This document provides details for a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. The solicitation number is 36C26123R0099 for the VISN 21 MACC Group 2 - E Wing AHU Upgrade project, which involves upgrading the HVAC system in the E Wing of a VA facility. The bid documents file attached is a 13MB PDF with plans and specifications for replacing the air handling unit to improve climate control in the specified area. Offerors should review the provided documents thoroughly to understand the full scope of work required prior to submitting a response. The opportunity type is listed as a solicitation, suggesting the agency is seeking bids or proposals from contractors to complete the HVAC upgrade work. No other details such as response dates, award timing, or pricing terms are included in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING LIST

0 GRID / COLUMN LINE DESIGNATOR

EQUIPMENT NUMBER

ROOM NAME

ROOM NAME / NUMBER

REVISION TAG

PLAN NORTH

NORTH ARROW WITH TRUE

NORTH INDICATION

ELEVATION NUMBER

SECTION

INTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

Name Elevation

FLOOR LEVEL &

NAME

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

SHEET KEYNOTE

A101

SIM

EXTERIOR ELEVATION

A-101

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PROJECT TEAMSITE LOCATIONANNOTATION DRAWING SYMBOLSGENERAL NOTES

1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A

COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW

ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.

2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED BEFORE

SUBMITTING COST QUOTATIONS FOR WORK.

3. NOTIFY THE ARCHITECT PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE

PROVIDED PRIOR TO CONTINUING WITH WORK.

4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT

5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION.

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.

6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE

CONTRACTOR'S EXPENSE.

7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.

8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH

RESPECT TO DELIVERY DATE, QUALITY, OR COST.

9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S

MEANS AND METHODS OR FOR TEMPORARY STRUCTURES.

10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL

EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.

11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA

REGULATIONS DURING CONSTRUCTION.

12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE.

A101

A101

NORTH

AREA OF WORK

WHITE RD.

P

A T T E

R S

O N

R D

KRUKO

E-WING

A-WING

JA

RRETT

WSKI RD.

INDEX OF DRAWINGS

T1-AE101

DISCIPLINE:

G - GENERAL

A - ARCHITECTURE

P - PLUMBING

M - MECHANICAL

E - ELECTRICAL

SHEET TYPE

DESIGNATOR

BUILDING NUMBER

SHEET NUMBER

WITHIN SERIES

KRUKO-

W

SKI RD.

W H

IT

E

R D

JA

RRETT

W A

R D

R D

KRUKOWSKI RD.

E

D B

A

C

G

F

H

AMB

CARE

C-WING

AREA OF WORK

T1-AHU-1

PHASING NOTES

PHASE 1A* - ISOLATE AND DRAIN CHILLED WATER RISER AND REPLACE BRANCH ISOLATION VALVES ON EACH LEVEL.

REPLACE 4TH FLOOR 3-WAY VALVE TO ALLOW BY-PASS FLOW.

PHASE 1B* - CORE SLABS AND PROVIDE NEW ELECTRICAL RISERS IN MECHANICAL SPACES TO PREPARE FOR NEW

EQUIPMENT CONNECTIONS.

PHASE 2**- REPLACE T1-AHU-1 ON LEVEL 1 AND REMOVE EXISTING ELECTRICAL RISERS (CRANING NOT REQUIRED)

PHASE 3**- REPLACE T1-AHU-4 ON LEVEL 4 AND REMOVE EXISTING ELECTRICAL RISERS (CRANING REQUIRED)

PHASE 4**- REPLACE T1-AHU-3 ON LEVEL 3 AND REMOVE EXISTING ELECTRICAL RISERS (CRANING REQUIRED)

PHASE 5**- REPLACE T1-AHU-2 ON LEVEL 2 AND REMOVE EXISTING ELECTRICAL RISERS (CRANING REQUIRED)

* PHASES REQUIRED TO BE COMPLETED OVER A WEEKEND (OVERTIME HOURS MAY BE REQUIRED) ** PHASES CAN BE COMPLETED DURING NORMAL HOURS, BUT SCHEDULE MUST BE COORDINATE WITH COR WITH SPECIAL

NOISE CONSIDERATIONS FOR NEARBY STAFF (OFFICE SPACE VACATING MAY BE REQUIRED).

***PHASE 2,3,4,5 - VACATING THE FLOOR DURING CONSTRUCTION WILL NEED TO BE COORDINATED WITH OCCUPANTS OF EACH FLOOR. IT WILL BE UP TO EACH FLOOR IF THEY WANT TO VACATE. IF CONTRACTOR IS REQUESTING FOR OCCUPANTS

TO VACATE, VA REQUIRES A MINIMUM OF 14 DAYS ADVANCE NOTICE FOR EACH FLOOR.

ONLY ONE FIRE SPRINKLER ZONE MAY BE SHUT DOWN AT ANY TIME. CONTRACTOR TO COORDINATE DOWNTIME WITH VA

AND PROVIDE FIRE WATCH PROVISIONS.

ROOMS THAT NEED TEMPORARY COOLING:

LEVEL 1:

• 1-B100 SPACE (ALL INTERVIEW ROOMS, VREO OFFICE, SUPERVISOR VRE OFFIC, PUBLIC CONTACT COACH OFFICE AND

PUBLIC EMPLOYEE'S SPACE AND VRE EMPLOYEES' SPACE).

• ROOM 1-A103 - HAWAII OFFICE OF VETERAN AFFAIRS.

• ROOM C102 - DISABLED AMERICAN VETERANS.

• ROOM 1-C104 - VETERANS FOR FOREIGN WARS.

• ROOM 1-105 - WOUNDED WARRIOR PROJECT.

LEVEL 2:

• 2-B100 - ENTIRE EMPLOYEE'S SPACE.

• 2A-100C - DIRECTOR'S OFFICE.

• 2A-A104 - DIRECTOR'S PROGRAM ANALYST OFFICE.

LEVEL 4:

