S02 DRAWINGS 1.pdf

PDF 14 MB Posted

Attached to
Y1DA--630A4-18-415 INSTALL GENERATOR FOR BUILDINGS 85 AND 86
Solicitation number
36C24221B0061
Issued by

About this file

This document outlines requirements for a federal construction contract opportunity with the Department of Veterans Affairs. The scope of work involves replacing condenser water piping from the chiller plant to cooling towers located on the roof of Building 4 at the VA Brooklyn Medical Center. Key requirements include performing all work according to drawings, specifications and statements of work provided; complying with federal, state and local codes; submitting schedule, bond and insurance documentation within 10 days of award; completing the project within 260 days of notice to proceed; coordinating any utility interruptions at least 3 weeks in advance; using appropriate containment equipment for above-ceiling work; and following safety, environmental and hazardous materials protocols.

View the file

Other files

File Type Posted
S02 SPECS 5.pdf PDF
S02 SPECS 1.pdf PDF
S02 DRAWINGS 5.pdf PDF
S02 DRAWINGS 4.pdf PDF
S02 DRAWINGS 3.pdf PDF
S02 SPECS 3.pdf PDF
S02 SPECS 4.pdf PDF
S02 SPECS 2.pdf PDF
S02 ALL POSTERS.pdf PDF
S02 ADDITIONAL INSERTS.pdf PDF
S02 SPECS 6.pdf PDF
S02 Participation Goals for Minorities and Females.pdf PDF
S02 DRAWINGS 2.pdf PDF
36C24221B0061.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DocuSign Envelope ID: 321439A2-342D-493C-8C93-31C9F6F982A6

2/22/2021

AutoCAD SHX Text CIVIL ENGINEER: Brett Basquin, PE 2128 Moores Mill Road Suite C Auburn, AL 36830 (O) 334.887.6064 ext. 302 (F) 334.887.6024 BRETT BASQUIN, SOLE PROPRIETOR

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST

FROM CONSTRUCTION OPERATIONS.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR

VISUAL INSPECTIONS.

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

C

LASS I

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST

FROM DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE

WORK IS BEING PERFORMED.

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

3. WIPE WORK SURFACES WITH DISINFECTANT, WET MOP

AND/OR VACUUM WITH HEPA VACUUM BEFORE LEAVING

WORK AREA.

4. REMOVE ISOLATION OF HVAC.

IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS

DEPENDING UPON THE AREA CLASS DESIGNATION

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK

IS BEING DONE TO PREVENT CONTAMINATION OF DUCT

SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK,

PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA

OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO WORK SITE WITH

HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

5. CARTS. COVER TRANSPORT RECEPTACLES OR TAPE

COVERING UNLESS SOLID LID.

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED By THE ENVIRONMENTAL

HEALTH AND SAFETY AND INFECTION CONTROL AND

THOROUGHLY CLEANED BY ENVIRONMENTAL SANITATION

SECTION.

1. OBTAIN INFECTION CONTROL PERMIT BEFORE

CONSTRUCTION BEGINS.

2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING

DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL

CUBE METHOD BEFORE CONSTRUCTION BEGINS.

4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

5. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES

APPROPRIATELY.

6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO

PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED

USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK

SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS

THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK

SITE.

7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO

WEAR SHOE COVERS.

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS THOROUGHLY CLEANED BY

ENVIRONMENTAL MANAGEMENT.

2. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

3. WET MOP AREA WITH DISINFECTANT.

4. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

6. CARTS. COVER TRANSPORT RECEPTACLES OR TAPE

COVERING.

7. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE

WORK IS BEING PERFORMED.

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

C

LASS II

C

LASS III

C

LASS IV

Infection Control Risk Mitigation Recommendations Matrix of Precautions for Construction and Renovation

Type of Construction / Project Activity Table TYPE A Inspection and Non-Invasive Activities

Includes, but is not limited to:

• Removal of ceiling tiles for visual inspection limited to 20 Ln Ft tile per 160 sq. ft. space.

• Painting (but not sanding).

• Wall covering, electrical trim work, minor plumbing, and activities which do not generate dust require cutting of walls or access to ceilings other than for visual inspection.

• Patching walls - not exceeding 8 sq. ft.

TYPE B Small scale, short duration activities which create minimal dust.

Includes, but is not limited to:

• Installation of telephone and computer cabling.

• Access to chase spaces.

• Cutting of walls or ceiling where dust migration can be controlled.

• Patching walls - exceeding 8 sq. ft.

TYPE C Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components and assemblies or new construction.

Includes, but is not limited to:

• Sanding of walls for painting or wall covering exceeding 32 sq. ft., or vacant areas.

• Removal of floor coverings, ceiling tiles and casework.

• New wall construction

• Uncontained duct, HVAC or electrical work above ceilings.

• Major cabling activities.

• Any other project where high levels of dust are generated.

TYPE D Major demolition and construction projects

Includes, but is not limited to:

• Activities that require consecutive work shifts

• Requires heavy demolition or removal of a complete cabling system.

• New Construction.

PATIENT RISK GROUP TABLE

GROUP 1

LOW RISK

GROUP 2

MEDIUM RISK

GROUP 3

HIGH RISK

GROUP 4

HIGHEST RISK

- ADMINISTRATIVE OFFICES

- PUBLIC CORRIDORS

- ELEVATORS

- DAY ROOMS

- CANTEEN RETAIL STORE

- VACANT WARDS OR

VACANT ICU'S ETC.

- OUTPATIENT, URGENT CARE

& PRIMARY CARE CLINICS

- LABORATORY

- CARDIOLOGY

- ECHOCARDIOGRAPHY

- ENDOSCOPY

- FOOD SERVICES

- INTERIM CARE & MEDICAL

UNITS

- NUCLEAR MEDICINE

- PHARMACY

- PHYSICAL THERAPY

- RADIOLOGY & NUCLEAR

MEDICINE

- RESPIRATORY THERAPY

- CCU

- EMERGENCY ROOM

- LABORATORY

- OUTPATIENT SURGERY

- PHARMACY

- POST ANESTHESIA CARE

UNIT

- SURGICAL UNITS

- ANY AREA CARING FOR

IMMUNICOMPROMISED

PATIENTS

- SPD STORAGE /

STERILIZATION

- INTENSIVE CARE UNITS

- TB NEGATIVE PRESSURE

ISOLATION ROOMS

-OPERATING ROOM

INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS:

CONSTRUCTION PROJECT BY PATIENT RISK

PATIENT RISK GROUP

LOW RISK GROUP 1

MEDIUM RISK GROUP 2

HIGH RISK GROUP 3

HIGHEST RISK GROUP 4

TYPE A TYPE B TYPE C TYPE D

I

I

I

II

II

II

II

III/IV

II

II

III/IV

III/IV

III/IV

IV

IV

IV

CONSTRUCTION PROJECT TYPE

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL

INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

A. PROVIDE CONTAINMENT AS REQUIRED (BY HOSPITAL) INFECTION CONTROL REPRESENTATIVE FOR WORK

OUTSIDE MAJOR AREA.

B. RISK GROUP, CONSTRUCTION TYPE & CLASS DESIGNATION IS INDICATED VIA DASHED BOX FOUND ON CHARTS

PROVIDED THIS SHEET.

ICRA / PHASING GENERAL NOTES

1. CONTRACTOR TO PROVIDE A PLASTIC DUST PARTITION IN FRONT OF EXISTING DOOR.

2. EXISTING CONCRETE CURB

3. EXISTING GENERATOR

4. EXISTING TRANSFORMER

5. EXISTING HOUSEKEEPING PAD

6. PROTECT EXISTING ELECTRICAL WALL PANELS WITH PLASTIC BARRIER.

7. PLASTIC ENCLOSURE OVER EXISTING EQUIPMENT - SEE DETAIL 2/G-002.

ICRA / PHASING KEYNOTES#

4. WET MOP AREA WITH DISINFECTANT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK

IS BEING PERFORMED.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

101A

101B

ELECTRICAL

ROOM

MECHANICAL

ROOM

FEC

101C

FEC

F.F.

EX

IS

TIN

G

CE

ILI

NG

H

EI

GH

T NON RATED PLASTIC BARRIER ENCLOSURE

BASIS OF DESIGN: ZIP WALL OR EQUAL

INSTALL INTERIOR SUPPORT AS

NECESSARY

EXISTING CEILING

PLASTIC CEILING TO BE AS LOW AS

POSSIBLE TO COVER EQUIPMENT

PROVIDE ONE ZIPPER ACCESS

MINIMUM PER ENCLOSURE

COORDINATE WITH VA STAFF

FOR LOCATION

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects FEBRUARY 19, 2021

INSTALL GENERATOR FOR

BUILDINGS 85, 86 AND 87 (SA)

630A4-18-415

VA NEW YORK HARBOR HEALTHCARE

SYSTEM, ST. ALBANS CAMPUS

179-00 LINDEN BLVD,

JAMAICA, NY 1134-1468

19-227

BID DOCUMENTS

FULLY SPRINKLERED

20-1-SA

2/

/2

5:

:5

PM

B85, B86, B87

G-002

NPM, DGCWVS

INFECTION CONTROL RISK

ASSESSMENT (ICRA)

2 2

1 ICRA PLAN

SCALE: 1/4" = 1'-0"

2 PLASTIC ENCLOSURE ELEVATION

SCALE: 1/2" = 1'-0"

1. DEMOLISH EXISTING 2 COURSE HIGH 8" W CMU CURB. SEE

DETAIL 5/A1-01 THIS SHEET.

2. DEMOLISH EXISTING 2" HIGH CONCRETE HOUSEKEEPING

PAD.

3. FOR EXISTING ELECTRICAL EQUIPMENT TO REMAIN PROVIDE

PLASTIC ENCLOSURES/TENTING TO PROTECT ELECTRICAL

EQUIPMENT DURING DEMOLITION PHASE - SEE ELECTRICAL

DRAWINGS.

CONTRACTOR TO VERIFY ANY ADDITIONAL EQUIPMENT TO

BE PROTECTED.

4. EXISTING DOOR TO REMAIN

5. EXISTING LOUVER TO REMAIN

6. REMOVE EXISTING ROOFING INSULATION DOWN TO EXISTING

METAL DECK. REMOVE EXISTING ROOF EDGE AND ALL

ASSOCIATED NAILERS.

7. REMOVE EXHAUST FAN AND CURB, PATCH HOLE IN METAL

DECK WITH NEW METAL DECK PATCH.

8. REMOVE EXISTING VENT STACK, PATCH HOLE IN METAL

DECK WITH NEW METAL DECK PATCH.

9. REMOVE EXISTING ROOF DRAIN.

10. PROVIDE PLASTIC ZIPPER BARRIER AT DOOR OPENING

DURING DEMOLITION PHASE.

11. ELECTRICAL ROOM 101, MECHANICAL ROOM 102 CONTAINS

HAZARDOUS MATERIALS SEE SPECIFICATIONS 02 83 13.13

LEAD-PAINT REMOVAL. VETERANS ADMINISTRATION REPORT

"ASBESTOS AND LEAD PAINT REPORT SURVEY US DEPT OF

VETERANS AFFAIRS INSTALL GENERATOR FOR BLDG 85, 86,

AND 87 PROJECT" JUNE 2020

X SHEET KEY NOTES

ICRA

DocuSign Envelope ID: 321439A2-342D-493C-8C93-31C9F6F982A6

2/22/2021

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text CIVIL ENGINEER: Brett Basquin, PE 2128 Moores Mill Road Suite C Auburn, AL 36830 (O) 334.887.6064 ext. 302 (F) 334.887.6024 BRETT BASQUIN, SOLE PROPRIETOR

19-227 G-001 BID
Sheets and Views
G-001-G-001

19-227 G-002 BID

2021-02-22T13:58:00-0800
Digitally verifiable PDF exported from www.docusign.com