S02 - Division Construction Costs - E Wing HVAC Upgrade.docx

DOCX document 27 KB Posted

Attached to
VISN 21 MACC Group 2 - E Wing AHU Upgrade
Solicitation number
36C26123R0099
Issued by

About this file

This document provides a divisional cost breakdown template for the E Wing HVAC Upgrade project. The template includes line items for construction cost divisions 0 through 34 and requests the contractor to provide a total price for each division. Additional line items are included for other costs, bonds and insurance, overhead, profit, and a grand total. The contractor is instructed to sign and date the completed form.

The related federal contract opportunity is a solicitation to upgrade the air handling units for the E Wing under the VISN 21 MACC Group 2 contract with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. Solicitation number 36C26123R0099 requests pricing for the E Wing AHU upgrade project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION CONSTRUCTION COSTS

Title: E Wing HVAC Upgrade

SOLICITATION: 36C26123R0099 PROJECT: 459-20-002

Provide Complete Divisional Cost Break-Out for Complete Project

*If necessary, add additional lines for each Division applicable to this project.

**This document is to be used only for price analysis

REF
DESCRIPTION
TOTAL

00000

DIVISION 0-SPECIAL SECTIONS
$
01000
DIVISION 1-GENERAL REQUIREMENTS
$
02000
DIVISION 2-EXISTING CONDITIONS
$

03000

DIVISION 3-CONCRETE
$

04000

DIVISION 4-MASONRY
$

05000

DIVISION 5-METALS
$
06000
DIVISION 6-WOOD AND PLASTIC
$

07000

DIVISION 7-THERMAL AND MOISTURE PROTECTION
$

08000

DIVISION 8-DOORS AND WINDOWS
$

09000

DIVISION 9-FINISHES
$

10000

DIVISION 10-SPECIALTIES
$

11000

DIVISION 11-EQUIPMENT
$

12000

DIVISION 12-FURNISHINGS
$

13000

DIVISION 13-SPECIAL CONSTRUCTION
$

14000

DIVISION 14-CONVEYING EQUIPMENT
$

21000

DIVISION 21-FIRE SUPPRESSION
$

22000

DIVISION 22-PLUMBING
$

23000

DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING
$

26000

DIVISION 26-ELECTRICAL
$

27000

DIVISION 27-COMMUNICATIONS
$

28000

DIVISION 28-ELECTRONIC SAFETY AND SECURITY
$

31000

DIVISION 31-EARTHWORK
$

32000

DIVISION 32-EXTERIOR IMPROVEMENTS
$

33000

DIVISION 33-UTILITIES
$

34000

DIVISION 34-TRANSPORTATION
$

SUB TOTAL:

OTHER

BONDS AND INSURANCE

OVERHEAD

PROFIT

TOTAL

__________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .