S02_Attachment 5_IFB Contractor Cost Estimate Worksheet.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 36C78623B0020
About this file
This document contains a contractor cost estimate worksheet template and information for the federal contract opportunity Solicitation Number 36C78623B0020 for burial expansion services at Fort Sill National Cemetery. The cost estimate worksheet template lists construction specification divisions with fields to provide lump sum pricing for divisions applicable to the project. The related federal contract opportunity is seeking bids for burial expansion and site work at Fort Sill National Cemetery, to be conducted by the Department of Veterans Affairs National Cemetery Administration. Bid documents must be submitted electronically by the response date. The opportunity type is listed as a solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78623B0020 0002.docx | DOCX document | |
| 36C78623B0020 0001.docx | DOCX document | |
| S02_Attachment 2_Drawings_920CM3005.pdf | ||
| 36C78623B0020.docx | DOCX document | |
| S02_Attachment 1_SOW_920CM3005.pdf | ||
| S02_Attachment 3_Specifications_920CM3005.pdf | ||
| S02_Attachment 4_Wage Determination_OK20230023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number |
| Project Name |
| Division | CLIN1 | CLIN 2 | Total |
| Division 0 | |||
| Special Sections | |||
| Division 01 | |||
| General Requirements | |||
| Division 02 | |||
| Existing Conditions | |||
| Division 03 | |||
| Concrete | |||
| Division 04 | |||
| Masonry | |||
| Division 05 | |||
| Metals | |||
| Division 06 | |||
| Wood, Plastic, and Composites | |||
| Division 07 | |||
| Thermal and Moisture Protection | |||
| Division 08 | |||
| Openings (Doors, Windows, etc...) | |||
| Division 09 | |||
| Finishes | |||
| Division 10 | |||
| Specialties | |||
| Division 11 | |||
| Equipment | |||
| Division 12 | |||
| Furnishings | |||
| Division 13 | |||
| Special Construction | |||
| Division 14 | |||
| Fire Suppression | |||
| Division 22 | |||
| Plumbing | |||
| Division 23 | |||
| Heat, Ventilating, and Air Conditioning | |||
| Division 25 | |||
| Integrated Automation | |||
| Division 26 | |||
| Electrical | |||
| Division 27 | |||
| Communications | |||
| Division 28 | |||
| Electronic Safety and Security | |||
| Division 31 | |||
| Earthwork | |||
| Division 32 | |||
| Exterior Improvements | |||
| Division 33 | |||
| Utilities | |||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $ $
File details come from the government source that posted it. Updated .