• 4C-107

• 4C-109

• 4C-115

• 4C-118

• 4C-119

Romanyk Consulting Focusing on what matters

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

8910 7 6 5 4 3 2 1

U.S. Department of Veterans Affairs

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g

A H

U M

E P

V

.r v t

/8

/2

:4

:1

A M

PROJECT NUMBER - 459-20-002

E-WING AHU REPLACEMENT

100% BID DOCUMENTS

JULY 8, 2022

AW DAW

459-20-002

T1

T1-GI100

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

COVER SHEET 100% BID DOCUMENTS E-WING AHU REPLACEMENT

SHEET # SHEET TITLE

GENERAL

T1-GI100 COVER SHEET

T1-GI101 GENERAL ABBREVIATIONS

ARCHITECTURAL

T1-AS101 SITE PLANS - BASEMENT & LEVEL 1 - ARCHITECTURAL

T1-AS102 SITE PLANS - LEVELS 2 & 3 - ARCHITECTURAL

T1-AS103 SITE PLANS - LEVEL 4 & ROOF - ARCHITECTURAL

T1-AD101 ENLARGED PLANS – LEVELS 1 & 2 – ARCHITECTURAL DEMOLITION

T1-AD102 ENLARGED PLANS – LEVELS 3 & 4 – ARCHITECTURAL DEMOLITION

T1-AE101 ENLARGED PLANS – LEVELS 1 & 2 – ARCHITECTURAL

T1-AE102 ENLARGED PLANS – LEVELS 3 & 4 – ARCHITECTURAL

T1-AE300 EXTERIOR ELEVATIONS

T1-AE500 DETAILS

SPRINKLER

T1-F-001 SPRINKLER DETAILS, SYMBOLS, NOTES, AND ABBREVIATIONS

T1-FD101 ENLARGED PLANS - LEVELS 1 & 2 - FIRE PROTECTION DEMOLITION

T1-FD102 ENLARGED PLANS - LEVELS 3 & 4 - FIRE PROTECTION DEMOLITION

T1-FP101 ENLARGED PLANS - LEVELS 1 & 2 - FIRE PROTECTION

T1-FP102 ENLARGED PLANS - LEVELS 3 & 4 - FIRE PROTECTION

MECHANICAL

T1-M-001 MECHANICAL SYMBOLS, NOTES, AND ABBREVIATIONS

T1-M-002 MECHANICAL SCHEDULES

T1-MS101 SITE PLANS - LEVEL 0 & LEVEL 1 - MECHANICAL

T1-MS102 SITE PLANS - LEVELS 2 & 3 - MECHANICAL

T1-MS103 SITE PLANS - LEVEL 4 & ROOF - MECHANICAL

T1-MD101 ENLARGED PLANS - LEVELS 1 & 2 - MECHANICAL DEMOLITION

T1-MD102 ENLARGED PLANS - LEVELS 3 & 4 - MECHANICAL DEMOLITION

T1-MH101 ENLARGED PLANS - LEVELS 1 & 2 - HVAC

T1-MH102 ENLARGED PLANS - LEVELS 3 & 4 – HVAC

T1-MH200 3D VIEWS - LEVELS 1, 2, 3, 4 - HVAC

T1-MH300 HVAC DETAILS

T1-MH301 HVAC DETAILS

T1-MH302 AHU ELEVATIONS

T1-MP101 ENLARGED PLANS - LEVELS 1 & 2 - MECHANICAL PIPING

T1-MP102 ENLARGED PLANS - LEVEL 3 & 4 - MECHANICAL PIPING

T1-MP200 CHILLED WATER PIPING DIAGRAM

T1-MP300 MECHANICAL PIPING DETAILS

ELECTRICAL

T1-E-001 ELECTRICAL SYMBOLS, NOTES, AND ABBREVIATIONS

T1-ED101 ENLARGED ELECTRICAL DEMOLITION PLANS - LEVEL 1 & 2

T1-ED102 ENLARGED ELECTRICAL DEMOLITION PLANS - LEVEL 3 & 4

T1-EP101 ENLARGED ELECTRICAL PLANS - LEVEL 1 & 2

T1-EP102 ENLARGED ELECTRICAL PLANS - LEVEL 3 & 4

T1-E-400 ELECTRICAL DETAILS

T1-E-501 ELECTRICAL SCHEDULES

Grand total: 40

OWNER:

VA Pacific Islands Health Care System Spark M. Matsunaga VA Medical Center 459 Patterson Road, Honolulu, HI 96819

CONTRACTING OFFICER REP. (COR):

Spark M. Matsunaga VA Medical Center 459 Patterson Road Honolulu, HI 96819-1522

Marvin Patacsil COTR Marvin.Patacsil@va.gov

808-433-0162 808-940-1133 cell

PROJECT ARCHITECT:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Rebecca C. Olson, AIA, ACHA Rebecca.Olson@RomaynkConsulting.com

855-424-3838 x302 602-430-1265 cell

MECHANICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855.424.3838 x324

319.721.4986 cell

ELECTRICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Jeffrey Koehler Jeffrey.Koehler@RomanykConsulting.com

855.424.3838 x315

262.930.0903 cell

Revisions: Date:

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g A

H U v rv t

/8

/2

:3

:4

A M

MK DAW

459-20-002

T1

T1-GI101

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

GENERAL ABBREVIATIONS 100% BID DOCUMENTS E-WING AHU REPLACEMENT

EWC EVAPORATIVE WATER COOLER

EUH ELECTRIC UNIT HEATER RTU ROOF TOP UNIT

ET EXPANSION TANK RR RETURN REGISTER

ERP ELECTRIC RADIANT PANEL RG RETURN GRILLE

ERC ELECTRIC REHEAT COIL RF RETURN FAN

EH EXHAUST HOOD RCCH REMOTE CONDENSER CHILLER

EGS EMERGENCY GAS SHUTOFF RAHX ROTARY AIR HEAT EXCHANGER

EF EXHAUST FAN RAD REFRIGERANT AIR DRYER

EDH ELECTRIC DUCT HEATER

ECU EVAPORATIVE CONDENSER UNIT PTAC PACKAGED TERMINAL AIR CONDITIONER WFM WATER FLOWMETER

ECC ENGINEERING CONTROL CENTER PHC PREHEAT COIL WFCV WATER FLOW CONTROL VALVE

EC EVAPORATIVE COOLER PF PRE-FILTER WF WATER FILTER

P PUMP WCUH AIR COOLED UNIT HEATER

DXCC DIRECT-EXPANSION COOLING COIL WCPU AIR COOLED PACKAGED UNIT

DX DIRECT-EXPANSION OFM OIL FLOWMETER WCHP AIR COOLED HEAT PUMP

DPS DIFFERENTIAL PRESSURE SWITCH/SENSOR OAI OUTSIDE AIR INTAKE WCCU AIR COOLED CONDENSING UNIT

DPA DIFFERENTIAL PRESSURE ASSEMBLY WCCH AIR COOLED CHILLER

DDC DIRECT DIGITAL CONTROLS NPSH NET POSITIVE SUCTION HEAD WC AIR COOLED

NGFM NATURAL GAS FLOW METER

CWP CONDENSER WATER PUMP VSD VARIABLE SPEED DRIVE

CWCC CHILLED WATER COOLING COIL MAU MAKE-UP AIR UNIT VPS VARIABLE PRIMARY SYSTEM

CV CONSTANT VOLUME VI VIBRATION ISOLATOR

CUH CABINET UNIT HEATER LLHX LIQUID TO LIQUID HEAT EXCHANGER

CU CONDENSING UNIT VFD VARIABLE FREQUENCY DRIVE

CT COOLING TOWER HX HEAT EXCHANGER VAV VARIABLE AIR VOLUME

CS CONDENSATE STORAGE TANK HVD HOISTWAY VENT DAMPER V VALVE

CP CONDENSATE PUMP HWUH HOT WATER UNIT HEATER

COMP COMPRESSOR UNIT HWP HEATING HOT WATER PUMP UH UNIT HEATER

CHW CHILLED WATER HWC HOT WATER COIL UC UNIT COOLER

CHP CHILLED WATER PUMP HWHC HOT WATER HEATING COIL

CFP CHEMICAL FEED PUMP HW HOT WATER TU TERMINAL UNIT

CC COOLING COIL HUM HUMIDIFIER UNIT MOUNTED TP TRAP

HTM HUMIDIFIER TERMINAL

BWT BOILER PLANT WATER TUBE HRP HYDRONIC RADIANT (CEILING) PANEL SWHX STEAM TO WATER HEAT EXCHANGER

BTCU BLOW OFF TANK CONTROL VALVE HP HEAT PUMP SVS STEAM VENT SILENCER

BT BOILER TANK HD HOOD SV STEAM PRESSURE REDUCING VALVE

BSC BIOLOGICAL SAFETY CABINETS HC HEATING COIL SUH STEAM UNIT HEATER

BHX BOILER BLOWDOWN HEAT EXCHANGER H HUMIDIFIER ST STEAM TRAP

BHW HOT WATER HEATING BOILER SSR SOLID SEPARATOR

BFT BOILER PLANT FIRE TUBE FTR FIN TUBE RADIATION SSHX STEAM TO STEAM HEAT EXCHANGER

B BOILER FOHX FUEL OIL HEAT EXCHANGER SR SUPPLY AIR REGISTER

FOT FUEL OIL TANK SPRV STEAM PRESSURE REDUCING VALVE

AW AIR WASHER FOP FUEL OIL PUMP SPD SUPPLY PROCESS AND DISTRIBUTION

AS AIR SEPARATOR FM FLOWMETER SP GR SPECIFIC GRAVITY

AHU AIR-HANDLING UNIT FHX FLUE GAS/FEEDWATER HEAT EXCHANGER SP STATIC PRESSURE

AFMD AIR FLOW MEASURING DEVICE FF FINAL FILTER SHC STEAM HEATING COIL

AFCV AIR FLOW CONTROL VALVE FD FIRE DAMPER SH STEAM HUMIDIFIER

AF AFTER-FILTERS FCUH FAN COIL UNIT HEATING ONLY SF SUPPLY FAN

ACU AIR-CONDITIONING UNIT FCUC FAN COIL UNIT COOLING ONLY SDPR SMOKE DAMPER

ACCU AIR-COOLED CONDENSING UNIT FCU FAN COIL UNIT (4 PIPE) SD SUPPLY AIR DIFFUSER

ACCH AIR-COOLED CHILLER F/SDPR COMBINATION FIRE SMOKE DAMPER SD SMOKE DETECTOR

AAHX AIR TO AIR HEAT EXCHANGER SAD SOUND ATTENUATING DEVICE

EQUIPMENT ABBREVIATIONS EQUIPMENT ABBREVIATIONS EQUIPMENT ABBREVIATIONS

GPM GALLONS PER MINUTE

GPH GALLONS PER HOUR MTD MEAN TEMPERATURE DIFFERENCE

GPD GALLONS PER DAY M/S METERS PER SECOND

GAL GALLONS MM MILLIMETER

GA GAUGE MIN MINIMUM

MHP MOTOR HORSEPOWER

FT-WC FEET OF WATER COLUMN MERV MINIMUM EFFICIENCY REPORTING VALUE

FT-LB FOOT-POUND MCA MULTICHANNEL ANALYZER

FT FEET MCA MAXIMUM CURRENT AMPACITY YR YEAR

FPS FEET PER SECOND MBH 1000 BTUH

FPM FEET PER MINUTE MAX MAXIMUM WPD WATER SIDE PRESSURE DROP

F FAHRENHEIT M METER WG WATER GAGE

WB WET-BULB (TEMPERATURE)

