This document summarizes responses to vendor questions regarding solicitation number 36C26123R0099 for the E Wing AHU Upgrade at the Veterans Health Administration VISN 21 MACC Group 2 contract. The responses provide clarification on project requirements such as allowing an extended project duration of 60 weeks for new air handler equipment with long lead times. Temporary cooling requirements and locations are also specified. Additional details are given on fire alarm and sprinkler work scopes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26123R0099 - E Wing AHU Upgrade RFI’s

RFI #1 – RFP calls for the project to be completed in 270 calendar days. The lead time for AHU Equipment is approximately 60 weeks out, can the project duration be extended?

RCC: Equipment lead times are still trending around this long, sometimes shorter. Recommend for the VA to extend as needed for the approved air handlers per contractor feedback.

RFI #2 – In reference to GI100, Phasing Notes under Rooms that need temporary cooling, please provide required capacity or tonnage of temp AC needed to provide per room per Level. Please confirm if outside air duct of the temp AC can be release above ceiling.

RCC: The preferred method of temporary cooling is by portable AC units per room, with heat rejection to route above ceiling into plenum space.

RFI #3 – Please provide construction drawings and details for the fire alarm system including location of the new duct smoke detectors, new smoke or fire dampers and other fire alarm devices such as addressable relays, etc..that need to be replaced or install per floor at Mechanical Room.

RCC: Fire Alarm devices are called out on the electrical drawings. Exact location and installation method is on the contractor to coordinate in the field. See response to RFI#5.

RFI# 4 – Please provide as-built of the Fire Alarm system at each Mechanical Rooms with schematic or riser diagram. Please provide the manufacturer and brand of the fire alarm panel to connect the fire alarm devices.

VA Response: A fire panel alarm and sensor upgrade is anticipated to complete prior to construction of the E- Wing AHU Upgrades. See Attachment 1 for the 100% Construction Design Drawings. Construction to complete in June 2024. The manufacturer of the new fire alarm panel is Notifier.

RFI#5 – The fire alarm system for E-Wing will be upgraded soon in a different VA project that was recently awarded which includes the Mechanical Rooms fire alarm devices. Please advise if this scope of work will be descope from this solicitation since it is covered by a different contract already.

VA Response: New fire alarm devices shall be descoped from this solicitation. However, the Contractor is responsible for removal and re-installation of fire alarm devices as required during construction.

RFI#6 – In reference to EP101, enlarge plans for electrical room 1B-106, C1-1 and 2C-110D RCC: Enlarged Plans are shown for those rooms, with relevant information included. RFI is not understandable.

RFI#7 - Fan schedule Note 1 on sheet T1-M-002 states 1-VFD serving the duplex fans but also calls for a dedicated fully redundant VFD. Electrical drawings do not show the redundant VFD. Is intent to have 1-VFD per motor or is intent to have 2 separate electrical feeders with 1-VFD on each feed?

RCC: There is a single point for an electrical connection that will serve both the primary and the redundant VFD.

So there is one feeder to the equipment which will have 2 VFDs.

RFI#8 - Can temp cooling be staged outside building near parking lot?

RCC: No. The preferred method of temporary cooling is by portable AC units per room, with heat rejection to route above ceiling into plenum space.

RFI#9 – Please provide anticipated location of the new riser or floor to floor/ wall to wall penetration as the existing condition where the existing disconnect safety switch and VFD is tight and looks like no space to penetrate.

RCC: The conduit riser was anticipated to be located in the northwest corner of the mechanical room (see drawing below). Coordinate exact route in the field.

RFI#10 – In reference to Drawings T1-AS101 to AS103. Please confirm that the mechanical rooms walls/ partition are non-rated walls as no rating drawn in the plans.

RCC: Room walls are not rated per existing fire protection plans.

RFI#11 – In reference to firestop scope of work, please advise what brand or manufacturer is the VA currently using in E-Wing? Also please provide typical firestop detail required for this project on both floor to floor penetration and wall to wall penetration.

RCC: Details provided below.

RFI#12 – Please advise thickness of the existing concrete floor slab to be cored for new conduit riser. Please confirm RCC: Slab thicknesses vary. Field verify location of holes to avoid drilling through joists and other large supporting members.

RFI#13 – Please confirm no hazardous abatement scope of work anticipated in this solicitation such as lead or asbestos abatement. Is there a current hazardous survey report available? If so please provide.

RCC: Hazardous materials was not expected and is not in scope of work. No hazardous materials were identified during site survey.

RFI#14 – Please confirm no repair of exiting flooring coating is anticipated in this scope of work as no spec has been provided.

RCC: Per VA. Not anticipated to be included.

RFI#15 – Drawing T1-GI100 Phasing notes Phase 1B states to core slabs and provide new electrical risers in mechanical spaces to prepare for new equipment connections. While drawing T1-E-501 detail 1 – Existing partial one line diagram – demo shows only demolition of circuit breaker, conduit and wire up to BMECH Panel and BMECH Panel. No demolition of electrical riser from BMECH Panel up to the AHUs per floor. Please clarify scope of work regarding the existing electrical riser from BMECH Panel up to AHUs per floor.

RCC: The conduits and cables to existing AHUs will be removed back to BMECH Panel after removed from demo’ed AHUs.

RFI#16 - During the site visit, the Mechanical Rooms become storage area for tools/ carts/ spares/ etc..please confirm if these will be removed by the VA prior starting of construction work at no cost to the General Contractor.

RCC: VA to clear out rooms as needed. Contractor to provide a month notice to provide ample time to empty out mechanical rooms as needed prior to transitioning from mechanical room to the next.

RFI#17 – Please confirm VA Facility Maintenance to support the General Contractor during outages for Electrical, Fire Sprinkler and Mechanical Systems including turning on/ off electrical panels for lock out tag out, on/ off existing valves, draining to existing floor drain/ filling up water for flushing, hydrotesting, etc on fire sprinkler/ mechanical system per floor, during work hours, off hours and weekends as needed at no cost to the General Contractor.

VA response: VA can support.

RFI#18 - Please advise location and sq footage of lay down area and staging area for this solicitation.

VA Response: Staging location is approximately 40 sq ft X 40 sq ft. See photo below.

RFI#19 – Please confirm Contractor can use and have access to existing elevators for personnel and material handling use for this project.

VA Response: Elevator can be used by the contractor before and after business hours. The contractor will be responsible in protecting the interior of the elevator. Contractor shall be aware and shall not exceed the weight limit that is posted within the elevator.

RFI#20 - Specs 230923 states to use Pitot type airflow station. Confirm that contractor can use Accutrol type airflow station.

RCC: Per VA. Contractor to provide submittal for preapproval.

RFI#21 - Specs 230923 state airflow stations to be rated for 250 degF. This is an expensive add, standard ones are rated at 120 degF.

RCC: Per VA. This should be acceptable since the air handlers do not have heating capability.

RFI#22 - Per phasing plan, occupants on each floor can chose to stay or vacate during construction. Please provide hours of operation for each floor and confirm no temporary cooling required for rooms not specified.

VA Response: Occupants may choose to work in their office. It will be up to their leadership if they will be allowed to work from home. However, cooling may not be required for areas that are not identified.

“***PHASE 2,3,4,5 - VACATING THE FLOOR DURING CONSTRUCTION WILL NEED TO BE

COORDINATED WITH OCCUPANTS OF EACH FLOOR. IT WILL BE UP TO EACH FLOOR IF THEY

WANT TO VACATE. IF CONTRACTOR IS REQUESTING FOR OCCUPANTS TO VACATE, VA

REQUIRES A MINIMUM OF 14 DAYS ADVANCE NOTICE FOR EACH FLOOR.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

FIRE PANELS ALARM AND

ASSOCIATED SENSORS

UPGRADE

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

FULLY SPRINKLERED

WVS RR

G-001

COVER SHEET

FIRE PANELS ALARM AND ASSOCIATED SENSORS

UPGRADE

459 PATTERSON ROAD

HONOLULU, HI 96819

APOGEE PROJECT #: 19-148VA PROJECT #: 459-16-106

PROJECT SITE MAP

HONOLULU VAMC

N

SCALE: NTS

PROJECT LOCATION MAP

HONOLULU VAMC

N

SCALE: NTS

DRAWING LIST

1 2

DocuSign Envelope ID: 7A00D387-BA17-4E36-BAED-87F57688728F

5/18/2022

JSherwood Stamp

VHAHONTangR Highlight

VHAHONTangR Highlight

VHAHONTangR Highlight

VHAHONTangR Highlight

VHAHONTangR Highlight

VHAHONTangR Highlight

VHAHONTangR Highlight

VHAHONTangR Highlight

VHAHONTangR Highlight

VHAHONTangR Highlight

VHAHONTangR Highlight

GENERAL NOTES

ABBREVIATIONS

INFECTION CONTROL RISK ASSESSMENT NOTES:

FIBER OPTIC

SINGLE MODE

MULTIMODE

DRIVE

STREET

CONCRETE MASONRY UNIT

EQUAL

STAINLESS

NOT RATED

ABOVE FINISHED FLOOR

EXPANSION JOINT

CONTROL JOINT

QUICK RELEASE SPRINKLER

FAHRENHEIT

LIMIT OF DEMOLITION

EXISTING

NEW

NOT IN CONTRACT

EXPOSED TO STRUCTURE

NOT TO SCALE

SIMILAR

BUILDING

PHONE

INCORPORATED

SOUTH

DEAD LEG

GALLONS PER MINUTE

ON CENTER

CONTRACTING OFFICER REPRESENTATIVE

PUBLIC ADDRESS MASS NOTIFICATION SYSTEM

INFORMATION TECHNOLOGY

FO

SM

MM

DR.

ST.

CMU

EQ.

STL.

NR.

A.F.F.

EJ

CJ

Q.R.S.

°F

(E)

(N)

N.I.C.

E.T.S.

N.T.S.

SIM.

BLDG.A.

PH.

INC.

S.

DL

GPM

O.C.

COR

PAMNS

IT

1. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, MEASURING EXISTING DIMENSIONS AND OBSERVING

EXISTING CONDITIONS BEFORE BEGINNING WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION. CONTRACTOR TO FIELD

VERIFY ALL DIMENSIONS OF EXISTING SITE CONDITION PRIOR TO START OF WORK AND ORDERING OF MATERIALS.

2. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFECTION CONTROL PRECAUTION MEASURES BASED ON THE TYPE AND LOCATION OF

WORK BEING PERFORMED. CONFIRM PRECAUTION MEASURES WITH COR PRIOR TO BEGININING WORK IN SAID AREA.

3. PENTRATIONS THRU RATED CONSTRUCTION (FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS, SMOKE PARTITIONS, HORIZONTAL ASSEMBLIES, AND VERTICAL OPENINGS) SHALL MAINTAIN CONTINUITY OF RATED CONSTRUCTION. CONTRACTOR

RESPONSIBLE FOR IDENTIFYING RATED AREAS AND FIRESTOPPING ALL PENETRATIONS. CONTACT COR AND A/E FOR CLARIFICATION AS

NEEDED. VA GUIDELINES STATE ALL RATED CONSTRUCTION TO BE CLEARLY LABELED.

4. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE DIVISION 1 SPECIFICATIONS

5. CONTRACTOR TO PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES. (IF DAMAGED, REPAIR, PATCH, REPLACE, OR SAND SMOOTH AND TO MATCH EXISTING ADJACENT MATERIALS.)

6. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY WHEN DISCREPANCIES TO THE DRAWINGS ARE FOUND IN THE FIELD.

7. CONTRACTOR TO INSTALL TEMPORARY BALL-IN-TUBE SYSTEM TO MONITOR AND ENSURE PRESSURE LEVEL TO MEET VA GUIDELINE

WITHIN CONSTRUCTION AREA. (CONTRACTOR TO VERIFY LOCATIONS) WITH VA COR PRIOR TO INSTALLATION.

ICRA CLASSIFICATIONS

BUILDING RISK

GROUP

CONSTRUCTION PROJECT

ACTIVITY

CLASSIFICATION

BUILDING T1 (E-WING)

BUILDING 30 (ACC)

BUILDING 32

(PARKING GARAGE)

BUILDING 110 (CFA)

LOW RISK

HIGH RISK

LOW RISK

HIGHEST RISK

TYPE B

TYPE B

TYPE B

TYPE B

CLASS II

CLASS II

CLASS II

CLASS III

NOTE: REFERENCE VA PACIFIC ISLANDS HEALTHCARE SYSTEM INFECTION CONTROL ASSESSMENT MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION IN CONSTRUCTION DOCUMENTS FOR FURTHER INFORMATION.

CLASS III ICRA REQUIREMENTS ONLY APPLY TO BUILDING 110 FCP WORK.

DEMO KEY NOTES

KEY NOTES

1. PLASTIC BARRIER WITH ZIPPER ACCESS. SEE DETAIL THIS SHEET.

2. ZIPPER ACCESS POINT.

3. REMOVE EXISTING BASE.

4. RELOCATE ALL DEVICES LOCATED IN EXISTING WALL TO FACE OF NEW 6" STUD WALL.

1. ADD 6" 20 GA. METAL STUD WALL TIGHT TO EXISTING WITH 5/8" TYPE X GYPSUM BOARD TO 8" ABOVE EXISTING CEILING. TAPE AND FINISH, LEVEL 4, AND PREP WALL FOR PAINT. PAINT WALL, COLOR TO BE SELECTED BY VA, 1 COAT PRIMER, 2 COATS LATEX, EGGSHELL.

2. INSTALL NEW BASE TO MATCH EXISTING.

3. EXISTING ACT CEILING TO REMAIN. TRIM GRID AND TILES TO FIT TO NEW STUD WALL.

X

X

* OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.

COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.

SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE COR.

COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISINFECTANT. REMOVE ISOLATION OF HVAC SYSTEM

IN AREAS WHERE WORK IS BEING PERFORMED.

COVER ALL RETURNS AND SUPPLY DUCTS AT THE GRATE/DIFFUSES WITH FILTER MEDIA OR BLANKED OFF ENTIRELY PER ICRA

REQUIREMENTS.

KEEP CONSTRUCTION SITE CLEAN AND NEAT AT ALL TIMES.

CONTRACTOR TO CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR COR TO INSPECT.

VA ECM STAFF WILL PERFORM FINAL VERIFICATION OF CLEANING AND SANITATION. COR TO PERFORM FINAL INSPECTION.

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H

E I G

H T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

F.F.

PLASTIC SHEET BARRIER NON RATED

6 MIL PLASTIC SHEET

BARRIER

EXISTING WALL

ASSEMBLY

EXISTING CEILING

BOTTOM SEALING

RUNNER

TOP SEALING

RUNNER

SUPPORT POLES,

QUANTITY PER

MANUF.

RECOMMENDATIONS

AS

REQU.

1A106

TOILET

1A104

TOILET

1A103B

VET SVC

1A103C1A103D

OFFICE1A103E

DIRECTOR

1A-103A

OFFICE

1A-103

ELEVATORELEVATOR

SNACK

SHOPRECEPTION

WAITING AREA

SECURITY/

1A-101

INFO

SLOPE

OFFICE OF VET SVC

STAIR

FAMILY

(STATE OF HAWAII)

WOMENS

TOILET

MENS

OFFICE

NO-1

A102

A102

WAITING AREA

WAITING AREA

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

FIRE PANELS ALARM AND

ASSOCIATED SENSORS

UPGRADE

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

FULLY SPRINKLERED

WVS RR

E-WING - FLOOR PLANS AND ICRA

INFORMATION

A-102

HEPA CART DETAIL

ICRA BARRIER WALL TYPE

SCALE 1/ 2 " = 1' - 0"

SCALE 3/4 " = 1' - 0"

1 E-WING BUILDING PARTIAL PLAN

SCALE: 1/8" = 1' 0"

NORTH

PLAN

0 4 8 16

2 ENLARGED PLAN - DEMOLITION

SCALE: 1/4" = 1' 0"

0 2 4 8

NORTH

PLAN

3 ENLARGED PLAN - NEW WORK

SCALE: 1/4" = 1' 0"

0 2 4 8

NORTH

PLAN

E-WING

DocuSign Envelope ID: 7A00D387-BA17-4E36-BAED-87F57688728F

5/18/2022

PHARMACY

B-A101

ELEVATOR ELEVATOR

B-A100

B-A104

B-A105

ELECTRICAL

B-A101B

TO

C

RA

WL S

PA

CE

B A106

MEN

IRM

B-A107

MECHANICAL

ROOM

TO

C

RA

WL S

PA

CE

TO CRAWL SPACE

B-A103

WOMEN

IRM

STORAGE

STAIR

CORRIDOR

F

F

S

SD

F

F

F

F

F

S

F

SD

F

S

F

S

F

S

F

S

F

S

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

HONOLULU VA,

UPGRADE FIRE ALARM

PANELS AND SENSORS

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

KEY NOTES:

SHEET NOTES:

FULLY SPRINKLERED

FIRE ALARM SYMBOL LEGEND

FIRE ALARM PULL STATION

SYMBOL DESCRIPTION

F

F

S

FIRE ALARM SPEAKER

FIRE ALARM STROBE

FIRE ALARM SPEAKER AND STROBE

FIRE ALARM DOOR OPEN HOLDER

FIRE ALARM PHOTOELECTRIC SMOKE

DETECTOR

FIRE ALARM CEILING MOUNTED SPEAKER

DD

FIRE ALARM DUCT SMOKE DETECTOR W/

ADDRESSABLE RELAY

FIRE ALARM HEAT DETECTOR

FIRE ALARM NAC PANEL

FIRE ALARM ANNUNCIATOR PANEL

NAC

FAAP

F

S

F

S

HD

SD

FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP

FLOW SWITCH

TAMPER SWITCH

PIV

REMOTE LIGHT/TEST SWITCH FOR

DUCT DETECTORS

F FIRE ALARM BELL

FIRE ALARM CONTROL PANELFACP

RADIO FIRE ALARM TRANSMITTERRFAT

KEYPLAN

= AREA OF WORK

POST INDICATOR VALVE WITH TAMPER

SWITCH AND MONITOR MODULES

F

C

FIRE ALARM PULL STATION WITH STOPPER II

COVERS WITH 9 VOLT DC BATTERIES

NORTH

PLAN

0 4 8 161 E-WING BASEMENT FIRE ALALRM PLAN

SCALE: 1/8" = 1' 0"

E-WING BASEMENT FIRE ALARM

PLAN

JWBRSB

1. PROVIDE NEW FIRE ALARM DEVICES,

RACEWAYS AND WIRING AND CONNECT TO

NEW FIRE ALARM SYSTEM.

