S02. Calculation of Self-Performed and Sub-Contracted Work.pdf
PDF 74 KB Posted
- Attached to
- Y1DA--RENOVATE & RECONFIGURE CLINICAL SERVICES
- Solicitation number
- 36C25021B0004_1
About this file
This document provides details for a federal contract solicitation to renovate clinical services spaces at the Louis Stokes Cleveland VA Medical Center. The solicitation seeks bids to renovate existing spaces within the first floor of the main building for Blood Draw, Pre-Op, EEG, and CWT areas. The project magnitude is between $1,000,000 to $5,000,000 according to the NAICS code 236220 for general building construction with a business size standard of $39.5 million. The solicitation is a 100% set-aside for a Service-Disabled Veteran Owned Small Business. Bids are due by April 28, 2021 and must be submitted through the SF1442 form. The place of performance is the VA Medical Center in Cleveland, Ohio.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for NAICS codes
238210 & 238220) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
Specification Division SDVOB Vendor (Y or
N)
Personnel Cost Material/Equipment Costs
Division 01 $ $
Division 02 $ $
Division 03 $ $
(Add additional lines as necessary for each
Division applicable to this project)
Sub Total (Personnel Costs, Material/Equipment Costs)
Profit $
Home Office Overhead $
Bond $
Grand Total $
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $_________________
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’: $__________________
4. Self-performed work = Line 3/Line 1 x 100 = __________%
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project
(includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.
(signature) Date
(Typed Name of Authorized Representative)
(Title of Authorized Representative)