EWT ENTERING WATER TEMPERATURE LWT LEAVING WATER TEMPERATURE W WATTS

ESP EXTERNAL STATIC PRESSURE LVG LEAVING

ENT ENTERING LH LATENT HEAT TSP TOTAL STATIC PRESSURE

EGT ENTERING GLYCOL TEMPERATURE LGT LEAVING GLYCOL TEMPERATURE TD TEMPERATURE DIFFERENCE

EER ENERGY EFFICIENCY RATIO LF LINEAR FOOT (FEET)

EAT ENTERING AIR TEMPERATURE LBS/HR POUNDS PER HOUR SQ M SQUARE METER

LAT LEAVING AIR TEMPERATURE SQ FT SQUARE FOOT (FEET)

DP DEWPOINT L/S LITERS PER SECOND SP GR SPECIFIC GRAVITY

DIA DIAMETER L/M LITERS PER MINUTE SCFM STANDARD CUBIC FEET PER MINUTE

DEG DEGREE L/H LITERS PER HOUR SAT SUPPLY AIR TEMPERATURE

dB DECIBEL L LITER SI SQUARE INCHES

DB DRY-BULB TEMPERATURE

kWH KILOWATT HOUR RPM REVOLUTIONS PER MINUTE

COP COEFFICIENT OF PERFORMANCE kW KILOWATT RLA RUN LOAD AMPERE

CM/S CENTIMETER PER SECOND kPA KILO PASCAL RAT RETURN AIR TEMPERATURE

CM CUBIC METER KG/HR KILOGRAM PER HOUR RAF RADIO-FREQUENCY

CFT CUBIC FEET KG KILOGRAM

CFH CUBIC FEET PER HOUR PSIG POUNDS PER SQUARE INCH-GAGE

CFM CUBIC FEET PER MINUTE IPLV INTEGRATED PART LOAD VALUE PSIA POUNDS PER SQUARE INCH ATMOSPHERE

C CENTIGRADE (CELSIUS) IN-LB INCH-POUND PSI POUNDS PER SQUARE INCH

IN WG INCH WATER GAUGE PPM PARTS PER MILLION

BTUH BRITISH THERMAL UNIT PER HOUR IN HG INCHES OF MERCURY PA PASCAL

BTU BRITISH THERMAL UNIT IN INCHES

BHP BRAKE HORSE POWER NPLV NON-STANDARD PART LOAD VALUE

HZ HERTZ Nm NEWTON-METER

APD AIR SIDE PRESSURE DROP HP HORSEPOWER NC NOISE CRITERIA

UNITS OF MEASURE UNITS OF MEASURE UNITS OF MEASURE

XFER TRANSFER

VHA VETERANS HEALTH ADMINISTRATION

UTIL UTILITY

UPC UNIVERSAL PLUMBING CODE

UL UNDERWRITER'S LABORATORY

TEMP TEMPERATURE

TYP TYPICAL

SPEC SPECIFICATION

SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL...

SI INTERNATIONAL SYSTEM OF UNITS

SHT SHEET

SEN SENSIBLE HEAT

SCI SPINAL CODE INJURY

SA SUPPLY AIR

RM ROOM

RO REVERSE OSMOSIS

RDS ROOM DATA SHEETS

REQD REQUIRED

RA RETURN AIR

R/E RETURN OR EXHAUST

PSS PRIMARY SECONDARY SYSTEM

PGW PROPYLENE GLYCOL-WATER SOLUTION

OR OPERATING ROOM

OD OUTSIDE DIAMETER

OC ON CENTER

OA OUTSIDE AIR

NTS NOT TO SCALE

NSPC NATIONAL STANDARD PLUMBING CODE

NOM NOMINAL

NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION

NO NORMALLY OPEN

NIC NOT IN CONTRACT

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NEC NATIONAL ELECTRICAL CODE

NC NORMALLY CLOSED

NA NOT APPLICABLE (ALSO N/A)

MRI MAGNETIC RESONANCE IMAGING

MER MECHANICAL EQUIPMENT ROOM

MIN MINIMUM

MAX MAXIMUM

LPG LIQUID PROPANE GAS

IPC INTERNATIONAL PLUMBING CODE

ID INSIDE DIAMETER

ICU INTENSIVE CARE UNIT

I/O INPUT/OUTPUT

HAC HOUSEKEEPING AIDE’S CLOSET

EX EXISTING (OR EXIST)

EL ELEVATION

ESMT EASEMENT

ETO ETHYLENE OXIDE

EA EXHAUST AIR

DWG DRAWING

CO2 CARBON DIOXIDE

CENT CENTRIFUGAL

BMT BONE MARROW TRANSPLANT

BLDG BUILDING

ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

ASHRAE

AMERICAN SOCIETY OF HEATING REFRIGERATION AIR CONDITIONING

ENGINEERS

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AMB AMBIENT

AFG ABOVE FINISHED GRADE

AFF ABOVE FINISHED FLOOR

A/E ARCHITECTS AND ENGINEERS

GENERAL ABBREVIATIONS

FLOOR PLAN NOTES

PARTITION RATING LEGEND

SCOPE OF WORK

ROLLING SHUTTER

1. GC SHALL VERIFY DIMENSIONS OF EQUIPMENT AND

COORDINATE INSTALLATION WITH ALL TRADES WHERE

REQUIRED.

2. GC SHALL INSTALL IN-WALL METAL BACKING FOR ALL

PARTITION-MOUNTED EQUIPMENT, ACCESSORIES, PARTITION

STOPS, ETC.

3. GC SHALL PROVIDE UL APPROVED FIRE- RESISTIVE

PENETRATION SYSTEMS WHERE PLUMBING IS LOCATED IN A

FIRE-RATED PARTITION ASSEMBLY.

FB1 = FIRE BARRIER 1HR

FB2 = FIRE BARRIER 2HR

FB3 = FIRE BARRIER 3HR

FP1 = FIRE PARTITION 1HR

FP1/2 = FIRE PARTITION 1/2HR

FW2 = FIRE WALL 2HR

FW3 = FIRE WALL 3HR

SB1 = SMOKE BARRIER

SE1 = SHAFT ENCLOSURE 1HR

SE2 = SHAFT ENCLOSURE 2HR

SP = SMOKE PARTITION

NON-RATED INTERIOR PARTITION WALL

NO SCOPE OF WORK ASSOCIATED

IN SHADED AREA

T O

C R

A W

L S

P A

C E

WOMEN

B-A103

ELEVATORELEVATOR

CORRIDOR

PHARMACY

B-A101

B-A100

STAIR

MEN

B-A106

IRM

B-A107

ELECTRICAL

B-A105

MECH

RM

B-A104

IRM

STORAGE

B-A101B

TO CRAWL SPACE

T O

C R

A W

L S

P A

C E

OFFICE

1A-103A

OFFICE OF VET SVC

1A-103

WAITING AREA

SECURITY/

INFO

VET SVC

1A103B

OFFICE

1A103C

OFFICE

1A103D

DIRECTOR

1A103E

OPEN OFFICE

OPEN OFFICE

COPY AREA

OFFICE

1-B100B

CORRIDOR

OFFICE

1-B106

OFFICE

1-B108

OFFICE

1-B110

OFFICE

1-B112

OFFICE

1-B114CORRIDOR

1-B115

OFFICE

1-B115B

OFFICE

1-B115A

OFFICE

1-B116

OFFICE

1-B117

STAIR

OFFICE

1-B113B

OFFICE

1-B113A

OFFICE

1-B111

OFFICE

1-B107

CONFERENCE

RM

1-B105

TELE

1-B104 ELECTRICAL

1-B103

STORAGE

1-B102

FILE RM

1-B100D

OFFICE

1-B100A

OPEN OFFICE

1-B100

RECEPTION

SNACK

SHOP

1A-101

ELEVATOR ELEVATOR

WOMENS

TOILET

STAIR

NO-1

FAMILY

TOILET

1A104

MENS

TOILET

1A106

TOILET

COPY

1-C101A

AMERICAN LOGIAN

HOMLESS SECTION

1-C101

OFFICE

1-C101B

OFFICE

1-C105

TELE

1-C106

ELECTRICAL

1-C108

STORAGE

1-C109

CONFERENCE RM

1-C111

FILE RM

1-C114

OFFICE

1-C114B

OFFICE

1-C114A

OFFICE

1-C116

TOILET

1-C119

CORRIDOR

OPEN

OFFICE

CHIEF ENGINEER

OFFICE

1-C110

ADMIN

ASST

1-C112

OFFICE

1-C113

OFFICE

1-C115

OFFICE

1-C118

CHILLER

PLANT

EMERGENCY

GENERATOR

STAIR

WOOD EQUIP.

1-C120

CARPENTRY

1-C120A

LOCKSMITH

1-C120B

CORRIDOR

OFFICE

1-C107A

OFFICE

VFW

1-C104

CORRIDOR

OFFICE

1-C103

COPY/SUPPLY

1-C103A

DIRECTOR

1-C103B

DISABLED AMERICAN

1-C102A

RECEPTION

1-C102

STORAGE

1-C100

T1-AD101

T1-AE101

MECH. RM.

B-A106

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

NORTH

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g A

H U v rv t

/8

/2

:3

:4

A M

MK DAW

459-20-002

T1

T1-AS101

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

SITE PLANS - BASEMENT & LEVEL 1 -

ARCHITECTURAL

100% BID DOCUMENTS E-WING AHU REPLACEMENT

1/16" = 1'-0"

OVERALL PLAN - BASEMENT - ARCHITECTURAL

1/16" = 1'-0"

OVERALL PLAN - LEVEL 1 - ARCHITECTURAL

SCOPE OF WORK

1. GC SHALL VERIFY DIMENSIONS OF EQUIPMENT AND

COORDINATE INSTALLATION WITH ALL TRADES WHERE

REQUIRED.

2. GC SHALL INSTALL IN-WALL METAL BACKING FOR ALL

PARTITION-MOUNTED EQUIPMENT, ACCESSORIES, PARTITION

STOPS, ETC.

3. GC SHALL PROVIDE UL APPROVED FIRE- RESISTIVE

PENETRATION SYSTEMS WHERE PLUMBING IS LOCATED IN A

FIRE-RATED PARTITION ASSEMBLY.

FB1 = FIRE BARRIER 1HR

FB2 = FIRE BARRIER 2HR

FB3 = FIRE BARRIER 3HR

FP1 = FIRE PARTITION 1HR

FP1/2 = FIRE PARTITION 1/2HR

FW2 = FIRE WALL 2HR

FW3 = FIRE WALL 3HR

SB1 = SMOKE BARRIER

SE1 = SHAFT ENCLOSURE 1HR

SE2 = SHAFT ENCLOSURE 2HR

SP = SMOKE PARTITION

NON-RATED INTERIOR PARTITION WALL

NO SCOPE OF WORK ASSOCIATED

IN SHADED AREA

COPY RM

2A-104

PGM ANALYST VBA

REGIONAL OFFICE

2A-104A

SECY

2A-100C

DIRECTOR VA

REGIONAL OFFICE

2A-110B

CONFERENCE RM

2-A100

CORRIDOR

OFFICE

2-B101A

OFFICE

2-B101B

OPEN OFFICE

2-B101

CORRIDOR

OPEN OFFICE

2-B105

STORAGE

FILE RM

2-B106

CORRIDOR

HAC

2-B107

STAIR

TEL

2-B104

ELECTRICAL

2-B103

STORAGE

2-B102

OPEN OFFICE

2-B100

OFFICE

2-A101

WOMENS

TOILET

2-A103

ELEVATOR ELEVATOR

STAIR

NO-1

WOMENS

TOILET

2A-105

MENS

TOILET

2A-107

MENS

TOILET

2A-108

OPEN OFFICES

2C-100

HOUSEKEEPING

2-C100B

COPY RM

2-C100A

TELE

2-C100C

ELECTRICAL

2-C100D

2-C100E

OFFICE

2C-100G

OFFICE

2-C100F

OFFICE

2-C101A

OFFICE

2-C100B

CORRIDOR

OFFICE

2-C101C

OFFICE

2-C101E

OFFICE

2-C101F

OFFICE

2-C101G

OPEN OFFICES

2-C101D

CHIEF

OFFICE

(QM)

2-C101D1

STAIR

CORRIDOR

OFFICE

2-C102

CHIEF MANAGEMENT

SVC OFFICE

2-C103

OFFICE

2-C104

T1-AD101

T1-AE101

MECH. RM.

2A-106

STOR

3-A103A

HSK

3-A104

PRIVACY

OFFICER

OFFICE

3-A103

3-A101A

OFFICE

3-A101B

HRM

3-A101

OFFICE

3-A101C

HRIS OFFICE

3-A101E

HUMAN RESOURCE

MANAGEMENT

3-B100

PROCESSING AND

RECORD ROOM

3-B100C

FILE RM

3-B100D

PAYROLL

OFFICE

3-B104

3-B105

CORRIDOR

CORRIDOR

3-B106

OFFICE

3-B106A

3-B106B

CHIEF OF

DEPARTMENT

3-B106C

CORRDIDOR

WORK AREA

3-B108

HSK

3-B107

STAIR

OFFICE

3-B106D

ACCOUNTING

CHIEF

3-B106E

3-B106F

OFFICE

3-B106G

3-B106H

TELE

3-B105C

ELECTRICAL

3-B105B

FINANCIAL

RESOURCE

MANAGEMENT

3-B103

HRM

3-B102

ASSISTANT CHIEF

OFFICE

3-B100E

HRM NURSE

RECRUITER

OFFICE

3-B102A

CREDIT

UNION

3-B101

HRM

3-A100

ELEVATOR ELEVATOR

WOMENS

TOILET

3-A102

STAIR

NO 1

CORRIDOR

WOMENS

TOILET

3-A105

MENS

TOILET

3-A107

MENS

TOILET

3-A108

CONFERENCE ROOM

3-C100

CHIEF

3-C102

SYSTEMS

REDESIGN

OFFICE

3-C103

IRM

3-C105

ELECTRICAL

3-C106

OFFICE

3-C108B

OFFICE

3-C108C

STORAGE

3-C107

ACQUISITION AND MATERIAL

MANAGEMENT SERVICE

3-C101

OFFICE

3-C101A

IRM

OFFICE

3-C104

OFFICE

3-C108A

IRM

3-C108

CORRIDOR

OFFICE

3-C108G

SERVER RM

3-C108D

IRM

OFFICE

3-C108E

ELEC RM

3-C108F

CORRIDOR

IRM

OFFICE

3-C109

STAIR

STORAGE

3-B105A

T1-AD102

T1-AE102

MECH. RM.

3A-106

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

NORTH

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g A

H U v rv t

/8

/2

:3

:4

A M

MK DAW

459-20-002

T1

T1-AS102

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

SITE PLANS - LEVELS 2 & 3 - ARCHITECTURAL 100% BID DOCUMENTS E-WING AHU REPLACEMENT

1/16" = 1'-0"

OVERALL PLAN - LEVEL 2 - ARCHITECTURAL

1/16" = 1'-0"

OVERALL PLAN - LEVEL 3 - ARCHITECTURAL

SCOPE OF WORK

NO-1

STORAGE

STAIR

MECH RM

ELEVATOR RM

1. GC SHALL VERIFY DIMENSIONS OF EQUIPMENT AND

COORDINATE INSTALLATION WITH ALL TRADES WHERE

REQUIRED.

2. GC SHALL INSTALL IN-WALL METAL BACKING FOR ALL

PARTITION-MOUNTED EQUIPMENT, ACCESSORIES, PARTITION

STOPS, ETC.

3. GC SHALL PROVIDE UL APPROVED FIRE- RESISTIVE

PENETRATION SYSTEMS WHERE PLUMBING IS LOCATED IN A

FIRE-RATED PARTITION ASSEMBLY.

FB1 = FIRE BARRIER 1HR

FB2 = FIRE BARRIER 2HR

FB3 = FIRE BARRIER 3HR

FP1 = FIRE PARTITION 1HR

FP1/2 = FIRE PARTITION 1/2HR

FW2 = FIRE WALL 2HR

FW3 = FIRE WALL 3HR

SB1 = SMOKE BARRIER

SE1 = SHAFT ENCLOSURE 1HR

SE2 = SHAFT ENCLOSURE 2HR

SP = SMOKE PARTITION

NON-RATED INTERIOR PARTITION WALL

NO SCOPE OF WORK ASSOCIATED

IN SHADED AREA

DIRECTOR'S

CONFERENCE RM

4-A105

OFFICE OF ACOS

EDUCATION

4A-103A

OFFICE

4-A104A

OFFICE

4-A104

OFFICE

4-A101C

OFFICE

4-A101B

OFFICE

4-A101A

RESEARCH

DEPARTMENT

OFFICE

4-A101

OFFICE

4-A100

OFFICE

4-B100E

CONFERENCE RM

4-B100D

OFFICE

4-B101

OFFICE OF DEPUTY

DIRECTOR OF UNIVERSITY

OF HAWAII

4-B100A

DIRECTOR

4-B100B

OFFICE

4-B100C

OFFICE

4-B102B

OFFICE

4-B102A

OFFICE

4-B102

COPY AREA

OFFICE

4-B102C

OFFICE

4-B102D

CORRIDOR

OFFICE

4-B103

OFFICE

4-B104

STORAGE

4-B106

ELEC

4-B107

TEL

4-B108

STORAGE

4-B109

STORAGE

4-B110

OFFICE

4-B111

IMAGING UNIT OFFICE

4-B112

OFFICE

4-B112A

OFFICE

4-B114

STAIR

CORRIDOR

OFFICE

4-B115

OFFICE

4-B116

CONFERENCE RM

4-B117

OFFICE

4-B113

INSTITUTE FOR THE

DIRECTOR

4-B105A

ELEVATOR

#4

ELEVATOR

#4

WOMENS

TOILET

STAIR

NO 1

CORRIDOR

WOMENS

TOILET

4-A106

MENS

TOILET

4A-108

MENS

TOILET

4-A109

OFFICE

4-C100B

OFFICE OF THE REGIONAL

COUNSEL

4-C100

HAC

4C-101

OFFICE

CREDENTIALING

4C-103

OFFICE

AFFAIRS

4C-102

CORRIDOR

4-C103B

OFFICE OF THE REGIONAL

COUNCIL

4-C103A

TEL

4-C104

ELEC

4-C105

STORAGE

4-C106

OFFICE

4-C108

OFFICE

4-C110

OFFICE

4-C112

FILE/FAX/COPY

PRINT RM

4-C114

OPEN OFFICE

4-C116

FILE STORAGE RM

4-C117

HEALTH SYSTEM

SPECIALIST

4-C119

STAFF

LOUNGE

4-C120

STAIR

CONFERENCE RM

4-C122

CHIEF OF STAFF

4-C118

TOILET

4-C118A

DIRECTOR

4-C115

COMPLAINT AND

FACILITY PLANNING

4-C113

CORRIDOR

4-C111

ASSOCIATE

DIRECTOR

4-C109

ASST COUNSEL

OFFICER

4-C107

T1-AD102

T1-AE102

MECH. RM.

4A-107

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

NORTH

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g A

H U v rv t

/8

/2

:3

:4

A M

MK DAW

459-20-002

T1

T1-AS103

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

SITE PLANS - LEVEL 4 & ROOF -

ARCHITECTURAL

100% BID DOCUMENTS E-WING AHU REPLACEMENT

1/16" = 1'-0"

OVERALL PLAN - LEVEL 4 - ARCHITECTURAL

1/16" = 1'-0"

OVERALL PLAN - PENTHOUSE/ROOF - ARCHITECTURAL

SCOPE OF WORK

KEYNOTES

NO SCOPE OF WORK ASSOCIATED

IN SHADED AREA

A

B

C

T1-AE300

T1-AE300

19 20

T1-AE300

T1-EAL-1 (EX)

T1-OAL-1 (EX)

A

B

C

T1-AE300

T1-AE300

19 20

T1-AE300

T1-EAL-2 (EX)

T1-OAL-2 (EX)

MECH. RM.

2A-106

AD101

AD101

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

NORTH

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g A

H U v rv t

/8

/2

:3

:3

A M

MK DAW

459-20-002

T1

T1-AD101

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

ENLARGED PLANS – LEVELS 1 & 2 –

ARCHITECTURAL DEMOLITION

100% BID DOCUMENTS E-WING AHU REPLACEMENT

3/8" = 1'-0"

ENLARGED PLAN - 1-A105 ARCHITECTURAL DEMOLITION

3/8" = 1'-0"

ENLARGED PLAN - 2-A106 ARCHITECTURAL DEMOLITION

NO. DESCRIPTION

1 EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN.

2 EXISTING AIR INTAKE LOUVER TO REMAIN.

3 EXISTING EXHAUST AIR LOUVER TO BE REMOVED AND DISCARDED.

4 EXISTING EXHAUST AIR FAN AND PLENUM TO BE REMOVED. REFER TO MECHANICAL

PLANS FOR MORE INFORMATION.

5 EXISTING EXHAUST AIR FAN AND PLENUM TO REMAIN. REFER TO MECHANICAL PLANS

FOR MORE INFORMATION.

6 EXISTING EXHAUST AIR FAN AND PLENUM TO BE REMOVED. REFER TO MECHANICAL

PLANS FOR MORE INFORMATION.

NTS

KEYPLAN - LEVEL 1

MECH RM.

B-A106

(NOT USED).

NTS

KEYPLAN - LEVEL 2

NO SCOPE OF WORK ASSOCIATED

IN SHADED AREA

A

B

C

T1-AE300

T1-AE300

19 20

T1-AE300

T1-EAL-3 (EX)

T1-OAL-3 (EX)

MECH. RM.

3A-106

A

B

C

T1-AE300

T1-AE300

19 20

T1-AE300

T1-EAL-4 (EX)

T1-OAL-4 (EX)

MECH. RM.

4A-107

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

NORTH

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g A

H U v rv t

/8

/2

:3

:3

A M

MK DAW

459-20-002

T1

T1-AD102

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

ENLARGED PLANS – LEVELS 3 & 4 –

ARCHITECTURAL DEMOLITION

100% BID DOCUMENTS E-WING AHU REPLACEMENT

3/8" = 1'-0"

ENLARGED PLAN - 3-A106 ARCHITECTURAL DEMOLITION

3/8" = 1'-0"

ENLARGED PLAN - 4-A107 ARCHITECTURAL DEMOLITION

NO. DESCRIPTION

1 EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN.

2 EXISTING AIR INTAKE LOUVER TO REMAIN.

3 EXISTING EXHAUST AIR LOUVER TO BE REMOVED AND DISCARDED.

4 EXISTING EXHAUST AIR FAN AND PLENUM TO BE REMOVED. REFER TO MECHANICAL

PLANS FOR MORE INFORMATION.

5 EXISTING EXHAUST AIR FAN AND PLENUM TO REMAIN. REFER TO MECHANICAL PLANS

FOR MORE INFORMATION.

6 EXISTING EXHAUST AIR FAN AND PLENUM TO BE REMOVED. REFER TO MECHANICAL

PLANS FOR MORE INFORMATION.

1" = 100'-0"

KEYPLAN - LEVEL 3

1" = 100'-0"

KEYPLAN - LEVEL 4

(NOT USED).

(NOT USED).

(NOT USED).

AD102

AD102

NO SCOPE OF WORK ASSOCIATED

IN SHADED AREA

A

B

C

T1-AE300

T1-AE300

19 20

T1-AE300

T1-EAL-1 (EX)

T1-OAL-1 (EX)

T1-AHU-1

2 16

A

B

C

T1-AE300

T1-AE300

19 20

T1-AE300

T1-OAL-2 (EX)

T1-AHU-2

T1-EAL-2

MECH. RM.

2A-106

AD101

AD101

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

NORTH

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g A

H U v rv t

/8

/2

:3

:3

A M

MK DAW

459-20-002

T1

T1-AE101

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

ENLARGED PLANS – LEVELS 1 & 2 –

ARCHITECTURAL

100% BID DOCUMENTS E-WING AHU REPLACEMENT

3/8" = 1'-0"

ENLARGED PLAN - 1-A105 ARCHITECTURAL

3/8" = 1'-0"

ENLARGED PLAN - 2-A106 ARCHITECTURAL

NO. DESCRIPTION

1 EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN.

2 EXISTING AIR INTAKE LOUVER TO REMAIN.

3 INSTALL NEW EXHAUST AIR LOUVER.

1" = 100'-0"

KEYPLAN - LEVEL 1

1" = 100'-0"

KEYPLAN - LEVEL 2

AE101

AE101

MECH RM.

B-A106

NO SCOPE OF WORK ASSOCIATED

IN SHADED AREA

A

B

C

T1-AE300

T1-AE300

19 20

T1-AE300

T1-OAL-3 (EX)

T1-AHU-3

T1-EAL-3

MECH. RM.

3A-106

A

B

C

T1-AE300

T1-AE300

19 20

T1-AE300

T1-OAL-4 (EX)

T1-AHU-4

T1-EAL-4

MECH. RM.

4A-107

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g A

H U v rv t

/8

/2

:3

:4

A M

MK DAW

459-20-002

T1

T1-AE102

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

ENLARGED PLANS – LEVELS 3 & 4 –

ARCHITECTURAL

100% BID DOCUMENTS E-WING AHU REPLACEMENT

3/8" = 1'-0"

ENLARGED PLAN - 3-A106 ARCHITECTURAL

3/8" = 1'-0"

ENLARGED PLAN - 4-A107 ARCHITECTURAL

NO. DESCRIPTION

1 EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN.

2 EXISTING AIR INTAKE LOUVER TO REMAIN.

3 INSTALL NEW EXHAUST AIR LOUVER.

1" = 100'-0"

KEYPLAN - LEVEL 3

1" = 100'-0"

KEYPLAN - LEVEL 4

AE102

AE102

(NOT USED).

ELEVATION NOTES

1. THE REMOVAL OF EXHAUST AIR LOUVERS IS TO PROVIDE AN

EQUIPMENT PATHWAY FOR THE EQUIPMENT AND MATERIALS

DEMOLITION AND NEW WORK. REFER TO PHASING

GUIDELINES FOR TIMING AND OTHER PROCEDURES FOR THIS

WORK.

2. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS

AND MATCH EXISTING COLOR/FINISHES ON EXTERIOR

FACADE AND EXISTING LOUVER.

AE LEVEL 02

12' - 10"

AE LEVEL 03

25' - 8"

AE LEVEL 04

38' - 6"

AE ROOF/PH

51' - 4"

AE LEVEL 01

0' - 0"

17 18

MEP LEVEL 01

0' - 0"

MEP LEVEL 02

12' - 10"

MEP

PENTHOUSE/ROOF

51' - 4"

MEP LEVEL 03

25' - 8"

MEP LEVEL 04

38' - 6"

T1-EAL-2 (EX)

T1-EAL-1 (EX)

T1-EAL-3 (EX)

T1-EAL-4 (EX)

AE LEVEL 02

12' - 10"

AE LEVEL 03

25' - 8"

AE LEVEL 04

38' - 6"

AE ROOF/PH

51' - 4"

AE LEVEL 01

0' - 0"

17 18

MEP LEVEL 01

0' - 0"

MEP LEVEL 02

12' - 10"

MEP

PENTHOUSE/ROOF

51' - 4"

MEP LEVEL 03

25' - 8"

MEP LEVEL 04

38' - 6"

T1-EAL-4

T1-EAL-3

T1-EAL-2

T1-EAL-1 (EX)

T1-AE500

AE LEVEL 02

12' - 10"

AE LEVEL 03

25' - 8"

AE LEVEL 04

38' - 6"

AE ROOF/PH

51' - 4"

AE LEVEL 01

0' - 0"

MEP LEVEL 01

0' - 0"

MEP LEVEL 02

12' - 10"

MEP

PENTHOUSE/ROOF

51' - 4"

MEP LEVEL 03

25' - 8"

MEP LEVEL 04

38' - 6"

19 20

T1-OAL-1 (EX)

T1-OAL-2 (EX)

T1-OAL-3 (EX)

T1-OAL-4 (EX)

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g A

H U v rv t

/8

/2

:3

:4

A M

MK DAW+EM

459-20-002

T1

T1-AE300

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

EXTERIOR ELEVATIONS 100% BID DOCUMENTS E-WING AHU REPLACEMENT

NO. DESCRIPTION

1 EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN. SHOWN FOR REFERENCE.

2 EXISTING AIR INTAKE LOUVER TO REMAIN.

3 EXISTING EXHAUST AIR LOUVER TO BE REMOVED AND DISCARDED.

4 INSTALL NEW DARK BROWN CLEAR ANODIZED ALUMINUM (TO MATCH EXISTING

COLOR/FINISH) EXHAUST AIR LOUVER. REFER TO MECHANICAL PLANS FOR LOUVER

SCHEDULE AND TECHNICAL DATA.

1/4" = 1'-0"

EXHAUST AIR DISCHARGE LOUVERS - DEMOLITION

1/4" = 1'-0"

EXHAUST AIR DISCHARGE LOUVERS

1/4" = 1'-0"

OUTSIDE AIR INTAKE LOUVERS

BIRD OR INSECT

SCREEN

EXTRUDED ALUMINUM

FRAME

EXTRUDED ADJUSTABLE

BLADE

EXTERIOR INTERIOR

SILL FLASHING

BIRD OR INSECT

SCREEN

EXTRUDED ALUMINUM

FRAME

EXTRUDED ADJUSTABLE

BLADE

EXTERIOR INTERIOR

EXTRUDED ALUMINUM FRAME

EXTRUDED ADJUSTABLE

BLADE

EXTERIOR

INTERIOR

T1-AE500

Sim

T1-AE500

Sim

T1-AE500

Sim

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

NOT TO SCALE

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g A

H U v rv t

/8

/2

:3

:4

A M

MK EM

459-20-002

T1

T1-AE500

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

DETAILS 100% BID DOCUMENTS E-WING AHU REPLACEMENT

1/2" = 1'-0"

LOUVER HEAD DETAIL

1/2" = 1'-0"

LOUVER SILL DETAIL

1/2" = 1'-0"

LOUVER JAMB DETAIL

1" = 1'-0"

LOUVER ELEVATION

DRAWING SYMBOLS

SPRINKLER NOTESSPRINKLER DEMO NOTES

NOTES:

1. ADJUST SPRINKLER DROPS AS NECESSARY TO CLEAR OBSTRUCTIONS SUCH AS THE

CEILING "T" BAR SUSPENSION SYSTEM, LIGHT FIXTURES, ETC. PROVIDE A PIPE HANGER

IF THE HORIZONTAL OFFSET LENGTH EXCEEDS 24 IN. [610mm].

2. THIS SPRINKLER HEAD DROP IS APPLICABLE ONLY WHERE IT IS NOT NECESSARY TO

RETAIN AN UPRIGHT SPRINKLER FOR PROTECTION OF COMBUSTIBLE CONSTRUCTION

ABOVE THE CEILING.

3. PROVIDE LENGTH TO SUIT.

1/2" SCH 80 CLOSE NIPPLE

AND 1/2" x 1" ELBOW

1" BLACK STEEL SCH 40

PIPING (TYP)

SPRINKLER BRANCH LINE

1" x 1/2" PIPE REDUCING

COUPLING

N O

T E

NOTE 3

PROVIDE NEW PENDENT

SPRINKLER HEAD

SUSPENDED CEILING

ESCUTCHEON CUP

1/2" ORIFICE PENDENT

SPRINKLER (WHITE FINISH)

SUSPENDED CEILING

RETAINING CLIP

1" x 1/2" PIPE REDUCING

COUPLING

CUP/ESCUTCHEON

H4

H7

A

26-SF 3

26-TU-I-I

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

DRAWING NUMBER WHERE DRAWN

BUILDING NO. WHERE EQUIPMENT IS LOCATED

1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE DEPARTMENT

OF VETERANS AFFAIRS (VA) STANDARDS.

2. DESIGN BASIS INFORMATION: PROVIDE DESIGN, MATERIALS, EQUIPMENT,

INSTALLATION, INSPECTION, AND TESTING OF THE AUTOMATIC SPRINKLER SYSTEM

IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13.

3. ALL WORK SHALL BE IN CONFORMANCE WITH THE NFPA 13 CODE - LATEST EDITION.

THE VA SERVES AS AUTHORITY HAVING JURISDICTION.

4. THESE DOCUMENTS ARE INTENDED TO COMPLY WITH APPLICABLE CODES. WHERE

DISCREPANCIES OCCUR, NOTIFY THE ENGINEER/ARCHITECT IN WRITING FOR

INTERPRETATION. CORRECT ANY INSTALLATION THAT FAILS TO COMPLY WITH THE

CODES AND STANDARDS AT NO ADDITIONAL COST TO THE OWNER.

5. CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY INCLUDING ALL LABOR,

MATERIALS, PERMITS, TAXES, FEES, INSPECTIONS, HARDWARE, AND COST FOR

INSTALLATION FOR A COMPLETE AND OPERATIONAL SYSTEM.

6. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE NEW, COMPLETE WITH

MANUFACTURER’S GUARANTEE OR WARRANTY AND SHALL BE LISTED BY A

NATIONALLY RECOGNIZED TESTING LABORATORY.

7. PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE SEALED WITH APPROPRIATE

FIRE PROOFING MATERIALS TO RESTORE FIRE RATING. REFER TO ARCHITECTURAL

DRAWINGS FOR FIRE RATED WALLS.

8. CONTRACTOR SHALL KEEP THE WORK AREA CLEAN OF ALL DEBRIS ON A DAILY

BASIS. ALL NEW MATERIALS AWAITING INSTALLATION SHALL BE KEPT IN AREAS

DESIGNATED BY THE OWNER.

9. DRAWINGS SHALL NOT BE SCALED FOR DIMENSIONS. REFER TO DIMENSIONED

ARCHITECTURAL FLOOR PLANS. IF THE DIMENSIONS CANNOT BE DETERMINED BY

THE INFORMATION GIVEN, CONTRACTOR SHALL CONTACT THE ENGINEER FOR

ADDITIONAL INFORMATION.

10. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY FOR THE PURPOSE OF

DETERMINING IF THE WORK OF THE CONTRACTOR IS PROCEEDING IN ACCORDANCE

WITH THE CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION SHOULD NOT

BE CONSTRUED AS EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY OR

QUANTITY OF THE WORK, BUT RATHER PERIODIC IN AN EFFORT TO GUARD THE

OWNER AGAINST DEFECTS OR DEFICIENCIES IN THE WORK OF THE CONTRACTOR.

11. INFORMATION CONTAINED ON THE DRAWINGS IS IN ITSELF INCOMPLETE AND VOID

UNLESS USED IN CONJUNCTION WITH ALL OTHER DISCIPLINE DRAWINGS, THE

SPECIFICATIONS, TRADE PRACTICES, OR APPLICABLE STANDARDS, CODES, ETC.,

AND SHALL BE CONSIDERED THE CONTRACT DOCUMENTS AND WITH ALL THEREIN BY

REFERENCE, WHICH THE CONTRACTOR CERTIFIES KNOWLEDGE OF BY SIGNING THE

CONTRACT.

12. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY, UNRELIEVED BY REVIEW OF

SHOP DRAWINGS OR PERIODIC OBSERVATION OF CONSTRUCTION, FOR COMPLIANCE

WITH THE CONTRACT DOCUMENTS, FOR DIMENSIONS TO BE CONFIRMED AND

CORRELATED ON THE JOB SITE AND BETWEEN INDIVIDUAL DRAWINGS OR SETS OF

DRAWINGS FOR FABRICATION PROCESSES AND CONSTRUCTION TECHNIQUES

(INCLUDING EXCAVATION, SHORING, SCAFFOLDING, BRACING, ERECTION, FORM

WORK, ETC.), FOR COORDINATION OF THE VARIOUS TRADES, AND FOR SAFE

CONDITIONS ON THE JOB SITE. VARIATIONS IN FIELD CONDITIONS RELATIVE TO THE

CONTRACT DOCUMENTS SHALL BE REPORTED TO THE ENGINEER AS SOON AS THEY

ARE FOUND. WORK SHALL NOT PROGRESS UNTIL WRITTEN PERMISSION FROM THE

ENGINEER IS OBTAINED.

13. ALL EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED SO AS TO BE EASILY

ACCESSIBLE. ALL CLEARANCES FOR EQUIPMENT PER MANUFACTURERS GUIDELINES

AND CODE COMPLIANCE SHALL BE REQUIRED.

14. PROVIDE ACCESS PANELS FOR VALVES, ETC. THAT ARE LOCATED IN CONCEALED

AREAS. COORDINATE WITH GENERAL CONTRACTOR FOR EXACT LOCATION AND WITH

ARCHITECTURAL PLANS FOR FINISHES.

15. ALL COMPONENTS OF SYSTEMS SHALL BE PROVIDED FOR A COMPLETELY

OPERATIONAL, UNDERSTANDABLE, SAFE, AND CLEAN SYSTEM; INCLUDING BUT NOT

LIMITED TO EXTRANEOUS FIXTURE TRIM AS SPECIFIED, LABELS, SERVICE AND

COMMISSIONING INTO OPERATION, TESTING AND CLEANING, FIRE AND LIFE SAFETY

REQUIREMENTS, AND CONSIDERING THE REQUESTS OF OWNERS PERSONNEL.

16. ELECTRICAL PANELS SHOWN FOR REFERENCE. DO NOT ROUTE ANY COMPONENTS

ABOVE OR IN FRONT OF ELECTRICAL EQUIPMENT. MAINTAIN CODE REQUIRED

CLEARANCES.

17. FIRE PROTECTION CONTRACTOR SHALL REVIEW ALL PROJECT PLANS AND

SPECIFICATIONS, THEN CONTACT OWNER AND LOCAL FIRE DEPARTMENT FOR

COORDINATION OF DOCUMENTATION AND SYSTEM REQUIREMENTS PRIOR TO

STARTING WORK.

18. ALL REQUIREMENTS FOR WORKING ON FIRE PROTECTION SYSTEM, INCLUDING BUT

NOT LIMITED TO FIRE WATCH, HYDRANT FLOW TESTING, SYSTEM SHUTDOWNS AND

TESTING, ARE THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR.

19. PLANS ARE DIAGRAMMATIC AND INTENDED TO CONVEY SCOPE OF WORK AND

GENERAL LOCATIONS OF EQUIPMENT, MATERIALS, ETC. NOT ALL RISERS, DROPS,

OFFSETS, VALVES, ETC. ARE SHOWN. PROVIDE RISERS, DROPS, OFFSETS, VALVES,

ETC. AS REQUIRED TO MEET SPACE REQUIREMENTS AND TO AVOID INTERFERENCES

WITH OTHER TRADES. MAKE FINAL CONNECTIONS TO FIXTURES, EQUIPMENT, ETC.

AS REQUIRED AND/OR PER MANUFACTURER'S RECOMMENDATIONS.

20. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LAYOUT OWN WORK

ACCORDINGLY AND IS RESPONSIBLE FOR DETERMINING EXACT LOCATIONS FOR

EQUIPMENT, MATERIALS, ETC.

21. THE EXISTING SPRINKLER SYSTEM SHALL BE MODIFIED PER SPECIFIED PLANS AND

SPECIFICATIONS. FIELD VERIFY EXISTING SPRINKLER SYSTEM REQUIREMENTS PRIOR

TO BIDDING.

22. COORDINATE SCOPE OF WORK WITH THE WORK OF OTHER TRADES PRIOR TO

INSTALLATION. ISSUES DUE TO LACK OF COORDINATION EFFORT WILL BE

CORRECTED AT NO ADDITIONAL COST TO THE OWNER.

23. COORDINATE LOCATION OF SYSTEM COMPONENTS WITHIN LIMITS OF STRUCTURE

AND OTHER ENGINEERED SYSTEMS. ROUTE ALL PIPING IN CONCEALED SPACES AND

INSTALL PIPING AS HIGH AS POSSIBLE. CENTER SPRINKLER HEADS WITHIN CEILING

TILES. OFFSET SYSTEMS ROUTING AS REQUIRED, PROVIDING REQUIRED MATERIALS

AND DRAIN POINTS. PIPE SHALL NOT BE ROUTED IN EXTERIOR WALLS UNLESS

NOTED. COORDINATE ROUTING OF PIPING TO MAINTAIN REQUIRED SERVICE

CLEARANCES AROUND ANY EQUIPMENT AND ELECTRICAL ITEMS.

24. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING

PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW

SYSTEMS. COORDINATE WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS

SCOPE.

25. ALL ELEMENTS OF CONSTRUCTION SHALL BE INSTALLED BY SKILLED TRADESMEN OF

THERE PARTICULAR TRADE, AND INSTALLED IN A NEAT WORKMANLIKE MANNER

KEEPING WITH THE HIGHEST STANDARDS OF THE TRADE.

26. COORDINATE SCOPE OF WORK WITH PROJECT SCHEDULES AGREED UPON BY

OWNER AND ALL CONTRACTORS.

27. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS ABOUT DESIGN

STANDARDS, PRODUCTS, DRAWINGS, SUBMITTALS, DOCUMENTATION,

COORDINATION, AND INSTALLATION.

1. ALL PIPING AND DUCTWORK IS SHOWN SCHEMATICALLY BASED ON EXISTING PLANS.

CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF VERIFYING ROUTES

OF ALL EXISTING CONDITIONS AND EXISTING UTILITIES PRIOR TO BIDDING AND

STARTING OF WORK. IF CONDITIONS DIFFER GREATLY CONTACT ENGINEER.

2. CONDUCT A PRECONSTRUCTION AIR AND WATER FLOW TEST OF EXISTING SYSTEMS

AND MAINS SERVING EACH AREA AND FLOOR BEFORE STARTING ANY DEMOLITION

WORK. SUBMIT REPORT OF FLOWS AND FINDINGS TO ENGINEER AND OWNER.

3. COORDINATE SCHEDULE OF WORK WITH OWNER AND PROVIDE SUFFICIENT NOTICE

BEFORE ANY SHUTDOWNS, TO MINIMIZE DISRUPTIONS TO ANY CONCURRENT

OPERATIONS.

4. COMPLY WITH SITE SAFETY PROCEDURES OF OWNER, GENERAL CONTRACTOR, AND

OSHA.

5. DEMOLISH MATERIALS, EQUIPMENT, AND ASSOCIATED SYSTEMS AS SHOWN WITHIN

SCOPE OF WORK AREA AS DESIGNATED/NOTED. DEMOLISH ALL BRANCH DUCT AND

PIPE, SUPPORTS, ACCESSORIES, EQUIPMENT, TERMINAL DEVICES, CONTROLS,

WIRING, CONDUITS, AND ASSOCIATED ITEMS BACK TO RESPECTIVE MAINS. THEN CAP,

SEAL, REPAIR, REINSULATE MAIN CONNECTIONS AS REQUIRED. NOTHING SHALL BE

ABANDONED IN PLACE UNLESS NOTED OTHERWISE. REMOVE ALL DEMOLISHED ITEMS

FROM SITE AND DISPOSE PROPERLY PER LOCAL LAWS.

6. HATCHED OR GRAYED OUT AREAS ARE NOT WITHIN CONTRACT BOUNDARY.

COORDINATE WITH OWNER IF SUCH AREAS REQUIRE ACCESS TO COMPLETE SCOPE

OF WORK, SUCH AS REMOVING A BRANCH MAIN BACK TO LARGER MAIN TO ELIMINATE

DEAD LEGS.

7. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING

PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW

SYSTEMS. COORDINATE WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS

SCOPE. 8.SAVE NOTED ITEMS FOR REUSE OR OWNERS SALVAGE. STORE NOTED

ITEMS AND OTHER ITEMS IDENTIFIED BY OWNER IN OWNER’S DESIGNATED STORAGE

AREA.

8. PROTECT EXISTING TO REMAIN EQUIPMENT, MATERIALS, AND SURROUND SITE FROM

DAMAGE DURING DEMOLITION. REPAIRS AND REPLACEMENT OF EXISTING TO REMAIN

CONDITIONS SHALL BE THE CONTRACTOR’S RESPONSIBILITY.

9. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

H o n o lu lu E

W in g A

H U

/H o n o lu lu

E -W in g

A H

U M

E P

V

.r v t

/8

/2

:4

:0

A M

AW DAW

459-20-002

T1

T1-F-001

459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM

JULY 8, 2022

SPRINKLER DETAILS, SYMBOLS, NOTES, AND

ABBREVIATIONS

100% BID DOCUMENTS E-WING AHU REPLACEMENT

SPR SPRINKLER LINE

PRV PRESSURE REDUCING VALVE

PD PRESSURE DROP OR DIFFERENCE

NPW NON POTABLE WATER

NOM. NOMINAL

NO NORMALLY OPEN

NIC NOT IN CONTRACT

NC NORMALLY CLOSED

FS FLOW SWITCH

FP FIRE PROTECTION

FM FLOW METER

FDC FIRE DEPARTMENT (HOSE) CONNECTION

FD FLOOR DRAIN

DN DOWN

DCW DOMESTIC COLD WATER

C CELSIUS

BFP REDUCED PRESSURE BACKFLOW PREVENTER

AS AUTOMATIC SPRINKLER

AG AIR GAP

SPRINKLER ABBREVIATIONS

NTS

TYPICAL RECESSED SPRINKLER HEAD DROP DETAIL

NTS

SEMI-RECESSED SPRINKLER HEAD DETAIL

WEF WALL EXHAUST FAN

WCPU WATER COOLED PACKAGED UNIT

WCHP WATER COOLED HEAT PUMPS

WCCU WATER COOLED CONDENSING UNIT

WCCH WATER COOLED CHILLER

WC WATER COOLED

Wb WET-BULB (TEMPERATURE)

VSD VARIABLE SPEED DRIVE

IS INSECT SCREEN VI VIBRATION ISOLATOR

ICF IN-LINE CENTRIFUGAL FAN VFD VARIABLE FREQUENCY DRIVE

IAQ INDOOR AIR QUALITY VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VAV VARIABLE AIR VOLUME

HOA HAND/OFF/AUTOMATIC V VALVE

HD HOOD

HB HOSE BIBB TU TERMINAL UNIT

TSTAT THERMOSTAT

FV FACE VELOCITY TSP TOTAL STATIC PRESSURE

FM FLOW METER TR TOP REGISTER

FD FIRE DAMPER TDS TOTAL DISSOLVED SOLIDS

FD FLOOR DRAIN TDH TOTAL DYNAMIC HEAD

FCW FORWARD CURVED WHEEL (FAN) TD TEMPERATURE DIFFERENCE

FCUC FAN COIL UNIT COOLING ONLY TAB TESTING, ADJUSTING, BALANCE

FC FLEXIBLE CONNECTION

FA FREE AREA SR SUPPLY AIR REGISTER

F/SDPR COMBINATION FIRE SMOKE DAMPER SPS STATIC PRESSURE SENSOR

SPD SUPPLY PROCESS AND DISTRIBUTION

EWT ENTERING WATER TEMPERATURE SP STATIC PRESSURE

EWC EVAPORATIVE WATER COOLER SG SUPPLY AIR GRILLE

EUH ELECTRIC UNIT HEATER SF SUPPLY FAN

ETO ETHYLENE OXIDE SD SUPPLY AIR DIFFUSER

ET EXPANSION TANK SCR SILICON CONTROLLED RECTIFIER

ER EXHAUST REGISTER SAT SUPPLY AIR TEMPERATURE

ENT ENTERING SAD SOUND ATTENUATING DEVICE

EGS EMERGENCY GAS SHUTOFF SA SUPPLY AIR

EG EXHAUST GRILLE

EF EXHAUST FAN RV RELIEF VALVE

EER ENERGY EFFICIENCY RATIO RTU ROOF TOP UNIT

ECU EVAPORATIVE CONDENSER UNIT RS REFRIGERANT SUCTION

ECC ENGINEERING CONTROL CENTER RR RETURN REGISTER

EC EVAPORATIVE COOLER RO REVERSE OSMOSIS

EAT ENTERING AIR TEMPERATURE RLA RUN LOAD AMPERE

EA EXHAUST AIR RL REFRIGERANT LIQUID LINE

RHG REFRIGERANT HOT GAS

DXCC DIRECT EXPANSION COOLING COIL RH RELATIVE HUMIDITY

DX DIRECT EXPANSION RG RETURN GRILLE

DP DEW POINT TEMPERATURE RF RETURN FAN

DP DIFFUSER PLATE RELAD RELIEF AIR DAMPER

DIW DEIONIZED WATER REA RELIEF AIR

DF DIFFUSER RDS ROOM DATA SHEETS

DDC DIRECT DIGITAL CONTROLS RD REFRIGERANT DISCHARGE

DB DECIBELS RCU RECIPROCATING CHILLER UNIT

Db DRY-BULB TEMPERATURE RCCH REMOTE CONDENSER CHILLER

RAT RETURN AIR TEMPERATURE

CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER) RAHX ROTARY AIR HEAT EXCHANGER

CWR CONDENSER WATER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .