S02. 36C26323Q0022.pdf
PDF 791 KB Posted
- Solicitation number
- 36C26323Q0022
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. UEI: EFT:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
438-23-1-1115-0003
636-23-1-8895-0005
36C26323Q0022 10-31-2022
Melissa Garrett 605-336-3230 x7289 11-15-2022
10:00 AM CST
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
2501 W. 22nd St.
Sioux Falls SD 57105
X 100
X
541990
$16.5 Million
N/A
X
VA Iowa City Health Care System 601 Highway 6 W, Iowa City, IA 52246 VA Sioux Falls Health Care System 2501 W 22nd St, Sioux Falls, SD 57105
NETWORK 23 CONTRACTING OFFICE
2501 W. 22nd St.
Sioux Falls SD 57105 https://www.fsc.va.gov/einvoice.asp
VA Financial Services Center Via The Tungsten Network Refer to VAAR Clause 852.232-72
See CONTINUATION Page
Electrical Conditions Survey Services in support of the Iowa City VA Health Care System and Sioux Falls VA Health Care System.
Period of Performance: 12/01/2022 to 11/30/2023
Offerors shall be registered and active at System for Award Management (SAM) at https://beta.sam.gov at time of offer.
Refer to Section B.2 (Price/Cost Schedule) for line items.
Refer to Section B.3 (Statement of Work) for scope of work requested.
This solicitation uses FAR Part 13 (Simplified Acquisition Procedures) and is being solicitated as a Total Small Business Set-Aside.
All questions must be in writing and emailed to Melissa.Garrett@va.gov. All questions must be received no later than 10:00 AM CST Nov 4, 2022.
See CONTINUATION Page
636-3630162-8895-854100-2543-0400555X9 636-23-1-8895-0005
X X
X 1(one)
Curt LaRose
VA-VHA-2021-8C9AEA64
36C26323Q0022
Table of Contents
SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 PRICE/COST SCHEDULE
B.3 STATEMENT OF WORK (SOW)
SECTION C - CONTRACT CLAUSES
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
C.3 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
C.4 SUPPLEMENTAL INSURANCE REQUIREMENTS
C.5 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA
ACQUISITION OF COMMERCIAL ITEMS (APR 2020)
C.6 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (MAY 2022) (JUL 2020) (DEVIATION)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
D.1 WAGE DETERMINATION (Iowa City) D.2 WAGE DETERMINATION (Sioux Falls)
SECTION E - SOLICITATION PROVISIONS
E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
E.2 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2021)
E.3 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—
COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2022) (JUL 2020)
(DEVIATION)
E.4 52.233-2 SERVICE OF PROTEST (SEP 2006)
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
Contractor Name:
SAM Unique Identity Number:
DUNS Number:
Point of Contact:
Phone Number:
Email Address:
b. GOVERNMENT: Contracting Officer 36C263
Contracting Officer: Curt LaRose
Phone Number: 605.336.3230 x7573
Email Address: curt.larose@va.gov
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management
3. INVOICES: Invoices shall be submitted in arrears:
Other [X] After completion of job
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Tungsten Electronic Invoicing System VA Tungsten Number is: AAA544240062 va.registration@tungsten-network.com Refer to VAAR Clause 852.232-72
5. INVOICING INSTRUCTIONS:
In addition to information required for submission of a “proper” invoice in accordance with FAR 52.212-4 (g), all invoices must include:
• Name and Address of Contractor
• Contractor’s Invoice Date and Invoice Number
• Contract Number, Task Order Number, and/or Purchase Order Number
• Date(s) of Service
• Cost of service, i.e., hourly rate, quantity, job cost, trip, etc.
• Total price
Electronic Invoice Submission Method. Invoice(s) shall be electronically submitted through the Tungsten Network: https://www.tungsten-network.com/customer-campaigns/veterans-affairs/.
The VA-FSC pays all associated transaction fees for VA orders.
The Tungsten direct vendor support number is 877-489-6135 for VA contracts. During Implementation (technical set-up) Tungsten will confirm your Tax Payer ID Number with the VA- FSC. This process can take up to five (5) business days to complete to ensure your invoice is automatically routed to your Certifying Official for approval and payment. https://www.tungsten-network.com/us/support/’. The VA-FSC pays all associated transaction fees for VA orders.
For additional information, please contact:
• Tungsten Support, Phone: 1-877-752-0900, Email: va.registration@tungsten-network.com
• Department of Veterans Affairs Financial Service Center, Phone: 1-877-353-9791, Email: vafscched@va.gov
6. ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
mailto:va.registration@tungsten-mailto:va.registration@tungsten-mailto:vafscched@va.gov
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 JB __________________ __________________
Electrical testing and reporting per SOW in support of the Sioux Falls VA Health Care System PRINCIPAL NAICS CODE: 541990 - All Other Professional, Scientific, and Technical Services PRODUCT/SERVICE CODE: H359 - Inspection - Electrical and Electronic Equipment Components
1.00 JB __________________ __________________
Arc Flash Engineering Studies Services per SOW in support of the Iowa City VA Health Care System PRINCIPAL NAICS CODE: 541990 - All Other Professional, Scientific, and Technical Services PRODUCT/SERVICE CODE: H359 - Inspection - Electrical and Electronic Equipment Components
GRAND TOTAL __________________
B.3 STATEMENT OF WORK (SOW)
Title
Three Year Breaker Test Services to support the Iowa City VA Facility
General Overview
The Contractor shall perform electrical system studies for the Iowa City VA Health Care System located at 601 Highway 6 W, Iowa City, IA 52246 as noted in this Scope of Work (SOW) and other contract documents. This contract shall complete all items noted in VHA Directive 1028 Facility Electrical Power Systems for a 3-year inspection.
The Iowa City VA Technical Representative is Keith Bryant.
Place of Performance
Iowa City VA Health Care System 601 Highway 6 W Iowa City, IA 52246
Period of Performance
Period of performance runs 12-01-2022 to 11-30-2023.
Scope of Work
a. The Contractor shall have a minimum of five (5) years of specialized continuous experience in testing, inspection, cleaning, adjusting, and appraising electrical distribution systems and apparatus to assure their reliable operations.
i. The contractor shall demonstrate his ability to meet this requirement of the specifications by including his complete response to the technical evaluation criteria found in “Attachment A” of this specification and furnishing it with his bid.
ii. Failure to provide a complete and clear response to the technical evaluation criteria found in “Attachment A” will result in the bid being found not responsive.
b. All work performed shall be fully documented by the Contractor. Testing shall be performed in compliance with manufacturers’ recommendations and applicable NEMA, NEC, NFPA, ASTM, ASA, and VA standards. All outages shall be scheduled and approved in writing in at least two weeks in advance. Outages will be scheduled only at night and on weekends.
c. A complete list of distribution system equipment and apparatus to be inspected, cleaned, tested, and adjusted is found in “Attachment B” of this specification.
2. MAINTENANCE AND TESTING REQUIREMENTS:
a. In addition to complying with the general codes referenced in 1. B., the contractor shall pay special attention to compliance with VHA Directive 1028 (see Attachment B) and
NFPA 70B.
b. Switchgear Equipment, Medium Voltage Circuit Breakers, and Protective Relays:
i. Record switchgear, breaker, and device nameplate information and compare with facility’s one-line diagram, when available. Identify and record discrepancies.
ii. Inspect all electrical equipment, including each breaker, and report damaged, or malfunctioning equipment, loose connections or material or any contamination that must be corrected. Clean where appropriate.
iii. Check equipment for level, security to foundation, and operation of doors.
Report any unfavorable environmental conditions such as excessive moisture.
iv. Visually inspect the equipment ground and record the number and size of ground bus and straps, Report deficiencies, and clean where appropriate.
v. Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase, and phase-to-ground with suitable megohmmeter. Record values, report deficiencies, and clean where appropriate.
vi. Draw or rack each breaker from its cell. Remove arc chutes, clean, inspect, and adjust all contracts as necessary. Measure and record contact resistance in micro-ohms and clean all insulating surfaces. Megger and record phase-to-phase and phase-to-ground. Lubricate as necessary.
vii. Electrically close and trip each breaker with control switch. Manually close and trip each breaker. Trip each breaker with each of its protective devices. Tighten all connections. Record any discrepancies.
viii. Remove each relay from its case. Clean, inspect, and tighten all connection.
Apply three multiples of relay tap current to each relay to verify manufacturers’ time current characteristics. Test each relay for instantaneous pickup. Test all ground fault relays for proper calibration and operation. Report deficiencies and adjust where appropriate.
c. Primary Disconnects
i. De-energize entire substation, clean all insulating surfaces, and clean and dress all contacts.
ii. Measure contact resistance in micro-ohms, Megger each phase-to-ground.
Record any discrepancies.
iii. Clean and inspect cubicle, tighten all untapped connections, and lubricate as necessary.
d. Transformer
i. Record transformer nameplate information and compare with the facility’s one-line diagram, when available. Record discrepancies.
ii. Inspect transformer and accessories and report damage, loose connections ore material, shipping blocks, or contaminations that must be corrected. Clean where appropriate, inspect for leaks and tighten all untapped connections.
Clean insulating surfaces.
iii. Sample all insulating liquids and test dielectric and water content.
e. Low Voltage Circuit Breakers
i. Record switchgear, breaker, and device nameplate information and compare with the facility’s one-line diagram, when available. Record discrepancies.
NOTE: Work includes all service equipment and power distribution panel boards but not branch-circuit panel boards that are used on the various floors in the buildings.
ii. Inspect equipment and each breaker and report damage, loose connections or material, or contamination that must be corrected. Clean where appropriate.
iii. Check equipment for level, security to foundations, and operation of doors.
Report any unfavorable environmental conditions such as excessive moisture or conducting dust that must be corrected. Clean where appropriate.
iv. Visually inspect the equipment ground an record the number and size of ground bus and straps. Report deficiencies.
v. Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase, and phase-to-ground with suitable megohmmeter. Record values, report deficiencies and clean where appropriate.
vi. Clean and inspect each breaker. Megger phase-to-phase, phase-to-ground, and measure contact resistance in micro-ohms. Test each series over current trip device for pickup at 200% and 300% of its rating for instantaneous pickup.
Clean and dress all contact surfaces and lubricate as necessary.
f. Generators
i. Record nameplate data including manufacturer, age, and capacity. List fuel type, kW load under load conditions, number of hours of fuel tank capacity, and number of hours of accumulated run time.
ii. Test run the generators in loaded condition. Record the transfer time and evaluated the reliability of the emergency power system.
g. Batteries
i. Provide and replace batteries inside each micro-logic, size ½ AA 3.6 volts – Schneider Electric part number 33593. Approximately 85 batteries.
3. REPORTS:
a. Provide two copies of data, testing, and inspection results to the Maintenance and Operations (M&O) Engineer of all devices tested as required by the scope. Report shall be securely bound and in an 8 ½ x 11 format. Provide one electronic copy (CD) of the report as either a PDF file or Word document.
b. At a minimum, the report shall include the following:
i. Summary of project
ii. Description of equipment tested
iii. Description of tests
iv. Test Data
v. Analysis and recommendations
c. Test data records shall include the following minimum requirements:
i. Identification of the testing organization
ii. Equipment identification
iii. Humidity, temperature, and other conditions that may affect the results of the tests/calibrations
iv. Date of inspections, tests, maintenance and/or calibrations
v. Identification of the testing technician
vi. Indication of inspections, tests, maintenance and/or calibration to be performed and recorded
vii. Indication of expected results when calibrations are to be performed
viii. Indication of “as-found” and “as-left” results, as applicable
ix. Sufficient spaces to allow all results and comments to be indicated
4. ELECTRICAL GROUNDING SYSTEM TESTING CRITERIA
a. Grounding Testing Procedures
i. This section describes grounding system testing procedures.
ii. These tests should be performed when the site ground system can be safely disconnected from the power company neutral wire.
b. Overview
i. Testing will be performed using one of the three methods which are described as follows:
1. Three-Point / Fall of Potential Testing
This method is the most widely accepted. However, performing the test may require access to areas that may be beyond the site property lines. When testing a grounding electrode system consisting of a multi-bonded/ multi-grounding electrode system, the distance required for testing is directly related to the effective diagonal distance of the buried grounding electrode system.
2. Clamp-on Ohmmeter
This method shall be used when access to necessary space needed for the Three-point/Fall of Potential test is not available. However, the clamp-on Ohmmeter test can only be performed after AC utilities have been connected to the site and various feed conductors are accessible.
3. Combined Soil Resistivity Testing with Clamp-on Ohmmeter Testing
This method shall only be used in special cases where three-point/fall of potential testing or clamp-on ohmmeter testing cannot directly provide a suitable evaluation. The data obtained from soil resistivity testing and clamp-on ohmmeter testing is then used by an engineering firm specializing in grounding electrode system design to make determinations regarding the grounding electrode system.
c. Limitations to Performance Testing
i. The following conditions must be met in order to perform grounding electrode system testing:
1. Three-point/fall of potential testing is possible only if the following conditions can be met:
A. Sufficient land area must be available to perform a three point/ fall-of-potential test. The reference probe may likely need to be inserted into soil that is beyond the site property line. Testing using a clamp-on ohmmeter may be an option in these cases.
B. The grounding electrode system must be able to be isolated from the power company grounded conductor (may be a neutral wire).
2. Clamp-on Ohmmeter testing is possible only if the following conditions can be et:
A. Site must be supplied with commercial power company-provided power.
B. Neutral wire must be present as part of the power company service.
C. Neutral wire must be part of an extensive power company grounding system.
In systems such as 3-phase delta service, the neutral wire may not be part of the extensive power company grounding system.
D. The grounding electrode system must be connected to the power company grounded conductor (may be a neutral wire).
E. For sites using a multi-bonded/multi-grounding electrode system, a point on neutral wire for meter to clamp onto must be available before its first bond to the site.
F. For single grounding electrode system, the grounding electrode conductor must be accessible for meter to clamp onto at a point between the grounding electrode and any other connection (such as the Telephone Company grounding or metallic pipe).
3. Combined Soil Resistivity/Clamp-on Ohmmeter testing is possible only if the following conditions can be met:
A. System must be such that gathering of individual grounding electrode system component values with a clamp-on-ohmmeter can be available.
B. A soil resistivity profile for the site has been performed.
b. If these conditions cannot be met, an added supplemental grounding electrode system can be installed. This supplemental grounding electrode system could be installed and tested prior to its connection to the existing system. This supplemental system should be installed in such a manner as to allow an easy disconnect point for future testing.
d. Three Point / Fall of Potential Test Procedure
The three point/fall of potential test is the most widely accepted and recommended test method. This procedure is described in detail in ANSI/IEEE STD 81.2.
In the three point/fall of potential test, two test rods are driven into the soil. These rods are placed in a straight line from an electrode in the grounding electrode system to be tested (referred to here as connection 'X'). One of the test rods (referred to here as rod 'Z') is placed at a known distance from the 'X' connection. The other test rod (referred to here as rod 'Y') is placed at various distances between the 'x' connection and rod 'Z', a potential difference (voltage drop) will exist between the 'x' connection and rod Y. The fall of potential tester measures the voltage drop between the 'X' connection and rod 'Y', and converts the measurement to a resistance reading using Ohm's Law (R=E/I). In this manner, the resistance at any point between 'x' connection and rod 'z' can be measured.
The multiple readings obtained during this test are entered and plotted as data points on a graph. From the graph, the resistance of the grounding electrode system can be determined.
This test requires disconnection of the site grounding electrode system from the power company grounded conductor, and the disconnection of all other grounds that may be connected to the site grounding system, such as telecommunications system grounds.
This is required in order to allow testing that is limited only to the site grounding electrode system. Attempting to perform measurements while the site remains connected to the extensive ground/neutral system of the power company and telecommunications utilities artificially enhances the grounding electrode system reading, resulting in measurement error.
e. Clamp-On Ohmmeter Testing Procedure
The clamp-on ohmmeter test can be performed on both single grounding electrode and multi-grounding electrode systems. However, the test can only be accurately performed on a site supplied by commercial power.
NOTE: if the electrical service provided by the power company does not contain a neutral wire that is bonded to the extensive power company ground system (such as a three-phase delta service), the clamp-on ohmmeter will not give an accurate reading. In these cases, this is because the neutral wire is locally derived at the transformer and is not part of the extensive power company grounding system; therefore, it cannot provide an effective low resistance return path.
The clamp-on ohmmeter works on the basis of injecting a known voltage into the grounding electrode system in order to create a current flow whose value is a function of the grounding electrode system resistance. The test current flows from the grounding electrode system through the earth, returning to the grounding electrode system via the power company's multi-grounded neutral wire. The meter then measures this current and converts the measurement to a resistance reading using Ohm's Law (R=E/I). As such, the meter displays a resistance of the grounding electrode system in ohms. Since the power company's grounding system is so extensive, the meter considers it to be of negligible value and disregards its effect on the reading.
This test requires disconnection of the site utility power. This is required in order to allow testing that is limited only to site grounding system. Attempting to perform measurements while the site remains connected to the utility's extensive grounding/neutral system artificially enhances ground readings that result in measurement error.
f. Combined Soil Resistivity Testing with Clamp-On Ohmmeter
Providing site soil resistivity readings along with clamp-on ohmmeter readings is at times the only method available for grounding electrode system resistance verification.
This test can be performed in the energized state where the grounding connections are accessible. Once the external grounding electrode system has been verified, the internal system can then be tested.
This test will verify only the conductivity to the main ground buss of the commercial power system. This test will not confirm the status to the exterior grounding electrode system or fall of potential.
The internal system should be visually inspected and made free of defects prior to testing.
Never disconnect any part of the grounding system while in operation. Once visual inspection has been made, a digital low resistance measurement will be made between all bolted/compressed connections and between bolted/compressed connections to enclosures. All bolted connections should be torque to NETA specifications, then retested with a digital low resistance meter. These readings should be documented in a format so that connectivity and conductivity of the grounding electrode system can be demonstrated. External grounding electrode system test procedures are performed in the de-energized state.
Internal grounding electrode system test procedures can be performed in the de-energized or energized state.
g. Recommended Changes to VHA Directive 1028
The current VHA Directive 1028 grounding testing requirement is, "Inspect and tighten ground connections. Test ground resistance for the entire facility grounding system."
It is suggested that the following criteria be added to VHA Directive 1028:
i. Perform visual inspection for bonding conductor and equipment grounding conductor condition, continuity, and termination. Correct any defects.
ii. Perform soil resistivity tests in several locations (if fall-of-potential test method is to be used).
iii. After visual inspection and correction of defects is complete, use a digital low resistance meter to measure resistance between all bolted/compressed connections and between bolted/compressed connections to enclosures. All bolted connections will be torqued to NETA specifications, then retested. These readings shall be documented in a format so that connectivity and conductivity can be calculated as to the effectiveness of the grounding electrode system through-out the systems.
iv. Ground resistance tests shall be performed using fall-of-potential method or calibrated clamp-on ground resistance tester.
Attachment A
Factor #1 Understanding of the
Requirement
1) Provide a descriptive plan showing how work will be accomplished.
2) Identify specific testing equipment to be used.
Pass
Fail
Factor #2 Technical Ability to Provide requirements
1) Provide a list that includes the key personnel performing services and their responsibilities.
2) Provide proof that the personnel providing these services are “Qualified Persons” under NFPA 70B
Factor #3 Past Performance
1) How many similar installations has your company performed within the past 5 years? List ten most recent projects of similar scope.
2) List as least five references who can attest to your ability to perform this kind of service. Please include name, address, telephone number and point of contact.
ATTACHMENT B
Location Breakers Brand CAT # Micrologic #
BLDG #1, (BW02 Shaft) B06-5 Main SqD - Powerpact PGA36100 ET 1.0I
BLDG #1, USS9 (BW116)
#2 - USS 9 Main SqD - MasterPact WA4JJR64B3SXXXXXXAV 6.0P
#3 - Normal - ATS 1 - X-RAY -
BW116 (X220H)
SqD - MasterPact WA4ATR64A3SXXXXXXA 6.0P
#4 - Normal - ATS 1 - EQ -
BW116 (ADP1H)
SqD - MasterPact WA4ATR64C3SXXXXXXA 6.0P
#5 - Normal - ATS 1 - ELV -
BW116 (EDP1H)
SqD - MasterPact WA4ASR64A3SXXXXXXA 6.0P
#6 - Normal - ATS 1 - LS -
BW116 (LDP1H)
SqD - MasterPact WA4ASR64A3SXXXXXXA 6.0P
#7 - Normal - ATS 1 - CB -
BW116 (CDP1H)
SqD - MasterPact WA4ASR64A3SXXXXXXA 6.0P
#8 - 64 Slice CT SqD - MasterPact WA4ASR64B3SXXXXXXA 6.0P
#9 - N300H SqD - MasterPact WA4ASR64A3SXXXXXXA 6.0P
#10 - NB33H SqD - MasterPact WA4ATR64A3SXXXXXXA 6.0P
#11 - N400H SqD - MasterPact WA4PPR64A3SXXXXXXA 6.0P
#12 - MCC-1108H SqD - MasterPact WA4PPR64A3SXXXXXXA 6.0P
#13 - NB30H SqD - MasterPact WA4ASR64B3SXXXXXXA 6.0P
#14 - N120H SqD - MasterPact WA4PPR64A3SXXXXXXA 6.0P
#15 - N320H SqD - MasterPact WA4ATR64A3SXXXXXXA 6.0P
#16 - NX220H SqD - MasterPact WA4ASR64B3SXXXXXXA 6.0P
#17 - N220H SqD - MasterPact WA4ASR64B3SXXXXXXA 6.0P
#18 - NDP3H SqD - MasterPact WA4AAR64A3SXXXXXXA 6.0P
#19 - Normal - ATS 1 - EQXOR
- 3W103D (A310H)
SqD - MasterPact WA4ASR64B3SXXXXXXA 6.0P
#22 - PNL PMDP SqD - MasterPact WA4AAR64A3SXXXXXXA 6.0P
BLDG #1, GDPH (BW116)
#1 Emergency - ATS 1 - CB -
BW116 (CDP1H)
SqD - Powerpact PGA36040U63AE1W 5.0P
#2 Emergency - ATS 1 - EQ -
BW116 (ADP1H)
SqD - Powerpact PGA36080U63BE1W 5.0P
#3 Emergency - ATS 1 - ELV -
BW116 (EDP1H)
SqD - Powerpact PGA36080U63AE1W 5.0P
#4 Emergency - ATS 1 - LS -
BW116 (LDP1H)
SqD - Powerpact PGA36025U63AE1W 5.0P
#5 Emergency - ATS 1 - X-RAY
- BW116 (X220H)
SqD - Powerpact PGA36080U63BE1W 5.0P
#6 Emergency - ATS 1 - 5MCC
- 5S16 (5MCC)
SqD - Powerpact PGA36040U63AE1W 5.0P
BLDG #1 (BW200)
PMDP - NB34H SqD - Powerpact JGA36250U53XEHLY 5.2E
PMDP - N130L/R SqD - Powerpact HGA36150U53XEH 5.2E
BLDG #1 (3W103B)
NDP3H - Main SqD - Powerpact PGA36120U33CLV 5.0
NDP3H - ATS 1 - EQOR -
3W103D
SqD - Powerpact PGA36080U33B 5.0
NDP3H - ATS 1 - CBOR -
3W103D
SqD - Powerpact PGA36060U33C 5.0
NDP3H - TN410 SqD - Powerpact JGA36250U31X 3.2
NDP3H - N410H SqD - Powerpact HGA36100U31X 3.2
NDP3H - SPARE SqD - Powerpact JGA36250U31XLY 3.2
BLDG #1 (3W103D)
CDP3H - Main SqD - Powerpact LGA36400U31X 3.3
CDP3H - C410H SqD - Powerpact HGA36100U31X 3.2
CDP3H - TCDP3 SqD - Powerpact JGA36250U31XLY 3.2
CDP3H - SPARE SqD - Powerpact JGA36250U31XLY 3.2
CDP3 - Main SqD - Powerpact LGA36400U31X 3.3
CDP3 - COR1A SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR1B SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR2A SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR2B SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR3A SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR3B SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR4A SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR4B SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR5A SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR5B SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR6A SqD - Powerpact HDA36100U31X 3.2
CDP3 - COR6B SqD - Powerpact HDA36100U31X 3.2
CDP3 - C402L & R SqD - Powerpact JDA36250U31XLY 3.2
CDP3 - C401 SqD - Powerpact JDA36250U31XLY 3.2
ADP3H - Main SqD - Powerpact PGA36080U31BLV 3.0
A310H - Main SqD - Powerpact LGM36400U31X 3.3
BLDG #1 GDPH-OR
(3W103D)
#2 Emergency - ATS 1 - CBOR - 3W103D
SqD - Powerpact PGA36060U63CE1 5.0P
#3 Emergency - ATS 1 - EQOR - 3W103D
SqD - Powerpact PGA36080U63BE1W 5.0P
#4 Emergency - ATS 1 - EQXOR - 3W103D
SqD - Powerpact PGA36040U63AE1W 5.0P
BLDG #1 (2W152)
X220H - CATH PANEL SqD - Powerpact LGA36400U33X 3.3S
2W174 CT SqD - Powerpact HGA36150U33X 3.2S
BLDG #1 (2W144) Breaker MD SqD – Powerpact LJL36400U31XSA 3.3
BLDG #1 (4W61A) 4BDH - Main SqD - Powerpact MGA36600LV ET 1.0
BLDG #1 (12th)
1200 - Main SqD - Powerpact MJA36800LV ET 1.0
1200H Main SqD - Powerpact RKA36120LV ET 1.0I
1200H - T1200 SqD - Powerpact MJA36350 ET 1.0
ATS - ELEVATOR SqD - Powerpact MJA36400 ET 1.0
BLDG #2 (130A)
USS2A - Main SqD - Powerpact RKF36100U44A 6.0A
201H-2 SqD - Powerpact PKA36025U31A 3.0
101H-2 SqD - Powerpact PKA36025U31A 3.0
XFMR T300 SqD - Powerpact PKA36040U31A 3.0
102H-2 SqD - Powerpact PKA36040U31B 3.0
ELEVATOR SqD - Powerpact PKA36025U31A 3.0
SPARE SqD - Powerpact PKA36025U31A 3.0
EWH-1 SqD - Powerpact PKA36025U31A 3.0
101DP-2 - Main SqD - Powerpact RGA36100CU31ALV 3.0
BLDG #7
4000A MAIN SqD – Masterpact WA6KKZ64A3SXXXXXX 6.0P (ERMS)
CHILLER #1 SqD - Powerpact RKF36160U63BE1 5.0P
CHILLER #2 SqD - Powerpact RKF36160U63BE1 5.0P
MCC 95-1 SqD - Powerpact RKA36120CU63CE1 5.0P
MCC 95-2 SqD - Powerpact RKA36120CU63CE1 5.0P
7-1-1 SqD - Powerpact LJA36400CU43XEN 5.3A
BLDG #7 (AGNUS) Chiller Generator Breaker SqD - Powerpact RGR36250CU44AABSK 6.0A
BLDG #11
#1 - Main SqD - Masterpact WA5JGR64A3SXXXXXXA 6.0A (ERMS)
#4 - Chiller #3 SqD - Masterpact WA5EER64A3SXXXXXXA 6.0A
#5 - 7-1-3 SqD - Masterpact WA5EAR64A3SXXXXXXA 6.0A
#6 - MDPH-50 SqD - Masterpact WA5EAR64A3SXXXXXXA 6.0A
BLDG #16 (ESP) (MEZZ)
GDP-OR SqD - Masterpact WA4ECR63A3FXXXXXXA 5.0P
SUB MAIN SqD - Masterpact WA4EBR44A3SXXXXXXA 5.0P
ATS 16 - BOILER SqD - Masterpact WA4AAR44A3SXXXXXXA 5.0P
GDPH SqD - Masterpact WA4AAR44A3SXXXXXXA 5.0P
ESS SWITCH GEAR SqD - Masterpact WA4AAR44A3SXXXXXXA 5.0P
BLDG #16 (MEZ) MDP SqD - Powerpact MJP36500 ET 1.0
BLDG # 41 (B25)
MDPH-41 – MAIN SqD - Powerpact MG 600 ET 1.0
EDPH-41 - MAIN SqD - Powerpact MG 800 ET 1.0
BLDG #41 (DOTTY)
RESEARCH GENERATOR (KOHLER
400)
SqD X-6304-117 none
BLDG #42 (B41B) MDPH-42 – MAIN SqD - Powerpact MG 800 ET 1.0
BLDG #43
Normal Main SqD - MasterPact WA4EAR44A3SXXXXXXA 6.0A
Normal - ATS 43 - CB SqD - MasterPact WA4ASR44A3SXXXXXXA 6.0A
Normal - ATS 43 - EQ SqD - MasterPact WA4ASR44A3SXXXXXXA 6.0A
Normal - ATS 43 - LS SqD - MasterPact WA4PWR44A3SXXXXXXA 6.0A
Normal - ATS 1 - BIO - SB12A SqD - MasterPact WA4AAR44A3SXXXXXXA 6.0A
Emergency Main SqD - MasterPact WA4EAR44A3SXXXXXXA 6.0A
Emergency - ATS 43 - CB SqD - MasterPact WA4ASR44A3SXXXXXXA 6.0A
Emergency - ATS 43 - EQ SqD - MasterPact WA4ASR44A3SXXXXXXA 6.0A
Emergency - ATS 43 - LS SqD - MasterPact WA4PWR44A3SXXXXXXA 6.0A
Emergency - ATS 1 - BIO - SB12A SqD - MasterPact WA4AAR44A3SXXXXXXA 6.0A
BLDG #44
N2 - South Main - Coralville (Left) SqD - MasterPact WA4FFR74A3CFFFXXCA 6.0H
N3 - SB02H SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N4 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N5 - 1000A BUS SqD - MasterPact WA4EER74A3SXXXXXXA 6.0H
N6 - TB05-3 SqD - MasterPact WA4AAR74A3SXXXXXXA 6.0H
N7 - 301-1H SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N8 - PNL 505H SqD - MasterPact WA4AAR74A3SXXXXXXA 6.0H
N9 - B05-2H SqD - MasterPact WA4AAR74A3SXXXXXXA 6.0H
N10 - 11MCC SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N11 - PNL 108H SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N12 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N13 - PNL 1200H SqD - MasterPact WA4EER74A3SXXXXXXA 6.0H
BLDG #44
N14 - Normal - ATS 1 - 5MCC SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N15 - BLDG #1 EMG SWBD SqD - MasterPact WA4EAR74B3SXXXXXXA 6.0H
N16 - TIE BREAKER SqD - MasterPact WA4FFR74A3CFFFXXCA 6.0H
N17 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N18 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N19 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N20 - B05-1H SqD - MasterPact WA4EER74A3SXXXXXXA 6.0H
N21 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N22 - SPARE SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N23 - B06-1H SqD - MasterPact WA4EER74B3SXXXXXXA 6.0H
N24 - T1000 SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N25 - 600A BUSS SqD - MasterPact WA4EAR74A3SXXXXXXA 6.0H
N26 - North Main - Iowa City (Right)
SqD - MasterPact WA4FFR74A3CFFFXXCA 6.0H
BLDG #45 (MARLEY)
EMERGENCY GENERATOR MAIN
BREAKER
SqD - PowerPact 244-9920 5.0P
BLDG #50 MDPH-50 SqD - PowerPact PJA36080U33ALV 5.0
BLDG #1 (SB12A) ATS 1 - BIO - SB12A ASCO 7000 J7ACTBB30260N5XC 260
BLDG #1 (BW116)
ATS 1 - X-RAY - BW116 (X220H) ASCO 7000 J7ACTBB30600N5XC 600
ATS 1 - EQ - BW116 (ADP1H) ASCO 7000 J7ACTBB30600N5XC 600
ATS 1 - ELV - BW116 (EDP1H) ASCO 7000 J7ACTBB30400N5XC 400
ATS 1 - LS - BW116 (LDP1H) ASCO 7000 J7ACTBB30260N5XC 260
ATS 1 - CB - BW116 (CDP1H) ASCO 7000 J7ACTBB30400N5XC 400
BLDG #1 (3W103D)
ATS 1 - CBOR - 3W103D ASCO 7000 J7ACTBB30400N5XC 400
ATS 1 - EQOR - 3W103D ASCO 7000 J7ACTBB30600N5XC 600
ATS 1 - EQXOR - 3W103D ASCO 7000 J7ADTBB30400N5XC 400
BLDG #1 (5S16) ATS 1 – 5EQ - 5S16 (5MCC) ASCO 7000 400
BLDG #1 (12th) ATS 1 - ELV - (12TH) Zenith ZTSH40EC-5 400
BLDG #7 (Chiller Plant) ATS - Chiller ASCO 7000 F7ACTBC34000N5XM 4000
BLDG #16 (Boiler Plant) ATS 16 - BOILER ASCO 7000 F7ACTBC3600N5XC 600
BLDG #40
ATS-4 KOHLER MODEL K KCT - AMWA - 0400S 400
ATS-3 KOHLER MODEL K KCT - AMWA - 0230S 230
BLDG #41
ATS-2-41 KOHLER MODEL K KCT - AMWA - 0230S 230
ATS-1-41 KOHLER MODEL K KCT - AMWA - 0400S 400
BLDG #42
ATS-E ASCO 7000 D07ATSC30100N50C 100
ATS-X ASCO 7000 J07ATSC30400N50C 400
BLDG #43 (Courtyard)
ATS 43 - CB ASCO 7000 J7ACTBB30400N5XC 400
ATS 43 - EQ ASCO 7000 J7ACTBB30400N5XC 400
ATS 43 - LS ASCO 7000 J7ACTBB30150N5XC 150
Location Main Feeder Breakers Brand CAT # Schweitzer #
BLDG #7 MEZZ
2U - BLDG #16 Boiler Plant SqD V5D7133Y000 SEL-351A
2L - Spare SqD V5D7133Y000 SEL-351A
3U - BLDG #1 - T4 South Transformer
SqD V5D7133Y000 SEL-351A
3L - Spare SqD V5D7133Y000 SEL-351A
4L - Iowa City Main SqD V5D7133Y000 SEL-351
6L - BLDG #11 - T8 - Chiller #3 SqD V5D7133Y000 SEL-351A
7L - Left Tie (NC) SqD V5D7133Y000 SEL-351A
8L - Bertha Generator
(2000KW)
SqD V5D7133Y000 SEL-300G
9L - Right Tie (NO) SqD V5D7133Y000 SEL-351A
12L - Coralville Main SqD V5D7133Y000 SEL-351
13U - BLDG #20, 40, 41, 42 SqD V5D7133Y000 SEL-351A
13L - Spare SqD V5D7133Y000 SEL-351A
14U - BLDG #2 SqD V5D7133Y000 SEL-351A
14L - BLDG #1 - T3 North Transformer
SqD V5D7133Y000 SEL-351A
15U - T1 - Chiller #4/5 SqD V5D7133Y000 SEL-351A
15L - Spare SqD V5D7133Y000 SEL-351A
16U - Space - No Breaker SEL-351
16L - T7 Clinical Addition SqD V5D7133Y000 SEL-351A
MEZZ Breaker Location
Transformers 13.8 - 480 Brand CAT # KVA
15U T1 (BLDG# 7), Chiller #4, #5, (4000A Bolt Lock) SqD 2694042819 2500
14U T2 (BLDG #2), USS2A SqD TX02558001 750
14L T3 (BLDG #44, Right), (North Courtyard XFMR) SqD F5EE14722L 1500
3U T4 (BLDG #44, Left), (South Courtyard XFMR) SqD F5EE14722K 1500
2U T5 (BLDG #16), Boiler Plant WESTINGHOUSE A37E533GTP 300
16L T7 (BLDG #1), CA - USS9 SqD F5EE147T27 1500
6L T8 (BLDG #11) (Under BLDG
#7 MEZ)
SqD F5EE1487DP 1500
13U T9 (BLDG #41), Research SqD F5EE0165SN 1000
VHA DIRCTIVE 1028 is attached to this solicitation as VHA DIRCTIVE 1028.
Title
Tri-Annual Electric Testing services to support the Sioux Falls VA Facility
General Overview
The Contractor shall perform electrical system studies for the Sioux Falls VA Health Care System located at 2501 West 22nd Street, Sioux Falls, SD 57105 as noted in this Scope of Work (SOW) and other contract documents. This contract shall complete all items noted in VHA Directive 1028 Facility Electrical Power Systems for a 3-year inspection.
The Sioux Falls VA Technical Representative is Timothy Wakefield.
Place of Performance
Sioux Falls VA Health Care System 2501 West 22nd Street Sioux Falls, SD 57105
Period of Performance
Period of performance runs 12-01-2022 to 11-30-2023.
Scope of Work
a. All work shall be accomplished in strict compliance with VHA Directive 1028 Facility Electrical Power Systems requirements, NFPA-70E, Current Edition (Standard for Electrical Safety in the Workplace); and IEEE 242-2001, Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems. All survey work will be accomplished on energized equipment unless an outage is required due to specific equipment safety conditions which the Contractor shall address and indicate in the power outage request. All requests for outages shall be submitted in writing to the Sioux Falls VA Technical Representative a minimum of thirty (30) days in advance. Request shall state reason, date, exact time of, and approximate duration of such interruption. Electrical systems may NOT be interrupted without prior written approval of the Technical Representative. Work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of the Sioux Falls VA Health Care System. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours at no additional cost to the Government.
b. Appropriate personal protective equipment (PPE) shall be used for all required work, such as where it is necessary to remove covers/open equipment thereby exposing live buses or other energized components.
Tests and records for PPE should be provided to VA Technical Representative for review (ie glove testing).
c. Sioux Falls VA Health Care System staff (VA Technical Representative, VA
Electricians, etc.) shall observe work done under this contract, but shall not perform the work. The Contractor shall have or shall hire licensed journeyman level qualified staff for accessing/opening electrical equipment. Therefore, the Contractor shall provide or hire an electrician, have proper staffing, PPE, and equipment to perform such tasks without VA assistance.
d. The Contractor shall conduct an entrance briefing with the VA Technical
Representative and others as deemed necessary by local leadership upon arrival at the Medical Center. The Contractor shall use the meeting to introduce their team and to discuss the procedures for the work required under this contract. The Contractor shall provide a written survey of compliance plan and have the VA Technical Representative review the document. This document shall be based upon VHA Directive 1028, Electrical Power Distribution Systems, NFPA-70E, Current Edition (Standard for Electrical Safety in the Workplace) and IEEE 242-2001, Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems. At the completion of each site survey, the Contractor shall conduct a short exit briefing with the Medical Center Director or designee to discuss any major problems or life- threatening issues if any are discovered during the survey. All information obtained during site visits or any conditions discovered during subsequent calculations shall be kept in strict confidence.
e. The electrical system study will include site visits to the Sioux Falls VA Health
Care System by a team assembled by the Contractor. The contractor’s team members will consist of experienced, professional staff having extensive knowledge in the field of electrical power and shall include at least one registered professional electrical engineer. All team members shall be part of the current standing VISN 23 AE IDIQ. The Contractor will be responsible for obtaining all necessary data for these reports from as-built drawings, field investigations and from available Sioux Falls VA Health Care System staff (utilizing the staff’s knowledge and familiarity of the facility electrical systems).
Information for site electrical utilities will also be gained from as-built drawings and contractor’s personal inspection of these utilities.
f. Provide the VA Technical Representative with a project schedule within 14 days of issuance of the NTP for approval and thereafter provide a weekly project status report summarizing the study’s overall progress against the projected schedule. The weekly project status report's goal is to keep all stakeholders informed of progress, mitigate issues before they arise, and ensure that the project will land within the scope schedule. The contractor shall distribute a meeting agenda before each meeting is to take place and distribute meeting minutes after.
g. Qualifications
1. Electrical work must be completed by a licensed electrician
2. Electrical work will be completed on 13.8kV electrical systems and electrician must provide documentation showing qualifications for work on medium voltage systems
h. Key Personnel
• VA
Contracting Officer
Sioux Falls VA Health Care System Technical Representative VISN 23 Capital Asset Manager (CAM) or representative
• Contractor
Office Project Manager Site Superintendent Journeyman Electrician and other licensed electricians Additional Staff Required for System Studies and Review
VA FURNISHED ITEMS
a. Drawings. Available “As-built” drawings are not 100% accurate and will need verification by the Contractor. Not all buildings have “As-Built” drawings.
b. A list of buildings to be assessed. The list shall identify each building (by common name and building number), the current function and total gross square footage. This information is only to be used to assist in determining costs for the required services.
Building # Building Use Building Square Footage
Building 1 Business, Mental Health in-patient and out-patient
52816
Building 5 Business, Assembly, Dental, Warehouse, Health Care, Surgery, Nursing Home and more…
330610
Building 51 Integrated Health 2897 Building 16 Business 6104 Building 17 Business 4094 Building 28 Research 5818 Building 38 Business 24445 Building 7 Engineering Shops 3780 Building 8 Laundry 7108 Building 9 Mechanic Shop 4148
Building 11 Boiler Plant 6662 Building 19 Gas House 120 Building 24 Auxiliary Power Unit 226 Building 27 Electrical Switchgear 1198 Building 50 Generator Building 1662 Building 51 Emergency Management 1162
Building T15 Storage 3035
c. Plans and One-line Diagrams. Available site plan, incoming electrical service and primary distribution system one-line diagram and basic one-line diagrams for the buildings at the Sioux Falls VA Health Care System. Not all the buildings have one-line drawings, nor is all the information on the plans and diagrams up to date, etc. The plans and one-line drawings shall require verification work.
d. VHA Directive 1028.
e. Additional drawings, if available, as required by the contractor to verify existing field conditions.
f. Sioux Falls VA Health Care System Personnel: Individuals knowledgeable of the existing electrical systems shall accompany the Contractor’s team members during the site investigation. The contractor shall coordinate and verify schedule and personnel, with the VA Technical Representative, in advance of site visit(s). VA Technical Representative Engineer shall ensure that medical center personnel are available to accompany the survey team. In the event of an operation emergency, assistance from Sioux Falls VA Health Care System staff will be intermittent.
Contractor must have skilled staffing and equipment to perform task without VA assistance.
g. Any significant electrical maintenance and testing reports performed at the Sioux Falls VA Health Care System.
h. Previous ARC Fault/Electrical Study. Information contained within an Electrical System Study completed in 2020. No other information available.
DELIVERABLES
a. For the 95% and Final submissions, provide hard copies and electronic copies (compact disc) of the electrical system study (including data files).
1. Copies of each submittal shall be provided to:
- Sioux Falls VA Technical Representative
2. Drawings (Qty 3 - half-size for site, primary one-line diagram and secondary one-line diagrams). Use the latest version of AutoCAD (compatible with the local VA’s version) and provide the viewer on each CD. For the Final Study Submittal, the local VA shall receive “live” CADD drawing files which can be manipulated and updated.
3. Reports shall be loose leaf, three-hole punched, in an appropriately sized binder to include all data and drawings. Each binder shall include a cover sheet including, but not limited to, the VA’s name, VISN, location (City and State) and date. In addition, an insert including this information shall be inserted into the “spine” of the binder. (3 full sets to be provided)
4. Submit a proposed schedule for completion of each of the studies.
b. 95% submission SHALL include:
1. Include an updated Executive Summary.
2. Minutes of the Entrance Briefing with the VA Technical Representative to include
VHA Directive 1028 and Compliance Survey.
3. Deficiencies report and cost estimates.
4. All items identified (below and shall be as a separate tab or section) to include, but shall not be limited to:
A. One-Line Diagrams B. Grounding Analysis C. Hazard-Risk Table D. Recommendations E. Cost Estimates
5. Completed analysis and calculations for the entire Primary and Secondary Distribution.
6. Completed one-line diagrams. Each building on the Building List that attached to the Scope of Work shall be identified on the diagrams.
7. Provide hardcopy and electronic files for the following:
A. Updated Site plan to show current electrical distribution system duct banks, manholes, transformers, etc.
B. Updated Main Medical Center building floor plans with current electrical distribution system equipment, panelboards, MCC’s, etc.
C. Updated One-Line drawings for the Sioux Falls VA Health Care System electrical distribution systems.
D. Updated secondary One-Line drawings for buildings and equipment, etc.
c. For Final Submission, provide four hard copies and four electronic copies
(compact disc) of the electrical system study (including data files).
1. A completed report, including all corrected data from the 95% submittals and the coordination curves shall be printed in color.
2. Responses to the 95% submission comments from Sioux Falls VA Health
Care System staff and VISN 23 CAM staff.to include Peer Review comments including annotations and response.
3. Electronic copy (CD) of the entire report including all SKM data, AutoCAD, Word, Excel files and PDF.
4. Color photos that show devices listed on the deficiency report.
5. Provide final report shall include the followings:
A. The Executive Summary.
B. Cost Estimates.
C. Responses to the 95% submission comments from VACO, VA CFM, VAMC, and Peer Review, including annotations and response.
D. In addition to previous sizes One-line diagrams for primary distribution system on 11”x17" including laminating.
Electronic copies (CD) of the entire report including AutoCAD, Word, Excel files and PDF formats.
SPECIFIC SCOPE
The Contractor shall prepare a complete all testing required per VA Directive 1028 on the 3-year cycle for each building. Each of the key focus areas are listed below.
One Line Diagrams:
The one-line diagrams shall show the schematic wiring of the electrical distribution system for each building. Include all electrical equipment and wiring protected by the over current devices.
(Must reference 2016 one-line drawings for example of expectations)
The one-line diagrams the following specific information:
Calculated Short Circuit values at each bus.
Breaker and fuse ratings.
Transformer kVA, voltage ratings and wiring connections.
Voltage at each bus.
Identification of each bus.
Conduit material, feeder sizes and lengths.
Generator kW and voltage ratings.
Room Number for each electrical equipment including, but not limited to, the panelboard, disconnect, and transformer, etc
Infra-Red Scanning/Thermographic Survey shall be performed on electrical equipment.
The Contractor shall use an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .