S02_Attachment 5_IFB Contractor Cost Estimate Worksheet.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C78622B0008
About this file
This document contains a contractor cost estimate worksheet template and information on a related federal contract opportunity for construction services. The cost estimate worksheet template lists construction divisions and includes fields for lump sum costs for divisions utilized on a project, as well as fields for bonds, overhead, and profit to calculate total costs.
The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs National Cemetery Administration to construct a new restroom at the Fort Lyon National Cemetery. The solicitation number is 36C78622B0008 and includes a statement of work as an attachment. The response due date and award date are not provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78622B0008 0002.docx | DOCX document | |
| MS02_Attachment 1_Plans_889CM3005_Part1R.pdf | ||
| 36C78622B0008 0001.docx | DOCX document | |
| MS02_Attachment 2_01 45 00 Quality ControlR1.pdf | ||
| S02_Attachment 4_Specifications_889CM3005.pdf | ||
| S02_Attachment 1_SOW_889CM3005.pdf | ||
| S02_Attachment 2_Plans_889CM3005_Part1.pdf | ||
| S02_Attachment 3_Plans_889CM3005_Part2.pdf | ||
| S02_Attachment 6_WD_CO20220001.pdf | ||
| 36C78622B0008_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
This estimate is based on a detailed measurement of quantities. We have made allowances for items that were not clearly defined in the drawings. The client should verify these allowances.
| IFB Number |
| Project Name |
| Division | Base Bid | CLIN1 | CLIN 2 | CLIN3 | Total |
| Division 0 | |||||
| Special Sections | |||||
| Division 01 | |||||
| General Requirements | |||||
| Division 02 | |||||
| Existing Conditions | |||||
| Division 03 | |||||
| Concrete | |||||
| Division 04 | |||||
| Masonry | |||||
| Division 05 | |||||
| Metals | |||||
| Division 06 | |||||
| Wood, Plastic, and Composites | |||||
| Division 07 | |||||
| Thermal and Moisture Protection | |||||
| Division 08 | |||||
| Openings (Doors, Windows, etc...) | |||||
| Division 09 | |||||
| Finishes | |||||
| Division 10 | |||||
| Specialties | |||||
| Division 11 | |||||
| Equipment | |||||
| Division 12 | |||||
| Furnishings | |||||
| Division 13 | |||||
| Special Construction | |||||
| Division 14 | |||||
| Fire Suppression | |||||
| Division 22 | |||||
| Plumbing | |||||
| Division 23 | |||||
| Heat, Ventilating, and Air Conditioning | |||||
| Division 25 | |||||
| Integrated Automation | |||||
| Division 26 | |||||
| Electrical | |||||
| Division 27 | |||||
| Communications | |||||
| Division 28 | |||||
| Electronic Safety and Security | |||||
| Division 31 | |||||
| Earthwork | |||||
| Division 32 | |||||
| Exterior Improvements | |||||
| Division 33 | |||||
| Utilities | |||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $ $ $ $