S02 - Construction Drawings 10-16-2023.pdf
PDF 9 MB Posted
- Attached to
- Z2DA--405-24-001 | Asphalt and Concrete Repairs
- Solicitation number
- 36C24124B0043
About this file
This document appears to be a set of construction drawings for asphalt and concrete repairs at the Department of Veterans Affairs (VA) White River Junction Campus. The key details are:
The work includes milling and replacing asphalt, repairing concrete steps, protecting utility structures, and installing new catch basins and curbing. Specific areas include the Patriot Drive entrance, the Building 2/8/37 area, the Veterans Drive and Cafeteria Loading Dock access road, and other campus-wide repairs. The contractor is required to provide layout plans, maintain access for emergency vehicles, and continuously work in specific areas until completion. The related federal contract opportunity is Solicitation Number 36C24124B0043 for Asphalt and Concrete Repairs, with the Department of Veterans Affairs as the procuring agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
E
F
.E = "' C
• C
.c "o .5 .c
• C • 0 "'
" C□
• C
.c • u "' .5
• C
ON
J>
C
.cuC
C
.cu .5 " 0 □ .c
• C
• C
.cu .5 .c� .c �
�o .c�
IX)
• C
.cu .5 L t □ 0 □-
• o C
• C
.c IX) u .5 .c :E ...� c o
C "' =u::s � m N N ro n N
I
I
.C "' u w
C
L
C w "' w o_
C
I N w
0 "-"' Ct:
C
·s:
o_
I st- N
I 0 st- /st- N
I
ReviionlF w u "' ·� L o_ w-"' w w .,:
u w
C
(f)
VA FORM
1 2 3 4 5 6 7
DEPARTMENT OF VETERANS AFFAIRS
V.A.M.C. HITE RIVER JUNCTION CAMPUS
100% CONSTRUCTION DOCUMENT DRA INGS
FOR
ASPHALT & CONCRETE REPAIRS CAMPUS WIDE
AUGUST2023
UNITED STATES GEOLOGICAL SURVEY (USGS) MAP
Dale
DrawrgTdle
COVER SHEET
0B-6231
1 2 3 4 5 6 7
ChHl,adm r-- ., l
PROJECT LOCATION MAP
I, t.., I
(NOT TO SCALE)
I• r--...f.__ . -
...---- 'I., orth r/arre
-- - .J) �-----� J,r stol -,-..___, Atldl!OII le ury ast Middlebury or t Rutland l/.uU011d )
\V '
J ast Ran olph an lph
-.... • -.... _ WHITE 'fll'v°ER f
I
.ltJNCTION CAMPUS v
1,.. MEDICAL
(co n
·est Tops] allingfo d indsor
_,.......__Ll/lscutney erkins i le
ORTHOPHOTO
(NOT TO SCALE)
Project 11tle
1� N
!Location I
Drawrg Nurmer WHITE RIVER JUNCTION CAt.FUS VT IDate IIChecked 110r� G-0.01
. 7/fl/2.0Zl
. TA
E___j 1 OF 7
8 9
VISN 1
�@Illa @ii '¥'®1b811'11111111 ffeJll!mDll'II
ASPHALT & CONCRETE
REPAIRS CAMPUS WIDE
.E = "'• C
A 11
C
.c
C • 0 "'
B §
C
D
C
§o
.c ' u "' C
C
C
.c u C
" 0 □ .c
C
E 42 "<t" •
C
.c u C
C
F II
.c u.,
• a C
C
II
.c 00 u C co
1 2 3
:J[JallfJIII(
4 5 6 7
� AREA A - LOADING DOCKS, � C . \J
REMOVE & REPLACE BIT.
J "..--x CONG. BINDER & SURFACE r=='::����.J=':��A=...A �....,}'J'J\__-"--A_--A.__., "-A
X -: 0 - - - --- ' COURSES (3-1/2" TOTAL) ---.J
==='"°"""-,,/ • �EE ENLARGED P,��---------�:::-:j
.111111111 •
I
• oo 0 O
I
' ' l '
• ' y 1
REPLACE 2 FLIGHTS OF �
1-'.>--' CONCRETE STEPS
TO BUILDING 6,
. // SEE DETAIL SHEETS
• 0
-x..
\ - r.l ra,..._:
Q
I • D ...k-LOCATION 3: MILL & REPLACE 2" ASPHALT •
D AROUND MANHOLE, ENSURE MANHOLE
o_ m 0 <D "'
N
I "'
I m
0,,.
N N
I "' I m C
D "' u C o_ l;
.2'"
0, C o_ _.,,, m 0, C
C 0, m "
D
0 "-"
Ct:
0, C o_
-00 I ..N I "' 0
N
I 0
60 120 -=--=-=-c:j Feet
SCALE IN FEET:
Dale
•r I /{)) •
I , AREA E - PARKING LOT 5 SIDEWALK AND X-WALK IMPROVEMENTS:
REPLACE ASPHALT WALK WITH RAISED SIDEWALK, CURB &
GUTTER; RETROFIT EXISTING CATCH BASIN AND ADD CATCH
BASIN; MILL & REPAVE AT INTERSECTION; SEE ENLARGED PLAN .
AREA C - PATRIOT DRIVE ENTRANCE
SEE ENLARGED PLAN
AREA B - BLDG 2, 8 & 37,
REMOVE & REPLACE BIT .
CONG. BINDER & SURFACE
COURSE (3-1/2" TOTAL)
SEE ENLARGED PLAN
I
0 CJ
--..!t �
- - �,,-ss- 0-
MILL AND REPLACE 2" ASPHALT,
LOCATIONS 1 & 2 ON PATRIOT DR,
,.___,-..___,.._, kl 24' X 22' = 528 SF EACH aPL
PL
I"-,__,- "I
D
I II
=C<:'a • I
I i � 0000 '
DCI
. l
I, i I I n.----., E
• COVER IS RECESSED FOR PLOWS,
8'X8' TOTAL
I •
I I
• r c-- 1-
I I y
I I I I I I
•I I I
--;; ReviionlF 1., .f >---------------+-----< Drawi'g TIiie Project TIiie 1::
§ e--=--------------,----------, e--- ----------------j-------------------,e-------------1e-------------------------------, OVERVIEW PLAN
ASPHALT & CONCRETE
REPAIRS CAMPUS WIDE 1� Nllllber
'l§_ _ ILocatlon I Drawrg Nurrber
8 f----- -- - - - - - - - - -+-------1 _.,,, - WHITE RIVER .AJNCTION CMl'US VT o 7/f7/2DZJ TA fl'M 2 OF 7 _.,,, A
I
I! ,.,__.., ,Io, -S� CJ�
/; o 1
I o' oO o LJ0'
E
VISN 1
� �®!ill ©ii � �ll'iillliil �Dll'il f �- =========:=== IDate llehQed l�BlWl G-001 v,l.::::================-==============================-=======:::::::.:==========================-=================-=====:::::::.:===:.!::::==::::.::=====::::.::=======::..l
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
.E = "'• C
A 11
• C
.c "o. ,
• C • 0 "'
B §
C
D
• C
§o
• C
• C
.cu
.cuC " 0□ .c
• C
E 42 "<t"
F
• C
.cuC
• C
II
.c
IX)
• a C
• C
II
.c IX) u C .c � ...
co
1 2 3
GENERAL NOTES:
1. CONTRACTOR IS TO REPLACE EXISTING PAVEMENT, CURBING, WALKWAYS AND
DRAINAGE STRUCTURES AS SHOWN ON THE PLANS.
A. CURBING: NEW GRANITE CURBING SHALL HAVE A 6-INCH REVEAL AND
MATCH THE TOP OF EXISTING CURB ELEVATIONS (AREA B); RESET
GRANITE CURB SHALL HAVE A 6-INCH REVEAL AND MATCH EXISTING
BOTTOM OF CURB ELEVATION (AREA C); NEW CONCRETE MOUNTABLE
CURB AND GUTTER SHALL HAVE A 4-INCH REVEAL AND MATCH
APPROVED LAYOUT PLAN PROVIDED BY CONTRACTOR (AREA E); ANY
ADJUSTMENTS MUST BE APPROVED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR).
B. PAVEMENT: ALL EXISTING SURFACE PAVEMENT ELEVATIONS TO BE
REPLACED SHALL BE SURVEYED PRIOR TO ANY PAVEMENT DEMOLITION.
AT PARKING AREAS AND LOADING DOCKS, REPLACED PAVEMENT
SURFACE ELEVATIONS SHALL MATCH THE EXISTING PAVEMENT SURFACE
ELEVATIONS EXCEPT WHERE SPECIFICALLY NOTED ON THE DRAWINGS.
ALL ACCESS ROADS THAT ARE CROWNED SHALL BE CONSTRUCTED AT
1 / 4-INCH PER FOOT. ALL ACCESS ROADS THAT ARE CROSS SLOPED
SHALL MAINTAIN THE EXISTING SLOPE UNIFORMLY. MINOR DEVIATIONS
BETWEEN EXISTING AND FINAL PAVEMENT SURFACE ELEVATIONS ARE
ACCEPTABLE SUBJECT TO APPROVAL BY THE COR; SUCH DEVIATIONS
SHALL NOT NEGATIVELY IMPACT SURFACE DRAINAGE OR SMOOTH
TRANSITIONS TO WALKWAYS, CURBING, ETC.
C. SIDEWALK: ALL EXISTING SIDEWALK SHALL BE SURVEYED PRIOR TO ANY
SIDEWALK DEMOLITION. CONTRACTOR SHALL PROVIDE LAYOUT PLAN
WITH NEW SIDEWALK ELEVATIONS, CROSS SLOPES AND CURB CUT
DETAILS FOR VA APPROVAL (AREA E).
D. PAVEMENT MARKINGS: EXISTING PAVEMENT AND CURB MARKINGS SHALL
BE NOTED AND REPLACED UPON REPAVING.
E. STORM DRAINS: ALL STORM DRAIN RETROFIT AND NEW WORK SHALL BE
SURVEYED PRIOR TO ANY DEMOLITION. CONTRACTOR SHALL PROVIDE
LAYOUT PLAN WITH NEW SIDEWALK ELEVATIONS, CROSS SLOPES, CURB
CUT AND TRANSITION CURB DETAILS FOR VA APPROVAL (AREA E).
2. ALL DIMENSIONS AND QUANTITIES STATED ARE DERIVED FROM AERIAL BASE
MAPS. CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND QUANTITIES FOR
BIDDING PURPOSES. NOTIFY OWNER OF ANY SUBSTANTIAL DISCREPANCIES.
4 5
31.IJlNtJY/f
I
;J
I
I I
I /
I - ... -
7 8
I
I
AFTER COMPLETING DEEP PATCHES: -
REMOVE AND REPLACE
2'' BITUMINOUS SURFACE COURSE,
413 SY TOTAL IN AREA C
DEEP PATCH, --
3' X 60'
/ J
/ . I
I
. I
I .· . I
I I
I I
_I I I
I
I . I
I
DEEP PATCH,---...· 1
8' X 40' I I
_I / I . I
_I I
I . I
_I I
I . I
_I I
I I
I
-----PL
DEEP PATCH,
3' X 120'
REMOVE AND RESET
105 LF OF GRANITE
CURB,
SEE DETAILS
[II]
3. EXISTING UTILITIES ARE NOT FULLY DEPICTED ON THE DRAWINGS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD SURVEY ALL UTILITIES PRIOR TO
THE START OF CONSTRUCTION. CONTRACTOR SHALL EMPLOY A UTILITY
LOCATOR FIRM TO MARK ALL UNDERGROUND UTILITIES BEFORE DIGGING ON
VA PROPERTY.
NOTE: DEEP PATCHES INCLUDE: REMOVE & REPLACE 6" GRAVEL BASE
:::,e [L
N "' ----st-0 n N
I "'0 I
'7>
C
D n u C
[L l;
.2' "
"' C
[L _.,,,m "'C E'
C "' m " D
Ct:
"' C
[L
----00 I st
N
I "'0 st-
N
I0
4. UTILITY MANHOLES, CATCH BASINS, HAND HOLES, VALVE BOXES, GATE
VALVES, ETC. SHALL BE PROTECTED DURING CONSTRUCTION OR
TEMPORARILY LOWERED AND THEN RESET TO FINAL SURFACE ELEVATION
AFTER REPAVING OPERATIONS. CONTRACTOR SHALL IDENTIFY LOCATIONS OF
ABOVE MENTIONED STRUCTURES PRIOR TO START OF WORK. THE
CONTRACTOR SHALL PROVIDE RIM ELEVATIONS AND INVERT ELEVATIONS FOR
ALL NEW OR RETROFITTED CATCH BASINS, CURB INLETS AND ASSOCIATED
DRAIN LINES.
5. THE CONTRACTOR'S STORAGE AREA AND GENERAL STOCKPILE LOCATION
SHALL BE DESIGNATED AT THE PRE-CONSTRUCTION CONFERENCE AND MAY
BE CHANGED TO ACCOMMODATE EITHER THE REQUIREMENTS OF THE U.S.
GOVERNMENT OR CONSTRUCTION PHASING.
6. THE CONTRACTOR'S HAUL ROUTES SHALL BE DESIGNATED AT THE
PRE-CONSTRUCTION CONFERENCE AND MAY BE CHANGED TO MEET EITHER
THE REQUIREMENTS OF THE U.S. GOVERNMENT OR CONSTRUCTION PHASING.
7. SEDIMENTATION AND EROSION CONTROL MEASURES ARE NOT SHOWN ON THE
PLANS FOR CLARITY. THE CONTRACTOR SHALL COMPLY WITH ALL
APPLICABLE LOCAL, STATE AND FEDERAL SEDIMENTATION AND EROSION
REQUIREMENTS AND CRITERIA.
8. MAINTAIN ACCESS FOR EMERGENCY VEHICLES THOROUGH ALL CONSTRUCTION
SITES AT ALL TIMES.
9. WORK IN SPECIFIC AREAS MUST BE PERFORMED CONTINUOUSLY UNTIL ALL
ITEMS OF WORK REQUIRED IN THAT AREA HAVE BEEN COMPLETED.
VARIANCES MUST BE APPROVED BY THE COR.
BLDG
EXISTING DRAIN CULVERT, CONTRACTOR SHALL _ _____,
PROTECT PIPE DURING EXCAVATION,
BACKFILLING AND PAVING
AND 2'' BIT. CONC. BINDER COURSE.
AREA C - PATRIOT DRIVE ENTRANCE
REMOVE AND REPLACE 3-1 /2" ASPHALT, 16,638 SF,---...
FINE GRADE GRAVEL SURFACE TO ENSURE POSITIVE
DRAINAGE TO EXISTING STORM DRAINS
' lo ;,x � L----+l�FlRE_IE LA�NSt'
IT!:7
====-=°-4=-=�-lll!�
FIRE LANE
20 40
SCALE IN FEET:
Feet
FINE GRADE GRAVEl:---<'-t--.......\_ BASE TO DIRECT iil SURFACE FLOW \ !iJ
TOWARD STORM �
DRAINS
- - -�N¼N - _cl?.£sr
LOADING
DOCK
EXCAVATE AND REMOVE 4" DIAMETER STEEL
,____,__,� BOLLARDS (2) TO 6" BELOW FINISH
SURFACE ELEVATION. FILL VOID WITH
ASPHALT AND COMPACT.
BLDG
REMOVE AND REPLACE
ASPHALT HANDICAP
RAMP IN-KIND
AREA A - LOADING DOCKS + BUILDING 28
BLDG
MILL AND REPLACE 2"--'
ASPHALT AROUND
MANHOLE, 8'X8' TOTAL
--;; ReviionlF Dale i �-----------�-��-----------�- - - - - - -- - - - -�- - - - - -��-------------------- - -� DrawrgTdle Project TIiie
1Project405-. 24-00INll!iler ct >-_------------+-------< --;; e-- -- - - - - - - - ----t----------1r-- - - - - - - - - - - ----t--- - - - - - - - - - --------1e--- -- - --n ------------------------------1
! :========================== AREA A, AREA C, GENERAL NOTES 1� N1111ber
'l§_ ,-_------------+-------i I Locatlon
I Drawrg Nurrber
8 e--- - - - - - - - - ----j----------j _.,,, - WHITE RIVER .AJNCTION CMl'US VT
0 f-------------+-------< 7/fl/2DZJ fl'M 3 OF 7_.,,, 0 10 20
-==-c:::il-=-=:::J Foo1
SCALE IN FEET:
I
I I
I
I
VISN 1
� �®!ill ©ii � �ll'iillliil �Dll'il f ::=-==============:==== IDate llehQed l�awn C-1 v,l.::::===============-===========================:.!::::======�======================:::::.:===============-======-===:::::.!:==:::::.:=====:::.!:::======:::..l
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
C
D
E
.E = "' C
0 - C
.c "o ., .c
C • 0 "'
C
C
C
.c
C
.c C
" 0 0 .c
C
.c C
.c � .c "'
• 0 E
IX)
0 - C
.c
L • <T
•o C
C
.c IX) C
.c co
:::,e [L
CD
<T> st-n N
I en
I <T>
C
D nu C
[L l;
.2' "
C
[L m "' C E'
D
C "' m "
D
AREA E NOTES:
PARKING LOT 5
r---.
C, C, cou
REMOVE EXISTING 4' WIDE ASPHALT WALK,
APPROXIMATELY 90' LONG, & REPLACE WITH 4'
WIDE RAISED CONCRETE WALK WITH MOUNTABLE
CURB & GUTTER. PROVIDE THICKENED
OUTBOARD EDGE OF GRAVEL BASE, UP TO 1'
DEEP, WHERE NEEDED TO MEET DESIGN GRADES.
1. CONTRACTOR TO PROVIDE LAYOUT PLAN WITH NEW CURB, GUTTER,
SIDEWALK & CATCH BASIN LOCATIONS/ELEVATIONS FOR VA APPROVAL.
2. VA TO APPROVE ALL SUBGRADE AND FORMWORK ELEVATIONS PRIOR
TO POURING CONG. OR PAVING.
3. CONTRACTOR SHALL PROVIDE ONE LANE OF TRAFFIC AT ALL TIMES
AND TWO LANES TRAFFlC WHEN NO WORK IS OCCURRING.
4. CONTRACTOR RESPONSIBLE FOR RAISING, LOWERING AND/OR
RESETTING ALL UTILITY VALVE BOXES, MANHOLES AND STORM DRAIN
FRAMES AND COVERS DUE TO CHANGES IN ASPHALT SURFACE
ELEVATIONS.
5. IN AREAS WHERE NEW CURB AND SIDEWALK ELEVATIONS ARE R/>JSED,
SURROUNDING GRASS AREA ELEVATIONS SHALL BE RAISED TO
MAINTAIN POSITIVE DRAINAGE AWAY FROM SIDEWALK.
0 10 20
Feet
SCALE IN FEET
2 3
EXTEND NEW CURB & GUTTER APPROXIMATELY 125' FOR ----
PED-X IMPROVEMENTS. CONTRACTOR TO PROVIDE LAYOUT
PLAN FOR VA APPROVAL DEPICTING ALL SURFACE
ELEVATIONS, CROSS SLOPES AND CURB CUTS.
TRANSFORMER, --
DO NOT DISTURB
RESTORE DISTRURBED AND RECLAIMED AREAS
WITH 4" TOPSOIL, SEED & COIR BLANKETS,
PROVIDE CLEAN, COMPACTABLE FILL BELOW
TOPSOIL AS NEEDED TO MEET DESIGN GRADES.
0 0
RETROFlT EXISTING CATCH BASIN
TO ACCEPT MANHOLE COVER;
DEMOLISH APPROX. 25' CURB;
RECLAIM AREA BEHIND NEW
CURB & SIDEWALK .
I
I
I
I
4 5
BLDG
GREENHOUSE
-0 i
NEW ASPHALT CROSSWALK WITH 2%
CROSS SLOPE, RAISED AT NORTH
END FOR IMPROVED FOOTING
'---- INSTALL NEW CATCH BASIN TO MATCH EXISTING IN
CURB LINE. CONNECT NEW CATCH BASIN TO EX NG
RETROFITTED CATCH BASIN WITH 18" DIAMETE PE.
CONTRACTOR TO PROVIDE LAYOUT PLAN W OCATIONS,
AND ELEVATIONS FOR GRATE, ADJACENT LT, PIPE AND
BASIN INVERTS.
I
MILL & REPLACE UP TO 2'' _ __,
ASPHALT THIS AREA,
----- MILL & GRADE TO CONVEY
STORM WATER TOWARD DRAINS I
MILL 3-1/2", FINE GRADE GRAVEL BASE AND
REPAVE 2,820 SF THIS AREA TO IMPROVE
FLOW TOWARD NEW AND EXISTING STORM
DR/>JNS & TO PROVIDE R/>JSED PEDESTRIAN
WALKWAY ACROSS PATRIOT DRIVE. VA TO
APPROVE LAYOUT PLAN AND FINAL MILLING
AND GRAVEL GRADING PRIOR TO PAVING
2,200 SF
-S !"'-1
�L1fil �-"6·1
Jf/OM
:J,,Y-Y
III]
y
RAISE & RESET 3' x2'
GAS VALVE BOX
,l
LIMITS OF
NEW ASPHALT---...
REPLACE ALL
STRIPING (TYPICAL)
I I I
�o___,[
M/>JNTAIN
2_,;c �
REMOVE & REPLACE EXISTING --'r--...
BOLT DOWN, GASKET LINED,
HIGH POINT '\,_
AREA E - PARKING LOT 5 WALKWAY
BLDG
I STEAM MANHOLE COVER, RING
AND BASE; PROVIDE POSITIVE
DR/>JNAGE AWAY FROM COVER.
FIRE LANE
AFTER REMOVAL OF ASPHALT CONTRACTOR SHALL
FlNE GRADE GRAVEL BASE UP TO 6"+/- TO
PROVIDE LOW FLOW CHANNELS DIRECTED TOWARDS
STORM DRAIN. VA TO APPROVE LAYOUT PLAN
AND FINISH GRADE PRIOR TO PAVING
[g]
BLDG 2
PROVIDE 2% CROSS-SLOPE FOR PEDESTRL-\NS. ---..
VA TO APPROVE LAYOUT PLAN AND GRAVEL
BASE FINISH GRADE PRIOR TO PAVING
I _.,,..
""'------............ -L-- � '
PA TR/OT DRIVE REMOVE & RESET FRAME, GRATE & BASE,
UP TO 4" LOWER TO IMPROVE CAPTURE u___________________________ OF SURFACE FLOWS.
Guardro17 j
FlRE LANE
---x----x---x-i-
X I --
/ / REMOVE AND REPLACE 3-1/2" ASPHALT, 31,479 SF
FIRE LANE
FlRE
LANE
FIRE LANE
LIMITS OF
NEW ASPHALT
III]
"'sdumo �
BLDG 1
III]
.ldOUDj
,o
Ji
J� • �
"'----FlNE GRADE GRAVEL BASE FOR
LOW FLOW CHANNEL TO
DR.oJNAGE INLET
Ct:
C
[L
/ /0 III] r-- STRIPE FIRELANES, CROSSWALKS />JND PARKING STALLS i- j°,] �
!l
REMOVE AND RESET DRAIN FRAME, GRATE &
BASE +/- 3" TO ENSURE POSITIVE DRAINAGE
AWAY FROM BUILDING 8 ENTRANCE. VA TO
APPROVE LAYOUT OF ALL FRAME/GRATE
ELEVATIONS PRIOR TO PAVING.
I st N
I en st-
N
I
Dale r
AREA B - BUILDING 2, 8 and 37
--;; ReviionlF1., Drawi'g TIiie Project TIiie 1::
�a�E =1
0 20 40
FMI
SCALE IN FEET
VISN 1
8 ILocatlon I
Drawi'g Nurrber
� 1--------------------+------1 WHITE RIVER .AJNCTION CMl'US
!���;:;;:;�===========::::.:=============================='..:::::========-=============================-=================::!.=I
D =:=,2DZJ====:!.1�1�=A=ed===l.!:l:=a=:==�1 =c=-=�::OF::::::7==�=�===:mi=ll'iillli=il=®�=llll=@il=nll'il=:!..I
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
C
D
E
F
.E = "' C
0 -• C
• •.c "o., " 0 .c• C • 0 "' " C 0 • C
�o
.c ' 0 "' C
C
ON
0 - C
.c 0 ., 1: 0 0 □-.
E
.c �
0 -• C
.c C
" 0 0 .c C
0 - "'• C
.c C
•.c � .c "'•• �o
.c �
IX)
0 -• C
.c 0 ., L •
1:
0 □-
• o
C
0 -• C
.c IX) C
.c � "'"' •• • c o
C " "
::,e�"' � :r::
[L
N st-st-n N
I en
I □->
C
D n u
C
[L
.2'" >
C
[L _.,,, m "' C
0 �
D
C -� m "
D
:5-w m
0 = [L
C "' m "
D I
N _.,,, m
0 "-""' "' C
[L
I st- N I en 0 st-_.,,, st- N
I
0 _.,,, m
0 �
[L _.,,, m -" m m u _.,,, m "' C "' E'
D _.,,, V, :JIJ,,'f[JlfWT(
BLDG 88
Pl -·
ReviionlF Dale
VA FORM 08-6231
2 3 4 5
'f7c:;;�=,n=:=�1 _.c
�t::::::'.-"=�+�g ►
BLDG 8
J5-----%'
=D-s--+--"c-- �--"IB:►
- '--, REPAIR DAMAGEfa ASPHALT )" g
MEET EXISTING
GRANITE CURB
LIMITS OF NEW-'---------1
ASPHALT
I�
I► ���� L
�1�:M ���l�E.
END REPLACE
CONCRm CURB
BLDG
T-63 r..
DUMPSTER
�------------ n
CAITTERIA LOADING DOCK ACCESS ROAD:
REMOVE AND REPLACE 3-1 /2" ASPHALT, 2,217 SF
REMOVE AND REPLACE CONCRETE CURB WITH GRANITE, 200 LF
COORDINATE PAVING WmH CAFmRIA STAFF TO ALLOW UNINTERRUPTED DELI/ERIES
-----INSTALL 7' WIDE CURB CUT WITH GRANITE.
REPAIR DAMAGE TO ASPHALT RAMP BEHIND CURB WITH MIN.
3' LONG ASPHALT PATCH TO PROVIDE SMOOTH TRANSITION
CURB AT NORTH SIDE
MEET EXISTING GRANITE ,- ""
� OF CURB CUT.
s---s---s---
@ �· I -<>-
I
0 0 s s
---Pl __ _
Pl -- .-
---PL - -
FM
s
REPLACE 20'
CURB CUT
, --@- s
FM�
I il' s
---Pl __ _ s
7 8 9
X
I
END REMOVE & REPLACE ASPHALT
"; I AT EXISTING CURB CUTS
I J
I
I
C) �
WAmNG
AREA
t t
END REMOVE & REPLACE CURB AT
CURB JOINT NEAREST TO NORTHWEST
CORNER OF WAITING AREA
BLDG 39
:iii III]" REPLACE 26'
WIDE CURB CUT
vmRANS DRWE:
0 -¢' n
REMOVE & REPLACE CONCRm CURB AND GUTTER WITH GRANITE BOTH SIDES OF VETERAINS DRIVE (1,386 LF TOTAL).
REMOVE AND REPLACE 3-1/2" ASPHALT, 13,407 SF
REPLACE STRIPING ON NEW PAVEMENT TO MATCH EXISTING
I
00 0 0 0 0
REPLACE CURB AND GUTTER BOTH SIDES OF VETERANS DRIVE:
CONTRACTOR SHALL SURVEY, RECORD AIND SUBMIT EXISTING CURB AND GUITTR VERTICAL AND HORIZONTAL ALIGNMENT DATA TO VA PRIOR TO DEMOLITION. VERTICAL AIND HORIZONTAL ALIGNMENT OF REPLACEMENT CURB TO MATCH EXISTING TOP OF CURB ELEVATIONS/LOCATION AT LIMITS OF NEW WORK AND CRITICAL LOCATIONS SUCH AS EXISTING STORM DRAIN INLIETS. HORIZONTAL AIND VERTICAL ALIGNMENT OF ), --ALL NEW GRANITE CURB SHALL BE APPROVED BY VA PRIOR TO INSTALLATION OF NEW CURB.
u
0 O
----p-- - 1d __ _
Ao- -
I
Pl __ _ --- - - - ---,d __ _
------ ------ I
SCALE IN FEET
I I I I
I I I
---1d
AREA D - VE I EHANS DRIVE AND CAFETERIA LOADING DOCK ACCESS RD
Drawi'g TIiie
AREAD
2 3 4 5 6 7
Project TIiie
1::
1�Nllllber
!Location I
Drawi'g Nurrber . WHITE RIVER .AJNCTION CMl'US
IDate IIChecked 110r� C-3
. 7/fl/2DZJ
. TA
E___j 5 OF 7
8 9
VISN 1
�®llll@il �ll'iillliil �Dll'il
C
D
E
,2 = "' C 0
�00- C 0
.c "o.5 .c C • 0 "' C □ C 0
N go
.c. u "'.5 C
C
.cu C
.E C
.c u .5 " 0 □ .c C 0
0 0 .. • C 0
.c u . 5 .c �
• 0�
OJ
�00- C 0
.c .5
. o
C 0
.E C
.c "' u .5 .c :E ..� co 0
B IT. CONC. SURFACE & ---�
B IT. CONC BINDER
1 2
EXCAVATE 6" AND PLACE 6" GRAVEL BASE
RESET VERTICAL GRANITE CURB
NO SCALE
B IT. CONC. SURFACE & ---
B IT. CONC B INDER
REMOVE EX ISTING CONCRETE BASE
REMOVE AND RESET EX ISTING GRANITE CURB
(6"x18" W/6" REVEAL)
ASPHALT PAVEMENT
TO REMAIN
SAWCUT EDGE OF EXISTING
PAVEMENT
EXISTING BIT. CONG.
PAVEMENT
EXISTING PAVEMENT
SUBGRADE
REMOVE AND REPLACE
3-1/2" ASPHALT
..-----:-7
,...-- TACK COAT
----- PRIME COAT
1-½" BIT. CONG. CLASS
1-1 SURFACE COURSE
2" HMA BINDER COURSE
FINE GRADE AND COMPACT
EXISTING GRAVEL BASE TO
MAINTAIN OR IMPROVE DRAINAGE
TO STORMWATER STRUCTURES
NOTE:
t::::::11 lt=llt=llt=lll=lll=llt=lll=lli=II
REMOVE AND REPLACE 6" GRAVEL BASE
AT DEEP PATCH LOCATIONS NOTED IN
AREA C-PATRIOT DRIVE ENTRANCE.
UNDISTURBED EARTH
CJ ��MOVE AND REPLACE 3-1/2' ASPHALT
ASPHALT PAVEMENT
TO REMAIN
SAWCUT EDGE OF EXISTING
PAVEMENT
EXISTING BIT. CONG.
PAVEMENT
REMOVE AND REPLACE
2• ASPHALT
..-----:-7,..--- TACK COAT
2" BIT. CONC. 1YPE I
SURFACE COURSE
EXISTING PAVEMENT EXISTING HMA BINDER
SUBGRADE COURSE TO REMAIN
EXISTING GRAVEL BASE
FRAIE 4 GRATE,
I SEE NOTES BELOW I
ITYP, I B"' CRUSHED GRAVEL
PLAN VIEW
E����I(�� PAVEIENT OR CONCRETE m
:;i:
GRAVEL ! !
BASE/BAO<FlLL
�·F=====f,,r. �
::' _.;··:��: •• ,.:,1',\···-:,:,,.1···':, r
6u MIN. COhPACTED GRAVELADDITIONAL DEPTH MAY BE REQUIRED TO PROVIDE A STABLE BASE •
SECTION VIEW
AVEIENT OR CDNmETE
1s• PIPE,, M INIMUM 1'
CO\JER
REfflOFIT EXISTING CATCH BASIN
TO ACCEPT NEW MANHOLE CO'VER
AND PIPE INLET
SECTION VIEW
CONCENTRIC CONE
DETAIL-CATCH BASIN WITH FRAME & GRATE
N.T.S
NOTES:
1. CONCRETE: 4,000 PSI AFTER 28 DAYS,
2, REINFORCING: H-20 LOADING, 4 X 4/4 X 4 W,W,M, SLAB TOP-
NO, 5'S@ 8" O,C,
3, SHIPLAP JOINTS SEALED WITH 1 STRIP OF 1" DIA BUTYL RUBBER SEALANT,
4, EACH CASTING TO HAVE LIFTING HOLES CAST IN,
5. EACH SECTION TO BE LABELED AS NOTED,
6. C. I, FRAME AND GRATE SHALL BE "LEBARON" #LF 246 OR APPROVED EQUAL.
7. GRATING TO BE INSTALLED TO CONFORM TO PITCH OF ROADWAY AND SET 1"
BELOW FINISH PAVEMENT,
NEW CONSTRUCTION
VARIES
REFER TO DETA ILS
;;}i .·. · · oEXiSTING GRA VEL FIL�-·
CUT BACK 12" MIN. IN AREAS
UNDERMINED OR DISTURBED
DUR ING CONSTRUCllON
EXISTING PA VEMENT
3"±
A PPLY TACK COAT TO
PA VEMENT FACE
12 PAVEMENT SAW CUT
NOT TO SCALE
WEST ENTRANCE STEPS EAST ENTRANCE STEPS
J!Fi�J!FiJ!Fit!!trt!!tri!!trJ!tri!!fii!!:1
UNDISTURBED EARTH )
0 �rs
UILDING 6 STAIRS - REPLACE 2 SEPARATE ENTRANCE STAIRS
-s!
n 0N co0 nN I <D0 I 0, en "' c>
EXISTING
NO SCALE
0 •O
• ,.,. GRAVEL
·v,BASE
REMOVE 6" GRAVEL BASE
VERTICAL GRANITE CURB
#5 DOWELS• 18
O.C, . FIXED END
JOINT
SEALER
R•1 /811
PAINT AND OIL
END a' DOWEL
. •.O. . ·er
WIM R�INFORCEMENT. TERMINATE
WWM2 --T
. · ·o ... EXPANSION CAPSLIP FIT USE 318" EXP, JOINT FILLiR
FOR SIDEWALK AND USE 1/2 EXP,
JOINT FILLER FOR DRIVEWAY,
. o· ·-, o': . .. .-o
EXPANSION JOINT
-:!_/4"X2" GROOVE
FILLED WITH
rWWM Ri
JOINT SEALER. WWM
SEE NOTE 1• . O• '
FIXED END I t •Q
,-,0. ·o .•
'-PAINT AND OILTHIS END
CONTRACTION JOINT
·o ..
INFORCEMENT, TERMINATEFROM JOINT
CJ ��MOVE AND REPLACE 2' ASPHALT
6x6-W2.9xW2.9 WWF (GALV.)
NEW 4" CAST-IN-PLACE CONCRETE
SIDEWALK (f'c=4,000 PSI)
FINISH GRADE
6"
EXPANS ION JOINT --�
4'
MEDIUM BROOM
FlNISH
1.5%±D.5%
SECTION VIEW
NEW 4" CAST-IN-PL.ACE CONCRETE
SIDEWALK (f'c=4,00D PSI)
MATCH TOP OF CURB
EXISTING
PAVEMENT
ACCEPTED, COMPACTED, & GRADED SUBGRADE
LONGITUDINAL VIEW
NOTES:
FRONT STOOP FOR
BLDG 6 TO REMAIN
I I- 4• -1- MATCH EXISllNG \I
EXPANSION JOINT
I I I I I
I I I I I
STEEL HANDRAIL AND SLEEVE
AS REQUIRED, SEE DETAIL BELOW
fl
::--. -r i- #4 BAR•
MATCH
EXISTING:
M CAST IRON ABRASIVE
SAFETY NOSING
�:::;s�TAIR TREAD & NOSING DET-AIL
, NO SCALE
CONCRETE CHEEK WALL
<f
EACH SIDE AS REQUIRED,
MATCH EXISllNG
BOTTOM TREAD
19-3/4" DEEP
EXPANSION JOINT (TYP.)
REPLACE 5' -5" WIDE
CONCRETE LANDING
EXISllNG SIDEWALK
TO REMAIN
. <f <l
I
D� 1. PROVIDE CONTRACTION JOINTS AT 5' 0.C. (6' MAX). EXISllNG STEEL HANDRAILS: "'
D 2. CONSTRUCT FULL -DEPTH EXPANSION JOINTS AT 20' O.C. (25' MAX) AND AT ALL PC'S AND PT'S OF CURVES. REMOVE RUST, REPAINT AND RESET "' en C
E'
D
C en D
I _'.::J i" D ""' "" en C ·s:D (L
I -s!N I "'0
N
I00 .,/ ReYilionlF o· ; .. C?:·., b ·
�/◄-x2u GROOVE
FILLED WITH WWM RI;
JOINT SEALER. WWM 2
SEE NOTE 1
I . . •n
,-_-.o . . -� .FIXED END .Q
I I •o •.
-PAINT AND OIL
THIS END
CONSTRUCTION JOINT
INFORCEMENT, TERMINATEFROM JOINT
CONCRETE PAVING JOINTS
N.T.S
NOTES:
1, FOR SIDEWALKS, USE 1/8"X2" GROOVE FILLED WITH JOINT SEALER,
2, PLACE EXPANSION JOINTS AT ALL PC'S AND PT'S OF CURVES AND AT
20 FT INTERVALS ON STRAIGHT RUNS,
3, PLACE CONTRACTION JOINTS AT 5 FT INTERVALS UNLESS OTHERWISE
NOTED ON THE PLANS,
Dale
·e f------------------f-----
CONCRETE SIDEWALK
NlS
L
10"R
10"R
JOINT REINFORC ING
(SEE JO INT DETAJLS)
NOTES:
1. CROSS SLOPE OF GUTTER SAME f,S PAVEMENT.
4" GRAVEL BASE
2. SCORE OR SAWCUT CONTRACTION JOINTS j" DEEP AT 6' ON CENTER MAXIMUM.
3. SCORE OR SAWCUT CONTROL JOINTS 1" DEEP AT 18' ON CENTER MAXIMUM .
4. PR0"1DE FULL DEPTH EXPANSION JOINT AT 60' ON CENTER MAXIMUM.
5. CROSS SLOPE OF GUTTER SAME PS PAVEMENT.
MOUNT ABLE CONCRETE CURB AND GU 11 ER
NTS
/14 BAR @
8" EW (TYP.)
¼" THICK
PIPE SLEEVE
6"x 6"x ¼" THICK
PLATE WELDED
ALL AROUND
: ,f- ...
3" CLR
NON-SHRINK GROUT
CAST-IN-PLACE
CONCRETE
l-6"-j
0 6"
�l
HANDRAIL POST SLEEVE DETAIL
SCALE: 2"=1'
NOTES:
1. REPLACE 2 CONCRETE STAIRWAYS AT BUILDING 6.
2. STAIR TREADS SHALL HAVE A NON-SUP FINISH.
3. CONCRETE SHALL HAVE A 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI.
4. MATCH EXISllNG CONCRETE DIMENSIONS INCLUDING RISER HEIGHTS, TREAD DEPTHS AND OVERALL STAIRWAY WIDTH OF
6'-9.5". STAIRWAYS CONTAIN 16 RISERS WITH AN INTERMEDIATE LANDING 5'-1" DEEP AND BOTTOM LANDING 5'-5"
DEEP. TREAD DEPTH IS 12" EXCEPT BOTTOM TREAD AT 19.5" DEEP.
5. REMOVE AND PROTECT HANDRAILS FOR REINSTALLAllON. REMOVE SCALE AND RUST FROM HANDRAILS, REPAINT AND
RESET IN NEW CONCRETE STEPS.
G) B�LDING 6 CONCRETE STAIR DETAIL
Drawing TIiie Project 11tle
,;;; f-----------------e-----1---------------------+----------------------jf---------- e-------------------------------------
SITE DETAILS "'
��� IIUcl'QNlffilel' CAM"\JS WDE VISN 1
! "-=----------------+-------< ;.::1�
RII/ER==JU=NCll==ON
C=AM"\JS=====VT=�1 Draq Nulltler
�@Illa @ii W®ibBll'IIIIIII ffeJll!mDll'II
.f 1---------+------, IDate ll�ed l�awn
D-1
� 7/fl/2.0Zl TA RPM 6 OF 7 -:::11::=============::::!===:!.!::===============::::!�===============�========:::..========================================================::!.::===::!.::===::!.::======::::.:========::::.l
VA FORM 0B-6231
1 2 3 4 5 6 7 8 9
C
D
E
F
,2 = "' C
C
00 •.c "o
"□.c C • 0 "'
C □ C
N go
.c. a "' C
C
C
.ca
�a C
.c a C
" 0□ .c
C
C
.c a C
00 .c�.c
�o .c �
OJ
C
.c a
C t □ er
• o C
C
.c OJ a C
.c co oc:
C =u :,a� oc:
:r:
:,a
N co
N I I
0 -w
D
C
3' 0 �
D
C
D
?w o_
C
D I
N
0 "-oc:
C
·s:
o_
I N I N i:::
I u o_ u
C
E'
D
V, ReviionlF Dale
VA FORM 08-6231
2 3 4 5
2 3 4 5
NOTES:
4" LOAM, SEED & STRAW �ULCH
(COMPACTED TO REQUIRED
THICKNESS USING A LAWN ROLLER)
ACCEPTABLE, COMPACTED
& GRADED SUBGRADE
I. LOAM, SEED AND STRAW MULCH ALL UNPAVED DISTURBED AREAS UNLESS OTHERWISE NOTED.
2. LOAM SHALL BE FRIABLE TOPSOIL STRIPPED FROM ON-SITE. LOAM SHALL BE FREE FROM REFUSE, STONES LARGER THAN 2 INCH AND ROOTS LARGER THAN 1 INCH.
3. SEEDING RATE: 150 LBS. PER ACRE.
4. SEEDING MIXTURE AS SPECIFIED OR AS DIRECTED BY ENGINEER.
5. PLACE JUTE/COIR BLANKETS AT LOCATIONS NOTED ON THE PLANS •
LOAM, SEED AND STRAW MULCH
NlS
Drawirg Tdle
MISC. DETAILS
STAKE (iYP.) HAY BALE (TYP.)
SECTION A-A
STAKE (TYP.)
HAY BALE FOR
EROSION CONTROL
UNDISTURBEC EARTH
STAKED FILTER FABRIC
FOR EROSION CONTROL
6"x6" TRENCH;
LAY FILTER FABRIC IN
TRENCH END UP SLOPE
AND BACKFlLL
SECTION B-B
B
L
PLAN
B
J
FLOW
>---- FlLTER FABRIC FOR
EROSION CONTROL
(STAKE FILTER FABRIC
AT I' INTERVALS)
TYPICAL HAY BALE AND SILT FENCE DETAIL
N1S
Project Tdle
1�: RIVER .AJNCTION CMl'US VT I
I
Date 7/fl/2DZJ I□�
1::
IIUcill Nllllber
: CMl'US WDE
Drawirg Nurrber
D-2
7 OF7
VISN 1
�®llll@il �ll'iillliil �Dll'il
File details come from the government source that posted it. Updated .