P01 - Bid Documents Full Size - E Wing HVAC Upgrade.pdf
PDF 13 MB Posted
- Attached to
- VISN 21 MACC Group 2 - E Wing AHU Upgrade
- Solicitation number
- 36C26123R0099
About this file
This document provides details for a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. The solicitation number is 36C26123R0099 for the VISN 21 MACC Group 2 - E Wing AHU Upgrade project, which involves upgrading the HVAC system in the E Wing of a VA facility. The bid documents file attached is a 13MB PDF with plans and specifications for replacing the air handling unit to improve climate control in the specified area. Offerors should review the provided documents thoroughly to understand the full scope of work required prior to submitting a response. The opportunity type is listed as a solicitation, suggesting the agency is seeking bids or proposals from contractors to complete the HVAC upgrade work. No other details such as response dates, award timing, or pricing terms are included in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING LIST
0 GRID / COLUMN LINE DESIGNATOR
EQUIPMENT NUMBER
ROOM NAME
ROOM NAME / NUMBER
REVISION TAG
PLAN NORTH
NORTH ARROW WITH TRUE
NORTH INDICATION
ELEVATION NUMBER
SECTION
INTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
Name Elevation
FLOOR LEVEL &
NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
SHEET KEYNOTE
A101
SIM
EXTERIOR ELEVATION
A-101
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PROJECT TEAMSITE LOCATIONANNOTATION DRAWING SYMBOLSGENERAL NOTES
1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A
COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW
ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.
2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED BEFORE
SUBMITTING COST QUOTATIONS FOR WORK.
3. NOTIFY THE ARCHITECT PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE
PROVIDED PRIOR TO CONTINUING WITH WORK.
4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT
5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.
6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE.
7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.
8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH
RESPECT TO DELIVERY DATE, QUALITY, OR COST.
9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S
MEANS AND METHODS OR FOR TEMPORARY STRUCTURES.
10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL
EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.
11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA
REGULATIONS DURING CONSTRUCTION.
12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE.
A101
A101
NORTH
AREA OF WORK
WHITE RD.
P
A T T E
R S
O N
R D
KRUKO
E-WING
A-WING
JA
RRETT
WSKI RD.
INDEX OF DRAWINGS
T1-AE101
DISCIPLINE:
G - GENERAL
A - ARCHITECTURE
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
SHEET TYPE
DESIGNATOR
BUILDING NUMBER
SHEET NUMBER
WITHIN SERIES
KRUKO-
W
SKI RD.
W H
IT
E
R D
JA
RRETT
W A
R D
R D
KRUKOWSKI RD.
E
D B
A
C
G
F
H
AMB
CARE
C-WING
AREA OF WORK
T1-AHU-1
PHASING NOTES
PHASE 1A* - ISOLATE AND DRAIN CHILLED WATER RISER AND REPLACE BRANCH ISOLATION VALVES ON EACH LEVEL.
REPLACE 4TH FLOOR 3-WAY VALVE TO ALLOW BY-PASS FLOW.
PHASE 1B* - CORE SLABS AND PROVIDE NEW ELECTRICAL RISERS IN MECHANICAL SPACES TO PREPARE FOR NEW
EQUIPMENT CONNECTIONS.
PHASE 2**- REPLACE T1-AHU-1 ON LEVEL 1 AND REMOVE EXISTING ELECTRICAL RISERS (CRANING NOT REQUIRED)
PHASE 3**- REPLACE T1-AHU-4 ON LEVEL 4 AND REMOVE EXISTING ELECTRICAL RISERS (CRANING REQUIRED)
PHASE 4**- REPLACE T1-AHU-3 ON LEVEL 3 AND REMOVE EXISTING ELECTRICAL RISERS (CRANING REQUIRED)
PHASE 5**- REPLACE T1-AHU-2 ON LEVEL 2 AND REMOVE EXISTING ELECTRICAL RISERS (CRANING REQUIRED)
* PHASES REQUIRED TO BE COMPLETED OVER A WEEKEND (OVERTIME HOURS MAY BE REQUIRED) ** PHASES CAN BE COMPLETED DURING NORMAL HOURS, BUT SCHEDULE MUST BE COORDINATE WITH COR WITH SPECIAL
NOISE CONSIDERATIONS FOR NEARBY STAFF (OFFICE SPACE VACATING MAY BE REQUIRED).
***PHASE 2,3,4,5 - VACATING THE FLOOR DURING CONSTRUCTION WILL NEED TO BE COORDINATED WITH OCCUPANTS OF EACH FLOOR. IT WILL BE UP TO EACH FLOOR IF THEY WANT TO VACATE. IF CONTRACTOR IS REQUESTING FOR OCCUPANTS
TO VACATE, VA REQUIRES A MINIMUM OF 14 DAYS ADVANCE NOTICE FOR EACH FLOOR.
ONLY ONE FIRE SPRINKLER ZONE MAY BE SHUT DOWN AT ANY TIME. CONTRACTOR TO COORDINATE DOWNTIME WITH VA
AND PROVIDE FIRE WATCH PROVISIONS.
ROOMS THAT NEED TEMPORARY COOLING:
LEVEL 1:
• 1-B100 SPACE (ALL INTERVIEW ROOMS, VREO OFFICE, SUPERVISOR VRE OFFIC, PUBLIC CONTACT COACH OFFICE AND
PUBLIC EMPLOYEE'S SPACE AND VRE EMPLOYEES' SPACE).
• ROOM 1-A103 - HAWAII OFFICE OF VETERAN AFFAIRS.
• ROOM C102 - DISABLED AMERICAN VETERANS.
• ROOM 1-C104 - VETERANS FOR FOREIGN WARS.
• ROOM 1-105 - WOUNDED WARRIOR PROJECT.
LEVEL 2:
• 2-B100 - ENTIRE EMPLOYEE'S SPACE.
• 2A-100C - DIRECTOR'S OFFICE.
• 2A-A104 - DIRECTOR'S PROGRAM ANALYST OFFICE.
LEVEL 4:
• 4C-107
• 4C-109
• 4C-115
• 4C-118
• 4C-119
Romanyk Consulting Focusing on what matters
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
8910 7 6 5 4 3 2 1
U.S. Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g
A H
U M
E P
V
.r v t
/8
/2
:4
:1
A M
PROJECT NUMBER - 459-20-002
E-WING AHU REPLACEMENT
100% BID DOCUMENTS
JULY 8, 2022
AW DAW
459-20-002
T1
T1-GI100
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
COVER SHEET 100% BID DOCUMENTS E-WING AHU REPLACEMENT
SHEET # SHEET TITLE
GENERAL
T1-GI100 COVER SHEET
T1-GI101 GENERAL ABBREVIATIONS
ARCHITECTURAL
T1-AS101 SITE PLANS - BASEMENT & LEVEL 1 - ARCHITECTURAL
T1-AS102 SITE PLANS - LEVELS 2 & 3 - ARCHITECTURAL
T1-AS103 SITE PLANS - LEVEL 4 & ROOF - ARCHITECTURAL
T1-AD101 ENLARGED PLANS – LEVELS 1 & 2 – ARCHITECTURAL DEMOLITION
T1-AD102 ENLARGED PLANS – LEVELS 3 & 4 – ARCHITECTURAL DEMOLITION
T1-AE101 ENLARGED PLANS – LEVELS 1 & 2 – ARCHITECTURAL
T1-AE102 ENLARGED PLANS – LEVELS 3 & 4 – ARCHITECTURAL
T1-AE300 EXTERIOR ELEVATIONS
T1-AE500 DETAILS
SPRINKLER
T1-F-001 SPRINKLER DETAILS, SYMBOLS, NOTES, AND ABBREVIATIONS
T1-FD101 ENLARGED PLANS - LEVELS 1 & 2 - FIRE PROTECTION DEMOLITION
T1-FD102 ENLARGED PLANS - LEVELS 3 & 4 - FIRE PROTECTION DEMOLITION
T1-FP101 ENLARGED PLANS - LEVELS 1 & 2 - FIRE PROTECTION
T1-FP102 ENLARGED PLANS - LEVELS 3 & 4 - FIRE PROTECTION
MECHANICAL
T1-M-001 MECHANICAL SYMBOLS, NOTES, AND ABBREVIATIONS
T1-M-002 MECHANICAL SCHEDULES
T1-MS101 SITE PLANS - LEVEL 0 & LEVEL 1 - MECHANICAL
T1-MS102 SITE PLANS - LEVELS 2 & 3 - MECHANICAL
T1-MS103 SITE PLANS - LEVEL 4 & ROOF - MECHANICAL
T1-MD101 ENLARGED PLANS - LEVELS 1 & 2 - MECHANICAL DEMOLITION
T1-MD102 ENLARGED PLANS - LEVELS 3 & 4 - MECHANICAL DEMOLITION
T1-MH101 ENLARGED PLANS - LEVELS 1 & 2 - HVAC
T1-MH102 ENLARGED PLANS - LEVELS 3 & 4 – HVAC
T1-MH200 3D VIEWS - LEVELS 1, 2, 3, 4 - HVAC
T1-MH300 HVAC DETAILS
T1-MH301 HVAC DETAILS
T1-MH302 AHU ELEVATIONS
T1-MP101 ENLARGED PLANS - LEVELS 1 & 2 - MECHANICAL PIPING
T1-MP102 ENLARGED PLANS - LEVEL 3 & 4 - MECHANICAL PIPING
T1-MP200 CHILLED WATER PIPING DIAGRAM
T1-MP300 MECHANICAL PIPING DETAILS
ELECTRICAL
T1-E-001 ELECTRICAL SYMBOLS, NOTES, AND ABBREVIATIONS
T1-ED101 ENLARGED ELECTRICAL DEMOLITION PLANS - LEVEL 1 & 2
T1-ED102 ENLARGED ELECTRICAL DEMOLITION PLANS - LEVEL 3 & 4
T1-EP101 ENLARGED ELECTRICAL PLANS - LEVEL 1 & 2
T1-EP102 ENLARGED ELECTRICAL PLANS - LEVEL 3 & 4
T1-E-400 ELECTRICAL DETAILS
T1-E-501 ELECTRICAL SCHEDULES
Grand total: 40
OWNER:
VA Pacific Islands Health Care System Spark M. Matsunaga VA Medical Center 459 Patterson Road, Honolulu, HI 96819
CONTRACTING OFFICER REP. (COR):
Spark M. Matsunaga VA Medical Center 459 Patterson Road Honolulu, HI 96819-1522
Marvin Patacsil COTR Marvin.Patacsil@va.gov
808-433-0162 808-940-1133 cell
PROJECT ARCHITECT:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Rebecca C. Olson, AIA, ACHA Rebecca.Olson@RomaynkConsulting.com
855-424-3838 x302 602-430-1265 cell
MECHANICAL ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com
855.424.3838 x324
319.721.4986 cell
ELECTRICAL ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Jeffrey Koehler Jeffrey.Koehler@RomanykConsulting.com
855.424.3838 x315
262.930.0903 cell
Revisions: Date:
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g A
H U v rv t
/8
/2
:3
:4
A M
MK DAW
459-20-002
T1
T1-GI101
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
GENERAL ABBREVIATIONS 100% BID DOCUMENTS E-WING AHU REPLACEMENT
EWC EVAPORATIVE WATER COOLER
EUH ELECTRIC UNIT HEATER RTU ROOF TOP UNIT
ET EXPANSION TANK RR RETURN REGISTER
ERP ELECTRIC RADIANT PANEL RG RETURN GRILLE
ERC ELECTRIC REHEAT COIL RF RETURN FAN
EH EXHAUST HOOD RCCH REMOTE CONDENSER CHILLER
EGS EMERGENCY GAS SHUTOFF RAHX ROTARY AIR HEAT EXCHANGER
EF EXHAUST FAN RAD REFRIGERANT AIR DRYER
EDH ELECTRIC DUCT HEATER
ECU EVAPORATIVE CONDENSER UNIT PTAC PACKAGED TERMINAL AIR CONDITIONER WFM WATER FLOWMETER
ECC ENGINEERING CONTROL CENTER PHC PREHEAT COIL WFCV WATER FLOW CONTROL VALVE
EC EVAPORATIVE COOLER PF PRE-FILTER WF WATER FILTER
P PUMP WCUH AIR COOLED UNIT HEATER
DXCC DIRECT-EXPANSION COOLING COIL WCPU AIR COOLED PACKAGED UNIT
DX DIRECT-EXPANSION OFM OIL FLOWMETER WCHP AIR COOLED HEAT PUMP
DPS DIFFERENTIAL PRESSURE SWITCH/SENSOR OAI OUTSIDE AIR INTAKE WCCU AIR COOLED CONDENSING UNIT
DPA DIFFERENTIAL PRESSURE ASSEMBLY WCCH AIR COOLED CHILLER
DDC DIRECT DIGITAL CONTROLS NPSH NET POSITIVE SUCTION HEAD WC AIR COOLED
NGFM NATURAL GAS FLOW METER
CWP CONDENSER WATER PUMP VSD VARIABLE SPEED DRIVE
CWCC CHILLED WATER COOLING COIL MAU MAKE-UP AIR UNIT VPS VARIABLE PRIMARY SYSTEM
CV CONSTANT VOLUME VI VIBRATION ISOLATOR
CUH CABINET UNIT HEATER LLHX LIQUID TO LIQUID HEAT EXCHANGER
CU CONDENSING UNIT VFD VARIABLE FREQUENCY DRIVE
CT COOLING TOWER HX HEAT EXCHANGER VAV VARIABLE AIR VOLUME
CS CONDENSATE STORAGE TANK HVD HOISTWAY VENT DAMPER V VALVE
CP CONDENSATE PUMP HWUH HOT WATER UNIT HEATER
COMP COMPRESSOR UNIT HWP HEATING HOT WATER PUMP UH UNIT HEATER
CHW CHILLED WATER HWC HOT WATER COIL UC UNIT COOLER
CHP CHILLED WATER PUMP HWHC HOT WATER HEATING COIL
CFP CHEMICAL FEED PUMP HW HOT WATER TU TERMINAL UNIT
CC COOLING COIL HUM HUMIDIFIER UNIT MOUNTED TP TRAP
HTM HUMIDIFIER TERMINAL
BWT BOILER PLANT WATER TUBE HRP HYDRONIC RADIANT (CEILING) PANEL SWHX STEAM TO WATER HEAT EXCHANGER
BTCU BLOW OFF TANK CONTROL VALVE HP HEAT PUMP SVS STEAM VENT SILENCER
BT BOILER TANK HD HOOD SV STEAM PRESSURE REDUCING VALVE
BSC BIOLOGICAL SAFETY CABINETS HC HEATING COIL SUH STEAM UNIT HEATER
BHX BOILER BLOWDOWN HEAT EXCHANGER H HUMIDIFIER ST STEAM TRAP
BHW HOT WATER HEATING BOILER SSR SOLID SEPARATOR
BFT BOILER PLANT FIRE TUBE FTR FIN TUBE RADIATION SSHX STEAM TO STEAM HEAT EXCHANGER
B BOILER FOHX FUEL OIL HEAT EXCHANGER SR SUPPLY AIR REGISTER
FOT FUEL OIL TANK SPRV STEAM PRESSURE REDUCING VALVE
AW AIR WASHER FOP FUEL OIL PUMP SPD SUPPLY PROCESS AND DISTRIBUTION
AS AIR SEPARATOR FM FLOWMETER SP GR SPECIFIC GRAVITY
AHU AIR-HANDLING UNIT FHX FLUE GAS/FEEDWATER HEAT EXCHANGER SP STATIC PRESSURE
AFMD AIR FLOW MEASURING DEVICE FF FINAL FILTER SHC STEAM HEATING COIL
AFCV AIR FLOW CONTROL VALVE FD FIRE DAMPER SH STEAM HUMIDIFIER
AF AFTER-FILTERS FCUH FAN COIL UNIT HEATING ONLY SF SUPPLY FAN
ACU AIR-CONDITIONING UNIT FCUC FAN COIL UNIT COOLING ONLY SDPR SMOKE DAMPER
ACCU AIR-COOLED CONDENSING UNIT FCU FAN COIL UNIT (4 PIPE) SD SUPPLY AIR DIFFUSER
ACCH AIR-COOLED CHILLER F/SDPR COMBINATION FIRE SMOKE DAMPER SD SMOKE DETECTOR
AAHX AIR TO AIR HEAT EXCHANGER SAD SOUND ATTENUATING DEVICE
EQUIPMENT ABBREVIATIONS EQUIPMENT ABBREVIATIONS EQUIPMENT ABBREVIATIONS
GPM GALLONS PER MINUTE
GPH GALLONS PER HOUR MTD MEAN TEMPERATURE DIFFERENCE
GPD GALLONS PER DAY M/S METERS PER SECOND
GAL GALLONS MM MILLIMETER
GA GAUGE MIN MINIMUM
MHP MOTOR HORSEPOWER
FT-WC FEET OF WATER COLUMN MERV MINIMUM EFFICIENCY REPORTING VALUE
FT-LB FOOT-POUND MCA MULTICHANNEL ANALYZER
FT FEET MCA MAXIMUM CURRENT AMPACITY YR YEAR
FPS FEET PER SECOND MBH 1000 BTUH
FPM FEET PER MINUTE MAX MAXIMUM WPD WATER SIDE PRESSURE DROP
F FAHRENHEIT M METER WG WATER GAGE
WB WET-BULB (TEMPERATURE)
EWT ENTERING WATER TEMPERATURE LWT LEAVING WATER TEMPERATURE W WATTS
ESP EXTERNAL STATIC PRESSURE LVG LEAVING
ENT ENTERING LH LATENT HEAT TSP TOTAL STATIC PRESSURE
EGT ENTERING GLYCOL TEMPERATURE LGT LEAVING GLYCOL TEMPERATURE TD TEMPERATURE DIFFERENCE
EER ENERGY EFFICIENCY RATIO LF LINEAR FOOT (FEET)
EAT ENTERING AIR TEMPERATURE LBS/HR POUNDS PER HOUR SQ M SQUARE METER
LAT LEAVING AIR TEMPERATURE SQ FT SQUARE FOOT (FEET)
DP DEWPOINT L/S LITERS PER SECOND SP GR SPECIFIC GRAVITY
DIA DIAMETER L/M LITERS PER MINUTE SCFM STANDARD CUBIC FEET PER MINUTE
DEG DEGREE L/H LITERS PER HOUR SAT SUPPLY AIR TEMPERATURE
dB DECIBEL L LITER SI SQUARE INCHES
DB DRY-BULB TEMPERATURE
kWH KILOWATT HOUR RPM REVOLUTIONS PER MINUTE
COP COEFFICIENT OF PERFORMANCE kW KILOWATT RLA RUN LOAD AMPERE
CM/S CENTIMETER PER SECOND kPA KILO PASCAL RAT RETURN AIR TEMPERATURE
CM CUBIC METER KG/HR KILOGRAM PER HOUR RAF RADIO-FREQUENCY
CFT CUBIC FEET KG KILOGRAM
CFH CUBIC FEET PER HOUR PSIG POUNDS PER SQUARE INCH-GAGE
CFM CUBIC FEET PER MINUTE IPLV INTEGRATED PART LOAD VALUE PSIA POUNDS PER SQUARE INCH ATMOSPHERE
C CENTIGRADE (CELSIUS) IN-LB INCH-POUND PSI POUNDS PER SQUARE INCH
IN WG INCH WATER GAUGE PPM PARTS PER MILLION
BTUH BRITISH THERMAL UNIT PER HOUR IN HG INCHES OF MERCURY PA PASCAL
BTU BRITISH THERMAL UNIT IN INCHES
BHP BRAKE HORSE POWER NPLV NON-STANDARD PART LOAD VALUE
HZ HERTZ Nm NEWTON-METER
APD AIR SIDE PRESSURE DROP HP HORSEPOWER NC NOISE CRITERIA
UNITS OF MEASURE UNITS OF MEASURE UNITS OF MEASURE
XFER TRANSFER
VHA VETERANS HEALTH ADMINISTRATION
UTIL UTILITY
UPC UNIVERSAL PLUMBING CODE
UL UNDERWRITER'S LABORATORY
TEMP TEMPERATURE
TYP TYPICAL
SPEC SPECIFICATION
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL...
SI INTERNATIONAL SYSTEM OF UNITS
SHT SHEET
SEN SENSIBLE HEAT
SCI SPINAL CODE INJURY
SA SUPPLY AIR
RM ROOM
RO REVERSE OSMOSIS
RDS ROOM DATA SHEETS
REQD REQUIRED
RA RETURN AIR
R/E RETURN OR EXHAUST
PSS PRIMARY SECONDARY SYSTEM
PGW PROPYLENE GLYCOL-WATER SOLUTION
OR OPERATING ROOM
OD OUTSIDE DIAMETER
OC ON CENTER
OA OUTSIDE AIR
NTS NOT TO SCALE
NSPC NATIONAL STANDARD PLUMBING CODE
NOM NOMINAL
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
NO NORMALLY OPEN
NIC NOT IN CONTRACT
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEC NATIONAL ELECTRICAL CODE
NC NORMALLY CLOSED
NA NOT APPLICABLE (ALSO N/A)
MRI MAGNETIC RESONANCE IMAGING
MER MECHANICAL EQUIPMENT ROOM
MIN MINIMUM
MAX MAXIMUM
LPG LIQUID PROPANE GAS
IPC INTERNATIONAL PLUMBING CODE
ID INSIDE DIAMETER
ICU INTENSIVE CARE UNIT
I/O INPUT/OUTPUT
HAC HOUSEKEEPING AIDE’S CLOSET
EX EXISTING (OR EXIST)
EL ELEVATION
ESMT EASEMENT
ETO ETHYLENE OXIDE
EA EXHAUST AIR
DWG DRAWING
CO2 CARBON DIOXIDE
CENT CENTRIFUGAL
BMT BONE MARROW TRANSPLANT
BLDG BUILDING
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASHRAE
AMERICAN SOCIETY OF HEATING REFRIGERATION AIR CONDITIONING
ENGINEERS
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AMB AMBIENT
AFG ABOVE FINISHED GRADE
AFF ABOVE FINISHED FLOOR
A/E ARCHITECTS AND ENGINEERS
GENERAL ABBREVIATIONS
FLOOR PLAN NOTES
PARTITION RATING LEGEND
SCOPE OF WORK
ROLLING SHUTTER
1. GC SHALL VERIFY DIMENSIONS OF EQUIPMENT AND
COORDINATE INSTALLATION WITH ALL TRADES WHERE
REQUIRED.
2. GC SHALL INSTALL IN-WALL METAL BACKING FOR ALL
PARTITION-MOUNTED EQUIPMENT, ACCESSORIES, PARTITION
STOPS, ETC.
3. GC SHALL PROVIDE UL APPROVED FIRE- RESISTIVE
PENETRATION SYSTEMS WHERE PLUMBING IS LOCATED IN A
FIRE-RATED PARTITION ASSEMBLY.
FB1 = FIRE BARRIER 1HR
FB2 = FIRE BARRIER 2HR
FB3 = FIRE BARRIER 3HR
FP1 = FIRE PARTITION 1HR
FP1/2 = FIRE PARTITION 1/2HR
FW2 = FIRE WALL 2HR
FW3 = FIRE WALL 3HR
SB1 = SMOKE BARRIER
SE1 = SHAFT ENCLOSURE 1HR
SE2 = SHAFT ENCLOSURE 2HR
SP = SMOKE PARTITION
NON-RATED INTERIOR PARTITION WALL
NO SCOPE OF WORK ASSOCIATED
IN SHADED AREA
T O
C R
A W
L S
P A
C E
WOMEN
B-A103
ELEVATORELEVATOR
CORRIDOR
PHARMACY
B-A101
B-A100
STAIR
MEN
B-A106
IRM
B-A107
ELECTRICAL
B-A105
MECH
RM
B-A104
IRM
STORAGE
B-A101B
TO CRAWL SPACE
T O
C R
A W
L S
P A
C E
OFFICE
1A-103A
OFFICE OF VET SVC
1A-103
WAITING AREA
SECURITY/
INFO
VET SVC
1A103B
OFFICE
1A103C
OFFICE
1A103D
DIRECTOR
1A103E
OPEN OFFICE
OPEN OFFICE
COPY AREA
OFFICE
1-B100B
CORRIDOR
OFFICE
1-B106
OFFICE
1-B108
OFFICE
1-B110
OFFICE
1-B112
OFFICE
1-B114CORRIDOR
1-B115
OFFICE
1-B115B
OFFICE
1-B115A
OFFICE
1-B116
OFFICE
1-B117
STAIR
OFFICE
1-B113B
OFFICE
1-B113A
OFFICE
1-B111
OFFICE
1-B107
CONFERENCE
RM
1-B105
TELE
1-B104 ELECTRICAL
1-B103
STORAGE
1-B102
FILE RM
1-B100D
OFFICE
1-B100A
OPEN OFFICE
1-B100
RECEPTION
SNACK
SHOP
1A-101
ELEVATOR ELEVATOR
WOMENS
TOILET
STAIR
NO-1
FAMILY
TOILET
1A104
MENS
TOILET
1A106
TOILET
COPY
1-C101A
AMERICAN LOGIAN
HOMLESS SECTION
1-C101
OFFICE
1-C101B
OFFICE
1-C105
TELE
1-C106
ELECTRICAL
1-C108
STORAGE
1-C109
CONFERENCE RM
1-C111
FILE RM
1-C114
OFFICE
1-C114B
OFFICE
1-C114A
OFFICE
1-C116
TOILET
1-C119
CORRIDOR
OPEN
OFFICE
CHIEF ENGINEER
OFFICE
1-C110
ADMIN
ASST
1-C112
OFFICE
1-C113
OFFICE
1-C115
OFFICE
1-C118
CHILLER
PLANT
EMERGENCY
GENERATOR
STAIR
WOOD EQUIP.
1-C120
CARPENTRY
1-C120A
LOCKSMITH
1-C120B
CORRIDOR
OFFICE
1-C107A
OFFICE
VFW
1-C104
CORRIDOR
OFFICE
1-C103
COPY/SUPPLY
1-C103A
DIRECTOR
1-C103B
DISABLED AMERICAN
1-C102A
RECEPTION
1-C102
STORAGE
1-C100
T1-AD101
T1-AE101
MECH. RM.
B-A106
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
NORTH
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g A
H U v rv t
/8
/2
:3
:4
A M
MK DAW
459-20-002
T1
T1-AS101
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
SITE PLANS - BASEMENT & LEVEL 1 -
ARCHITECTURAL
100% BID DOCUMENTS E-WING AHU REPLACEMENT
1/16" = 1'-0"
OVERALL PLAN - BASEMENT - ARCHITECTURAL
1/16" = 1'-0"
OVERALL PLAN - LEVEL 1 - ARCHITECTURAL
SCOPE OF WORK
1. GC SHALL VERIFY DIMENSIONS OF EQUIPMENT AND
COORDINATE INSTALLATION WITH ALL TRADES WHERE
REQUIRED.
2. GC SHALL INSTALL IN-WALL METAL BACKING FOR ALL
PARTITION-MOUNTED EQUIPMENT, ACCESSORIES, PARTITION
STOPS, ETC.
3. GC SHALL PROVIDE UL APPROVED FIRE- RESISTIVE
PENETRATION SYSTEMS WHERE PLUMBING IS LOCATED IN A
FIRE-RATED PARTITION ASSEMBLY.
FB1 = FIRE BARRIER 1HR
FB2 = FIRE BARRIER 2HR
FB3 = FIRE BARRIER 3HR
FP1 = FIRE PARTITION 1HR
FP1/2 = FIRE PARTITION 1/2HR
FW2 = FIRE WALL 2HR
FW3 = FIRE WALL 3HR
SB1 = SMOKE BARRIER
SE1 = SHAFT ENCLOSURE 1HR
SE2 = SHAFT ENCLOSURE 2HR
SP = SMOKE PARTITION
NON-RATED INTERIOR PARTITION WALL
NO SCOPE OF WORK ASSOCIATED
IN SHADED AREA
COPY RM
2A-104
PGM ANALYST VBA
REGIONAL OFFICE
2A-104A
SECY
2A-100C
DIRECTOR VA
REGIONAL OFFICE
2A-110B
CONFERENCE RM
2-A100
CORRIDOR
OFFICE
2-B101A
OFFICE
2-B101B
OPEN OFFICE
2-B101
CORRIDOR
OPEN OFFICE
2-B105
STORAGE
FILE RM
2-B106
CORRIDOR
HAC
2-B107
STAIR
TEL
2-B104
ELECTRICAL
2-B103
STORAGE
2-B102
OPEN OFFICE
2-B100
OFFICE
2-A101
WOMENS
TOILET
2-A103
ELEVATOR ELEVATOR
STAIR
NO-1
WOMENS
TOILET
2A-105
MENS
TOILET
2A-107
MENS
TOILET
2A-108
OPEN OFFICES
2C-100
HOUSEKEEPING
2-C100B
COPY RM
2-C100A
TELE
2-C100C
ELECTRICAL
2-C100D
2-C100E
OFFICE
2C-100G
OFFICE
2-C100F
OFFICE
2-C101A
OFFICE
2-C100B
CORRIDOR
OFFICE
2-C101C
OFFICE
2-C101E
OFFICE
2-C101F
OFFICE
2-C101G
OPEN OFFICES
2-C101D
CHIEF
OFFICE
(QM)
2-C101D1
STAIR
CORRIDOR
OFFICE
2-C102
CHIEF MANAGEMENT
SVC OFFICE
2-C103
OFFICE
2-C104
T1-AD101
T1-AE101
MECH. RM.
2A-106
STOR
3-A103A
HSK
3-A104
PRIVACY
OFFICER
OFFICE
3-A103
3-A101A
OFFICE
3-A101B
HRM
3-A101
OFFICE
3-A101C
HRIS OFFICE
3-A101E
HUMAN RESOURCE
MANAGEMENT
3-B100
PROCESSING AND
RECORD ROOM
3-B100C
FILE RM
3-B100D
PAYROLL
OFFICE
3-B104
3-B105
CORRIDOR
CORRIDOR
3-B106
OFFICE
3-B106A
3-B106B
CHIEF OF
DEPARTMENT
3-B106C
CORRDIDOR
WORK AREA
3-B108
HSK
3-B107
STAIR
OFFICE
3-B106D
ACCOUNTING
CHIEF
3-B106E
3-B106F
OFFICE
3-B106G
3-B106H
TELE
3-B105C
ELECTRICAL
3-B105B
FINANCIAL
RESOURCE
MANAGEMENT
3-B103
HRM
3-B102
ASSISTANT CHIEF
OFFICE
3-B100E
HRM NURSE
RECRUITER
OFFICE
3-B102A
CREDIT
UNION
3-B101
HRM
3-A100
ELEVATOR ELEVATOR
WOMENS
TOILET
3-A102
STAIR
NO 1
CORRIDOR
WOMENS
TOILET
3-A105
MENS
TOILET
3-A107
MENS
TOILET
3-A108
CONFERENCE ROOM
3-C100
CHIEF
3-C102
SYSTEMS
REDESIGN
OFFICE
3-C103
IRM
3-C105
ELECTRICAL
3-C106
OFFICE
3-C108B
OFFICE
3-C108C
STORAGE
3-C107
ACQUISITION AND MATERIAL
MANAGEMENT SERVICE
3-C101
OFFICE
3-C101A
IRM
OFFICE
3-C104
OFFICE
3-C108A
IRM
3-C108
CORRIDOR
OFFICE
3-C108G
SERVER RM
3-C108D
IRM
OFFICE
3-C108E
ELEC RM
3-C108F
CORRIDOR
IRM
OFFICE
3-C109
STAIR
STORAGE
3-B105A
T1-AD102
T1-AE102
MECH. RM.
3A-106
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
NORTH
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g A
H U v rv t
/8
/2
:3
:4
A M
MK DAW
459-20-002
T1
T1-AS102
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
SITE PLANS - LEVELS 2 & 3 - ARCHITECTURAL 100% BID DOCUMENTS E-WING AHU REPLACEMENT
1/16" = 1'-0"
OVERALL PLAN - LEVEL 2 - ARCHITECTURAL
1/16" = 1'-0"
OVERALL PLAN - LEVEL 3 - ARCHITECTURAL
SCOPE OF WORK
NO-1
STORAGE
STAIR
MECH RM
ELEVATOR RM
1. GC SHALL VERIFY DIMENSIONS OF EQUIPMENT AND
COORDINATE INSTALLATION WITH ALL TRADES WHERE
REQUIRED.
2. GC SHALL INSTALL IN-WALL METAL BACKING FOR ALL
PARTITION-MOUNTED EQUIPMENT, ACCESSORIES, PARTITION
STOPS, ETC.
3. GC SHALL PROVIDE UL APPROVED FIRE- RESISTIVE
PENETRATION SYSTEMS WHERE PLUMBING IS LOCATED IN A
FIRE-RATED PARTITION ASSEMBLY.
FB1 = FIRE BARRIER 1HR
FB2 = FIRE BARRIER 2HR
FB3 = FIRE BARRIER 3HR
FP1 = FIRE PARTITION 1HR
FP1/2 = FIRE PARTITION 1/2HR
FW2 = FIRE WALL 2HR
FW3 = FIRE WALL 3HR
SB1 = SMOKE BARRIER
SE1 = SHAFT ENCLOSURE 1HR
SE2 = SHAFT ENCLOSURE 2HR
SP = SMOKE PARTITION
NON-RATED INTERIOR PARTITION WALL
NO SCOPE OF WORK ASSOCIATED
IN SHADED AREA
DIRECTOR'S
CONFERENCE RM
4-A105
OFFICE OF ACOS
EDUCATION
4A-103A
OFFICE
4-A104A
OFFICE
4-A104
OFFICE
4-A101C
OFFICE
4-A101B
OFFICE
4-A101A
RESEARCH
DEPARTMENT
OFFICE
4-A101
OFFICE
4-A100
OFFICE
4-B100E
CONFERENCE RM
4-B100D
OFFICE
4-B101
OFFICE OF DEPUTY
DIRECTOR OF UNIVERSITY
OF HAWAII
4-B100A
DIRECTOR
4-B100B
OFFICE
4-B100C
OFFICE
4-B102B
OFFICE
4-B102A
OFFICE
4-B102
COPY AREA
OFFICE
4-B102C
OFFICE
4-B102D
CORRIDOR
OFFICE
4-B103
OFFICE
4-B104
STORAGE
4-B106
ELEC
4-B107
TEL
4-B108
STORAGE
4-B109
STORAGE
4-B110
OFFICE
4-B111
IMAGING UNIT OFFICE
4-B112
OFFICE
4-B112A
OFFICE
4-B114
STAIR
CORRIDOR
OFFICE
4-B115
OFFICE
4-B116
CONFERENCE RM
4-B117
OFFICE
4-B113
INSTITUTE FOR THE
DIRECTOR
4-B105A
ELEVATOR
#4
ELEVATOR
#4
WOMENS
TOILET
STAIR
NO 1
CORRIDOR
WOMENS
TOILET
4-A106
MENS
TOILET
4A-108
MENS
TOILET
4-A109
OFFICE
4-C100B
OFFICE OF THE REGIONAL
COUNSEL
4-C100
HAC
4C-101
OFFICE
CREDENTIALING
4C-103
OFFICE
AFFAIRS
4C-102
CORRIDOR
4-C103B
OFFICE OF THE REGIONAL
COUNCIL
4-C103A
TEL
4-C104
ELEC
4-C105
STORAGE
4-C106
OFFICE
4-C108
OFFICE
4-C110
OFFICE
4-C112
FILE/FAX/COPY
PRINT RM
4-C114
OPEN OFFICE
4-C116
FILE STORAGE RM
4-C117
HEALTH SYSTEM
SPECIALIST
4-C119
STAFF
LOUNGE
4-C120
STAIR
CONFERENCE RM
4-C122
CHIEF OF STAFF
4-C118
TOILET
4-C118A
DIRECTOR
4-C115
COMPLAINT AND
FACILITY PLANNING
4-C113
CORRIDOR
4-C111
ASSOCIATE
DIRECTOR
4-C109
ASST COUNSEL
OFFICER
4-C107
T1-AD102
T1-AE102
MECH. RM.
4A-107
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
NORTH
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g A
H U v rv t
/8
/2
:3
:4
A M
MK DAW
459-20-002
T1
T1-AS103
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
SITE PLANS - LEVEL 4 & ROOF -
ARCHITECTURAL
100% BID DOCUMENTS E-WING AHU REPLACEMENT
1/16" = 1'-0"
OVERALL PLAN - LEVEL 4 - ARCHITECTURAL
1/16" = 1'-0"
OVERALL PLAN - PENTHOUSE/ROOF - ARCHITECTURAL
SCOPE OF WORK
KEYNOTES
NO SCOPE OF WORK ASSOCIATED
IN SHADED AREA
A
B
C
T1-AE300
T1-AE300
19 20
T1-AE300
T1-EAL-1 (EX)
T1-OAL-1 (EX)
A
B
C
T1-AE300
T1-AE300
19 20
T1-AE300
T1-EAL-2 (EX)
T1-OAL-2 (EX)
MECH. RM.
2A-106
AD101
AD101
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
NORTH
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g A
H U v rv t
/8
/2
:3
:3
A M
MK DAW
459-20-002
T1
T1-AD101
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
ENLARGED PLANS – LEVELS 1 & 2 –
ARCHITECTURAL DEMOLITION
100% BID DOCUMENTS E-WING AHU REPLACEMENT
3/8" = 1'-0"
ENLARGED PLAN - 1-A105 ARCHITECTURAL DEMOLITION
3/8" = 1'-0"
ENLARGED PLAN - 2-A106 ARCHITECTURAL DEMOLITION
NO. DESCRIPTION
1 EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN.
2 EXISTING AIR INTAKE LOUVER TO REMAIN.
3 EXISTING EXHAUST AIR LOUVER TO BE REMOVED AND DISCARDED.
4 EXISTING EXHAUST AIR FAN AND PLENUM TO BE REMOVED. REFER TO MECHANICAL
PLANS FOR MORE INFORMATION.
5 EXISTING EXHAUST AIR FAN AND PLENUM TO REMAIN. REFER TO MECHANICAL PLANS
FOR MORE INFORMATION.
6 EXISTING EXHAUST AIR FAN AND PLENUM TO BE REMOVED. REFER TO MECHANICAL
PLANS FOR MORE INFORMATION.
NTS
KEYPLAN - LEVEL 1
MECH RM.
B-A106
(NOT USED).
NTS
KEYPLAN - LEVEL 2
NO SCOPE OF WORK ASSOCIATED
IN SHADED AREA
A
B
C
T1-AE300
T1-AE300
19 20
T1-AE300
T1-EAL-3 (EX)
T1-OAL-3 (EX)
MECH. RM.
3A-106
A
B
C
T1-AE300
T1-AE300
19 20
T1-AE300
T1-EAL-4 (EX)
T1-OAL-4 (EX)
MECH. RM.
4A-107
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
NORTH
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g A
H U v rv t
/8
/2
:3
:3
A M
MK DAW
459-20-002
T1
T1-AD102
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
ENLARGED PLANS – LEVELS 3 & 4 –
ARCHITECTURAL DEMOLITION
100% BID DOCUMENTS E-WING AHU REPLACEMENT
3/8" = 1'-0"
ENLARGED PLAN - 3-A106 ARCHITECTURAL DEMOLITION
3/8" = 1'-0"
ENLARGED PLAN - 4-A107 ARCHITECTURAL DEMOLITION
NO. DESCRIPTION
1 EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN.
2 EXISTING AIR INTAKE LOUVER TO REMAIN.
3 EXISTING EXHAUST AIR LOUVER TO BE REMOVED AND DISCARDED.
4 EXISTING EXHAUST AIR FAN AND PLENUM TO BE REMOVED. REFER TO MECHANICAL
PLANS FOR MORE INFORMATION.
5 EXISTING EXHAUST AIR FAN AND PLENUM TO REMAIN. REFER TO MECHANICAL PLANS
FOR MORE INFORMATION.
6 EXISTING EXHAUST AIR FAN AND PLENUM TO BE REMOVED. REFER TO MECHANICAL
PLANS FOR MORE INFORMATION.
1" = 100'-0"
KEYPLAN - LEVEL 3
1" = 100'-0"
KEYPLAN - LEVEL 4
(NOT USED).
(NOT USED).
(NOT USED).
AD102
AD102
NO SCOPE OF WORK ASSOCIATED
IN SHADED AREA
A
B
C
T1-AE300
T1-AE300
19 20
T1-AE300
T1-EAL-1 (EX)
T1-OAL-1 (EX)
T1-AHU-1
2 16
A
B
C
T1-AE300
T1-AE300
19 20
T1-AE300
T1-OAL-2 (EX)
T1-AHU-2
T1-EAL-2
MECH. RM.
2A-106
AD101
AD101
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
NORTH
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g A
H U v rv t
/8
/2
:3
:3
A M
MK DAW
459-20-002
T1
T1-AE101
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
ENLARGED PLANS – LEVELS 1 & 2 –
ARCHITECTURAL
100% BID DOCUMENTS E-WING AHU REPLACEMENT
3/8" = 1'-0"
ENLARGED PLAN - 1-A105 ARCHITECTURAL
3/8" = 1'-0"
ENLARGED PLAN - 2-A106 ARCHITECTURAL
NO. DESCRIPTION
1 EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN.
2 EXISTING AIR INTAKE LOUVER TO REMAIN.
3 INSTALL NEW EXHAUST AIR LOUVER.
1" = 100'-0"
KEYPLAN - LEVEL 1
1" = 100'-0"
KEYPLAN - LEVEL 2
AE101
AE101
MECH RM.
B-A106
NO SCOPE OF WORK ASSOCIATED
IN SHADED AREA
A
B
C
T1-AE300
T1-AE300
19 20
T1-AE300
T1-OAL-3 (EX)
T1-AHU-3
T1-EAL-3
MECH. RM.
3A-106
A
B
C
T1-AE300
T1-AE300
19 20
T1-AE300
T1-OAL-4 (EX)
T1-AHU-4
T1-EAL-4
MECH. RM.
4A-107
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g A
H U v rv t
/8
/2
:3
:4
A M
MK DAW
459-20-002
T1
T1-AE102
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
ENLARGED PLANS – LEVELS 3 & 4 –
ARCHITECTURAL
100% BID DOCUMENTS E-WING AHU REPLACEMENT
3/8" = 1'-0"
ENLARGED PLAN - 3-A106 ARCHITECTURAL
3/8" = 1'-0"
ENLARGED PLAN - 4-A107 ARCHITECTURAL
NO. DESCRIPTION
1 EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN.
2 EXISTING AIR INTAKE LOUVER TO REMAIN.
3 INSTALL NEW EXHAUST AIR LOUVER.
1" = 100'-0"
KEYPLAN - LEVEL 3
1" = 100'-0"
KEYPLAN - LEVEL 4
AE102
AE102
(NOT USED).
ELEVATION NOTES
1. THE REMOVAL OF EXHAUST AIR LOUVERS IS TO PROVIDE AN
EQUIPMENT PATHWAY FOR THE EQUIPMENT AND MATERIALS
DEMOLITION AND NEW WORK. REFER TO PHASING
GUIDELINES FOR TIMING AND OTHER PROCEDURES FOR THIS
WORK.
2. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS
AND MATCH EXISTING COLOR/FINISHES ON EXTERIOR
FACADE AND EXISTING LOUVER.
AE LEVEL 02
12' - 10"
AE LEVEL 03
25' - 8"
AE LEVEL 04
38' - 6"
AE ROOF/PH
51' - 4"
AE LEVEL 01
0' - 0"
17 18
MEP LEVEL 01
0' - 0"
MEP LEVEL 02
12' - 10"
MEP
PENTHOUSE/ROOF
51' - 4"
MEP LEVEL 03
25' - 8"
MEP LEVEL 04
38' - 6"
T1-EAL-2 (EX)
T1-EAL-1 (EX)
T1-EAL-3 (EX)
T1-EAL-4 (EX)
AE LEVEL 02
12' - 10"
AE LEVEL 03
25' - 8"
AE LEVEL 04
38' - 6"
AE ROOF/PH
51' - 4"
AE LEVEL 01
0' - 0"
17 18
MEP LEVEL 01
0' - 0"
MEP LEVEL 02
12' - 10"
MEP
PENTHOUSE/ROOF
51' - 4"
MEP LEVEL 03
25' - 8"
MEP LEVEL 04
38' - 6"
T1-EAL-4
T1-EAL-3
T1-EAL-2
T1-EAL-1 (EX)
T1-AE500
AE LEVEL 02
12' - 10"
AE LEVEL 03
25' - 8"
AE LEVEL 04
38' - 6"
AE ROOF/PH
51' - 4"
AE LEVEL 01
0' - 0"
MEP LEVEL 01
0' - 0"
MEP LEVEL 02
12' - 10"
MEP
PENTHOUSE/ROOF
51' - 4"
MEP LEVEL 03
25' - 8"
MEP LEVEL 04
38' - 6"
19 20
T1-OAL-1 (EX)
T1-OAL-2 (EX)
T1-OAL-3 (EX)
T1-OAL-4 (EX)
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g A
H U v rv t
/8
/2
:3
:4
A M
MK DAW+EM
459-20-002
T1
T1-AE300
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
EXTERIOR ELEVATIONS 100% BID DOCUMENTS E-WING AHU REPLACEMENT
NO. DESCRIPTION
1 EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN. SHOWN FOR REFERENCE.
2 EXISTING AIR INTAKE LOUVER TO REMAIN.
3 EXISTING EXHAUST AIR LOUVER TO BE REMOVED AND DISCARDED.
4 INSTALL NEW DARK BROWN CLEAR ANODIZED ALUMINUM (TO MATCH EXISTING
COLOR/FINISH) EXHAUST AIR LOUVER. REFER TO MECHANICAL PLANS FOR LOUVER
SCHEDULE AND TECHNICAL DATA.
1/4" = 1'-0"
EXHAUST AIR DISCHARGE LOUVERS - DEMOLITION
1/4" = 1'-0"
EXHAUST AIR DISCHARGE LOUVERS
1/4" = 1'-0"
OUTSIDE AIR INTAKE LOUVERS
BIRD OR INSECT
SCREEN
EXTRUDED ALUMINUM
FRAME
EXTRUDED ADJUSTABLE
BLADE
EXTERIOR INTERIOR
SILL FLASHING
BIRD OR INSECT
SCREEN
EXTRUDED ALUMINUM
FRAME
EXTRUDED ADJUSTABLE
BLADE
EXTERIOR INTERIOR
EXTRUDED ALUMINUM FRAME
EXTRUDED ADJUSTABLE
BLADE
EXTERIOR
INTERIOR
T1-AE500
Sim
T1-AE500
Sim
T1-AE500
Sim
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
NOT TO SCALE
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g A
H U v rv t
/8
/2
:3
:4
A M
MK EM
459-20-002
T1
T1-AE500
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
DETAILS 100% BID DOCUMENTS E-WING AHU REPLACEMENT
1/2" = 1'-0"
LOUVER HEAD DETAIL
1/2" = 1'-0"
LOUVER SILL DETAIL
1/2" = 1'-0"
LOUVER JAMB DETAIL
1" = 1'-0"
LOUVER ELEVATION
DRAWING SYMBOLS
SPRINKLER NOTESSPRINKLER DEMO NOTES
NOTES:
1. ADJUST SPRINKLER DROPS AS NECESSARY TO CLEAR OBSTRUCTIONS SUCH AS THE
CEILING "T" BAR SUSPENSION SYSTEM, LIGHT FIXTURES, ETC. PROVIDE A PIPE HANGER
IF THE HORIZONTAL OFFSET LENGTH EXCEEDS 24 IN. [610mm].
2. THIS SPRINKLER HEAD DROP IS APPLICABLE ONLY WHERE IT IS NOT NECESSARY TO
RETAIN AN UPRIGHT SPRINKLER FOR PROTECTION OF COMBUSTIBLE CONSTRUCTION
ABOVE THE CEILING.
3. PROVIDE LENGTH TO SUIT.
1/2" SCH 80 CLOSE NIPPLE
AND 1/2" x 1" ELBOW
1" BLACK STEEL SCH 40
PIPING (TYP)
SPRINKLER BRANCH LINE
1" x 1/2" PIPE REDUCING
COUPLING
N O
T E
NOTE 3
PROVIDE NEW PENDENT
SPRINKLER HEAD
SUSPENDED CEILING
ESCUTCHEON CUP
1/2" ORIFICE PENDENT
SPRINKLER (WHITE FINISH)
SUSPENDED CEILING
RETAINING CLIP
1" x 1/2" PIPE REDUCING
COUPLING
CUP/ESCUTCHEON
H4
H7
A
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE DEPARTMENT
OF VETERANS AFFAIRS (VA) STANDARDS.
2. DESIGN BASIS INFORMATION: PROVIDE DESIGN, MATERIALS, EQUIPMENT,
INSTALLATION, INSPECTION, AND TESTING OF THE AUTOMATIC SPRINKLER SYSTEM
IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13.
3. ALL WORK SHALL BE IN CONFORMANCE WITH THE NFPA 13 CODE - LATEST EDITION.
THE VA SERVES AS AUTHORITY HAVING JURISDICTION.
4. THESE DOCUMENTS ARE INTENDED TO COMPLY WITH APPLICABLE CODES. WHERE
DISCREPANCIES OCCUR, NOTIFY THE ENGINEER/ARCHITECT IN WRITING FOR
INTERPRETATION. CORRECT ANY INSTALLATION THAT FAILS TO COMPLY WITH THE
CODES AND STANDARDS AT NO ADDITIONAL COST TO THE OWNER.
5. CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY INCLUDING ALL LABOR,
MATERIALS, PERMITS, TAXES, FEES, INSPECTIONS, HARDWARE, AND COST FOR
INSTALLATION FOR A COMPLETE AND OPERATIONAL SYSTEM.
6. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE NEW, COMPLETE WITH
MANUFACTURER’S GUARANTEE OR WARRANTY AND SHALL BE LISTED BY A
NATIONALLY RECOGNIZED TESTING LABORATORY.
7. PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE SEALED WITH APPROPRIATE
FIRE PROOFING MATERIALS TO RESTORE FIRE RATING. REFER TO ARCHITECTURAL
DRAWINGS FOR FIRE RATED WALLS.
8. CONTRACTOR SHALL KEEP THE WORK AREA CLEAN OF ALL DEBRIS ON A DAILY
BASIS. ALL NEW MATERIALS AWAITING INSTALLATION SHALL BE KEPT IN AREAS
DESIGNATED BY THE OWNER.
9. DRAWINGS SHALL NOT BE SCALED FOR DIMENSIONS. REFER TO DIMENSIONED
ARCHITECTURAL FLOOR PLANS. IF THE DIMENSIONS CANNOT BE DETERMINED BY
THE INFORMATION GIVEN, CONTRACTOR SHALL CONTACT THE ENGINEER FOR
ADDITIONAL INFORMATION.
10. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY FOR THE PURPOSE OF
DETERMINING IF THE WORK OF THE CONTRACTOR IS PROCEEDING IN ACCORDANCE
WITH THE CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION SHOULD NOT
BE CONSTRUED AS EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY OR
QUANTITY OF THE WORK, BUT RATHER PERIODIC IN AN EFFORT TO GUARD THE
OWNER AGAINST DEFECTS OR DEFICIENCIES IN THE WORK OF THE CONTRACTOR.
11. INFORMATION CONTAINED ON THE DRAWINGS IS IN ITSELF INCOMPLETE AND VOID
UNLESS USED IN CONJUNCTION WITH ALL OTHER DISCIPLINE DRAWINGS, THE
SPECIFICATIONS, TRADE PRACTICES, OR APPLICABLE STANDARDS, CODES, ETC.,
AND SHALL BE CONSIDERED THE CONTRACT DOCUMENTS AND WITH ALL THEREIN BY
REFERENCE, WHICH THE CONTRACTOR CERTIFIES KNOWLEDGE OF BY SIGNING THE
CONTRACT.
12. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY, UNRELIEVED BY REVIEW OF
SHOP DRAWINGS OR PERIODIC OBSERVATION OF CONSTRUCTION, FOR COMPLIANCE
WITH THE CONTRACT DOCUMENTS, FOR DIMENSIONS TO BE CONFIRMED AND
CORRELATED ON THE JOB SITE AND BETWEEN INDIVIDUAL DRAWINGS OR SETS OF
DRAWINGS FOR FABRICATION PROCESSES AND CONSTRUCTION TECHNIQUES
(INCLUDING EXCAVATION, SHORING, SCAFFOLDING, BRACING, ERECTION, FORM
WORK, ETC.), FOR COORDINATION OF THE VARIOUS TRADES, AND FOR SAFE
CONDITIONS ON THE JOB SITE. VARIATIONS IN FIELD CONDITIONS RELATIVE TO THE
CONTRACT DOCUMENTS SHALL BE REPORTED TO THE ENGINEER AS SOON AS THEY
ARE FOUND. WORK SHALL NOT PROGRESS UNTIL WRITTEN PERMISSION FROM THE
ENGINEER IS OBTAINED.
13. ALL EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED SO AS TO BE EASILY
ACCESSIBLE. ALL CLEARANCES FOR EQUIPMENT PER MANUFACTURERS GUIDELINES
AND CODE COMPLIANCE SHALL BE REQUIRED.
14. PROVIDE ACCESS PANELS FOR VALVES, ETC. THAT ARE LOCATED IN CONCEALED
AREAS. COORDINATE WITH GENERAL CONTRACTOR FOR EXACT LOCATION AND WITH
ARCHITECTURAL PLANS FOR FINISHES.
15. ALL COMPONENTS OF SYSTEMS SHALL BE PROVIDED FOR A COMPLETELY
OPERATIONAL, UNDERSTANDABLE, SAFE, AND CLEAN SYSTEM; INCLUDING BUT NOT
LIMITED TO EXTRANEOUS FIXTURE TRIM AS SPECIFIED, LABELS, SERVICE AND
COMMISSIONING INTO OPERATION, TESTING AND CLEANING, FIRE AND LIFE SAFETY
REQUIREMENTS, AND CONSIDERING THE REQUESTS OF OWNERS PERSONNEL.
16. ELECTRICAL PANELS SHOWN FOR REFERENCE. DO NOT ROUTE ANY COMPONENTS
ABOVE OR IN FRONT OF ELECTRICAL EQUIPMENT. MAINTAIN CODE REQUIRED
CLEARANCES.
17. FIRE PROTECTION CONTRACTOR SHALL REVIEW ALL PROJECT PLANS AND
SPECIFICATIONS, THEN CONTACT OWNER AND LOCAL FIRE DEPARTMENT FOR
COORDINATION OF DOCUMENTATION AND SYSTEM REQUIREMENTS PRIOR TO
STARTING WORK.
18. ALL REQUIREMENTS FOR WORKING ON FIRE PROTECTION SYSTEM, INCLUDING BUT
NOT LIMITED TO FIRE WATCH, HYDRANT FLOW TESTING, SYSTEM SHUTDOWNS AND
TESTING, ARE THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR.
19. PLANS ARE DIAGRAMMATIC AND INTENDED TO CONVEY SCOPE OF WORK AND
GENERAL LOCATIONS OF EQUIPMENT, MATERIALS, ETC. NOT ALL RISERS, DROPS,
OFFSETS, VALVES, ETC. ARE SHOWN. PROVIDE RISERS, DROPS, OFFSETS, VALVES,
ETC. AS REQUIRED TO MEET SPACE REQUIREMENTS AND TO AVOID INTERFERENCES
WITH OTHER TRADES. MAKE FINAL CONNECTIONS TO FIXTURES, EQUIPMENT, ETC.
AS REQUIRED AND/OR PER MANUFACTURER'S RECOMMENDATIONS.
20. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LAYOUT OWN WORK
ACCORDINGLY AND IS RESPONSIBLE FOR DETERMINING EXACT LOCATIONS FOR
EQUIPMENT, MATERIALS, ETC.
21. THE EXISTING SPRINKLER SYSTEM SHALL BE MODIFIED PER SPECIFIED PLANS AND
SPECIFICATIONS. FIELD VERIFY EXISTING SPRINKLER SYSTEM REQUIREMENTS PRIOR
TO BIDDING.
22. COORDINATE SCOPE OF WORK WITH THE WORK OF OTHER TRADES PRIOR TO
INSTALLATION. ISSUES DUE TO LACK OF COORDINATION EFFORT WILL BE
CORRECTED AT NO ADDITIONAL COST TO THE OWNER.
23. COORDINATE LOCATION OF SYSTEM COMPONENTS WITHIN LIMITS OF STRUCTURE
AND OTHER ENGINEERED SYSTEMS. ROUTE ALL PIPING IN CONCEALED SPACES AND
INSTALL PIPING AS HIGH AS POSSIBLE. CENTER SPRINKLER HEADS WITHIN CEILING
TILES. OFFSET SYSTEMS ROUTING AS REQUIRED, PROVIDING REQUIRED MATERIALS
AND DRAIN POINTS. PIPE SHALL NOT BE ROUTED IN EXTERIOR WALLS UNLESS
NOTED. COORDINATE ROUTING OF PIPING TO MAINTAIN REQUIRED SERVICE
CLEARANCES AROUND ANY EQUIPMENT AND ELECTRICAL ITEMS.
24. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING
PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW
SYSTEMS. COORDINATE WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS
SCOPE.
25. ALL ELEMENTS OF CONSTRUCTION SHALL BE INSTALLED BY SKILLED TRADESMEN OF
THERE PARTICULAR TRADE, AND INSTALLED IN A NEAT WORKMANLIKE MANNER
KEEPING WITH THE HIGHEST STANDARDS OF THE TRADE.
26. COORDINATE SCOPE OF WORK WITH PROJECT SCHEDULES AGREED UPON BY
OWNER AND ALL CONTRACTORS.
27. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS ABOUT DESIGN
STANDARDS, PRODUCTS, DRAWINGS, SUBMITTALS, DOCUMENTATION,
COORDINATION, AND INSTALLATION.
1. ALL PIPING AND DUCTWORK IS SHOWN SCHEMATICALLY BASED ON EXISTING PLANS.
CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF VERIFYING ROUTES
OF ALL EXISTING CONDITIONS AND EXISTING UTILITIES PRIOR TO BIDDING AND
STARTING OF WORK. IF CONDITIONS DIFFER GREATLY CONTACT ENGINEER.
2. CONDUCT A PRECONSTRUCTION AIR AND WATER FLOW TEST OF EXISTING SYSTEMS
AND MAINS SERVING EACH AREA AND FLOOR BEFORE STARTING ANY DEMOLITION
WORK. SUBMIT REPORT OF FLOWS AND FINDINGS TO ENGINEER AND OWNER.
3. COORDINATE SCHEDULE OF WORK WITH OWNER AND PROVIDE SUFFICIENT NOTICE
BEFORE ANY SHUTDOWNS, TO MINIMIZE DISRUPTIONS TO ANY CONCURRENT
OPERATIONS.
4. COMPLY WITH SITE SAFETY PROCEDURES OF OWNER, GENERAL CONTRACTOR, AND
OSHA.
5. DEMOLISH MATERIALS, EQUIPMENT, AND ASSOCIATED SYSTEMS AS SHOWN WITHIN
SCOPE OF WORK AREA AS DESIGNATED/NOTED. DEMOLISH ALL BRANCH DUCT AND
PIPE, SUPPORTS, ACCESSORIES, EQUIPMENT, TERMINAL DEVICES, CONTROLS,
WIRING, CONDUITS, AND ASSOCIATED ITEMS BACK TO RESPECTIVE MAINS. THEN CAP,
SEAL, REPAIR, REINSULATE MAIN CONNECTIONS AS REQUIRED. NOTHING SHALL BE
ABANDONED IN PLACE UNLESS NOTED OTHERWISE. REMOVE ALL DEMOLISHED ITEMS
FROM SITE AND DISPOSE PROPERLY PER LOCAL LAWS.
6. HATCHED OR GRAYED OUT AREAS ARE NOT WITHIN CONTRACT BOUNDARY.
COORDINATE WITH OWNER IF SUCH AREAS REQUIRE ACCESS TO COMPLETE SCOPE
OF WORK, SUCH AS REMOVING A BRANCH MAIN BACK TO LARGER MAIN TO ELIMINATE
DEAD LEGS.
7. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING
PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW
SYSTEMS. COORDINATE WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS
SCOPE. 8.SAVE NOTED ITEMS FOR REUSE OR OWNERS SALVAGE. STORE NOTED
ITEMS AND OTHER ITEMS IDENTIFIED BY OWNER IN OWNER’S DESIGNATED STORAGE
AREA.
8. PROTECT EXISTING TO REMAIN EQUIPMENT, MATERIALS, AND SURROUND SITE FROM
DAMAGE DURING DEMOLITION. REPAIRS AND REPLACEMENT OF EXISTING TO REMAIN
CONDITIONS SHALL BE THE CONTRACTOR’S RESPONSIBILITY.
9. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
H o n o lu lu E
W in g A
H U
/H o n o lu lu
E -W in g
A H
U M
E P
V
.r v t
/8
/2
:4
:0
A M
AW DAW
459-20-002
T1
T1-F-001
459 - VA PACIFIC ISLANDS HEALTH CARE SYSTEM
JULY 8, 2022
SPRINKLER DETAILS, SYMBOLS, NOTES, AND
ABBREVIATIONS
100% BID DOCUMENTS E-WING AHU REPLACEMENT
SPR SPRINKLER LINE
PRV PRESSURE REDUCING VALVE
PD PRESSURE DROP OR DIFFERENCE
NPW NON POTABLE WATER
NOM. NOMINAL
NO NORMALLY OPEN
NIC NOT IN CONTRACT
NC NORMALLY CLOSED
FS FLOW SWITCH
FP FIRE PROTECTION
FM FLOW METER
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FD FLOOR DRAIN
DN DOWN
DCW DOMESTIC COLD WATER
C CELSIUS
BFP REDUCED PRESSURE BACKFLOW PREVENTER
AS AUTOMATIC SPRINKLER
AG AIR GAP
SPRINKLER ABBREVIATIONS
NTS
TYPICAL RECESSED SPRINKLER HEAD DROP DETAIL
NTS
SEMI-RECESSED SPRINKLER HEAD DETAIL
WEF WALL EXHAUST FAN
WCPU WATER COOLED PACKAGED UNIT
WCHP WATER COOLED HEAT PUMPS
WCCU WATER COOLED CONDENSING UNIT
WCCH WATER COOLED CHILLER
WC WATER COOLED
Wb WET-BULB (TEMPERATURE)
VSD VARIABLE SPEED DRIVE
IS INSECT SCREEN VI VIBRATION ISOLATOR
ICF IN-LINE CENTRIFUGAL FAN VFD VARIABLE FREQUENCY DRIVE
IAQ INDOOR AIR QUALITY VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VAV VARIABLE AIR VOLUME
HOA HAND/OFF/AUTOMATIC V VALVE
HD HOOD
HB HOSE BIBB TU TERMINAL UNIT
TSTAT THERMOSTAT
FV FACE VELOCITY TSP TOTAL STATIC PRESSURE
FM FLOW METER TR TOP REGISTER
FD FIRE DAMPER TDS TOTAL DISSOLVED SOLIDS
FD FLOOR DRAIN TDH TOTAL DYNAMIC HEAD
FCW FORWARD CURVED WHEEL (FAN) TD TEMPERATURE DIFFERENCE
FCUC FAN COIL UNIT COOLING ONLY TAB TESTING, ADJUSTING, BALANCE
FC FLEXIBLE CONNECTION
FA FREE AREA SR SUPPLY AIR REGISTER
F/SDPR COMBINATION FIRE SMOKE DAMPER SPS STATIC PRESSURE SENSOR
SPD SUPPLY PROCESS AND DISTRIBUTION
EWT ENTERING WATER TEMPERATURE SP STATIC PRESSURE
EWC EVAPORATIVE WATER COOLER SG SUPPLY AIR GRILLE
EUH ELECTRIC UNIT HEATER SF SUPPLY FAN
ETO ETHYLENE OXIDE SD SUPPLY AIR DIFFUSER
ET EXPANSION TANK SCR SILICON CONTROLLED RECTIFIER
ER EXHAUST REGISTER SAT SUPPLY AIR TEMPERATURE
ENT ENTERING SAD SOUND ATTENUATING DEVICE
EGS EMERGENCY GAS SHUTOFF SA SUPPLY AIR
EG EXHAUST GRILLE
EF EXHAUST FAN RV RELIEF VALVE
EER ENERGY EFFICIENCY RATIO RTU ROOF TOP UNIT
ECU EVAPORATIVE CONDENSER UNIT RS REFRIGERANT SUCTION
ECC ENGINEERING CONTROL CENTER RR RETURN REGISTER
EC EVAPORATIVE COOLER RO REVERSE OSMOSIS
EAT ENTERING AIR TEMPERATURE RLA RUN LOAD AMPERE
EA EXHAUST AIR RL REFRIGERANT LIQUID LINE
RHG REFRIGERANT HOT GAS
DXCC DIRECT EXPANSION COOLING COIL RH RELATIVE HUMIDITY
DX DIRECT EXPANSION RG RETURN GRILLE
DP DEW POINT TEMPERATURE RF RETURN FAN
DP DIFFUSER PLATE RELAD RELIEF AIR DAMPER
DIW DEIONIZED WATER REA RELIEF AIR
DF DIFFUSER RDS ROOM DATA SHEETS
DDC DIRECT DIGITAL CONTROLS RD REFRIGERANT DISCHARGE
DB DECIBELS RCU RECIPROCATING CHILLER UNIT
Db DRY-BULB TEMPERATURE RCCH REMOTE CONDENSER CHILLER
RAT RETURN AIR TEMPERATURE
CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER) RAHX ROTARY AIR HEAT EXCHANGER
CWR CONDENSER WATER…