S02 Attachment 1- Biloxi Physicist QASP.pdf
PDF 154 KB Posted
- Solicitation number
- 36C25626Q0007
About this file
This Quality Assurance Surveillance Plan (QASP) is for the Department of Veterans Affairs, specifically for annual compliance testing of diagnostic radiological equipment (imaging modalities). The document outlines performance standards and surveillance methods for a contract with a 100% acceptable quality level across six key performance tasks, including annual compliance testing, quarterly regulatory surveys, equipment functionality verification, documentation and reporting requirements, personnel qualification verification, and privacy information practices.
Key government personnel include Contracting Officer Stephanie Keo from the Department of Veterans Affairs Network Contracting Office 16 in Biloxi, MS, and Contracting Officer's Representative Jackson Holland. The surveillance methods include direct observation, 100% inspection of personnel credentials, and analysis of contractor progress reports. Performance will be rated as Excellent (exceeds standards), Satisfactory (meets standards), or Unsatisfactory (fails to meet standards). The government will conduct quarterly performance assessment meetings and document both positive and potentially unacceptable performance, with the possibility of issuing Contract Discrepancy Reports for performance issues.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
For: Biomedical Engineering
Contract Description: Annual Compliance Testing of Diagnostic Radiological Equipment (Imaging Modalities)
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored.
• How monitoring will take place.
• Who will conduct the monitoring.
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis.
However, the Government will coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO will ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: STEPHANIE KEO
Organization or Agency: Department of Veterans Affairs, Network Contracting Office 16, Biloxi, MS
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and will assure proper Government surveillance of the contractor’s performance. The COR will keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: JACKSON HOLLAND
c. Other Key Government Personnel – Tiffany Lee-Franklin- Assigned Contracting Specialist
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager – To Be Determined
b. Other Contractor Personnel – To Be Determined Title: To Be Determined
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix in the Performance Work Statement (PWS), includes performance standards. The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level
(AQL).
Task ID Indicator Standard Acceptable
Quality Level
Method of Surveillance Incentive
SOW 1
Reference Statement of Work
Annual Compliance Testing IAW State of MS, ACR, AAPM, Nuclear Regulatory Commission, and The Joint Commission
100%
Analysis of Contractor’s Reports & Direct Observation
Exercise of Option Period and Past Performance
SOW
Reference Statement of Work
Conduct quarterly surveys to meet all regulatory and accreditation standards
100%
Direct Observation & Analysis of Contractor’s Reports
Exercise of Option Period and Past Performance.
Reference Statement of Work
Ensure Equipment functions with the latest published edition of
NFPA-99,
OSHA, and
OEM
performance standards and specifications
100%
Direct Observation & Analysis of Contractor’s Reports
Exercise of Option Period and Past Performance
Task ID Indicator Standard Acceptable
Quality Level
Method of Surveillance Incentive
Reference Statement of Work
Required check in, documentation, and reporting is done by personnel performing services.
Reports are complete and accurate to ensure detailed descriptions of scheduled and unscheduled maintenance procedures including replaced parts and prices, required to maintain the equipment are
IAW
conformance standards
100% Analysis of Contractor’s Reports
Exercise of Option Period and Past Performance
Reference Statement of Work
Personnel performing services must be the qualification requirements in the SOW
100%
100% Inspection (of credentials or other documents for personnel performing work)
Exercise of Option Period and Past Performance
Privacy Information Practices (SOW-all sections)
Follow all federal regulations to ensure privacy measures remain intact
100%
Direct Observation & Analysis of Contractor’s Reports
Exercise of Option Period and Past Performance
5. INCENTIVES
The Government will use Exercise of Option Period (if applicable) and Past Performance as incentives. Incentives will be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF SURVEILLANCE*
Various methods exist to monitor performance. The COR will use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
Performance Standard(s): 1, 2, 3, & 6
b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
N/A
c. USER SURVEY. (Combines elements of validated user complaints and random sampling.
Random survey is conducted to solicit user satisfaction. May also generate inspections and sampling.)
N/A
d. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the patient to identify deficiencies.
Complaints are then investigated and validated.) N/A
e. 100% INSPECTION. Pertains to review of documents or credentials for vetting purposes to ensure qualifications have been or are being met. ID#: 5
f. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a problem/deficiency is suspected. Sample results are applicable only for the specific work inspected.
Since sample is not entirely random, it cannot be applied to total activity performance.)
N/A
g. RANDOM SAMPLING. (Designed to evaluate performance by randomly selecting and inspecting a sample of cases.
N/A
h. Progress or status meetings.
N/A
i. Analysis of contractor's progress reports. (Evaluate cost, schedule, maintenance documentation, etc.)
Performance Standard(s) ID #: 1, 2, 3, 4, & 6.
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale will be used to determine a positive, neutral, or negative outcome. The following ratings shall be used: Excellent = Exceeds Standards, Satisfactory = Meets Standards, Unsatisfactory = Fails To Meet Standards
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government will document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR will inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR will document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR will prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR will meet with the contractor quarterly via telephone (if necessary, i.e. if any problems exist) to assess performance and shall provide a written quarterly assessment.
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative (COR)
| Various methods exist to monitor performance. The COR will use the surveillance methods listed below in the administration of this QASP. |
| Performance Standard(s): 1, 2, 3, & 6 |
| Performance Standard(s) ID #: 1, 2, 3, 4, & 6. |
| 100: | |
| 100_2: | |
| 100_3: | |
| TaskRow1: | |
| 100_4: | |
| 100_5: | |
| 100_6: | |
| 2025-08-22T14:33:51-0500 | |
| JACKSON HOLLAND |
File details come from the government source that posted it. Updated .