
F.H.
F.E.C.
F.A.
FH.W.S.
FIN.
F.H.S.
ENCLOSURE
EQUIVALENT
EACH SIDE
EACH WAY
EXPANSION
EXPANSION BOLT
EXPOSURE
EXTERIOR
FLAT HEAD MACHINE
SCREW
SCREW
FIRE HORN
FIRE HOSE STATION
FLAT HEAD WOOD
FINISH
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FINISH FLOOR
FINISH GRADE
FIBERGLASS
FIRE HYDRANT
CABINET
FIRE ALARM
FACE BRICK
FIREBOARD
FIRE BELL
FURNISHED BY OTHERS
FACE
GALV. GALVANIZED
HOLLOW STRUC. STL.H.S.S.
FLUORESCENTFLOUR.
GENERAL CONTRACTORG.C.
E.W.C. ELECTRIC WATER CLOSET
FIRE VALVE CABINETF.V.C.
FOOD SERVICE EQUIPMENT
CONTRACTOR
F.S.E.C.
H.V.A.C. CONTRACTORH.C.
FIRE SUPPRESSION
CONTRACTOR
F.S.C.
PLASTIC LAMINATEP.LAM.
O.H.W.S.
SCREW
OVAL HEAD WOOD
APPROVAL)
PAPER TOWEL DISPENSER
PAPER TOWEL
PARTITION
DOUGLAS FIR
PRESSURE TREATED
REFLECTED CEILING
RADIUS
RUBBER BASE
QUARRY TILE
POLYVINYL-CHLORIDE
RECEPTACLE
R.C.P.
Q.T.
RAD.
R.B.
P.T.D.
PTN.
P.T.R.
P.V.C.
P.T.D.F.
REDWOOD
REFERENCE
REINFORCING
ROOF HATCH
ROUND HEAD METAL
RESILIENT
REFRIGERATOR
ROOF DRAIN
SCREW
ROOM
RAIN WATER LEADER
ROUGH OPENING
ROUND HEAD WOOD
SCREW
RDWD.
R.H.W.S.
R.W.L.
R.O.
RM.
R.H.M.S.
R.H.
RESIL.
REINF.
REFR.
REF.
R.D.
LIGHT
MATERIAL
LOW POINT
LIVE LOAD
LEFT HAND
MAT.
LT.
L.P.
L.L.
L.H.
MANHOLE
MINIMUM
MEDIUM
MANUFACTURER
MEMBRANE
MECHANICAL
MEDICINE CABINET
MACHINE BOLT
METAL
MASONRY OPENING
METAL THRESHOLD
MISCELLANEOUS
MODULAR
MOISTURE RESISTANT
MIRROR
M.C.
M.B.
MIN.
MH.
MFG.
MEMB.
MED.
MECH.
MIR.
MISC.
M.O.
MOD.
M.R.
M.T.
MTL.
MAX. MAXIMUM
NORTH
NATURAL
OVER
NUMBER
NOMINAL
NOT TO SCALE
NOT IN CONTRACT
OBSCURE
OUTSIDE DIAMETER
STUD
OFFICE
OUTSIDE FACE OF
ON CENTER
OVERFLOW
OVERALL
N.T.S.
O/ O.A.
OBS.
O.C.
O.D.
O.F.
OFF.
O.F.S.
(NOT PART OF OSA
N.
NAT.
N.I.C.
NO.
NOM.
PAINT
PLATE
PERFORATED
FOOT
POUNDS PER CUBIC
PANEL EDGE NAILING
PRESSED METAL
PAIR
FRAME
FOOT
POUNDS PER LINEAR
PLYWOOD
POUNDS PER SQUARE
PROPERTY
PLASTER
P.
P.C.F.
P.E.N.
PERF.
PL.
PLAS.
P.L.F.
PLYWD.
P.M.F.
PR.
P.S.F.
PROP.
OPP. OPPOSITE
POINT
PULL STATION
POUNDS PER SQUARE
INCH
P.STA.
PT.
P.S.I.
FOOT
(N) NEW
PLAN
REQUIREDREQD.
NON-COMBUSTIBLENON/COM
PLUMBING CONTRACTORP.C.
MECHANICAL, ELECTRICAL,
PLUMBING
M.E.P.
FRAMED MIRRORMR.
ROBE HOOKR.HK.
MOP HOLDERMP.H.
MOUNTEDMTD.
PAINTEDPTD.
TONGUE AND GROOVE
DRAWINGS
SOUTH
SEE CIVIL DRAWINGS
STORM DRAIN
SOLID CORE WOOD DOOR
DRAWINGS
SHEET
SIMILAR
SLIDING
SHEATHING
SHOWER
SECTION
SEALANT
SEE ELECTRICAL
SOLID BLOCKING
SOAP DISPENSER
SEE ARCHITECTURAL
S.E.D.
SHR.
SHT.
SIM.
SL.
SHTG.
S.BLKG.
S.A.D.
S.
SECT.
SEAL.
S.DISP.
S.D.
S.C.D.
SCWD
SQUARE
DRAWINGS
SPECIFICATION
SOUNDPROOF
DRAWINGS
STATION
STEEL
STORAGE
STANDARD
SUSPENDED
STRUCTURAL
DRAWINGS
STAINLESS STEEL
SEE MECHANICAL
SANITARY SEWER
SEE STRUCTURAL
SQUARE FOOT (FEET)
THICK
TEMPERED
TELEPHONE
TERRAZZO
TACKBOARD
TOP OF CURB
TRANSOM
TOP OF PLATE
TOP OF WALL
TOILET PAPER DISPENSER
TOE NAIL
TOOL JOINT
TOP OF PAVEMENT
TOP AND BOTTOM
T.O.C.
T.O.P.
T.O.PL.
T.O.W.
T.P.D.
TRN.
S.M.D.
SPEC.
S.P.
SQ.
S.S.D.
S. STL.
STO.
STL.
STD.
STA.
S.S.
SQ. FT.
T.B.
T&B.
TEL.
TEMP.
TER.
T&G.
SUSP.
T.J.
T.N.
THK.
STRUC.
S.L.D. SEE LANDSCAPE
TYPICAL
UNLESS NOTED OTHERWISE
URINAL
UNFINISHED
TELEVISION
VENT TO ROOF
VERTICAL
VESTIBULE
VERIFY IN FIELD
VINYL TILE
VINYL COMPOSITION
TILE
VERTICAL GRAIN
WEST
WITH
WINDOW
WOOD
WATER CLOSET
VINYL WALL COVERING
WITHOUT
WEIGHT
YARD
WATER PROOF
WATER HEATER
WATER COOLER
WELDED WIRE FABRIC
WATER RESISTANT
W/O
W.W.F.
W.P.
W.R.
WT.
YD.
T.V.
TYP.
UNF.
U.N.O.
V.C.T.
VERT.
VEST.
V.G.
V.I.F.
UR.
V.W.C.
W.
W/
W.C.
V.T.R.
W.F.
W.H
WDW.
WD.
V.T.
T.S. TUBE STEEL
SELF ADHERED SHEET
MEMBRANE
S.A.S.M.
SELF ADHERED FLEXIBLE
FLASHING
S.A.F.F.
WITHINW/IN
UNDERSIDEU/S
SANITARY NAPKIN
DISPOSAL
S.N.D.
T.S.C.D. TOILET SEAT COVER
DISPENSER
SANITARY NAPKIN
DISPENSER
S.N.V.
TOP OF SEATT.O.S.
SOUND ATTENUATION
BATT
S.A.B.
Name
Elevation
Room name
150 SF
S Y M B O L S
V.A. FURNISHED / CONTRACTOR
INSTALLED
(VC)
V.A. FURNISHED AND INSTALLED(VV)
SOLID WOOD DOORS.W.D.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FREDERICK VOLLMERHAUSEN
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
B a tt le C re e k
B n a te .m o u ld s .r v t
/2
/2
:5
:4
P
M
GI100
GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
Dept of Veteran's Affairs
03/29/2023 PQ DB
CORRECT SAFETY DEFICIENCIES
BUILDINGS 14, AND 22
515-21-102
BATTLE CREEK, MICHIGAN
BID DOCUMENTS
14 & 22
BATTLE
CREEK VA
MEDICAL
CENTER
G E N E R A L N O T E S
A. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND
FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.
B. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE
MINIMUM QUALITY OF WORK EXPECTED. MORE STRINGENT REQUIREMENTS
STIPULATED WITHIN RELEVANT MANUFACTURER’S INSTALLATION INSTRUCTIONS WILL
SUPERSEDE.
C. DRAWINGS & SPECIFICATIONS ARE COMPLIMENTARY COMPONENTS OF THE CONTRACT
DOCUMENTS. REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE COMPLETE SCOPE
OF WORK. NOTIFY ARCHITECT AND COR IMMEDIATELY FOR CLARIFICATION IF
INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS ARE DISCOVERED
D. DO NOT SCALE DRAWINGS, IF DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND,
NOTIFY ARCHITECT IMMEDIATELY FOR CLARIFICATION
E. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE C.O.R.
PRIOR TO PROCEEDING WITH WORK. CONTRACTOR SHALL SUBMIT AN RFI FOR ANY
DISCREPANCIES.
F. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER
THE APPLICABLE PROVISIONS OF THESE DOCUMENTS AND THE MANUFACTURER’S
INSTRUCTIONS.
G. ALL MATERIALS USED SHALL BE NEW UNLESS OTHERWISE NOTED AND/OR OF A
QUALITY TO MEET OR EXCEED ALL APPLICABLE INDUSTRY STANDARDS. WHERE
SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT NOTED, THE CONTRACTOR IS
REQUIRED TO NOTIFY THE COR TO OBTAIN A MINIMUM STANDARD OF QUALITY.
H. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR
CONSTRUCTION.
I. THE CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED
TO THE ADHERENCE TO OSHA REGULATIONS.
J. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL
LICENSED IN THE STATE WHERE THIS PROJECT IS LOCATED.
K. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING
THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS TO
CONTACT THE OWNER IMMEDIATELY PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
L. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO
TRUCKS OR INTO DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT
BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW
PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS.
COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE
PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION SITE.
M. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER TRADES, INCLUDING AT ALL
LIGHT FIXTURES, WIRING, PLUMBING FIXTURES, AND FINISHES.
N. EXACT SIZE AND LOCATION OF ALL FLOOR OPENINGS SHOWN ON ARCHITECTURAL
DRAWINGS SHALL BE VERIFIED WITH THE ASSOCIATED SUB-CONTRACTORS PRIOR TO
CONSTRUCTION. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND CAULK.
O. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE
FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION,
PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY
ACCOMMODATE THE NEW MATERIALS.
P. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
Q. ALL NEW DOOR OPENINGS SHALL BE 4" FROM A PERPENDICULAR PARTITION TO
OUTSIDE FACE OF FRAME, UNLESS NOTED OR DETAILED OTHERWISE.
R. ALL PARTITIONS, INCL. STUDS, BOARD, SOUND ATTENUATION BLANKETS, ETC. TO
EXTEND FROM TOP OF FLOOR SLAB TO UNDERSIDE OF CONCRETE SLAB ABOVE UNLESS
OTHERWISE NOTED.
S. CONTRACTOR IS TO CLOSE OFF ANY VOIDS LEFT AS A RESULT OF ANY REMOVALS AND
NEW CONSTRUCTION, AS WELL AS INFILL ANY EXISTING VOIDS IN NEWLY DESIGNATED
FIRE RATED PARTITIONS. ALL PATCHES SHALL MATCH AND ALIGN WITH SURROUNDING
MATERIALS AND SHALL BE IN ACCORDANCE WITH NFPA CODE. CONTRACTOR SHALL
SEAL PARTITION WALLS AROUND ALL M.E.P. PENETRATIONS OR OPENINGS, RESULTING
FROM M.E.P. INSTALLATIONS INCLUDING BUT NOT LIMITED TO THE SLAB, ABOVE AND
BELOW CEILINGS.
T. ALL NEW MASONRY WORK INCLUDING NEW PARTITIONS, INFILL AND PATCHING; MATCH
EXISTING COURSING AND TOOTH IN WITH EXISTING ADJACENT CONSTRUCTION.
U. NO EXISTING FIREPROOFING IS TO BE REMOVED FROM EXISTING BUILDING STRUCTURE
FOR ANY NEW INSTALLATION FOR ANY REASON.
V. ALL INTERIOR PARTITIONS ARE TO BE CONSTRUCTED FROM FLOOR TO DECK, AND ALL
PENETRATIONS SEALED. THIS INCLUDES SEALING ABOUT PIPE/DUCT/CONDUIT
PENETRATIONS. THE METHOD OF SEALING THE PENETRATIONS SHALL BE CONSISTENT
WITH THE RATING – IF ANY – OF THE WALL.
W. LABEL ALL RATED PARTITIONS (FIRE & SMOKE) ABOVE THE CEILING, ON BOTH SIDES OF
THE WALL.
X. USE 5/8" TYPE X GYPSUM WALLBOARD AT ALL FIRE-RATED PARTITIONS, ANCHOR W/
SCREWS AT 8" OC ON EDGES AT 12" OC IN FIELD PER UL DESIGN NUMBERS LISTED.
Y. FOR LOCATIONS OF EXISTING AND NEW FIRE-RATED PARTITIONS, SEE LIFE SAFETY
PLANS.
Z. COMPLAINTS BY PATIENTS OR EMPLOYEES SHALL BE DIRECTED TO THE COR AND
FACILITY SAFETY OFFICE. THE SAFETY OFFICE SHALL INVESTIGATE THE COMPLAINTS
AND MAKE RECOMMENDATIONS TO THE CONTRACTING OFFICER REPRESENTATIVE ON
HOW TO PROCEED.
AA. CONTRACTOR SHALL MAKE PROVISIONS TO ENSURE CONSTRUCTION NOISE DOES NOT
EXCEED THE OSHA THRESHOLD IN AREAS ADJACENT TO CONSTRUCTION AS WELL AS
TO ALLOW THE FACILITY TO OPERATE DURING CONSTRUCTION. ACTIONS THAT THE
CONTRACTOR SHALL TAKE TO MINIMIZE IMPACT INCLUDE:
1. NOTIFYING THE COR TWO DAYS PRIOR TO TIME OF HIGH NOISE PRODUCING
ACTIVITIES WHICH ARE TO BE COMPLETED BETWEEN THE HOURS OF 5:00 PM
AND 6:00 AM.
2. SCHEDULING HIGH NOISE ACTIVITIES DURING TIMES OF MINIMAL IMPACT.
BB. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE
TAKEN TO FINISH FACE OF CONSTRUCTION.
CC. LAYOUT AND VERIFY ALL PARTITION LOCATIONS PRIOR TO CONSTRUCTION FOR
CLEARANCES AND DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.
DD. WITHIN ALL METAL STUD PARTITIONS, THE GENERAL CONTRACTOR SHALL TO PROVIDE
BLOCKING FOR ALL WALL MOUNTED EQUIPMENT AND ACCESSORIES INCLUDING BUT
NOT LIMITED TO: MECHANICAL, ELECTRICAL AND PLUMBING DEVICES, FURNITURE,
CASEWORK, MILLWORK AND ALL OTHER WALL MOUNTED ACCESSORIES AND ITEMS.
SEE TYPICAL BLOCKING DETAILS IN METAL STUD WALLS INCLUDED IN THESE
DOCUMENTS FOR BLOCKING AND ANCHORING REQUIREMENTS.