2. ELEVATOR RECALL SMOKE DETECTOR. SEE

FIRE ALARM INTERFACE WITH ELEVATORS

DETAIL 2/FA501 FOR MORE INFO.

3. EXISTING SPRINKLER TAMPER AND FLOW

SWITCH FIRE PROTECTION DEVICES

(SPRINKLER DEVICES) TO REMAIN, PROVIDE

NEW MONITORING MODULARS AND CONNECT

TO NEW FIRE ALARM SYSTEM.

EWFA101

T1-EW

A. REPLACE ALL EXISTING FIRE ALARM DEVICES WIRING

WITH NEW FIRE ALARM DEVICES AND NEW WIRING

AND CONNECT TO NEW FIRE ALARM SYSTEM.

B. EXISTING FIRE ALARM CONDUIT BOXES THAT ARE

NOT PAINTED "RED" SHALL BE PAINTED "RED" AND

SHALL BE LABELED ACCORDING WITH NFPA, AND VA

FIRE PROTECTION DESIGN MANUAL.

C. PROVIDE BLANK COVER PLATES FOR ALL EXISTING

FIRE ALARM DEVICES THAT ARE NOT REPLACED.

D. ALL CIRCUIT BREAKER SERVING THE FIRE ALARM

EQUIPMENT SHALL BE PAINTED RED AND SHALL

HAVE LOCKING DEVICES (ELOCK-FA-E SERIES).

32 66

FIRE ALARM NOTIFICATIONS

ZONES - CODE RED BASEMENT FLOOR.

DocuSign Envelope ID: 26F43C1C-3576-4228-B012-7D5AB3485581

5/18/20225/18/2022

TOILET

1A104

1A103B

VET SVC

1A103C1A103D

OFFICE1A103E

DIRECTOR

1A-103A

OFFICE

1A-103

ELEVATORELEVATOR

SNACK

SHOPRECEPTION

WAITING AREA

SECURITY/

1A-101

INFO

COPY AREA

OFFICE

1-B100B

ELECTRICAL

1-B103

STORAGE

1-B102

1-B104

RM

1-B105

OFFICE

1-B106

1-B108

OFFICE

1-B113A

1-B111

1-B112

OFFICE

OFFICE

1-B114

1-B113B

OFFICE1-B117

1-B116

1-B115A

OFFICE

1-B115B

OFFICE

SLOPE

OFFICE OF VET SVC

OFFICE

CONFERENCE

OFFICE

1-B110

OFFICE

OFFICE OFFICE

OFFICE

TELE

STAIR

FAMILY

(STATE OF HAWAII)

WOMENS

TOILET

STAIR

1-B107

OFFICE

NO-1

CORRIDOR

F

S

F

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

F

F S

F

F

S

F S

F

F

S

F A

C P

SD

F

UP

UP

FS

SD

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

HONOLULU VA,

UPGRADE FIRE ALARM

PANELS AND SENSORS

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

KEY NOTES:

SHEET NOTES:

FULLY SPRINKLERED

FIRE ALARM SYMBOL LEGEND

FIRE ALARM PULL STATION

SYMBOL DESCRIPTION

F

F

S

FIRE ALARM SPEAKER

FIRE ALARM STROBE

FIRE ALARM SPEAKER AND STROBE

FIRE ALARM DOOR OPEN HOLDER

FIRE ALARM PHOTOELECTRIC SMOKE

DETECTOR

FIRE ALARM CEILING MOUNTED SPEAKER

DD

FIRE ALARM DUCT SMOKE DETECTOR W/

ADDRESSABLE RELAY

FIRE ALARM HEAT DETECTOR

FIRE ALARM NAC PANEL

FIRE ALARM ANNUNCIATOR PANEL

NAC

FAAP

F

S

F

S

HD

SD

FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP

FLOW SWITCH

TAMPER SWITCH

PIV

REMOTE LIGHT/TEST SWITCH FOR

DUCT DETECTORS

F FIRE ALARM BELL

FIRE ALARM CONTROL PANELFACP

RADIO FIRE ALARM TRANSMITTERRFAT

KEYPLAN

= AREA OF WORK

POST INDICATOR VALVE WITH TAMPER

SWITCH AND MONITOR MODULES

F

C

FIRE ALARM PULL STATION WITH STOPPER II

COVERS WITH 9 VOLT DC BATTERIES

NORTH

PLAN

0 4 8 161 E-WING FIRST FLOOR FIRE ALALRM PLAN

SCALE: 1/8" = 1' 0"

E-WING FIRST FLOOR FIRE

ALARM PLAN

JWBRSB

MATCH LINE, SEE EWFA103

EWFA102

T1-EW

1. EXISTING MAIN FIRE ALARM CONTROL PANEL

SHALL BE REPLACED WITH NEW FIRE ALARM

CONTROL PANEL AND TO BE RECESS IN NEW

STUD WALL. SEE ARCHITECTURAL SHEET A-102

FOR PATCHING AND PAINTING.

2. ELEVATOR RECALL SMOKE DETECTOR. SEE

FIRE ALARM INTERFACE WITH ELEVATORS

DETAIL 2/FA501 FOR MORE INFO.

3. PROVIDE NEW FIRE ALARM DEVICES,

RACEWAYS AND WIRING AND CONNECT TO

NEW FIRE ALARM SYSTEM.

4. EXISTING FIRE ALARM PULL BOX WITH CONDUIT

TO BE REUSED FOR NEW FIRE ALARM CABLING.

SPLICING AND WIRE NUT SHALL NOT BE USED.

A. REPLACE ALL EXISTING FIRE ALARM DEVICES WIRING

WITH NEW FIRE ALARM DEVICES AND NEW WIRING

AND CONNECT TO NEW FIRE ALARM SYSTEM.

B. EXISTING FIRE ALARM CONDUIT BOXES THAT ARE

NOT PAINTED "RED" SHALL BE PAINTED "RED" AND

SHALL BE LABELED ACCORDING WITH NFPA, AND VA

FIRE PROTECTION DESIGN MANUAL.

C. PROVIDE BLANK COVER PLATES FOR ALL EXISTING

FIRE ALARM DEVICES THAT ARE NOT REPLACED.

D. ALL CIRCUIT BREAKER SERVING THE FIRE ALARM

EQUIPMENT SHALL BE PAINTED RED AND SHALL

HAVE LOCKING DEVICES (ELOCK-FA-E SERIES).

33 66

FIRE ALARM NOTIFICATIONS

ZONES - CODE RED FIRST FLOOR.

1-C119

1-C118

1-C116

1-C115

ROLLING SHUTTER

OFFICE

OFFICE

OFFICE

1-C113

OFFICE

1-C114

FILE RM

1-C112

ASST

1-C111

CONFERENCE RM

1-C108

ELECTRICAL

1-C109

STORAGE

OFFICE

CHEIF ENGINEER

1-C110

1-C106

1-C101B

1-C105

1-C100

1-C101

STORAGE

HOMELESS SECTION

AMERICAN LOGIAN

OFFICE

1-C107A

1-C107

1-C104A

1-C104

1-C104B

OFFICE

1-C103

1-C102

RECEPTION

1-C102A

DISABLED AMERICAN

DIRECTOR

1A105

1-C103B

MECH RM

1A106

TOILET

1A104

TOILET

1A103B

VET SVC

1A-103A

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE1-C101A

1-C120

1-C120A

WOOD EQUIP.

