S02 - Attachment_4_ Base Offer Price Breakdown_(MANDATORY)_(2 Pages).pdf

PDF 291 KB Posted

Attached to
Z2DZ--FY22: NRM Tier 2 (PROJ: 672-22-604) DB - Replace Facility Main Feeders at San Juan VAMC.
Solicitation number
36C24822R0102
Issued by

About this file

This document contains a base offer price breakdown template for a construction project to replace facility main feeders at the San Juan Veterans Affairs Medical Center. The template includes line items for 16 construction divisions and requests pricing for labor, materials, and total costs for each. It indicates that offerors shall provide additional price breakdown to avoid lump sums. Pricing instructions note that the template reflects the overall base offer price for government price analysis. The related federal contract opportunity is solicitation number 36C24822R0102 from the Department of Veterans Affairs for design-build services to replace the main feeders at the San Juan VAMC facility.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Price Breakdown

Project Number:

Date:

Project Title

Project Location

Offeror Name

Offeror Street

Offeror City State Zip

Item Description Labor Material Total

Division 1 General Requirements $ - $ - $ -

Division 2 Existing Conditions - - -

Division 3 Concrete - - -

Division 4 Masonry - - -

Division 5 Metals - - -

Division 6 Wood and Plastic - - -

Division 7 Thermal & Moisture Protect - - -

Division 8 Doors and Windows - - -

Division 9 Finishes - - -

Division 10 Specialties - - -

Division 11 Equipment - - -

Division 12 Furnishings - - -

Division 13 Special Construction - - -

Division 14 Conveying Equipment - - -

Division 21 Fire Suppression - - -

Division 22 Plumbing - - -

Division 23 HVAC - - -

Division 26 Electrical - - -

Division 27 Communications - - -

Division 28 Electronic Safety & Security - - -

Division 31 Earthwork - - -

Division 32 Exterior Improvements - - -

Division 33 Utilities - - -

Division 34 Transportation Subtotal - - -

Attachment: 4

Division Subtotals : $ - $ - $ -

Overhead % 0.00% -

Profit % 0.00% -

Bond % 0.00% -

Overhead/Profit Subtotals : $ -

Total Base Offer Price $ - $ - $ -

Attachment: 4

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis.

VHASAJCLEMER

Highlight

File details come from the government source that posted it. Updated .