EE. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN
ACCORDANCE WITH THE SPECIFICATIONS.
1. PROVIDE CONTROL JOINTS IN GYPSUM WALLBOARD INTERIOR PARTITIONS AT 30 FEET
ON CENTER MAXIMUM. WHERE POSSIBLE, LOCATE AT CORNERS ABOVE OPENINGS.
VERIFY LOCATIONS WITH ARCHITECT. SEE THE ASSOCIATED TYPICAL DETAILS
INCLUDED IN THESE DOCUMENTS.
2. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT
INSTALLATION AND VERIFYING ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN
DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, OWNER AND ARCHITECT PRIOR
TO CONSTRUCTION.
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR HOSTING THE SUBMITTAL
EXCHANGE FOR THE DURATION OF THE PROJECT.
4. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR
WORK WITHIN THE EXISTING FACILITY.
5. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD
CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL
BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND
COR.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING
ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
7. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL
CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE
RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.
9. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
10. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE
C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED
AREAS.
11. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R.
FOR THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE
DONE WITHOUT THE WRITTEN APPROVAL OF THE C.O.R. THE C.O.R., NO LESS THAN 10
WORKING DAYS PRIOR TO THE REQUIRED OUTAGE, RESERVES THE RIGHT TO
DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE PERMITTED AT
ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES. IF WORK ACTIVITY WILL
GENERATE NOISE OVER 85 DECIBELS OR IF THE WORK SCHEDULED IS LIKELY TO
PRODUCE VIBRATIONS THROUGHOUT THE BUILDING STRUCTURE, THEN THE
CONTRACTOR SHALL WORK WITH THE COR TO SCHEDULE THE MOST APPROPRIATE
TIME TO PERFORM THE DISRUPTIVE WORK ACTIVITY.
12. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT
DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM.
COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES
WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL
RECEIVING THE C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE
TEMPORARY SERVICES AND/OR UTILITIES DURING INTERRUPTIONS AS REQUIRED AND
APPROVED BY THE C.O.R.
13. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT
DAMAGE TO THE V.A.'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR
OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE
REQUIRED. IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND
FROM THE RESULTS OF ALL CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO
DUST AND WATER.
14. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R.
BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE GENERAL
CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE
MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS
OF THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO
HOT WORK.
15. PROVIDE FIRE PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE
GOVERNING AUTHORITY.
16. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE
PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF
PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH
DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING MUST BE CONTINUOUS AND
UNOBSTRUCTED.
17. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL
INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.
18. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE
ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK
SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.
19. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS
REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL,
PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE
INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE
WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL,
ELECTRICAL AND PLUMBING.
20. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT,
WIRES, ANGLES, ETC. SHALL BE REMOVED. SEE DEMOLITION DRAWINGS FOR
ADDITIONAL INFORMATION. EXISTING LIGHTS MAY BE MAINTAINED AS TEMPORARY
CONSTRUCTION LIGHTING.
21. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT
DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN
THE FINAL CONSTRUCTION.
22. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF
REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW
MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN
FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING.
THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING
FINISH.
23. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE
FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION,
PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY
ACCOMMODATE THE NEW MATERIALS.
24. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE
NEW WORK. DETERMINE THE SIZE AND LOCATION OF PENETRATIONS FROM THE
EXISTING UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND
CAULK.
25. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY
CLOSED AND FIRE SAFE'D TO ACHIEVE THE PROPER FIRE RATING BY THE END OF
CONSTRUCTION OPERATIONS FOR EACH DAY.
26. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK
MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO THAT CRITICAL
STRUCTURAL MEMBERS ARE NOT DAMAGED.
27. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.
P H A S I N G N O T E S
A. BUILDING 14 MUST BE COMPLETED BEFORE BUILDING 22.
B. DURING EACH PHASE OF CONSTRUCTION, THE CONTRACTOR IS GIVEN HALF OF EACH FLOOR AT A TIME.