This document contains an amendment to a solicitation for a burial expansion project at Fort Sill National Cemetery. The key details are as follows:

The amendment serves to extend the bid due date by one week to July 10, 2023. It also provides answers to contractor questions regarding discrepancies in crypt counts and sizes between drawings, clarifying cleanout details, and confirming that identification sand is not required and quad crypts are acceptable. The project involves construction of 2,997 standard crypts and 47 oversized crypts. Tree protection fencing is to be installed around trees as indicated using high visibility orange vinyl fencing fixed every six feet with metal stakes. The solicitation number is 36C78623B0020 and the opportunity type is for a burial expansion project at Fort Sill National Cemetery through the Department of Veterans Affairs National Cemetery Administration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

920CM3005

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 To all Offerors/Bidders

36C78623B0020 06-29-2023

X X X

July 10, 2023 at 10:00 AM ET This amendment serves to extend the due date by one week to July 10, 2023 and answer RFIs on continuation page.

AMENDMENT-0002, Solicitation 36C78623B0020 Fort Sill Burial Expansion Contractor Questions & GOV Responses

1. On the project plan sheets, there is a discrepancy for the size of the concrete junction box at the start of the dual 36: pipe. Drawing sheet C-201 identifies this box as ST-1-JB-10’X5’ whereas drawing sheet C-403 identifies it as ST-1-JB-12’X5’. Please clarify which is correct.

1. GOV Response: The correct size for ST-1-JB is 12’ x 5’.

2. Note 5 on sheet C-403 references a 6” HDPE Cleanout and detail B1 sheet C-501. All cleanout details reference 4” PVC. Please clarify.

2. GOV Response: The main trunkline on the west side of the crypt field that flows south to north is a 6” non-perforated HDPE pipe. The cleanout riser size is not required to match the diameter of the pipe or material it is connected to, as it is for access only. The riser is to be 4” PVC and will transition to the size and material of the connecting pipe at the wye branch.

3. Project plans show that there are 2,997 standard crypts and 37 oversized crypts. Project Price Schedule calls for 2,999 standard crypts and 35 oversized crypts. Please confirm which is correct.

3. GOV Response: The correct count is 2,997 standard and 47 oversized.

4. Please confirm that no identification sand is to be installed above the crypts.

4. GOV Response: The NCA decided during the design phase to not install the identification sand layer.

5. Will the government allow for the utilization of Quad Crypts where applicable as opposed to all single crypt vaults where standard size are to be placed.

5. GOV Response: Yes, quad crypts are acceptable, but the contractor needs to adjust the layouts to match the plan layout and be able to get the gravel infill between the quad crypts.

6. There are several references to tree protection and/or tree protection barricades but no details or descriptions to describe what is required for this. Please clarify.

6. GOV Response: Contractor shall install the following tree protection where indicated:

· High visibility orange vinyl construction fencing (42” minimum height) around the drip line of the tree to be protected.

· Fencing shall be fixed every 6’ O.C. with metal stakes.