COPY/SUPPLY

1-C103A

1-C120B

LOCKSMITH

VTF

COPY

CARPENTRY

STAIR

FAMILY

OFFICE

VFW

CHILLER PLANT

EMERGENCY GENERATOR

TELE

TOILET

OPEN

OFFICE

ADMIN

MENS TOILET

STAIR

NO-1

OFFICE

1-C114A

OFFICE

1-C114B

OFFICE

CORRIDOR

CORRIDOR

CORRIDOR

F

F

F

S

DD

DD

F

S

F

F

S

F

S

F

F

S

F

F

F

S

F

S

F

F

S

F

S

F S

F

S

F

UP

UP

DD

+6'

F

+6'

+6'

SD

EXISTING

PANEL

'1EL1'

PIV

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

HONOLULU VA,

UPGRADE FIRE ALARM

PANELS AND SENSORS

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

KEY NOTES:

SHEET NOTES:

FULLY SPRINKLERED

FIRE ALARM SYMBOL LEGEND

FIRE ALARM PULL STATION

SYMBOL DESCRIPTION

F

F

S

FIRE ALARM SPEAKER

FIRE ALARM STROBE

FIRE ALARM SPEAKER AND STROBE

FIRE ALARM DOOR OPEN HOLDER

FIRE ALARM PHOTOELECTRIC SMOKE

DETECTOR

FIRE ALARM CEILING MOUNTED SPEAKER

DD

FIRE ALARM DUCT SMOKE DETECTOR W/

ADDRESSABLE RELAY

FIRE ALARM HEAT DETECTOR

FIRE ALARM NAC PANEL

FIRE ALARM ANNUNCIATOR PANEL

NAC

FAAP

F

S

F

S

HD

SD

FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP

FLOW SWITCH

TAMPER SWITCH

PIV

REMOTE LIGHT/TEST SWITCH FOR

DUCT DETECTORS

F FIRE ALARM BELL

FIRE ALARM CONTROL PANELFACP

RADIO FIRE ALARM TRANSMITTERRFAT

KEYPLAN

= AREA OF WORK

POST INDICATOR VALVE WITH TAMPER

SWITCH AND MONITOR MODULES

F

C

FIRE ALARM PULL STATION WITH STOPPER II

COVERS WITH 9 VOLT DC BATTERIES

NORTH

PLAN

0 4 8 161 E-WING FIRST FLOOR FIRE ALALRM PLAN

SCALE: 1/8" = 1' 0"

E-WING FIRST FLOOR FIRE

ALARM PLAN

JWBRSB

MATCH LINE, SEE EWFA102

EWFA103

T1-EW

1. PROVIDE NEW FIRE ALARM DEVICES,

RACEWAYS AND WIRING AND CONNECT TO

NEW FIRE ALARM SYSTEM.

2. EXISTING FIRE ALARM PULL BOX WITH CONDUIT

TO BE REUSED.

3. REPLACE EXISTING INTELLIGENT NETWORK

FIRE ALARM PANEL WITH NEW AND CONNECT

TO PARKING GARAGE, E-WING, CENTER OF

AGING, AND AMBULATORY CARE CLINIC.

4. EXISTING SPRINKLER TAMPER AND FLOW

SWITCH FIRE PROTECTION DEVICES

(SPRINKLER DEVICES) TO REMAIN, PROVIDE

NEW MONITORING MODULARS AND CONNECT

TO NEW FIRE ALARM SYSTEM.

5. LOCATION OF EXISTING PIV, CONTRACTOR

SHALL EXCAVATE, GRADE AND PREP LOCATION

FOR NEW CONDUIT, WIRE, TAMPER SWITCH,

AND MONITOR MODULE, VERIFY EXACT

LOCATION.

A. REPLACE ALL EXISTING FIRE ALARM DEVICES WIRING

WITH NEW FIRE ALARM DEVICES AND NEW WIRING

AND CONNECT TO NEW FIRE ALARM SYSTEM.

B. EXISTING FIRE ALARM CONDUIT BOXES THAT ARE

NOT PAINTED "RED" SHALL BE PAINTED "RED" AND

SHALL BE LABELED ACCORDING WITH NFPA, AND VA

FIRE PROTECTION DESIGN MANUAL.

C. PROVIDE BLANK COVER PLATES FOR ALL EXISTING

FIRE ALARM DEVICES THAT ARE NOT REPLACED.

D. ALL CIRCUIT BREAKER SERVING THE FIRE ALARM

EQUIPMENT SHALL BE PAINTED RED AND SHALL

HAVE LOCKING DEVICES (ELOCK-FA-E SERIES).

34 66

FIRE ALARM NOTIFICATIONS

ZONES - CODE RED FIRST FLOOR.

TOILET

2A-107

WOMENS

TOILET

2A-105STAIR

NO-1

CORRIDOR

COPY RM

2A-104

PGM ANALYST

VBA REGIONAL

OFFICE

2A-104A

SECY

2A-100CDIRECTOR VA

REGIONAL

OFFICE

2A-100B

CONFERENCE RM

2-A100

WOMENS

TOILET

2-A103

ELEVATORELEVATOR

OFFICE

2-A101

OPEN OFFICE

2-B100

OFFICE

2-B101A

OFFICE

2-B101B

ELECTRICAL

2-B103

STORAGE

2-B102

OPEN OFFICE

2-B101

TEL

2-B104

CORRIDOR

OPEN OFFICE

2-B105

CORRIDOR

STAIR

HAC

2-B107

STORAGE

FILE RM

2-B106

F

S

F

F

F

F

S

F

F

S

F

S

F

S

F

S

F

S

F

S

F S

SD

F

F

F

S

F S

UP

UP

DN

DN

+6'

F

S

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

HONOLULU VA,

UPGRADE FIRE ALARM

PANELS AND SENSORS

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

KEY NOTES:

SHEET NOTES:

FULLY SPRINKLERED

FIRE ALARM SYMBOL LEGEND

FIRE ALARM PULL STATION

SYMBOL DESCRIPTION

F

F

S

FIRE ALARM SPEAKER

FIRE ALARM STROBE

FIRE ALARM SPEAKER AND STROBE

FIRE ALARM DOOR OPEN HOLDER

FIRE ALARM PHOTOELECTRIC SMOKE

DETECTOR

FIRE ALARM CEILING MOUNTED SPEAKER

DD

FIRE ALARM DUCT SMOKE DETECTOR W/

ADDRESSABLE RELAY

FIRE ALARM HEAT DETECTOR

FIRE ALARM NAC PANEL

FIRE ALARM ANNUNCIATOR PANEL

NAC

FAAP

F

S

F

S

HD

SD

FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP

FLOW SWITCH

TAMPER SWITCH

PIV

REMOTE LIGHT/TEST SWITCH FOR

DUCT DETECTORS

F FIRE ALARM BELL

FIRE ALARM CONTROL PANELFACP

RADIO FIRE ALARM TRANSMITTERRFAT

KEYPLAN

= AREA OF WORK

POST INDICATOR VALVE WITH TAMPER

SWITCH AND MONITOR MODULES

F

C

FIRE ALARM PULL STATION WITH STOPPER II

COVERS WITH 9 VOLT DC BATTERIES

E-WING SECOND FLOOR FIRE

ALARM PLAN

NORTH

PLAN

0 4 8 161 E-WING SECOND FLOOR FIRE ALALRM PLAN

SCALE: 1/8" = 1' 0"

JWBRSB

MATCH LINE, SEE EWFA105

EWFA104

T1-EW

1. PROVIDE NEW FIRE ALARM DEVICES,

RACEWAYS AND WIRING AND CONNECT TO

NEW FIRE ALARM SYSTEM.

2. EXISTING FIRE ALARM PULL BOX WITH CONDUIT

TO BE REUSED.

3. ELEVATOR RECALL SMOKE DETECTOR. SEE

FIRE ALARM INTERFACE WITH ELEVATORS

DETAIL 2/FA501 FOR MORE INFO.

A. REPLACE ALL EXISTING FIRE ALARM DEVICES WIRING

WITH NEW FIRE ALARM DEVICES AND NEW WIRING

AND CONNECT TO NEW FIRE ALARM SYSTEM.

B. EXISTING FIRE ALARM CONDUIT BOXES THAT ARE

NOT PAINTED "RED" SHALL BE PAINTED "RED" AND

SHALL BE LABELED ACCORDING WITH NFPA, AND VA

FIRE PROTECTION DESIGN MANUAL.

C. PROVIDE BLANK COVER PLATES FOR ALL EXISTING

FIRE ALARM DEVICES THAT ARE NOT REPLACED.

D. ALL CIRCUIT BREAKER SERVING THE FIRE ALARM

EQUIPMENT SHALL BE PAINTED RED AND SHALL

HAVE LOCKING DEVICES (ELOCK-FA-E SERIES).

35 66

FIRE ALARM NOTIFICATIONS

ZONES - CODE RED SECOND FLOOR.

