S02 Building 1 Steam Tunnel Att.pdf
PDF 132 KB Posted
- Attached to
- Z2DA--631-22-001 Abate Asbestos Q1 2022
- Solicitation number
- 36C24122B0004
About this file
This document includes an attachment outlining asbestos abatement work and the related federal contract solicitation. The attachment describes asbestos abatement work to be performed in Room B-PC-2 of Building 1, including excavating a minimum 25-gallon sump pit, assuming soil contains asbestos, grading and pouring concrete over the floor area, and installing a sump pump.
The related federal contract solicitation is number 36C24122B0004 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The solicitation seeks offers for asbestos abatement work to be performed in the first quarter of 2022, as outlined in the attached scope of work. Responses are due by the date specified in the solicitation. The award will be made to one or more vendors who can successfully complete the asbestos abatement work by the required deadlines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06_IMG_0588.jpg | JPG image | |
| S06_Asbestos Sign In.pdf | ||
| S06_Wage Determination_MA20220003_06032022.docx | DOCX document | |
| S06_IMG_0587.jpg | JPG image | |
| 36C24122B0004 0001.docx | DOCX document | |
| S02 VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.pdf | ||
| S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf | ||
| S02 Specification 631-22-001.pdf | ||
| 36C24122B0004_1.docx | DOCX document | |
| S02 WD MA20220003 02252022.pdf | ||
| S02 SOW 631-22-001 Abate Asbestos Q1 2022.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 1 Room B-PC-2
1. Excavate Sump pit such that it has a minimum 25 gallon capacity when finished.
2. Assume that soil and gravel contains asbestos.
3. Spread excavated soil on room floor.
4. Grade floor to drain to sump
5. Brick or form walls of sump pit.
6. Install expansion board along perimeter of the room
7. Place a minimum of 3 in. concrete or shotcrete over entire floor area.
8. Provide a 1/3hp sump pump and plumb to floor drain in Room B109
Fl ow
Expansion Board
Min. 25 Gal Sump Pit with Brick or Concrete Walls
Plumbing as Necessary