S02. BID ISSUE SUBMISSION - DRAWINGS.pdf

PDF 37 MB Posted

Attached to
Y1DA--PROJECT 541-CSI-130 - PROVIDE SITE PREP FOR NUCLEAR MEDICINE BC-474
Solicitation number
36C25021B0032_1
Issued by

About this file

This document outlines a federal contract opportunity for site preparation work. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is soliciting bids to renovate and reconfigure spaces at the Louis Stokes Cleveland VA Medical Center to accommodate a new nuclear medicine SPECT/CT scanner. The project scope includes renovating and reconfiguring clinical services areas, with new mechanical, electrical, and plumbing work. The project value is between $500,000 and $1,000,000. Bids are due by May 20, 2021 and the NAICS code for this project is 236220. This opportunity is set aside for a Service-Disabled Veteran-Owned Small Business. All bidders must be verified in VETBIZ and registered in SAM to be eligible for award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL/PLUMBING

ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

C U s e rs

\r ic h \D o c u m e n ts

\V A

S P

E C

T C

T ri c h

Q X

K S

.r v t

/2

/2

:0

:2

P

M

BID ISSUE SUBMISSION

GI-1

TITLE SHEET & DRAWING INDEX PROVIDE SITE PREP FOR SPECT

CT ROOM BC-474

10701 EAST BLVD. CLEVELAND, OH

541-CSI-130

4.23.21 CJK JAW

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

PROVIDE SITE PREP FOR SPECT CT ROOM BC-474

10701 EAST BLVD. CLEVELAND, OH 44106

PROJECT NO. 541-CSI-130

Cleveland Veterans Affairs Medical Center

CODE INFORMATION:

I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER

10701 EAST BLVD.

CLEVELAND, OHIO

II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING

A. NATURE OF PROJECT: INTERIOR RENOVATIONS OF EXISTING BASEMENT LEVEL NUCLEAR

MEDICINE DEPARTMENT TO INSTALL A NEW SPECT CT SCANNER

B. DESIGN CODES: 2018 NFPA LIFE SAFETY CODE 101, IBC 2018

C. USE GROUP: I-2 HEALTH CARE - NO CHANGE PROPOSED

D. CONSTRUCTION TYPE: TYPE I-332, IB - NON-COMBUSTIBLE, PROTECTED

FIRE RATED CONSTRUCTION (LSC A.8.2.1.1)

EXTERIOR BEARING WALLS 3 HRS

INTERIOR BEARING WALLS 3 HRS

STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)

2 HRS (SUPPORTING 1 FLOOR ONLY)

2 HRS (SUPPORTING ROOF ONLY)

BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING

WALLS)

FLOOR-CEILING ASSEMBLIES 2 HRS

ROOF-CEILING ASSEMBLIES 1-1/2 HRS

INTERIOR NON-BEARING WALLS 0 HRS

EXTERIOR NON-BEARING WALLS 0 HRS

WALL ASSEMBLIES

EXIT ACCESS CORRIDOR WALLS 0 HR SMOKE PARTITIONS

E. PROJECT AREA: BASEMENT LEVEL: 1,160 SF

FIRST FLOOR: 9 SF

TOTAL: 1,169 SF

F. PROJECT AREA OCCUPANT LOAD: BASEMENT LEVEL: 12

G. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS

REQUIRED PER NEW IMPROVEMENTS PROPOSED

DRAWING INDEX:

BID ISSUE SUBMISSION

4.23.21

GI-1 TITLE SHEET & DRAWING INDEX

ARCHITECTURAL

LS-0.1A PHASE I BASEMENT LEVEL LIFE SAFETY PLAN

LS-0.1B PHASE II BASEMENT LEVEL LIFE SAFETY PLAN

AS-X-0.1 BASEMENT LEVEL - EXISTING CONDITIONS PLAN

AS-XC-0.1 BASEMENT LEVEL - EXISTING CEILING PLAN

AS-D-0.1A BASEMENT LEVEL - PHASE I DEMOLITION PLAN

AS-D-0.1B BASEMENT LEVEL - PHASE II DEMOLITION PLAN

AS-DC-0.1A BASEMENT LEVEL - PHASE I CEILING DEMOLITION PLAN

AS-DC-0.1B BASEMENT LEVEL - PHASE II CEILING DEMOLITION PLAN

AS-0.1A BASEMENT LEVEL - PHASE I PROPOSED IMPROVEMENT PLAN

AS-0.1B BASEMENT LEVEL - PHASE II PROPOSED IMPROVEMENT PLAN

AS-1.0 FIRST AND SECOND FLOOR EXHAUST SHAFT/DUCT ROUTING PLANS

AS-C-0.1A BASEMENT LEVEL - PHASE I REFLECTED CEILING PLAN

AS-C-0.1B BASEMENT LEVEL - PHASE II REFLECTED CEILING PLAN

AS-300 ENLARGED PLANS AND INTERIOR ELEVATIONS

AS-600 WALL TYPES, DOOR SCHEDULE, AND MILLWORK DETAILS

AS-700 FINISH PLAN AND SCHEDULE

MECHANICAL/HVAC

M-001 LEGEND AND INDEX OF DRAWINGS

MD-10B PARTIAL BASEMENT FLOOR PLAN - DEMO

MH-10B PARTIAL SUB-BASEMENT AND BASEMENT PLANS - HVAC

MH-101 PARTIAL FIRST FLOOR AND SECOND FLOOR - NEW

M-501 DETAILS

M-502 DETAILS

M-601 SCHEDULES

M-901 CONTROLS

M-902 CONTROLS

TECHNOLOGY

T-001 TECHNOLOGY LEGEND

T-D-0.1 DEMOLITION PLAN - TECHNOLOGY

T-T-0.1 NEW WORK PLAN - TECHNOLOGY

T-500 TECHNOLOGY DETAILS

T-501 SECURITY DETAILS

T-700 ENLARGED SIGNALS CLOSET PLAN

PLUMBING

P-001 LEGEND AND INDEX OF DRAWINGS

P-D-0.1A PARTIAL SUB BASEMENT PLUMBING DEMO PLAN - PHASE I

P-D-0.2A PARTIAL BASEMENT PLUMBING DEMO PLAN - PHASE I

P-D-0.1B PARTIAL SUB BASEMENT PLUMBING DEMO PLAN - PHASE II

P-D-0.2B PARTIAL BASEMENT PLUMBING DEMO PLAN - PHASE II

P-P-0.1A PARTIAL SUB BASEMENT PLUMBING PLAN - PHASE I

P-P-0.2A PARTIAL BASEMENT PLUMBING PLAN - PHASE I

P-P-0.1B PARTIAL SUB BASEMENT PLUMBING PLAN - PHASE II

P-P-0.2B PARTIAL BASEMENT PLUMBING PLAN - PHASE II

P-600 SANITARY RISER DIAGRAM

P-700 SCHEDULES AND DETAILS

FIRE PROTECTION

FP-F-0.1 PARTIAL BASEMENT PLAN - FIRE SUPPRESSION

ELECTRICAL

E-001 LEGEND AND ABBREVIATIONS

ED-0.1A ELECTRICAL BASEMENT - DEMOLITION PLAN - PHASE I

ED-0.1B ELECTRICAL BASEMENT - DEMOLITION PLAN - PHASE 2

EL-0.1A ELECTRICAL BASEMENT - LIGHTING PLAN - PHASE I

EL-0.1B ELECTRICAL BASEMENT - LIGHTING PLAN - PHASE 2

EL-1.1B ELECTRICAL FIRST FLOOR - LIGHTING PLAN - PHASE 2

EP-0.1A ELECTRICAL BASEMENT - POWER PLAN - PHASE 1

EP-0.1B ELECTRICAL BASEMENT - POWER PLAN - PHASE 2

EP-2.1B ELECTRICAL ROOF - POWER PLAN - PHASE 2

E-501 ELECTRICAL DETAILS

E-601 PANEL SCHEDULES

SCOPE OF WORK AREA

STRUCTURAL

SS-001 GENERAL NOTES - PHASE II

SS-100 BASEMENT LEVEL - PHASE II PROPOSED STRUCTURAL IMPROVEMENT

PLAN & DETAILS

BASEMENT LEVEL

N.T.S.

REFERENCE DRAWINGS

1-Q1 SIEMENS REFERENCE DRAWING A-101 ARCHITECTURAL EQUIPMENT PLAN

1-Q2 SIEMENS REFERENCE DRAWING A-102 SAFETY/SERVICE CLEARANCE PLAN

1-Q3 SIEMENS REFERENCE DRAWING S-101 STRUCTURAL FLOOR PLAN

1-Q4 SIEMENS REFERENCE DRAWING S-501 FLOOR REQUIREMENTS

1-Q5 SIEMENS REFERENCE DRAWING E-101 ELECTRICAL RACEWAY PLAN

1-Q6 SIEMENS REFERENCE DRAWING E-102 ELECTRICAL DIMENSION PLAN

Revisions: Date:

65% CD's SUBMISSION 8.7.20

100% CD's SUBMISSION 10.13.20

FINAL CD's SUBMISSION 11.19.20

BID ISSUE SUBMISSION 4.23.21

CG-1 CG-1

CG-1CG-1

CG-1

FE

F E

FE

FE

F E

FE

F E

F E

F E

F E

FE

F E

FE

PROJECT SCOPE BOUNDARY

3' - 0"

GC ACCESS

DOOR

EXISTING EGRESS PATHS TO REMAIN

UNAFFECTED DURING CONSTRUCTION

E

Injection Room

BC461

Nuc Med

BC475

Future Thyroid Uptake

BC448

EKG

BC436Storage

BC432

EKG

BC434

OFFICE

BC446

Rad Waste

BC446A

Nuc Med

BC474

Storage

BC431

Control Room

BC475A

Corridor

B-D311

Stair 5

E03

Conference

B-D352

Corridor

BC400C

Corridor

BC1087

Storage

BB427A

E.C.

G08A

Paint Shop

G08

Stair 6

E25

Corridor

CG01

Repair Station 2

BC490M

Repair Station 1

BC490N

Repair Station 3

BC490L

Ref. & Files

BC490O

Supv Office

BC1088

Repair Station

BC490B

Repair Station

BC490C

Repair Station

BC490E

Receiving & Cleaning

BC490A Repair Station 6

BC490I

Womens Showers

BC482A

Repair Station 9

BC490F

Repair Station 8

BC490G

Repair Station 7

BC490H

Bio Med

BC1089

Repair Station 5

BC490J

Repair Station 4

BC490K

Nuc Med CT

BC1090

Reading

BC1091

Soiled

BC1092

Patient Holding

BC1093

Holter

BC1094

Toilet

BC1095

Nuc Med CT

BC1096

Electrical

BC1097

Nuc Med

BC1098

Patient Holding

BC1099

Echo Stress

BC447

Office

BB428

Office

BB426

Storage

BB418

Stair #8

BB420

Service Room

BB419

Comm

BB472

Clos

BB471

Electrical

BB473

Office

BB468

Office

BB466

Office

BB482

Office

BB467

Office

BB483

Corridor

BC400B

Clean Storage

BC425

Staff

BC1100

Diabetes Coordinator

BC424

Echo Stress

BC445

Fes. Treatment

BC420

Corridor

BC400A

Diabetes Education

BC423

Dietitian

BC422

Dietitian

BC421

Conference Room

BC410

Eng. Office

BC444

Reading Room

BC443

Cardiology Tech

BC442

Corridor

BC400

Corridor

BC440

Corridor

BC430

Staff

BC441

Echo

BC437

Echo

BC435

Echo

BC433

Reception

BC471A

Work

BC1101

Corridor

BC470A

Interview

BC1102

Toilet

BC1103

Waiting

BC1104

Biohazard Storage

E26

Mens Restroom

BC481B

Corridor

BC470B

Womens Locker Room

BC1105

Mens Locker Room

BC1106

Corridor

CE03

Service Lobby

BC404

Tech Supv

BC311

IP Chief

BC312

Alcove

BC313

Staff Entry

BC314

ELEC.

BC315

Assistant Chief

BC316

Secretary & Waiting

BC317

Chief Pharm.

BC318

Admin. Assist.

BC319

Mainstreet Corridor

BC402

Closet

BB375A

Laminating

Room

BB375

Machine Room

BB374

Cad Room

BB373

Corridor

BC401

Tech Area

BB372

Paster Room

BB376

Lobby

BD300C

Mechanical

BC310A

Elevator Lobby

BC403

Office

BB427

Control

BC1107

Corridor

CG02

Vestibule

B-D401A

Storage

B-D401B

Office

BB465

Office

BB429

Corridor

BB530

Office

BB481

Repair Station

BC490D

6'

6' - 0"

MAINTAIN 6'-0"

MIN. CLEAR IN

CORRIDORS, TYP.

GC ACCESS

DOORNORTH DOOR LEAF SHALL BE

CLOSED AND NOT IN USE.

SOUTH LEAF SHALL BE ON

HOLD-OPENS AT ALL TIMES

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS AN "EXISTING

HEALTH CARE OCCUPANCY" PER NFPA 101 2018.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY

DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW

PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE

COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL

PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH

THE OPENING SIZE AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT

NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT

DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE

WITH SAFETY STANDARDS.

HAZARDOUS ROOM

EXISTING/NEW 2 HOUR RATED SMOKE BARRIER

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON

REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"

TYPICAL PARTITION DETAIL ON SHEET AS-600. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY

BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE

APPROVED BY THE COR.

SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT

CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE

SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.

PROJECT SCOPE BOUNDARY

SOLID WHITE AREA INDICATES

CONSTRUCTION AREA WITHIN SCOPE

OF WORK

GRAY HATCHED AREA INDICATES AREA

OUTSIDE OF SCOPE OF WORK. ALL

AREAS SHALL BE CONSIDERED

OCCUPIED AND IN USE BY THE VA

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRECONSTRUCTION: 60 DAYS

PHASE I: 40 DAYS

VA ACTIVATION OF PHASE I: 20 DAYS

PHASE II: 90 DAYS

TOTAL TIMEFRAME: 210 DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH ACTIVITIES WITH STAFF AND VA COR.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF

EXISTING FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

• ABOVE-CEILING WORK IN ROOMS OUTSIDE THE PROJECT SCOPE AREA

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL/PLUMBING

ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

C U s e rs

\r ic h \D o c u m e n ts

\V A

S P

E C

T C

T ri c h

Q X

K S

.r v t

/2

/2

:0

:3

P

M

BID ISSUE SUBMISSION

LS-0.1A

PHASE 1 BASEMENT LEVEL LIFE SAFETY

PLAN

PROVIDE SITE PREP FOR SPECT

CT ROOM BC-474

10701 EAST BLVD. CLEVELAND, OH

541-CSI-130

4.23.21 CJK JAW

NORTH

SCALE: 1/8" = 1'-0"

BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I

Revisions: Date:

65% CD's SUBMISSION 8.7.20

100% CD's SUBMISSION 10.13.20

C G

-1C G

-1

C G

-1 C

G -1

CG-1 CG-1

CG-1CG-1

CG-1

CG-1

Corridor

B-D311

Stair 5

E03

Conference

B-D352

Corridor

BC400C

Corridor

BC460

Storage

BB427A

E.C.

G08A

Paint Shop

G08

Stair 6

E25

Corridor

CG01

Repair Station 2

BC490M

Repair Station 1

BC490N

Repair Station 3

BC490L

Ref. & Files

BC490O

Supv Office

BC491

Repair Station

BC490B

Repair Station

BC490C

Repair Station

BC490E

Receiving & Cleaning

BC490A Repair Station 6

BC490I

Womens Showers

BC482A

Repair Station 9

BC490F

Repair Station 8

BC490G

Repair Station 7

BC490H

Bio Med

BC490

Repair Station 5

BC490J

Repair Station 4

BC490K

Nuc Med CT

BC468

Reading

BC467

Soiled

BC466

Patient Holding

BC464

Holter

BC449

Toilet

BC462

Nuc Med CT

BC453

Electrical

BC479

Nuc Med

BC452

Patient Holding

BC463

Echo Stress

BC447

Office

BB428

Office

BB426

Storage

BB418

Stair #8

BB420

Service Room

BB419

Comm

BB472

Clos

BB471

Electrical

BB473

Office

BB468

Office

BB466

Office

BB482

Office

BB467

Office

BB483

Corridor

BC400B

Clean Storage

BC425

Staff

BC451

Diabetes Coordinator

BC424

Echo Stress

BC445

Fes. Treatment

BC420

Corridor

BC400A

Diabetes Education

BC423

Dietitian

BC422

Dietitian

BC421

Conference Room

BC410

Eng. Office

BC444

Reading Room

BC443

Cardiology Tech

BC442

Corridor

BC400

Corridor

BC440

Corridor

BC430

Staff

BC441

Echo

BC437

Echo

BC435

Echo

BC433

Reception

BC471A

Work

BC471

Corridor

BC470A

Interview

BC473

Toilet

BC472

Waiting

BC470

Biohazard Storage

E26

Mens Restroom

BC481B

Corridor

BC470B

Womens Locker Room

BC482

Mens Locker Room

BC481

Corridor

CE03

Service Lobby

BC404

Tech Supv

BC311

IP Chief

BC312

Alcove

BC313

Staff Entry

BC314

ELEC.

BC315

Assistant Chief

BC316

Secretary & Waiting

BC317

Chief Pharm.

BC318

Admin. Assist.

BC319

Mainstreet Corridor

BC402

Closet

BB375A

Laminating

Room

BB375

Machine Room

BB374

Cad Room

BB373

Corridor

BC401

Tech Area

BB372

Paster Room

BB376

Lobby

BD300C

Mechanical

BC310A

Elevator Lobby

BC403

Office

BB427

Control

BC454

Corridor

CG02

Vestibule

B-D401A

Storage

B-D401B

Office

BB465

Office

BB429

Corridor

BB530

Office

BB481

Repair Station

BC490D

Nuc Med

BC475

Control Room

BC475A

Injection Room

BC461

Thyroid Uptake

BC448

OFFICE

BC446

EKG

BC436

Rad Waste

BC432A

Hot Lab

BC432

Storage

BC431

Nuc Med

BC474

FE

F E

FE

FE

F E

FE

F E

F E

F E

F E

FE

F E

FE

PROJECT SCOPE BOUNDARY

3' - 0"

CONSTRUCTION

ENTRY

Control Room

BC474A

6' - 0"

6'

EXISTING EGRESS PATHS TO REMAIN

UNAFFECTED DURING CONSTRUCTION

E

CONSTRUCTION

ENTRY

MAINTAIN 6'-0"

MIN. CLEAR IN

CORRIDORS, TYP.

4' - 9"

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS AN "EXISTING

HEALTH CARE OCCUPANCY" PER NFPA 101 2018.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY

DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW

PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE

COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL

PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH

THE OPENING SIZE AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT

NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT

DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE

WITH SAFETY STANDARDS.

HAZARDOUS ROOM

EXISTING/NEW 2 HOUR RATED SMOKE BARRIER

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON

REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"

TYPICAL PARTITION DETAIL ON SHEET AS-600. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY

BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE

APPROVED BY THE COR.

SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT

CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE

SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.

PROJECT SCOPE BOUNDARY

SOLID WHITE AREA INDICATES

CONSTRUCTION AREA WITHIN SCOPE

OF WORK

GRAY HATCHED AREA INDICATES AREA

OUTSIDE OF SCOPE OF WORK. ALL

AREAS SHALL BE CONSIDERED

OCCUPIED AND IN USE BY THE VA

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRECONSTRUCTION: 60 DAYS

PHASE I: 40 DAYS

VA ACTIVATION OF PHASE I: 20 DAYS

PHASE II: 90 DAYS

TOTAL TIMEFRAME: 210 DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH ACTIVITIES WITH STAFF AND VA COR.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF

EXISTING FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

• ABOVE-CEILING WORK IN ROOMS OUTSIDE THE PROJECT SCOPE AREA

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL/PLUMBING

ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

C U s e rs

\r ic h \D o c u m e n ts

\V A

S P

E C

T C

T ri c h

Q X

K S

.r v t

/2

/2

:0

:4

P

M

BID ISSUE SUBMISSION

LS-0.1B

PHASE 2 BASEMENT LEVEL LIFE SAFETY

PLAN

PROVIDE SITE PREP FOR SPECT

CT ROOM BC-474

10701 EAST BLVD. CLEVELAND, OH

541-CSI-130

4.23.21 CJK JAW

NORTH

SCALE: 1/8" = 1'-0"

BASEMENT LEVEL LIFE SAFETY PLAN - PHASE II

Revisions: Date:

65% CD's SUBMISSION 8.7.20

100% CD's SUBMISSION 10.13.20

CG-1

25 26 27

Q

RR

TT

VV

SS

UU

R1 R1

Injection Room

BC461Nuc Med

BC475

Thyroid Uptake

BC448

Corridor

BC430

EKG

BC436

Storage

BC432

EKG

BC434

Hot Lab

BC446

Rad Waste

BC446A

Nuc Med

BC474

Injection Room

BC431

Corridor

BC470B

Control Room

BC475A

Corridor

BC440

Corridor

BC460

DASHED RECTANGLE INDICATES SEPARATE

CONSTRUCTION PROJECT AREA "VA SITE

PREP FOR INTEVO" WHICH IS CURRENTLY

UNDER CONSTRUCTION. IMPROVEMENT

PLAN FOR SEPARATE PROJECT IS SHOWN

AS EXISTING CONDITIONS FOR THE

PURPOSES OF THIS PROJECT

CV

MG

MG

MG

CV

MG

FE CR

CR

CR CR CR

CR

CR

WALL-MTD. TEST

TUBE RACK

MIRROR

ELEC. PANEL

CONDUIT

CHASE

MOBILE STORAGE

RACK

FE

CR

CT SCANNER

LEAD RADIOACTIVE

WASTE CABINETS

NOTE: ALL WALLS IN

ROOM ARE LEAD-LINED

NOTE: ALL WALLS IN

ROOM ARE LEAD-LINED

NOTE: ALL

WALLS IN ROOM

ARE LEAD-LINED

GENERAL NOTES:

CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.

ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.

ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF

ALL APPLICABLE CODES.

PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.

WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW

TO MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.

ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS

REQUIRED.

NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED

BY THE OWNER UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY

POINTS.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.

PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.

DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"

ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.

THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE

PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.

REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT

WALLS TO MATCH EXISTING.

ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.

ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED

BY THE COR.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

SYMBOL LEGEND:

INDICATES EXISTING DOOR

INDICATES NEW DOOR

EXISTING WALLS TO REMAIN

NEW WALLS

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED

HATCHED AREA OUTSIDE OF PROJECT SCOPE.

ACCESS INTO CEILING SPACES MAY OCCUR, REFER

TO MEP DWGS.

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON

REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO TEMPORARY CONSTRUCTION BARRIER

DETAIL ON SHEET AS-600. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE

PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR.

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

GENERAL CONSTRUCTION PARTITION NOTE: WHERE TEMP. CONST. PARTITIONS CONFLICT

W/EX. LIGHTS/DIFFUSER/MEP ITEM LOCATIONS (INDICATED ON CEILING DEMOLITION PLANS), GC

SHALL COORD. W/COR TO EITHER TEMPORARILY REMOVE SUCH ITEMS, OR ADJUST LOCATION

OF CONST. PARTITION ACCORDINGLY TO ALLOW ITEMS TO REMAIN IN PLACE

EXISTING RECESSED MED. GAS CONTROL VALVE BOX

EXISTING MEDICAL AIR, VACUUM, OXYGEN WALL OUTLETS

EXISTING FIRE EXTINGUISHER CABINET

FE

CV

MG

CR

CARD READER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL/PLUMBING

ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

C U s e rs

\r ic h \D o c u m e n ts

\V A

S P

E C

T C

T ri c h

Q X

K S

.r v t

/2

/2

:0

:2

P

M

BID ISSUE SUBMISSION

AS-X-0.1

BASEMENT LEVEL EXISTING CONDITIONS

PLAN

PROVIDE SITE PREP FOR SPECT

CT ROOM BC-474

10701 EAST BLVD. CLEVELAND, OH

541-CSI-130

4.23.21 CJK JAW

NORTH

SCALE: 1/4" = 1'-0"

BASEMENT LEVEL EXISTING CONDITIONS PLAN

Revisions: Date:

65% CD's SUBMISSION 8.7.20

100% CD's SUBMISSION 10.13.20

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

9' - 3"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

8' - 0"A.F.F.

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

ACT-1

8' - 0"A.F.F.

Injection Room

BC461

Nuc Med

BC475

Thyroid Uptake

BC448

Corridor

BC430

EKG

BC436

Storage

BC432

EKG

BC434

Hot Lab

BC446

Rad Waste

BC446A

Nuc Med

BC474

Injection Room

BC431

Corridor

BC470B

Corridor

BC440

Corridor

BC460

Control Room

BC475A

DASHED RECTANGLE INDICATES SEPARATE

CONSTRUCTION PROJECT AREA "VA SITE

PREP FOR INTEVO" WHICH IS CURRENTLY

UNDER CONSTRUCTION. IMPROVEMENT

PLAN FOR SEPARATE PROJECT IS SHOWN

AS EXISTING CONDITIONS FOR THE

PURPOSES OF THIS PROJECT

EXISTING WALL-MTD

UV LIGHT FIXTURES

(4 TOTAL)

S

S

S S

S

S

S

S

S

GENERAL NOTES:

CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.

ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.

ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF

ALL APPLICABLE CODES.

PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.

WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW

TO MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.

ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS

REQUIRED.

NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED

BY THE OWNER UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY

POINTS.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.

PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.

DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"

ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.

THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE

PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.

REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT

WALLS TO MATCH EXISTING.

ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.

ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED

BY THE COR.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

CEILING SYMBOL LEGEND:

EXISTING CEILING

TILE AREAS TO

REMAIN

NEW CEILING TILE

AREAS

GYPSUM BOARD

CEILING/SOFFIT -

PAINTED FINISH

2 X 2 LIGHT FIXTURE

RECESSED CAN

LIGHT FIXTURE

RETURN AIR

DIFFUSERS

SUPPLY AIR DIFFUSERS

SECURITY CAMERA

RECESSED SPEAKER

WIRELESS ACCESS POINT

SD SMOKE DETECTOR

DOMED MIRROR

ILLUMINATED EXIT SIGNAGE

CEILING-MTD. NURSE

CALL LIGHT

GENERAL NOTE: ACCESS INTO CEILINGS OUTSIDE OF TEMPORARY CONSTRUCTION BARRIERS AS A PART OF A CONSTRUCTION PHASE MAY OCCUR. REFER TO MEP DRAWINGS FOR ABOVE-CEILING DEMOLITION THAT OCCURS OUTSIDE THE TEMPORARY CONSTRUCTION BARRIER EXTENTS. GC SHALL PROVIDE TEMPORARY PROTECTION MEASURES IN SUCH AREAS TO PROTECT EXISTING CONDITIONS. COORD. REQUIREMENTS W/VA COR

S

2 X 4 LIGHT FIXTURE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL/PLUMBING

ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

C U s e rs

\r ic h \D o c u m e n ts

\V A

S P

E C

T C

T ri c h

Q X

K S

.r v t

/2

/2

:0

:2

P

M

BID ISSUE SUBMISSION

AS-XC-0.1

BASEMENT LEVEL EXISTING CEILING PLAN PROVIDE SITE PREP FOR SPECT

CT ROOM BC-474

10701 EAST BLVD. CLEVELAND, OH

541-CSI-130

4.23.21 CJK JAW

NORTH

SCALE: 1/4" = 1'-0"

BASEMENT LEVEL EXISTING CEILING PLAN

Revisions: Date:

65% CD's SUBMISSION 8.7.20

100% CD's SUBMISSION 10.13.20

CG-1

3' - 0"

ALIGN

ALIGN

CV

MG

MG

CV

MG

1A

4'

4"

REMOVE MIRROR

REMOVE AND

RELOCATE WALL-MTD.

TEST TUBE RACK

5A

DOOR TO BE SEALED

DURING PHASE I

CONSTRUCTION

TEMPORARY

CONTRACTOR

ENTRY DOOR

ALIGN

COORD. LOCATION OF TEMP.

BARRIER W/ EXISTING

CONTROL ROOM EQUIPMENT

ALIGN6

5' - 2 1/2"

TEMP GC DOOR

13A

3'-10" +/-

GENERAL NOTES:

CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.

ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.

ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF

ALL APPLICABLE CODES.

PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.

WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW

TO MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.

ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS

REQUIRED.

NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED

BY THE OWNER UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY

POINTS.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.

PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.

DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"

ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.

THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE

PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.

REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT

WALLS TO MATCH EXISTING.

ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.

ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED

BY THE COR.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

SYMBOL LEGEND:

INDICATES EXISTING DOOR

INDICATES NEW DOOR

EXISTING WALLS TO REMAIN

NEW WALLS

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED

HATCHED AREA OUTSIDE OF PROJECT SCOPE.

ACCESS INTO CEILING SPACES MAY OCCUR, REFER

TO MEP DWGS.

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON

REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO TEMPORARY CONSTRUCTION BARRIER

DETAIL ON SHEET AS-600. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE

PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR.

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

GENERAL CONSTRUCTION PARTITION NOTE: WHERE TEMP. CONST. PARTITIONS CONFLICT

W/EX. LIGHTS/DIFFUSER/MEP ITEM LOCATIONS (INDICATED ON CEILING DEMOLITION PLANS), GC

SHALL COORD. W/COR TO EITHER TEMPORARILY REMOVE SUCH ITEMS, OR ADJUST LOCATION

OF CONST. PARTITION ACCORDINGLY TO ALLOW ITEMS TO REMAIN IN PLACE

EXISTING RECESSED MED. GAS CONTROL VALVE BOX

EXISTING MEDICAL AIR, VACUUM, OXYGEN WALL OUTLETS

EXISTING FIRE EXTINGUISHER CABINET

FE

CV

MG

CR

CARD READER

Injection Room

BC461

Nuc Med

BC475

Thyroid Uptake

BC448

Corridor

BC430

EKG

BC436

Storage

BC432

EKG

BC434

Hot Lab

BC446Rad Waste

BC446A

Nuc Med

BC474

Injection Room

BC431

Corridor

BC470B

Control Room

BC475A

Corridor

BC440

Corridor

BC460

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL/PLUMBING

ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

C U s e rs

\r ic h \D o c u m e n ts

\V A

S P

E C

T C

T ri c h

Q X

K S

.r v t

/2

/2

:0

:0

P

M

BID ISSUE SUBMISSION

AS-D-0.1A

BASEMENT LEVEL- PHASE I DEMOLITION

PLAN

PROVIDE SITE PREP FOR SPECT

CT ROOM BC-474

10701 EAST BLVD. CLEVELAND, OH

541-CSI-130

4.23.21 CJK JAW

NORTH

SCALE: 1/4" = 1'-0"

BASEMENT LEVEL DEMOLITION PLAN - PHASE I

DEMOLITION NOTES

NOTE COMMENT

1 REMOVE EXISTING DOOR, FRAME AND HARDWARE. FOR REMOVED DOORS ALONG CORRIDORS, INFILL OPENING AFTER REMOVAL OF EXISTING DOOR. ALIGN NEW WALL THICKNESS TO BE FLUSH ON BOTH SIDES OF WALL. FINISH CORRIDOR SIDE TO MATCH EXISTING FINISHES. FOR CORRIDOR-FACING DOORS THAT WILL BE REPLACED W/ LARGER OPENINGS, GC SHALL SCHEDULE FRAME REMOVAL AND REPLACEMENT TO MINIMIZE

TIME WITHOUT A DOOR IN PLACE

1A EXISTING DOOR/FRAME TO BE REMOVED AND RELOCATED, SEE IMPROVEMENT PLAN FOR NEW LOCATION

2 EXISTING WALL TO BE REMOVED, FULL HEIGHT

3 REMOVE PORTION OF EXISTING WALL REQUIRED FOR INSTALLATION OF NEW DOOR FRAME. SEE DOOR

SCHEDULE FOR FRAME SIZE

4 REMOVE EXISTING FLOORING AND WALL BASE IN ENTIRE ROOM

5 EXISTING MILLWORK TO BE REMOVED

5A EXISTING MILLWORK TO BE REMOVED AND RELOCATED. SEE IMPROVEMENT PLAN FOR NEW LOCATION

6 EXISTING PLUMBING FIXTURE TO BE REMOVED. SEE PLUMB. DWGS. FOR ANY PIPING TO BE REUSED AND/OR CAPPED & ABANDONED WHERE SINKS ARE INDICATED TO BE REMOVED, GC SHALL ALSO REMOVE EXISTING WALL-MOUNTED MIRROR, SOAP DISPENSER, & PAPER TOWEL DISPENSER, AND RE-INSTALL SAME AT NEW WALL-MTD. SINK LOCATIONS (SEE IMPROVEMENT PLANS), ALL NON-REUSED ITEMS SHALL BE RETURNED TO

THE VA

7 REMOVE EXISTING WALL-MOUNTED HANDRAIL

8 EXISTING SOLID LEAD RADIOACTIVE WASTE CABINETS TO BE REMOVED AND RELOCATED BY GC. SEE

IMPROVEMENT PLAN FOR NEW LOCATION

9 EXISTING CT SCANNER TO BE FULLY REMOVED BY CT VENDOR, RETAINED/PERFORMED BY VA

10 EXISTING MED. GAS OUTLETS TO BE REMOVED

11 DASHED LINE INDICATES EXISTING LEAD-LINED GYPSUM BOARD TO BE REMOVED ON PARTITIONS FACING

ROOM. STUDS TO REMAIN

11A DASHED LINE INDICATES EXISTING NON-LEAD-LINED GYPSUM BOARD TO BE REMOVED ON PARTITIONS FACING

ROOM. STUDS TO REMAIN

12 EXISTING FURNITURE IN ROOM TO BE FULLY REMOVED BY VA

13 REMOVE AND RELOCATE EXISTING CARD READER

13A EXISTING CARD READER TO REMAIN AND BE REWIRED TO NEW DOOR

14 CONTRACTOR SHALL BE AWARE THAT EXISTING CARPET FLOORING IN EX. CONTROL ROOM BC475A IS DISCONTINUED AND CANNOT BE REPLACED. EXISTING FLOORING MUST BE PROTECTED FROM DAMAGE AT ALL TIMES. ALL DAMAGES CAUSED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO ADDITIONAL

COST TO THE VA

Revisions: Date:

65% CD's SUBMISSION 8.7.20

100% CD's SUBMISSION 10.13.20

CG-1

1 1

EX. DOORS SHALL BE USED AS

CONSTRUCTION ENTRY AND WILL

BE REPLACED AS A PART OF

CONSTRUCTION. COORD. PHASING

OF DOOR REPLACEMENT TO OCCUR

AT END OF CONSTRUCTION

3' - 0"

6' - 0"

6'

7 7

ALIGN

ALIGN

+/- 4' - 10"

CV

MG

MG

CV

MG

5A

ALIGN

4' - 6"

EKG ROOMS SHALL REMAIN IN

USE THROUGHOUT PHASE II

CONSTRUCTION

CONTROL AND CT ROOMS SHALL REMAIN

IN USE THROUGHOUT CONSTRUCTION 1 7

13 13

11A

8'

/2

(FINISHES REMOVED PHASE I)

(FINISHES REMOVED PHASE I)

2'

EX. DOORS SHALL BE USED AS

CONSTRUCTION ENTRY AND WILL

BE REPLACED AS A PART OF

CONSTRUCTION. COORD. PHASING

OF DOOR REPLACEMENT TO OCCUR

AT END OF CONSTRUCTION

8" +/-

4' -4

4'

11A

GENERAL NOTES:

CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.

ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.

ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF

ALL APPLICABLE CODES.

PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.

WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW

TO MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.

ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

ALL NEW PENETRATIONS IN FIRE-RATED…