HOUSEKEEPING

2-C100B

COPY

AREA

2-C101E

CORRIDOR

OFFICE

2-C104

CHIEF

MANAGEMENT SVC

OFFICE

2-C103

OFFICE

2-C102

STAIR

CHIEF

OFFICE

(QM)

2-C101D1

OPEN OFFICES

2-C101D

CORRIDOR

OFFICE

2-C101G

OFFICE

2-C101F

OFFICE

2-C101C

OFFICE

2-C101B

OFFICE

2-C101A

OFFICE

2-C100F

OFFICE

2-C100G

2-C100E

ELECTRICAL

2-C100D

TELE

2-C100C

COPY RM

2-C100A

OPEN OFFICES

2-C100

MENS

TOILET

2A-108

MECHANICAL

2A-106

MENS

TOILET

2A-107

WOMENS

TOILET

2A-105

COPY RM

2A-104

PGM ANALYST

VBA REGIONAL

OFFICE

2A-104A

F

F

F

DD

F

S

F

S

F

S

F

S

F

F

S

F S

F

S

F

S

UP

DN

DN

UP

F

S

+6'

F

S

DD

EXISTING

PANEL

'2EL1'

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

HONOLULU VA,

UPGRADE FIRE ALARM

PANELS AND SENSORS

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

KEY NOTES:

SHEET NOTES:

FULLY SPRINKLERED

FIRE ALARM SYMBOL LEGEND

FIRE ALARM PULL STATION

SYMBOL DESCRIPTION

F

F

S

FIRE ALARM SPEAKER

FIRE ALARM STROBE

FIRE ALARM SPEAKER AND STROBE

FIRE ALARM DOOR OPEN HOLDER

FIRE ALARM PHOTOELECTRIC SMOKE

DETECTOR

FIRE ALARM CEILING MOUNTED SPEAKER

DD

FIRE ALARM DUCT SMOKE DETECTOR W/

ADDRESSABLE RELAY

FIRE ALARM HEAT DETECTOR

FIRE ALARM NAC PANEL

FIRE ALARM ANNUNCIATOR PANEL

NAC

FAAP

F

S

F

S

HD

SD

FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP

FLOW SWITCH

TAMPER SWITCH

PIV

REMOTE LIGHT/TEST SWITCH FOR

DUCT DETECTORS

F FIRE ALARM BELL

FIRE ALARM CONTROL PANELFACP

RADIO FIRE ALARM TRANSMITTERRFAT

KEYPLAN

= AREA OF WORK

POST INDICATOR VALVE WITH TAMPER

SWITCH AND MONITOR MODULES

F

C

FIRE ALARM PULL STATION WITH STOPPER II

COVERS WITH 9 VOLT DC BATTERIES

E-WING SECOND FLOOR FIRE

ALARM PLAN

NORTH

PLAN

0 4 8 161 E-WING SECOND FLOOR FIRE ALALRM PLAN

SCALE: 1/8" = 1' 0"

JWBRSB

MATCH LINE, SEE EWFA104

EWFA105

T1-EW

1. PROVIDE NEW FIRE ALARM DEVICES,

RACEWAYS AND WIRING AND CONNECT TO

NEW FIRE ALARM SYSTEM.

2. EXISTING FIRE ALARM PULL BOX WITH CONDUIT

TO BE REUSED.

3. EXISTING SPRINKLER TAMPER AND FLOW

SWITCH FIRE PROTECTION DEVICES

(SPRINKLER DEVICES) TO REMAIN, PROVIDE

NEW MONITORING MODULARS AND CONNECT

TO NEW FIRE ALARM SYSTEM.

A. REPLACE ALL EXISTING FIRE ALARM DEVICES WIRING

WITH NEW FIRE ALARM DEVICES AND NEW WIRING

AND CONNECT TO NEW FIRE ALARM SYSTEM.

B. EXISTING FIRE ALARM CONDUIT BOXES THAT ARE

NOT PAINTED "RED" SHALL BE PAINTED "RED" AND

SHALL BE LABELED ACCORDING WITH NFPA, AND VA

FIRE PROTECTION DESIGN MANUAL.

C. PROVIDE BLANK COVER PLATES FOR ALL EXISTING

FIRE ALARM DEVICES THAT ARE NOT REPLACED.

D. ALL CIRCUIT BREAKER SERVING THE FIRE ALARM

EQUIPMENT SHALL BE PAINTED RED AND SHALL

HAVE LOCKING DEVICES (ELOCK-FA-E SERIES).

36 66

FIRE ALARM NOTIFICATIONS

ZONES - CODE RED SECOND FLOOR.

H.R.PH4 PRIVACY

OFFICER

OFFICE

3-A103

STORAGE

3B105A

3B106H

3B106F

CORRIDOR

STOR

3-A103A

HSK

3A104

WOMENS

TOILET

3-A105

STAIR

NO 1

WOMENS

TOILET

3-A102

ELEVATORELEVATOR

3-A101A

OFFICE

3-A101B

HRM

3-A101

OFFICE

3-A101C

HRIS OFFICE

3-A101E

HUMAN RESOURCE

MANAGEMENT

3-B100

PROCESSING AND

RECORD ROOM

3B100C

ASSISTANT CHIEF

OFFICE

3B100E

HRM

3-A100

CREDIT

UNION

3-B101

HRM NURSE

RECRUITER

OFFICE

3B102A

HRM

3-B102

FILE RM

3B100D

PAYROLL

OFFICE

3B104

FINANCIAL

RESOURCE

MANAGEMENT

3-B103

ELECTRICAL

3B105B

TELE

3B105C

3-B105

CORRIDOR

3-B106

OFFICE

3B106G

CORRIDOR

OFFICE

3B106A

3B106B

CHIEF OF

DEPARTMENT

3B106C

WORK AREA

3B108

CORRIDOR

ACCOUNTING

CHIEF

3B106E

OFFICE

3B106D

HSK

3B107

STAIR

F

S

F

F

S

F

S

F

S

F

S

F

F

F

F

S

F

S

F

SD

F

F

S

F S

F

S

F

S

F

S

UP

UP

DN

DN

EXISTING

PANEL

'3EL2'

F

S

F

S

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

HONOLULU VA,

UPGRADE FIRE ALARM

PANELS AND SENSORS

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

KEY NOTES:

SHEET NOTES:

FULLY SPRINKLERED

FIRE ALARM SYMBOL LEGEND

FIRE ALARM PULL STATION

SYMBOL DESCRIPTION

F

F

S

FIRE ALARM SPEAKER

FIRE ALARM STROBE

FIRE ALARM SPEAKER AND STROBE

FIRE ALARM DOOR OPEN HOLDER

FIRE ALARM PHOTOELECTRIC SMOKE

DETECTOR

FIRE ALARM CEILING MOUNTED SPEAKER

DD

FIRE ALARM DUCT SMOKE DETECTOR W/

ADDRESSABLE RELAY

FIRE ALARM HEAT DETECTOR

FIRE ALARM NAC PANEL

FIRE ALARM ANNUNCIATOR PANEL

NAC

FAAP

F

S

F

S

HD

SD

FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP

FLOW SWITCH

TAMPER SWITCH

PIV

REMOTE LIGHT/TEST SWITCH FOR

DUCT DETECTORS

F FIRE ALARM BELL

FIRE ALARM CONTROL PANELFACP

RADIO FIRE ALARM TRANSMITTERRFAT

KEYPLAN

= AREA OF WORK

POST INDICATOR VALVE WITH TAMPER

SWITCH AND MONITOR MODULES

F

C

FIRE ALARM PULL STATION WITH STOPPER II

COVERS WITH 9 VOLT DC BATTERIES

E-WING THIRD FLOOR FIRE

ALARM PLAN

NORTH

PLAN

0 4 8 161 E-WING THIRD FLOOR FIRE ALALRM PLAN

SCALE: 1/8" = 1' 0"

JWBRSB

MATCH LINE, SEE EWFA107

EWFA106

T1-EW

1. PROVIDE NEW FIRE ALARM DEVICES,

RACEWAYS AND WIRING AND CONNECT TO

NEW FIRE ALARM SYSTEM.

2. EXISTING FIRE ALARM PULL BOX WITH CONDUIT

TO BE REUSED.

3. ELEVATOR RECALL SMOKE DETECTOR. SEE

FIRE ALARM INTERFACE WITH ELEVATORS

DETAIL 2/FA501 FOR MORE INFO.

A. REPLACE ALL EXISTING FIRE ALARM DEVICES WIRING

WITH NEW FIRE ALARM DEVICES AND NEW WIRING

AND CONNECT TO NEW FIRE ALARM SYSTEM.

B. EXISTING FIRE ALARM CONDUIT BOXES THAT ARE

NOT PAINTED "RED" SHALL BE PAINTED "RED" AND

SHALL BE LABELED ACCORDING WITH NFPA, AND VA

FIRE PROTECTION DESIGN MANUAL.

C. PROVIDE BLANK COVER PLATES FOR ALL EXISTING

FIRE ALARM DEVICES THAT ARE NOT REPLACED.

D. ALL CIRCUIT BREAKER SERVING THE FIRE ALARM

EQUIPMENT SHALL BE PAINTED RED AND SHALL

HAVE LOCKING DEVICES (ELOCK-FA-E SERIES).

37 66

FIRE ALARM NOTIFICATIONS

ZONES - CODE RED THIRD FLOOR.

UP

RAMP

DN

STORAGE

3-C107

IRM

OFFICE

3-C109

IRM

3-C108

OFFICE

3-C108C

CORRIDOR

STAIR

ELEC RM

3-C108F

IRM

OFFICE

3-C108E

SERVER RM

3-C108D

OFFICE

3-C108G

OFFICE

3-C108B

OFFICE

3-C108A

CORRIDOR

IRM

OFFICE

3-C104

OFFICE

3-C101A

ACQUISITION AND MATERIAL

MANAGEMENT SERVICE

3-C101

MECHANICAL ROOM

3A106

STOR

3-A103A

HSK

3A104

ELECTRICAL

3-C106

IRM

3-C105

SYSTEMS

REDESIGN

OFFICE

3-C103

CHIEF

3-C102

CONFERENCE ROOM

3-C100

MENS

TOILET

3-A108

MENS

TOILET

3A107

WOMENS

TOILET

3-A105

STAIR

NO 1

F

F

F

DD

F

S

F

S

F

F

S

F

S

F

F

S

F

S

DD

DD

DD

F

F

S

F

S

F

S

UP

DN

DN

UP

F

+6'

+6'

+6'

F

S

DD

DD

F

S

EXISTING

PANEL

+6'

+6'

+6'

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

HONOLULU VA,

UPGRADE FIRE ALARM

PANELS AND SENSORS

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

KEY NOTES:

SHEET NOTES:

FULLY SPRINKLERED

FIRE ALARM SYMBOL LEGEND

FIRE ALARM PULL STATION

SYMBOL DESCRIPTION

F

F

S

FIRE ALARM SPEAKER

FIRE ALARM STROBE

FIRE ALARM SPEAKER AND STROBE

FIRE ALARM DOOR OPEN HOLDER

FIRE ALARM PHOTOELECTRIC SMOKE

DETECTOR

FIRE ALARM CEILING MOUNTED SPEAKER

DD

FIRE ALARM DUCT SMOKE DETECTOR W/

ADDRESSABLE RELAY

FIRE ALARM HEAT DETECTOR

FIRE ALARM NAC PANEL

FIRE ALARM ANNUNCIATOR PANEL

NAC

FAAP

F

S

F

S

HD

SD

FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP

FLOW SWITCH

TAMPER SWITCH

PIV

REMOTE LIGHT/TEST SWITCH FOR

DUCT DETECTORS

F FIRE ALARM BELL

FIRE ALARM CONTROL PANELFACP

RADIO FIRE ALARM TRANSMITTERRFAT

KEYPLAN

= AREA OF WORK

POST INDICATOR VALVE WITH TAMPER

SWITCH AND MONITOR MODULES

F

C

FIRE ALARM PULL STATION WITH STOPPER II

COVERS WITH 9 VOLT DC BATTERIES

E-WING THIRD FLOOR FIRE

ALARM PLAN

NORTH

PLAN

0 4 8 161 E-WING THIRD FLOOR FIRE ALALRM PLAN

SCALE: 1/8" = 1' 0"

JWBRSB

MATCH LINE, SEE EWFA106

EWFA107

T1-EW

1. PROVIDE NEW FIRE ALARM DEVICES,

RACEWAYS AND WIRING AND CONNECT TO

NEW FIRE ALARM SYSTEM.

2. EXISTING FIRE ALARM PULL BOX WITH CONDUIT

TO BE REUSED.

3. EXISTING SPRINKLER TAMPER AND FLOW

SWITCH FIRE PROTECTION DEVICES

(SPRINKLER DEVICES) TO REMAIN, PROVIDE

NEW MONITORING MODULARS AND CONNECT

TO NEW FIRE ALARM SYSTEM.

A. REPLACE ALL EXISTING FIRE ALARM DEVICES WIRING

WITH NEW FIRE ALARM DEVICES AND NEW WIRING

AND CONNECT TO NEW FIRE ALARM SYSTEM.

B. EXISTING FIRE ALARM CONDUIT BOXES THAT ARE

NOT PAINTED "RED" SHALL BE PAINTED "RED" AND

SHALL BE LABELED ACCORDING WITH NFPA, AND VA

FIRE PROTECTION DESIGN MANUAL.

C. PROVIDE BLANK COVER PLATES FOR ALL EXISTING

FIRE ALARM DEVICES THAT ARE NOT REPLACED.

D. ALL CIRCUIT BREAKER SERVING THE FIRE ALARM

EQUIPMENT SHALL BE PAINTED RED AND SHALL

HAVE LOCKING DEVICES (ELOCK-FA-E SERIES).

38 66

FIRE ALARM NOTIFICATIONS

ZONES - CODE RED THIRD FLOOR.

STORAGE

4-B110

RESEARCH

DEPARTMENT

OFFICE

4-A101

OFFICE OF ACOS

EDUCATION

4A-103A

CORRIDOR

WOMENS

TOILET

4A-106

STAIR

NO 1

ELEVATOR

#4

ELEVATOR

#4

WOMENS

TOILET

OFFICE

4-A100

DIRECTOR'S

CONFERENCE

RM

4-A105OFFICE

4-A104A

OFFICE

4-A104

OFFICE

4-B100E

CONFERENCE RM

4-B100D

OFFICE

4-B101

OFFICE

4-A101A

OFFICE

4-A101B

OFFICE

4-A101C

OFFICE OF DEPUTY

DIRECTOR OF

UNIVERSITY OF HAWAI

4-B100A

OFFICE

4-B100C

DIRECTOR

4-B100B

OFFICE

4-B102B

OFFICE

4-B102A

OFFICE

4-B102

COPY AREA

CORRIDOR

CORRIDOR

OFFICE

4-B102C

OFFICE

4-B102D

INSTITUTE FOR

THE DIRECTOR

4-B105A

OFFICE

4-B103

OFFICE

4-B104

STORAGE

4-B106

ELEC

4-B107

TEL

4-B108

STORAGE

4-B109

OFFICE

4-B111

IMAGING UNIT OFFICE

4-B112

OFFICE

4-B112A

OFFICE

4-B114

OFFICE

4-B113

CONFERENCE RM

4-B117

OFFICE

4-B116

OFFICE

4-B115

STAIR

F

F

S

F

F

F

S

F

S

F

S

F

S

SD

SD

SD

F

F

S

F

HD

FS

F

S

F

S

F

S

F

UP

UP

DN

DN

F

S

EXISTING

PANEL

'4EL2'

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

HONOLULU VA,

UPGRADE FIRE ALARM

PANELS AND SENSORS

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

KEY NOTES:

SHEET NOTES:

FULLY SPRINKLERED

FIRE ALARM SYMBOL LEGEND

FIRE ALARM PULL STATION

SYMBOL DESCRIPTION

F

F

S

FIRE ALARM SPEAKER

FIRE ALARM STROBE

FIRE ALARM SPEAKER AND STROBE

FIRE ALARM DOOR OPEN HOLDER

FIRE ALARM PHOTOELECTRIC SMOKE

DETECTOR

FIRE ALARM CEILING MOUNTED SPEAKER

DD

FIRE ALARM DUCT SMOKE DETECTOR W/

ADDRESSABLE RELAY

FIRE ALARM HEAT DETECTOR

FIRE ALARM NAC PANEL

FIRE ALARM ANNUNCIATOR PANEL

NAC

FAAP

F

S

F

S

HD

SD

FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP

FLOW SWITCH

TAMPER SWITCH

PIV

REMOTE LIGHT/TEST SWITCH FOR

DUCT DETECTORS

F FIRE ALARM BELL

FIRE ALARM CONTROL PANELFACP

RADIO FIRE ALARM TRANSMITTERRFAT

KEYPLAN

= AREA OF WORK

POST INDICATOR VALVE WITH TAMPER

SWITCH AND MONITOR MODULES

F

C

FIRE ALARM PULL STATION WITH STOPPER II

COVERS WITH 9 VOLT DC BATTERIES

E-WING FOURTH FLOOR FIRE

ALARM PLAN

NORTH

PLAN

0 4 8 161 E-WING FOURTH FLOOR FIRE ALARM PLAN

SCALE: 1/8" = 1' 0"

JWBRSB

MATCH LINE, SEE EWFA109

EWFA108

T1-EW

1. PROVIDE NEW FIRE ALARM DEVICES,

RACEWAYS AND WIRING AND CONNECT TO

NEW FIRE ALARM SYSTEM.

2. EXISTING FIRE ALARM PULL BOX WITH CONDUIT

TO BE REUSED.

3. ELEVATOR RECALL SMOKE DETECTOR. SEE

FIRE ALARM INTERFACE WITH ELEVATORS

DETAIL 2/FA501 FOR MORE INFO.

A. REPLACE ALL EXISTING FIRE ALARM DEVICES WIRING

WITH NEW FIRE ALARM DEVICES AND NEW WIRING

AND CONNECT TO NEW FIRE ALARM SYSTEM.

B. EXISTING FIRE ALARM CONDUIT BOXES THAT ARE

NOT PAINTED "RED" SHALL BE PAINTED "RED" AND

SHALL BE LABELED ACCORDING WITH NFPA, AND VA

FIRE PROTECTION DESIGN MANUAL.

C. PROVIDE BLANK COVER PLATES FOR ALL EXISTING

FIRE ALARM DEVICES THAT ARE NOT REPLACED.

D. ALL CIRCUIT BREAKER SERVING THE FIRE ALARM

EQUIPMENT SHALL BE PAINTED RED AND SHALL

HAVE LOCKING DEVICES (ELOCK-FA-E SERIES).

39 66

FIRE ALARM NOTIFICATIONS

ZONES - CODE RED FOURTH FLOOR.

FILE STORAGE RM

4C-117

HEALTH SYSTEM

SPECIALIST

4C-119

OFFICE

CREDENTIALING

4C-103

OFFICE

4C-100B

OPEN OFFICE

4C-116

4C-111

CONFERENCE RM

4-C122

STAIR

CHIEF OF STAFF

4C-118

STAFF

LOUNGE

4C-120

CORRIDOR

TOILET

4C-118A

DIRECTOR

4C-115

COMPLAINT AND

FACILITY PLANING

4C-113

FILE/FAX/COPY

PRINT RM

4C-114

OFFICE

4C-112

OFFICE

4C-110

ASST COUNSEL

OFFICER

4C-107

ASSOCIATE

DIRECTOR

4C-109

OFFICE

4C-108

STORAGE

4C-106

ELEC

4C-105

TEL

4C-104

CORRIDOR

4C-103B

OFFICE PUBLIC

AFFAIRS

4C-102

HAC

4C-101

OFFICE OF THE

REGIONAL COUNCIL

4C-103A

OFFICE OF THE

REGIONAL COUNSEL

4C-100

MENS

TOILET

4A-109

WOMENS

TOILET

4A-106

MENS

TOILET

4A-108

MECH ROOM

4-A107

STAIR

DIRECTOR'S

CONFERENCE

RM

4-A105

F

F

F

F

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

F

F S

F

UP

DN

DN

UP

DD

+6'

F

S

F

S

F

S

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

HONOLULU VA,

UPGRADE FIRE ALARM

PANELS AND SENSORS

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

KEY NOTES:

SHEET NOTES:

FULLY SPRINKLERED

FIRE ALARM SYMBOL LEGEND

FIRE ALARM PULL STATION

SYMBOL DESCRIPTION

F

F

S

FIRE ALARM SPEAKER

FIRE ALARM STROBE

FIRE ALARM SPEAKER AND STROBE

FIRE ALARM DOOR OPEN HOLDER

FIRE ALARM PHOTOELECTRIC SMOKE

DETECTOR

FIRE ALARM CEILING MOUNTED SPEAKER

DD

FIRE ALARM DUCT SMOKE DETECTOR W/

ADDRESSABLE RELAY

FIRE ALARM HEAT DETECTOR

FIRE ALARM NAC PANEL

FIRE ALARM ANNUNCIATOR PANEL

NAC

FAAP

F

S

F

S

HD

SD

FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP

FLOW SWITCH

TAMPER SWITCH

PIV

REMOTE LIGHT/TEST SWITCH FOR

DUCT DETECTORS

F FIRE ALARM BELL

FIRE ALARM CONTROL PANELFACP

RADIO FIRE ALARM TRANSMITTERRFAT

KEYPLAN

= AREA OF WORK

POST INDICATOR VALVE WITH TAMPER

SWITCH AND MONITOR MODULES

F

C

FIRE ALARM PULL STATION WITH STOPPER II

COVERS WITH 9 VOLT DC BATTERIES

E-WING FOURTH FLOOR FIRE

ALARM PLAN

NORTH

PLAN

0 4 8 161 E-WING FOURTH FLOOR FIRE ALARM PLAN

SCALE: 1/8" = 1' 0"

JWBRSB

MATCH LINE, SEE EWFA108

EWFA109

T1-EW

1. PROVIDE NEW FIRE ALARM DEVICES,

RACEWAYS AND WIRING AND CONNECT TO

NEW FIRE ALARM SYSTEM.

2. EXISTING FIRE ALARM PULL BOX WITH CONDUIT

TO BE REUSED.

3. EXISTING SPRINKLER TAMPER AND FLOW

SWITCH FIRE PROTECTION DEVICES

(SPRINKLER DEVICES) TO REMAIN, PROVIDE

NEW MONITORING MODULARS AND CONNECT

TO NEW FIRE ALARM SYSTEM.

A. REPLACE ALL EXISTING FIRE ALARM DEVICES WIRING

WITH NEW FIRE ALARM DEVICES AND NEW WIRING

AND CONNECT TO NEW FIRE ALARM SYSTEM.

B. EXISTING FIRE ALARM CONDUIT BOXES THAT ARE

NOT PAINTED "RED" SHALL BE PAINTED "RED" AND

SHALL BE LABELED ACCORDING WITH NFPA, AND VA

FIRE PROTECTION DESIGN MANUAL.

C. PROVIDE BLANK COVER PLATES FOR ALL EXISTING

FIRE ALARM DEVICES THAT ARE NOT REPLACED.

D. ALL CIRCUIT BREAKER SERVING THE FIRE ALARM

EQUIPMENT SHALL BE PAINTED RED AND SHALL

HAVE LOCKING DEVICES (ELOCK-FA-E SERIES).

40 66

FIRE ALARM NOTIFICATIONS

ZONES - CODE RED FOURTH FLOOR.

DN

STORAGE

STAIR

NO-1

MECH RM

ELEVATOR RM

HD

SD

F

SD

F S

HD

SD

F

HD

SD

F

S

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

P

M

HONOLULU VA,

UPGRADE FIRE ALARM

PANELS AND SENSORS

459 PATTERSON ROAD,

HONOLULU, HI 96819

MAY 19, 2022

100% CONSTRUCTION DOCUMENTS

459-16-106

19-148

KEY NOTES:

SHEET NOTES:

FULLY SPRINKLERED

FIRE ALARM SYMBOL LEGEND

FIRE ALARM PULL STATION

SYMBOL DESCRIPTION

F

F

S

FIRE ALARM SPEAKER

FIRE ALARM STROBE

FIRE ALARM SPEAKER AND STROBE

FIRE ALARM DOOR OPEN HOLDER

FIRE ALARM PHOTOELECTRIC SMOKE

DETECTOR

FIRE ALARM CEILING MOUNTED SPEAKER

DD

FIRE ALARM DUCT SMOKE DETECTOR W/

ADDRESSABLE RELAY

FIRE ALARM HEAT DETECTOR

FIRE ALARM NAC PANEL

FIRE ALARM ANNUNCIATOR PANEL

NAC

FAAP

F

S

F

S

HD

SD

FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP

FLOW SWITCH

TAMPER SWITCH

PIV

REMOTE LIGHT/TEST SWITCH FOR

DUCT DETECTORS

F FIRE ALARM BELL

FIRE ALARM CONTROL PANELFACP

RADIO FIRE ALARM TRANSMITTERRFAT

KEYPLAN

= AREA OF WORK

POST INDICATOR VALVE WITH TAMPER

SWITCH AND MONITOR MODULES

F

C

FIRE ALARM PULL STATION WITH STOPPER II

COVERS WITH 9 VOLT DC BATTERIES

E-WING PENTHOUSE FIRE

ALARM PLAN

NORTH

PLAN

0 4 8 161 E-WING PENTHOUSE FIRE ALARM PLAN

SCALE: 1/8" = 1' 0"

JWBRSB

1. PROVIDE ELEVATOR RECALL FIRE ALARM

MODULES AND CONNECT TO ELEVATOR

CONTROLLER AND FIRE ALARM PANEL. SEE

DETAIL OF SHEET FA501 FOR MORE INFO.

2. PROVIDE NEW FIRE ALARM DEVICES,

RACEWAYS AND WIRING AND CONNECT TO

NEW FIRE ALARM SYSTEM.

3. PROVIDE NEW ADDRESSABLE HEAT

DETECTORS WITHIN 2 FT OF ALL SPRINKLER

HEADS.

4. EXISTING ELEVATOR CONTROLLERS.

5. EXISTING SPRINKLER TAMPER AND FLOW

SWITCH FIRE PROTECTION DEVICES

(SPRINKLER DEVICES) TO REMAIN, PROVIDE

NEW MONITORING MODULARS AND CONNECT

TO NEW FIRE ALARM SYSTEM.

6. CONTRACTOR TO HIRE ELEVATOR

CONTRACTOR TO HELP WITH ELEVATOR

RECALL AND SHUNT TRIP FOR FUNCTIONAL

SYSTEM.

EWFA110

T1-EW

A. REPLACE ALL EXISTING FIRE ALARM DEVICES WIRING

WITH NEW FIRE ALARM DEVICES AND NEW WIRING

AND CONNECT TO NEW FIRE ALARM SYSTEM.

B. EXISTING FIRE ALARM CONDUIT BOXES THAT ARE

NOT PAINTED "RED" SHALL BE PAINTED "RED" AND

SHALL BE LABELED ACCORDING WITH NFPA, AND VA

FIRE PROTECTION DESIGN MANUAL.

C. PROVIDE BLANK COVER PLATES FOR ALL EXISTING

FIRE ALARM DEVICES THAT ARE NOT REPLACED.

D. ALL CIRCUIT BREAKER SERVING THE FIRE ALARM

EQUIPMENT SHALL BE PAINTED RED AND SHALL

HAVE LOCKING DEVICES (ELOCK-FA-E SERIES).

41 66

FIRE ALARM NOTIFICATIONS

ZONES - CODE RED PENTHOUSE.

1. WALL ASSEMBLY - THE 1, 2, 3 OR 4 HR FIRE-RATED GYPSUM WALLBOARD/STUD WALL ASSEMBLY SHALL BE CONSTRUCTED

OF THE MATERIALS AND IN THE MANNER DESCRIBED IN THE INDIVIDUAL U300 OR U400 SERIES WALL OR PARTITION DESIGNS

IN THE UL FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTION FEATURES:

A. STUDS - WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS (MAX 2 HR FIRE RATED ASSEMBLIES) OR STEEL

CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER SPACED 16 IN. (406 MM) OC WITH

NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER END PLATES AND CROSS BRACES. STEEL STUDS TO BE MIN 3-5/8 IN. (92 MM)

WIDE BY 1-3/8 IN. (35 MM) DEEP CHANNELS SPACED MAX 24 IN. (610 MM) OC.

B. GYPSUM BOARD* - NOM 1/2 OR 5/8 IN. (13 OR 16 MM) THICK, 4 FT. (122 CM) WIDE WITH SQUARE OR TAPERED EDGES. THE

GYPSUM WALLBOARD TYPE, THICKNESS, NUMBER OF LAYERS, FASTENER TYPE AND SHEET ORIENTATION SHALL BE AS

SPECIFIED IN THE INDIVIDUAL U300 OR U400 SERIES DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX DIAM OF

OPENING IS 26 IN. (660 MM).

2. THROUGH PENETRANT - ONE METALLIC PIPE, CONDUIT OR TUBING INSTALLED EITHER CONCENTRICALLY OR

ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. THE ANNULAR SPACE BETWEEN PIPE, CONDUIT OR TUBING AND PERIPHERY

OF OPENING SHALL BE MIN OF 0 IN. (0 MM) (POINT CONTACT) TO MAX 2 IN. (51 MM). PIPE, CONDUIT OR TUBING TO BE

RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:

A. STEEL PIPE - NOM 24 IN. (610 MM) DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.

B. IRON PIPE - NOM 24 IN. (610 MM) DIAM (OR SMALLER) SERVICE WEIGHT (OR HEAVIER) CAST IRON SOIL PIPE, NOM 12 IN.

(305 MM) DIAM (OR SMALLER) OR CLASS 50 (OR HEAVIER) DUCTILE IRON PRESSURE PIPE.

C. CONDUIT - NOM 6 IN. (152 MM) DIAM (OR SMALLER) STEEL CONDUIT OR NOM 4 IN. (102 MM) DIAM (OR SMALLER) STEEL

ELECTRICAL METALLIC TUBING

D. COPPER TUBING - NOM 6 IN. (152 MM) DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBING

E. COPPER PIPE - NOM 6 IN. (152 MM) DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.

F. THROUGH PENETRATING PRODUCT* - FLEXIBLE METAL PIPING - THE FOLLOWING TYPES OF STEEL FLEXIBLE METAL GAS

PIPING MAY BE USED:

1. NOM 2 IN. (51 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY

NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

OMEGA FLEX INC

2. NOM 1 IN. (25 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY

NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

TITEFLEX CORP

A BUNDY CO

3. NOM 1 IN. (25 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY

NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

WARD MFG INC

3. FILL,VOID OR CAVITY MATERIAL* - CAULK OR SEALANT - MIN 5/8. 1-1/4,1-7/8 AND 2-1/2 IN. (16, 32, 48 AND 64 MM) THICKNESS

OF CAULK FOR 1, 2, 3 AND 4 HR RATED ASSEMBLIES, RESPECTIVELY, APPLIED WITHIN ANNULUS, FLUSH WITH BOTH SURFACES

OF WALL. MIN 1/4 IN. (6 MM) DIAM BEAD OF CAULK APPLIED TO GYPSUM BOARD/PENETRANT INTERFACE AT POINT CONTACT

LOCATION ON BOTH SIDES OF WALL.

THE HOURLY F RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN

WHICH IT IS INSTALLED, AS SHOWN IN THE FOLLOWING TABLE.

THE HOURLY T RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE TYPE OR SIZE OF THE PIPE OR CONDUIT AND

THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED, AS TABULATED BELOW:

+WHEN COPPER PIPE IS USED, T RATING IS 0 HR.

3M COMPANY - CP 25WB+ CAULK OR FB-3000 WT SEALANT,

*BEARING THE UL CLASSIFICATION MARKING

SYSTEM NO.W-L-1001

JUNE 15, 2005

F RATINGS - 1, 2, 3 AND 4 HR (SEE ITEMS 2 AND 3)

T RATINGS - 0, 1, 2, 3, AND 4 HR (SEE ITEM 3)

L RATING AT AMBIENT - LESS THAN 1 CFM/SQ FT

L RATING AT 400 F - LESS THAN 1 CFM/SQ FT

MAX PIPE OR

CONDUIT DIAM

IN. (mm)

1 (25)

1 (25)

4 (102)

6 (152)

12 (305)

F RATING

HR

1 OR 2

3 OR 4

1 OR 2

3 OR 4

1 OR 2

T RATING

HR

0+, 1 OR 2

3 OR 4

SECTION A-A

1B

1A

A

A

DUCT

DETECTOR

WITH

ADDRESABLE

RELAY

FACP

AIR HANDLING

STARTER / VFD

DUCT SENSOR / PROBE

DD

6'+

HD

INTERFACE RELAYS INSTALL WITHIN 3' OF

ELEVATOR CONTROLLER

R1

EQL

R2

EQL

R3

EQL

SHUNT TRIP

BREAKER

R4

EQL

HOT NEUTRAL

120 VAC CIRCUIT

(POWER TO OPERATE

SHUNT TRIP BREAKER)

FROM EMERGENCY

POWER SOURCE

R5

EQL

FIRE ALARM CONTROL UNIT

SCC1 SCC2 SCC3 SCC4

ACTUARION

CAUSES

RECALL TO

ALTERNATE

LEVEL

ACTUARION

CAUSES

RECALL TO

DESIGNATED

LEVEL

ACTUARION

CAUSES

FLASHING

OF

WARNING

SIGNAL

ACTUARION

CAUSES

DISCONNECT

OF MAIN LINE

ELEVATOR

POWER

1DC1

(SUPERVISORY)

ACTUARION

CAUSES

SUPERVISORY

SIGNAL

CONVENTIONAL OR

ADDRESSABLE

ZONE / CIRCUIT

MODULE

HD

ELEVATOR

HOISTWAY HEAT

DETECTOR(S)

ELEVATOR

MACHINE ROOM

HEAT DETECTOR(S)

SD

ELEVATOR

HOISTWAY SMOKE

DETECTOR(S)

ELEVATOR MACHINE

ROOM SMOKE

DETECTOR(S)

SD SD

ELEVATOR LOBBY

SMOKE DETECTOR

5TH FLOOR

SD

ELEVATOR LOBBY

SMOKE DETECTOR

4TH FLOOR

SD

ELEVATOR LOBBY

SMOKE DETECTOR

3RD FLOOR

SD

ELEVATOR LOBBY

SMOKE DETECTOR

2ND FLOOR

(ALTERNATE LEVEL)

SD

ELEVATOR LOBBY

SMOKE DETECTOR

GROUND FLOOR

(DESIGNATED LEVEL)

SD

ELEVATOR LOBBY

SMOKE DETECTOR

BASEMENT

1.

NOTE:

FIRE ALARM CIRCUITS ARE TO BE DESIGNED AND

INSTALLED IN ACCORDANCE WITH NFPA 72, NATIONAL FIRE

ALARM CODE AND NEC 70, NATIONAL ELECTRICAL CODE

R1 SIGNAL TO ELEVATOR CONTROLLER FOR RECALL TO DESIGNATED LEVEL.

R2 SIGNAL TO ELEVATOR CONTROLLER TO RECALL TO ALTERNATE LEVEL.

R3 SIGNAL TO ELEVATOR CONTROLLER FOR RECALL TO ALTERNATE LEVEL.

R4 SIGNAL TO ACTIVATE SHUNT TRIP RELAY.

R5 SUPERVISORY RELAY TO MONITOR PRESENCE OF VOLTAGE (POWER) TO OPERATE SHUNT

TRIP BREAKER

SCC1 SUPERVISED CONTROL CIRCUIT FOR OPERATING R1.

SCC2 SUPERVISED CONTROL CIRCUIT FOR OPERATING R2.

SCC3 SUPERVISED CONTROL CIRCUIT FOR OPERATING R3.

SCC4 SUPERVISED CONTROL CIRCUIT FOR OPERATING R4.

IDC1 INITIATING DEVICE CIRCUIT TO SUPERVISE R5 CONTACTS (MONITORING POWER TO OPERATE

SHUNT TRIP BREAKER).

COMPONENT FUNCTION

FIRE ALARM CONDUIT

FIRE ALARM BOX

CKT NO.: XXX

FIRE ALARM FIBER CABLE

TYPE: XXX

LOOP: XXX

FROM: XXX

T…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .