S02_Attachment 5_IFB Contractor Cost Estimate Worksheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1JZ--Fort Lyon Construct New Restroom 889CM3005 (VA-22-00040090)
Solicitation number
36C78622B0008
Issued by

About this file

This document contains a contractor cost estimate worksheet template and information on a related federal contract opportunity for construction services. The cost estimate worksheet template lists construction divisions and includes fields for lump sum costs for divisions utilized on a project, as well as fields for bonds, overhead, and profit to calculate total costs.

The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs National Cemetery Administration to construct a new restroom at the Fort Lyon National Cemetery. The solicitation number is 36C78622B0008 and includes a statement of work as an attachment. The response due date and award date are not provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp)
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

This estimate is based on a detailed measurement of quantities. We have made allowances for items that were not clearly defined in the drawings. The client should verify these allowances.

IFB Number
Project Name
DivisionBase BidCLIN1CLIN 2CLIN3Total
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

Overhead

Profit

GRAND TOTALS $ $ $ $ $